This document contains responses to questions regarding a solicitation for replacing two boilers, two heating hot water pumps, heating hot water piping, and HVAC controls in a building at Fort Hood, Texas. The solicitation seeks bids for a firm fixed price construction contract issued by the Mission and Installation Contracting Command at Fort Hood. Responses are provided to thirty-seven questions on topics such as acceptable boiler manufacturers, concrete testing requirements, commissioning needs, and whether temporary heating will be required. The bid due date is 14 July 2020 with bid opening on 15 July 2020. The contract is set aside for Service-Disabled Veteran-Owned Small Businesses and has an estimated value between $500,000 and $1,000,000. The period of performance is 150 days from notice to proceed.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011486461 AD111799P

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is for the Government to respond to industry questions.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Jun-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9115120B0009

X 9B. DATED (SEE ITEM 11)

29-May-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Jun-2020

CODE

MICC - FORT HOOD

36000 DARNALL LOOP, ROOM 1300B

FORT HOOD TX 76544-5025

W91151 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9115120B0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The following have been added by full text:

RFI QUESTIONS

RFI Questions W91151-20-B-0009 Answered Site Visit 8 June 2020

1. Will new construction documents be issued to remove the “specification blockers/sole source features” listed under the schedule which will result in backdoor sole sourcing against DPW protocol and Federal Acquisition Regulation guidelines?

See revised drawings dated Feb, 2020.

2. Will new construction documents be issued as per the Directorate of Public Works, Fort Hood, Texas, which will remove sole sourcing specification blockers such as “439 stainless steel”, 15:1 Turndown, and “Contact Shane Smith with Texas Air Systems for Pricing:512-656-7733” & dimensions 90”x35”x80” ?

3. Will you allow a superior 304SS stainless steel firetubes in lieu of the less expensive/cheaper 439 stainless steel as 304SS is more Cathodic and chemical resistant as it has a higher nickel content?

No preference. Heat exchanger shall meet and exceed the specs and scheduled boiler performance.

4. Is the Lochinvar CREST FBN6001 acceptable as it is the closest comparison boiler on the planet compared to the Aerco Benchmark?

Any brand that will meet or exceed the Specs and scheduled boiler performance is acceptable.

5. Since Aerco doesn’t make a true 6 million BTU/HR boiler(they have to put 2 heat exchangers inside of one cabinet to reach this size), wouldn’t it be preferable to use the Lochinvar CREST which does offer a true 6 million BTU/Hr boiler with a single heat exchanger?

No preference. Any brand that will meet or exceed the Specs and scheduled boiler performance is acceptable.

6. Will the bid date be delayed as the construction documents produced did not follow Ft Hood DPW protocol for sole sourcing?

No sole source equipment is being requested or required by Government.

7. Please advise three manufacturers you are accepting to ensure competitive bidding:

☐ Lochinvar CREST FBN6001 (Oslin Nation) w/316SS Heat Exchanger & 10:1 Turndown (78”H x 50”W x 103”D)

☐ RBI Flexcore CK6000 (GOES Heating Systems) w/316SS Heat Exchanger (80”H x 34”W x 110”D)

☐ Viessman CA3B 6.0 (GOES Heating Systems) w/316TISS Heat Exchanger (84”H x 39.5”W x 136”D)

☐ Fulton Endura+ EDR+6000 (Neal & Associates) w/316SS Heat Exchanger (79”H x 34”W x 117”D)

☐ Cleaver Brooks ClearFire-LC CFLC-6000 (C-B Sales) w/Duplex SS (106”H x 58”W x 126”D)

☐ Other:__________________________________________________________________________ No preference. Any brand that will meet or exceed the Specs and scheduled boiler performance is acceptable.

Is there any reason or data to back the requirement for the boilers to include a heat exchanger made ONLY from 439 stainless steel?

See revised drawings dated Feb, 2020.

8. Compared to 439 SS, there are other SS alloys (e.g 316Ti titanium stabilized SS) that meet and exceed the corrosion resistance and thermal properties at elevated temperatures.

316Ti titanium stabilized SS heat exchanger is acceptable by the government.

9. To require a 439 SS heat exchanger is tantamount to single-sourcing only one (1) boiler manufacturer (Aerco Benchmark) from only one supplier (Texas Air Systems) See revised drawings dated Feb, 2020.

