Amendment #1 19-B-0010
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Unsuccessful_bids_19-B-0010_ES.pdf | ||
| Revised_Bid_Abstract_19-B-0010.pdf | ||
| Bid_Abstract_3_19-B-0010.pdf | ||
| Bid_Abstract_2_19-B-0010.pdf | ||
| Bid_Abstract_4_19-B-0010.pdf | ||
| Technical_Exhibit_C_-_OEFM_Estimate_Sheet_-_BLANK_12-June-19...__(002).xlsx | XLSX spreadsheet | |
| Sign-in_Sheet_from_site_visit.pdf | ||
| 2a._Technical_Exhibit_A-Division_1_Specifications-Revised_24Jun19_(002).pdf | ||
| Response_to_Industry.pdf | ||
| Released_Solicitation_19-B-0010.pdf | ||
| Contractor's_Office_-_Holding_Yard_Fort_Hood_TX.PDF | ||
| Released_Solicitation_19-B-0010.pdf | ||
| 3a._Technical_Exhibit_B_-_Specifications.pdf | ||
| 4.2._Technical_Exhibit_D__FY17_-_OEFM_Estimate_Sheet_-_BLANK.XLSX | XLSX spreadsheet | |
| 2a._Technocal_Exhibit_A_-_Division_1-Specificaitons.pdf | ||
| Attachment_1-Appendix_A_04-Aug-2016.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011123744 AD000218P-1
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
A. The purpose of this amendment issuance is to provide Responses to Industry and to include Contrator Yard and Hauling Maps.
B. The purpose of this amendment is to change the Bid Opening Date and time to 16 July 2019 @ 1:00 P.M. Central Standard Time.
C. The purpose of this amendment is to change the amount of the bid guarantee to $500,000.00; previous amount w as $2,000.00.
D. Technical Exhibit C-Bid Sheet and Technical Exhibit B-Division 1 Specif ication has been updated.
E. All other terms and coniditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jun-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9115119B0010
X 9B. DATED (SEE ITEM 11)
30-May-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jun-2019
CODE
MISSION AND INSTALLATION CONTRACTING
MISSION CONTRACTING OFFICE (MCO)
36000 DARNALL LOOP, ROOM 1300B
FORT HOOD TX 76544-5025
W91151 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9115119B0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 02-Jul-2019 01:00 PM to 16-Jul-2019 01:00 PM.
The Issued By organization has changed from
MISSION AND INSTALLATION CONTRACTING
MISSION CONTRACTING OFFICE (MCO)
36000 DARNALL LOOP, ROOM 1300B
FORT HOOD TX 76544-5095
to
MISSION AND INSTALLATION CONTRACTING
MISSION CONTRACTING OFFICE (MCO)
36000 DARNALL LOOP, ROOM 1300B
FORT HOOD TX 76544-5025
The contract minimum amount has increased by $498,000.00 from $2,000.00 to $500,000.00.
The required performance has changed from Renovate and Repair Facilities IDIQA Bid Bond is required
(see section 00100, FAR Clause 52.228-1).Performance and Payment Bonds are required (see section 00700, FAR
Clause 52.228-15).As required by DFARS 236.204, the estimated magnitude for this project is between
$10,000,0000 and $25,000,000The NAICS for this acquisition is 238990, All Other specialty Trade Contractors (SB size standard $15.0 million).This acquisition is set aside for 100% Certified competative 8(a) Small Businesses; no large business quotes will be accepted for this procurement. The contractor will be required to provide a dedicated
Superintendent through completion of the project (see section 00700, FAR Clause 52.236-6). Project Manager, Quality Control and Superintendent Positions are considered key positions. These positions SHALL not be subcontracted below the prime contractor.The date set for receipt of proposal is 2 July 2019 at 1:00 pm. Proposal shall be submitted via mail to: MICC Fort Hood, Shoemaker Center, 36000 Darnal Loop, Room 1300 Ft Hood, TX
76544. to Renovate and Repair Facilities IDIQA Bid Bond is required (see section 00100, FAR Clause 52.228-
1).Performance and Payment Bonds are required (see section 00700, FAR Clause 52.228-15).As required by
DFARS 236.204, the estimated magnitude for this project is between $10,000,0000 and $25,000,000The NAICS for this acquisition is 238990, All Other specialty Trade Contractors (SB size standard $15.0 million).This acquisition is set aside for 100% Certified competative 8(a) Small Businesses; no large business quotes will be accepted for this procurement. The contractor will be required to provide a dedicated Superintendent through completion of the project (see section 00700, FAR Clause 52.236-6). Project Manager, Quality Control and Superintendent Positions are considered key positions. These positions SHALL not be subcontracted below the prime contractor.The date set for receipt of proposal is 16 July 2019 at 1:00 pm. Proposal shall be submitted via mail to: MICC Fort Hood, Shoemaker Center, 36000 Darnal Loop, Room 1300 Ft Hood, TX 76544..
