Technical Exhibit F - Lead Survey.pdf
PDF 2 MB Posted
- Attached to
- Repair Building 41011 Federal contract opportunity
- Solicitation number
- W91151-24-B-0002
About this file
This document is a Technical Exhibit for a Lead-Based Paint Hazard Survey conducted for Building 37011 at Fort Hood, Texas. The survey was performed by Clean Environments, Inc., a licensed lead consultant firm, on March 28, 2011. The survey identified lead-based paint on various interior and exterior surfaces of the building, including door frames, radiators, windows, and exterior walls. The report provides recommendations for addressing the lead-based paint hazards, such as stabilization, encapsulation, or removal by qualified lead abatement personnel. It also notes that the waste material generated during the abatement process should be properly characterized and disposed of in accordance with applicable regulations.
The related federal contract opportunity is for the Repair of Building 41011 at Fort Cavazos, Texas. This is a firm fixed price construction contract issued by the Mission and Installation Contracting Command (MICC) Fort Hood, a Department of the Army Materiel Command agency. The contract is set aside for 100% Women Owned Certified Small Businesses under NAICS code 236220, with an estimated value between $1,000,000 and $5,000,000. The work includes demolition, utility work, construction of a new ramp, stairs, and rails, and reconfiguration of infrastructure systems. The solicitation will be issued on May 22, 2024, with a bid opening on June 20, 2024, and a 300-day period of performance after contract award.
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clean Environments, inc.
Industrial Hygiene & Environmental Consultants
April 18,2011
Kickapoo Empire, LLC 1003 Paulsun Drive, Texas 78130 San Antonio, Texas 78219 Attn: Sonny Gomez
RE: Lead-Based Paint Hazard Survey, Building 37011, Fort Hood, Texas CEI Project JVs 9029B
Dear Mr. Gomez:
Clean Environments, Inc. conducted a limited lead-based paint survey of the interior and exterior surfaces scheduled to be impacted by renovations and/or demolition at the above referenced building on March 28,2011. The survey was conducted by Mr. Michael Williams, Lead Inspector, Department of State Health Services (DSHS) License NQ 2060822, working under Craig Nelson, Lead Risk Assessor, Department of State Health Services (DSHS) License N2 2070897 of Clean Environments, Inc, Lead Firm, DSHS License NQ 211-0096. This survey satisfies the EPA Renovation, Repair and Painting Final Rule 745.82 (a) (1).
The building was tested using an Innov-X Systems, Model a-6500R XRF Analyzer, Serial N2 8029.
A copy of the XRF data sheet is attached below.
SUMMARY:
• Interior: The following Lead Based Paint (LBP) surfaces were identified in the interior of the Building:
• Throughout Building, Door Frame, Metal, tan, intact
• Throughout Building, Door Frame, Wood, tan, intact
• Throughout Building, Door, Wood, tan, intact
• Throughout Building, Lower Exterior Window Panel, Glass, tan, intact
• Throughout Building, Radiator, Metal, tan, intact
• Men's Rest Room Ceiling, Sheetrock, tan, intact
• Exterior: The following Lead Based Paint (LBP) surfaces were identified on the exterior of the Building:
• Throughout Building, Lower Window Panel, Glass, tan, intact
• Throughout Building, Downspout, Metal, tan, intact
• Throughout Building, Stair Rails, Metal, tan, intact
10803 Gulfdale, Suite 210 • San Antonio, Texas 78216 • 210/349-7242 • Fax 210/349-1132
Lead-Based Paint Hazard Survey Building 37011, Fort Hood, Texas CEI Project JV»9029B
RECOMMENDATIONS
Survey results indicate that the building contains lead-based paint. The lead-based painted surfaces may be stabilized and repainted/encapsulated, removed to the substrate, or removed and replaced.
The waste material generated during the stabilization/removal process should be properly characterized (TCLP Lead) and disposed in accordance with the applicable TCEQ and EPA requirements. The waste material substrates with identified LBP should be segregated from non-LBP substrates. The LBP response actions should be conducted by qualified lead abatement personnel in accordance with the applicable Occupational Safety and Health Administration (OSHA), Lead in Construction Standard and OSHA Respiratory Protection Program standard.
Clean Environments, Inc. is a licensed lead consultant firm. We will be happy to assist in finding a licensed lead abatement contractor and preparing specifications for the abatement project. Clean Environments, Inc. also offers air monitoring and project management for lead abatement projects.
We will be happy to answer any questions concerning the report. It has been a pleasure to work with you on this project. We look forward to being of continued service to you.
If there are any questions concerning this project, please call.
