Attachment 6 Questions and Answers.pdf

PDF 84 KB Posted

Attached to
BLDG 53400 Communications Infrastructure Upgrade Ft. Cavazos Federal contract opportunity
Solicitation number
W9115123Q0079
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

This document contains questions and answers related to solicitation number W9115123Q0079 for a communications infrastructure upgrade at Building 53400 at Fort Cavazos. The solicitation is from the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood. The questions and answers clarify that the contract price will include all applicable federal, state and local taxes and duties. The manhole count on the drawings is confirmed to be accurate. Confined space entry procedures are outlined in an attached standard operating procedure. Mechanical collars for the infrastructure upgrade do not require fireproofing.

View the file

Other files for this federal contract opportunity

Other files attached to BLDG 53400 Communications Infrastructure Upgrade Ft. Cavazos, newest first.
File Type Posted
Amendment W9115123Q00790001.pdf PDF
Attachement 5 Confined Space Entry SOP 5AUG21.pdf PDF
Site Visit Sign in BLDG 53400 Fiber Install.pdf PDF
Attachment 1 Fort Cavazos Telecommunications Guide v2.pdf PDF
RFQ W91151Q0079.pdf PDF
Attachment 2 Bldg53400_FiberInstall Drawing.pdf PDF
Attachment 1 Ft. Cavazos Telecommunications Guide.pdf PDF
Attachment 4 SANEC VAL.docx DOCX document
Attachment 3 Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W91151-23-Q-0079 - BLDG 53400

Q: Are these projects tax exempt?

A: Per clause 52.212-4 (k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

Q: Is the manhole count on the drawings accurate?

A: Yes, the manhole count is accurate.

Q: Are there any confined space requirements in manholes?

A: Yes, See attached NEC Confined Space Entry SOP.

Q: Will mechanical collars need to be fireproofed?

A: No, the mechanical collars do not need to be fireproofed.

File details come from the government source that posted it. Updated .