EIE226-319 10R0004 Amd 1.pdf

PDF 22 KB Posted

Attached to
SOLICITATION: Repair CHPP Boilers, Phases I & 2 Federal contract opportunity
Solicitation number
W911KB-10-R-0004
Issued by
Department of the Army Corps of Engineers Engineering District Alaska

About this file

Amendment 1 Changes and Alterations

View the file

Other files for this federal contract opportunity

Other files attached to SOLICITATION: Repair CHPP Boilers, Phases I & 2, newest first.
File Type Posted
Amendment 07.pdf PDF
EIE226-319 Final RFP 19May10.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EIE226/319

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SUBJECT TITLE/LOCATION: REPAIR CHPP BOILERS PHASES 1 & 2, EIELSON AFB, ALASKA. (EIE226/319)

The purpose of this amendment is to incorporate changes & alterations to the RFP. Changes and alterations have been outlined in the attached changes and alterations page.

POC for this amendment is Ron Jackson, 907 753-5596.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Jun-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-10-R-0004

X 9B. DATED (SEE ITEM 11)

19-May-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Jun-2010

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

ELMENDORF AFB AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KB-10-R-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

Contract Changes and Alterations

RFP No. W911KB-08-R-0033 AMENDMENT #1

Project: Eie226-319: Repair CHPP Boilers Phases 1 & 2, Eielson AFB, Alaska.

Changes/Additions will be outlined in bold as follows: AMD#1… …AMD#1

Changes/Additions:

1. SF1442, Page 1 of 229, Block 13, Paragraph A, first sentence is revised as outlined below: (refers to hard copies)

FROM:

A. Sealed offers in original and 3 copies to perform the work required are due at the place specified in item 8 by 21 June 2010 local time: 2:00PM AK Time.

TO:

A. Sealed offers in original and AMD#1... 3 4 ...AMD#1 copies to perform the work required are due at the place specified in item 8 by 21 June 2010 local time: 2:00PM AK Time.

2. RFP, Page 16, Part 1.11. PROPOSAL FORMAT, Paragraph (b), first sentence is revised as outlined below: (refers to CDs)

FROM:

(b) Electronic Format: Provide four (4) searchable PDF CDs in read-only format, preferably using .pdf files.

TO:

(b) Electronic Format: Provide AMD#1… four (4) one (1) …AMD#1 searchable PDF CD in read-only format, preferably using .pdf files.

3. RFP, Page 16, Part 1.11. PROPOSAL FORMAT, Paragraph (d), is deleted in its entirety as outlined below:

AMD#1… (d) Final proposal copies: Submit one (1) original and (2) Copies of confirmed drawings and printed matter (Bound Volumes), as well as three (3) NOT read-only searchable PDF CDs. …AMD#1

W911KB-10-R-0004

4. RFP, Section 00 22 00, Page 29, Paragraph 5.1.1.a. Add the following sentence to the end of the paragraph: AMD#1… "Offerors may also provide additional examples (up to three) of relevant project experience for a key subcontractor." ...AMD#1

5. RFP, Section 00 22 00, Page 30, paragraph 6.1.1. Add the following sentence to the end of the paragraph: AMD#1… "Offerors may also provide past performance questionnaires for key subcontractors." …AMD#1

6. RFP, Section 00 22 00, Page 30, paragraph 7.1.2. Organization, third sentence is revised as outlined below:

FROM:

The Offeror shall document unequivocal teaming arrangements with its design firms(s) (see attachment 7).

TO:

The Offeror shall document unequivocal teaming arrangements with its design firms(s) AMD#1… (see attachment 7 5). …AMD#1

(End of Summary of Changes)

File details come from the government source that posted it. Updated .