The following have been modified:
SOW
SCOPE OF WORK
1. PROJECT NUMBER AND TITLE: AD000218P-1, Develop Facility Repairs Requirements Contract, Fort
Hood, Texas.
2. GENERAL INFORMATION:
DESCRIPTION OF WORK: THE CONTRACTOR shall provide all plant, supervision, labor, materials, equipment, supplies and transportation necessary to complete this scope of work. All work shall comply with all State, local and Federal laws and regulations, industry and construction codes and standards, manufacturer’s specifications and recommendations, and all contract special provisions, terms and conditions. The Contractor shall be responsible for obtaining all required licenses and permits to perform construction work on a Federal installation, be properly bonded and insured in accordance with FAR requirements.
The work consists of the following:
Repairing architectural features to the interior and/or exterior of buildings located on Fort Hood to include mold and asbestos abatement, replacement of flooring, ceiling tiles, doors, door frames, painting of facilities, and cleaning of exterior facades at any location that is owned by the Fort Hood Reservation.
3. SPECIAL PROVISIONS
3.1 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
The Contractor shall commence work under this contract in accordance with the section entitled "ASSIGNMENT
OF WORK" below. The Contractor shall prosecute the work diligently and complete all work by the date stated on the Task Order. The time stated for completion shall include final cleanup of the premises.
Un-Priced Unit Items for Project Work
Un-Priced Unit Items for Project Work that are not covered by the contract shall be negotiated individually. Un-priced items shall include; movement and storage of furniture, required after hours work, emergency work not otherwise addressed by the contract, and work items not addressed by the contract. The negotiated price to complete this work shall include payment for all labor, materials and equipment required to complete the work. This clause does not supersede Assignment of Work paragraph 4.2.5 Priority Task Order.
3.2 CONTRACTOR YARDS
a. A prime contractor requiring an area for storage of materials and equipment shall submit a request in writing to the Contracting Officer. A contractor yard will be issued only to the prime contractor. Subcontractors will not be issued a yard. The prime contractor shall be responsible for providing an area within the assigned contractor's yard to subcontractors requiring storage areas. The size and location of a contractor's yard will be determined based upon the type of contract and work to be performed.
b. The Contractor shall confine all operations, including storage materials, on Government premises to specific areas authorized or approved by the Contracting Officer.
c. Building structures, fences, portable buildings, and utilities shall not be erected without prior approval from the
Contracting Officer. Utility costs for contractor yards shall be paid by the Contractor at local prevailing rates. The
Contractor shall sign a utility sales agreement with the utility sales officer at the Environmental Management Office, Building 4612. The Contractor shall provide and maintain utility meters for electricity and water usage in accordance with appropriate specifications.
d. All of the above erected items shall be removed at the completion of the contract. Final contract payment will not be made until the contract site is cleaned and returned to its original condition. If the prime contractor fails to return the site to its original condition, the Government will return the contractor's yard to its original condition and will withhold the cost for such work from final contract payment.
e. A legible sign containing the same information and appearance as the project sign shall be posted at the contractor's yard.
f. If the Contractor has additional valid contracts, as the prime contractor, with the Directorate of Public Works that require a yard, the original yard may be reassigned to the Contractor contingent upon the Contracting Officer's approval and placement of a valid sign. Being a subcontractor on another contract does not authorize the reassignment of a yard.
g. The Contractor's yard shall be maintained in accordance with Division 1 and the appropriate referenced FAR clauses. Contractor yards will be periodically inspected by representatives from Post Safety, Fire Protection
Division, Environmental Management Office, and Contracting Officer's Representative to ensure compliance with contract specifications. Contractors not maintaining yards in compliance with the contract specifications will be requested to vacate their assigned yard area.
h. Only materials and equipment used for Government related contracts shall be stored at the contractor yard.
3.3 CLEANING UP
In addition to FAR 52.236-12, unless otherwise specified in the Technical Provisions, the contractor shall perform, at a minimum, a weekly cleanup of the work site. The cleanup of the work site shall include, but not limited to, the removal of scrap (waste materials), spoils, debris, and salvage material that results from work on this project as well as general upkeep of the site to include mowing, trimming and weed control.
3.4 AIRFIELD SECURITY REQUIREMENT
Contractors requiring access to Hood Army Airfield or Robert Gray Army Airfield shall secure civilian vehicle decals. A valid decal will be required of every civilian vehicle entering the airfields. The Contracting Officer or the
Contracting Officers Representative will provide the general information for Contractors to secure these decals.