10. The boiler schedule includes contact information for Shane Smith @ Texas Air Systems who is the Aerco boiler rep (image below) See revised drawings dated Feb, 2020.

11. My concern is that the schedule excludes the freedom to source the boiler in a manner that is in compliance with Federal Acquisition Rules and CICA (Competition in Contracting Act) See revised drawings dated Feb, 2020.

12. What boiler manufacturers are pre-approved? I would like to be sure we can provide a boiler that meets and/or exceeds the scheduled boiler performance.

No preference. Any brand that will meet or exceed the Specs and scheduled boiler performance is acceptable.

13. Specifically, I want to be sure that the Viessmann Vitocrossal 300 Series, Model CA3B 6.0 is pre-approved.

No preference. Any brand that will meet or exceed the Specs and scheduled boiler performance is acceptable.

14. Why is the maximum boiler width is limited to 35”?

There is a space limitation in the mechanical room. Need space for maintenance and clearances.

15. Is there a specific space limitation in the building that warrants this maximum width? This is a very unusual requirement.

Yes. There is a space limitation in the mechanical room. Need space for maintenance and clearances.

16. Why is only one pump being supplied for the 2-boiler primary-secondary piping system?

- This creates a single point of failure, which is generally avoidable.

- Two Possible solutions:

1. Provide each boiler with a dedicated primary boiler pump

2. Pipe the boiler loop as a variable-primary thereby eliminating the primary boiler pump(s) all together

17. Is there a warranty on the roof?

Yes. There is a warranty on the roof.

18. Who is the roofing contractor for this project?

Johnson roofing.

19. Who is the controls company that would be preferred for this project?

No preference.

20. What is the preferred brand of boiler for this project?

No preference as long as the new boilers meet and exceed Specs and the schedule.

21. The solicitation states on page 1, box 13 that the bid due date for this project is 15-JUL at 3pm. Page 5 states that the bid due date is 14-JUL at 3pm. What is the deadline to submit a bid for this solicitation?

The proposal is due on 14 July, the actual public bid opening will be conducted on 15 July.

22. Will adequate hours worked by the Quality Control Manager on this project be acceptable?

See specs, Division 1 for more info.

23. Will the government confirm if Commissioning for the new equipment is required for this project?

Factory commissioning is sufficient. See specs, division 23 for more info for HVAC equipment startup.

(3rd party commissioning is not required for this project)

24. Will the government confirm if TAB on new equipment will is required for this project?

YES. TAB IS REQUIRED

25. If Fire Suppression is to be modified for replacement of HVAC equipment, will the fire suppression need to be operational during construction? Will the piping need to be pressure tested after temporary modification? After permanent modification?

If fire suppression system is to be modified for replacement of HVAC, contractor shall coordinate an outage with the COR in advance. Yes the piping need to be pressure tested after permanent modification.

26. Please provide the installer of the existing roof’s contact info, or confirm that any new contractor may repair existing roof penetrations/patch new penetrations.

Johnson roofing. But any new certified roofing contractor can work on the roof as long as they don’t void the warranty.

27. Will new equipment pads require concrete testing? If yes, which types of testing? Please be specific.

Yes it is required. Air content, slump.

28. Please confirm if temporary Heating/Cooling will be required for this project?

No it is not required.

29. Will this project require any type of phasing while work is in progress?

Yes. One boiler at a time.

30. Will the building be occupied during construction?

Yes. Any outage shall be coordinated in advance with the COR.

31. Will temporary heating and/or cooling be required?

No it is not required.

32. Can we use the facilities on site or do we have to provide our own toilets.

Contractor to Provide own toilets.

33. If needed can the existing pad be added on to?

No. new concrete pad shall be installed per drawings.

34. Does the Government require concrete testing on pads?

Yes.

35. Does the Government require density testing?

Yes.

36. Will factory commissioning suffice for newly installed equipment or will the Government want 3rd party commissioning?

Yes factory commissioning is sufficient. See specs, division 23 for more info.

(3rd party commissioning is not required for this project)

37. Will 3rd party test and balance be required on this installation? If so, is it restricted to the newly installed equipment or the entire HVAC system?

Yes TAB is required on new HVAC equipment only.

38. Does the government want DALT testing?

No.

The following have been modified:

INSTRUCTIONS TO OFFERORS

Any bids received in response to this solicitation SHALL carry a 120 day acceptance period before prices need to verified, extended or re-negotiated.