Very truly yours, Craig N^son Michael Williams Lead Risk Assessor Lead Inspector DSHS License No 2070897 DSHS License # 2060822
Attachments: XRF Data Sheet
XRF DATA SHEETS
XRF RESULTS
Mode
Standardization LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection
Pass Fail
PASS
Positive Positive Negative Negative Negative Negative Negative Negative Negative Negative Negative Positive Negative Positive Negative Negative Negative Negative Negative Negative Negative Negative Positive Negative Negative Negative Negative Negative Negative Negative Negative Positive
Side Component Substrate Color ConditionDate
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
Reading
Pb
1.03
1.18
0.99
3.98
0.01
2.5
0.01
0.03
0.03
4.16
Room
Hall Hall Hall Hall Hall Hall Hall Hall Hall Rm 1C RmlC Rm 1C Rm 1C Rm 1C RmlC Rm 1C Rm 1C Rm 1C Rm 1C RmlC Rm 1C Rm 1C Rm 1C RmlC Rm 1C MensRR Mens RR Mens RR Mens RR
A A A A C C c D
A
D D
B
C B B B
A D A B
B
C
C C B C A D
A
Wall Radiator
Wall Door Frame Door Wall Wall
Door Frame Door Door
Door Frame Wall Wall
Door Frame Door
Ceiling Wall
Wall Door Frame Door
Wall
Door Frame Door
Wall Wall Door Frame Door
Wall
Exterior Wall
CMU
Metal
CMU
Wood Wood
CMU
CMU
Wood Wood Wood Wood
CMU
Wood Wood
Wood Sheetrock Sheetrock
Sheetrock Wood Wood
CMU
Metal
Metal Sheetrock
CMU
Metal
Wood
CMU
Wood
Tan Tan Tan Brown
Tan Tan Tan
Brown Tan
Tan Tan Tan
Tan Tan Tan
Tan Tan
Tan Tan Tan Tan Brown
Grey Tan
Tan Brown Brown Tan
Tan
Intact Intact Intact Intact
Intact Intact Intact
Intact Intact Intact Intact Intact
Intact Intact Intact
Intact Intact Intact Intact Intact Intact Intact Intact Intact
Intact Intact Intact Intact Intact
Ft. Hood, Bldg. 37011 CEI Project 9029 Page: 1
Date 3/28/2011
3/28/2011 3/28/2011
3/28/2011 3/28/2011 3/28/2011 3/28/2011
3/28/2011 3/28/2011
3/28/2011 3/28/2011 3/28/2011 3/28/2011 3/28/2011
3/28/2011 3/28/2011
3/28/2011 3/28/2011
3/28/2011 3/28/2011
3/28/2011 3/28/2011
3/28/2011 3/28/2011 3/28/2011 3/28/2011
3/28/2011
3/28/2011 3/28/2011
3/28/2011 3/28/2011
3/28/2011 3/28/2011
Reading
Mode LBP Inspection
LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection
LBP Inspection
LBP Inspection LBP Inspection LBP Inspection LBP Inspection
LBP Inspection LBP Inspection
LBP Inspection LBP Inspection
LBP Inspection
LBP Inspection LBP Inspection LBP Inspection
LBP Inspection LBP Inspection LBP Inspection LBP Inspection
LBP Inspection LBP Inspection LBP Inspection
LBP Inspection LBP Inspection
LBP Inspection LBP Inspection
Pass Fail Negative
Negative
Negative Positive Positive Negative
Negative Negative Negative
Negative Positive Positive Positive Negative Negative
Negative Positive Negative
Negative Negative Negative
Negative Positive Negative
Negative Negative
Negative Negative Negative
Negative Positive Positive
Pb
0.03
0.04 1.24
0.13
0.05
0.03 0.09
4.92 2.72
0.02
0.08 0.05 0.05
0.01 0.02 2.24 0.33
0.03 0.08
2.72
XRF RESULTS
Room Mens RR
Mens RR MensRR Mens RR Mens RR Jan. Closet Jan. Closet Women RR Women RR Women RR
Women RR Women RR Clerical Clerical
Clerical Clerical Clerical Clerical
Clerical Clerical Clerical Clerical
Office NW Office NW
Hall Hall
Hall
Hall Hall Offices
Offices Offices Offices
Side A
B
C
A
A
D
D
D
B
B
A
A
A
C
C
C
A
C
D
B
C
C
D
D
A
A
A
A
D
B
B
B
A
Component Stall
Stall
Stall Radiator Ceiling Wall Ceiling
Wall Wall Wall
Door Frame Door Wall Panel Door Frame Door
Column
Wall Panel Wall
Wall Panel Column
AB
Wall Door
Door Frame Door
Door Frame Wall Radiator Column
Wall
Wall Wall Panel Wall Panel
Substrate Metal
Metal
Metal Metal Sheetrock
CMU
Sheetrock
CMU
Metal Metal Metal Wood Metal Wood Wood Metal
Metal Wood
Metal
Metal
CMU
Wood Wood Metal Metal
Wood Metal Metal
CMU
CMU
Metal Metal
Color Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Brown Brown Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Condition Intact
Intact Intact Intact Intact Intact
Intact Intact Intact
Intact Intact Intact Intact Intact
Intact Intact Intact Intact Intact
Intact Intact Intact Intact
Intact Intact
Intact Intact Intact Intact Intact
Intact
Intact Intact
CEI Project 9029 Page:2
Date 3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
3/28/2011
Reading
Mode LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
Pass Fail Negative
Negative
Negative
Negative
Insufficient
Negative
Negative
Positive
PASS
Positive
Negative
Negative
Negative
Negative
Positive
Negative
Positive
Negative
Positive
Positive
Negative
Negative
Negative
Negative
Negative
Positive
Positive
Positive
Negative
PASS
Positive
Negative
Positive
Pb
1.1
0.88
0.22
0.01
3.75
3.01
0.01
3.96
0.02
0.82
0.04
0.03
0.08
2.13
2.87
1.13
0.99
1.06
XRF RESULTS
Room Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Side A
A
A
A
A
A
A
A
A
A
A
A
A
A
B
B
B
B
B
B
B
B
B
B
B
B
C
C
Component Rail
Stair
Stair
Foundation
AB
Wall Panel
Foundation
Rail
AB
AB
Stair
Rail
Foundation
Wall Panel
Downspout
Foundation
Wall Panel
Downspout
Wall Panel
Downspout
Wall
Boiler
Flu
Wall
Wall
Door
Door Frame
Rail
Foundation
Stanardization
Calibrate
Calibrate
Calibrate
Substrate Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Wood
Color Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Tan
Condition Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
0 (
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
CEI Project 9029 Page:3
File details come from the government source that posted it. Updated .