3.5 Main Cantonment, West Fort Hood, North Fort Hood Security Requirement.
Contractors requiring access to Main Cantonment, West Fort Hood, and North Fort Hood shall secure civilian vehicle decals. A valid decal will be required of every civilian vehicle entering any Fort Hood cantonment area.
The Contracting Officer or the Contracting Officers Representative will provide the general information for
Contractors to secure these decals. All tractor trailer trucks and pick-up trucks must enter Fort Hood Main cantonment & West Fort Hood areas through the Clarke Road Access Control Points (ACP's).
3.6 PROGRESS OF WORK
In the event that active work involves more than one site, the contractor shall, on a daily basis, inform the COR or the Government inspector assigned to this contract of all work scheduled. Notification shall be made between 7:30
AM and 8:00 AM each work day. Contractor shall provide information by E-Mail or send by fax to 288-2719. In the event the work schedule changes during the day, the contractor shall notify the same Government officials stated above. Changes in the original work schedule shall be reported as applicable.
3.7 COMMUNICATIONS
a. Communications Equipment. The Contractor shall provide adequate communications equipment for the performance of this contract. The Contractor shall provide a system of communication between his/her main office, all Contractor-furnished vehicles, key Contractor personnel, and the Government. The communications system shall be capable of transmitting and receiving from all locations on the Fort Hood military reservation where contract work is being performed. Citizen band radios will not be acceptable. The Contractor shall furnish portable communication units to the following key Contractor personnel, at a minimum: the Project Manager, the Quality
Control Chief, all crew supervisors, and the office manager/secretary. These people shall carry the portable communication unit assigned to them on their person at all times while on the installation.
3.8 CONTRACTOR REQUIREMENTS
The Contractor shall provide proof of being in the business of construction as a prime contractor for a minimum of 5 years. The Contractor's Project manager, Superintendent, and Quality Control Manager shall each have a minimum of 5 years of experience in construction.
3.9 ADP SUPPORT REQUIREMENTS
The Contractor is responsible at its own expense for obtaining its own automation hardware. Ownership of this system will remain with the Contractor. Each computer will be fully operational with MICROSOFT Windows. The
Contractor’s systems must be capable of running the following software applications: MICROSOFT OFFICE
SUITE 2003; INTERGRAPH/BENTLEY PRODUCTS-MICROSTATION V. 8, and others as specified by the
Contracting Officer to provide interconnectivity with Government systems software.
Printed communications between the COR and Technical Inspection Staff at DPW can be digitized and primarily be transferred via the Internet. Digitized as-built drawings and backup information can be transferred via CDRW.
The contractor shall provide printer capability for both letter quality text and graphics with a minimum 300 dpi resolution. Capabilities must support all required reports, forms, diagrams as specified in the contract or as specified by the Contracting Officer. The Contractor is responsible for providing its own plotter for doing 3-size and larger plot requirements.
3.10 RECORD DRAWINGS (DA 2877, AND DD 1354)
During the execution of each task order and to facilitate updating of record drawings, the Contractor shall maintain a detailed record (vector graphics files (CADD) at the job site of all changes and corrections from layouts shown on the provided drawings; or, as appropriate, the Contractor shall produce drawings of all work as completed. The
Contractor will be required to complete a DD Form 1354 (Transfer and Acceptance of Military Real Property), and
DA Form 2877 (Real Property Record Card). Appendix B and C of AR 420-17 provide instruction for the completion of these forms.
The Contractor shall enter all such changes and corrections to the contract and/or record drawings promptly. Each sheet of the corrected set shall be stamped with the markings; “RECORD DRAWINGS AS BUILT.” At the time of beneficial occupancy of each structure or facility involved under this contract, and prior to final payment for task orders requiring as-built drawings, the Contractor shall provide an updated record drawing in electronic format on a floppy disk or in an otherwise acceptable format prescribed by the Government. The drawing will contain a current application name and conform to the version of Microstation 8 (.dgn format) using TriService CAD stand setup and schema modified for Ft Hoof.
The Final as-built drawings shall be submitted within 10 working days of the date set for completion of each task order, and shall indicate, in addition to all changes and corrections, the actual location of all subsurface utility lines which were affected by or encountered during the work on the task order.
The as-built drawings shall show, by offset dimensions to two permanently fixed surface features, the end of each run and the location of each change in direction. Valves splice boxes, material types, and similar appurtenances shall be located by dimensions along the utility run from a reference point. The average depth below the surface of each run and type of material shall also be recorded. All information available about installed appurtenances shall be recorded and keyed to the installed location on the drawings. The final as-built and record drawings, and completed DD 1354 and DA 2877 shall be submitted to the Contracting Officer/COR for review and approval.