1. Submission of Bids The priced bid shall be supported by a draft progress schedule that demonstrates the offeror's understanding of the work requirements, phasing of work between buildings, and estimated time frames for ordering and installing equipment. Bidders are required to provide a CD copy of their bid documents with their IFB submission.

2. Electronic Bid Opening

Bid Opening will be held by telephone conference call. Bidders shall submit their bids through the Department of Defense Safe Access File Exchange (DoD SAFE) website:

https://safe.apps.mil

If you would like to submit a bid for W91151-20-B-0009, submit an email with the subject line “Intent to bid for W91151-20-B-0009” to Jermain.m.compton.civ@mail.mil and sonja.s.fields.civ@mail.mil by 1 July 2020 at

04:00 PM CST.

By 04:00 PM CST, 2 July 2020, you will receive an email from DoD Safe to create a drop-off (please see pages 10- 12 of attached DoD SAFE user guide).

Bidders shall submit their bids via DoD SAFE no later than 14 July 2020 at 3:00 PM CST, late submittals may not be accepted. Bidders should include bid number W91151-20-B-0009 in their short note to recipient on DoD

SAFE.

No hard copies or CDs will be accepted.

The Bidder can upload up to a maximum of 25 files, (total size cannot exceed 8GB). The Bidder shall place a Description of each file uploaded located in the "Description of File(s)" box located on the right. It is the Bidder's responsibility to ensure the proposal is uploaded acceptably.

PUBLIC BID

PUBLIC BID OPENING will be held via telephone conference on 15 July 2020 at 03:00 PM CST. The call in number will be: 978-990-5000, Pin 304649

3. Pre-requisites for Speciality Trade Licensure and Certification

Mechanical HVAC license class A (with minimum 5 years of experience), Certification Master Plumber, License Master Electrician, Certification HAZMAT Remediation Certification

In responding to this solicitation for bids, the bidder shall provide copies of certifications/training identified above and below as a part of the bid. Failure to provide this documentation will render the bid non- responsive and no further consideration will be given to that bidder for award of this contract. No substitution of the individual possessing the required pre-qualifications will be authorized without the written approval of the Contracting Officer, and no time will be allowed for the contractor to acquire the required training/certification after the contract is awarded.

4. Work Experience

The prime contractor shall demonstrate that it possesses general construction contract management by providing at least three examples of relevant work experience within the last 5 years in an awarded contract similar to the requirements stated in this solicitation. Documentation shall be submitted with the bid and include the contract number, the date of contract award, the customer's name and contact information, the awarded dollar value, the value of the contract at completion, a description of all work elements included in the contract, the number and type of specialty trades needed to complete the contract, the period of time allocated for completion of the work and actual time required to complete the work (include reasons for time extensions).

Federal work experience is preferred; however, the Government will accept work experience from both State and institutional and commercial contracts as well. No residential work experience will be considered appropriate for this purpose. Failure to provide this documentation will render the bid/offer non-responsive and no further consideration will be given to that bidder for award of this contract.

5. Pre-Bid and Pre-Construction Conferences

The Contracting Officer will conduct a pre-bid/pre-proposal conference in conjunction with the site visit. All potential bidders/offerors attending the site visit are highly encouraged to attend the pre-bid/pre-proposal conference.Information on the scheduled Site Visit is located in FAR 52.236-3 SITE VISIT (CONSTRUCTION) (FEB 1995) of this solicitation. Space limitations dictate that no more than two representatives from each company attend. The Contracting Officer will review solicitation submittal requirements, and other administrative matters critical for successful and timely performance of the work.

The Contractor shall attend a Government coordinated preconstruction conference within 10 calendar days of contract award. As a minimum, the conference shall be attended by the contractor’s appointed project manager, the superintendent, the QCM, and administrative personnel responsible for preparation of contract documents, certified payroll records and invoices. The contractor shall deliver letter appointments of its key personnel that include each individual’s duties, roles and responsibilities

6. Subcontractor List

Offerors shall submit a list of proposed subcontractors as an attachment to their bid. If offeror does not intend on utilizing subcontractors (self-perform), offeror shall state so in their bid. Failure to provide statement will render the quote nonresponsive and eliminate the offer from further consideration for

SECTION 00600 - REPRESENTATIONS & CERTIFICATIONS

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 0001: The purpose of this amenment is to update revised drawings.

Amendment 0002: The purpose of this amendment is to answer industry questions.