If the Contractor fails to maintain the record drawings, DD 1354, and DA 2877 as required above, the Contracting
Officer will consider that satisfactory progress has not been achieved for the period in question, thereby justifying retaining 10% ($500.00 Min) of any progress payments to be made until such drawings and completed forms are made current. The Contractor shall have 30 calendar days from the date of final inspection to provide complete final as-built drawings. A retainer fee in the amount of $500.00 or 1 percent of the contract cost, whichever is greater, shall be withheld from the Contractor until the final as-built drawings have been submitted by the Contractor and accepted by the Contracting Officer.
3.11 Specifications
An index for the Contract’s Specifications is shown under Specification Table of Contents. Some line items have specific specifications for a unit items as denoted in the index. Other unit items specifications are combined with multiple unit items and all are covered in one specification. If no specification exists for a unit item, the government assumes the description all the unit item self explanatory enough to not need a specification). All line items are assumed to include installation of the material specified.
4. ASSIGNMENT OF WORK
4.1 GENERAL
4.1.1 The intent of the assignment of work is to communicate to the Contractor that his/her organization must be flexible to the intermittent quantity and dollar amount of task orders issued during the entire contract period.
4.1.2 It is imperative that the Contractor's organization have the capability to pursue the completion, as scheduled, of a minimum of $250 thousand of unaccomplished work at any given time.
4.1.3 When the Contracting Officer determines it necessary, the Government retains the right to set sequence and completion dates for any task order.
4.1.4 Subject to compliance with all contract clauses, the Contractor will be given the latitude to plan the sequencing of accomplishment for task orders that have been issued and that have not received start dates selected by the
Government.
4.2 CONTRACT CLAUSES
4.2.1 The Government reserves the authority to place an upper limit, in the range of $250 thousand, on the amount of unaccomplished work that the Contractor shall and must pursue at any given time. The intent is to afford the
Government scheduling flexibility.
4.2.1.1 If the sum total of all active task orders is less than $150 thousand, the Contractor shall pursue the entire amount at that point in time, unless otherwise directed by the Contracting Officer.
4.2.2 At each Bi-weekly review the Contractor shall submit an updated work plan for approval of the Contracting
Officer. The Government shall have 3 working days to approve or disapprove the Contractor’s work plan. The work plan shall consist of start dates for enough issued task orders to comply with 4.2.1 above. When the
Contractor has received approval for his/her work plan the Government will not alter the start dates unless there is a noncompliance with 4.2.1 above.
4.2.2.1 Depending on the complexity of the project, as specified by the contracting representative, all task orders will have a preconstruction meeting with the project manager, contracting representative, prime contractor, and sub-contractors to discuss the project prior to the start of construction.
4.2.3 Start Dates that come due: Start dates are considered firm unless otherwise agreed to by the Government.
4.2.4 Construction Delays that are caused by the Government: For task orders that the Government delays for 4 consecutive work days, the Contractor may request a work stoppage. This request shall be made within 48 hours of the time the Contractor knew or should have known about the Governments action which could cause a delay. This request is for the Contractor’s convenience. The following procedure then goes into effect:
4.2.4.1 The exhausted portion of the performance period for the subject task order is recorded and the amount remaining is determined.
4.2.4.2 Fifteen (15) days are added to the remaining performance period of the subject task order. The subject task order then reverts to a task order that has just been issued.
4.2.5 Priority Task Order: The Government retains the authority to require the Contractor to mobilize on any issued task order at any time. The following procedure then goes into effect:
4.2.5.1 The Contractor may select a task order that he has mobilized on and request a work stoppage. The dollar amount of unaccomplished work left on the task order for work stoppage must be reasonably close to the total sum of contract work required for the emergency work order. To achieve this equality might require work stoppage on more than one task order.
4.2.5.2 The procedure then becomes the same as 4.2.4 Construction Delays that are caused by the Government.
4.3 DEFINITIONS
4.3.1 Bi-weekly: Occurring once every two weeks.
4.3.2 Active Task Order: A task order that has been issued but not completed.
4.3.3 Task Order Issue Date: This is the date the task order is issued. The issue date is not the same as the start date.
4.3.4 Start Date: The start date for each individual work order is established through the work plan that is submitted by the Contractor for approval at the bi-weekly review. The Contractor shall take into consideration the time frame required to obtain the digging permit which is 15 calendar days and approval of a traffic control plan which is 21 calendar days if needed.
4.3.5 Priority: A priority is defined as a situation that might pose a threat to life or property. A priority is also defined as a situation that, if not pursued, will cause the Government great harm or impact the Military’s mission to a degree that is not acceptable.
4.3.6 Performance Period: Each task order is assigned a performance period determined by the rates in the Table of
Performance Periods.
4.3.7 Unaccomplished Contract Work: Belonging to task orders that have start dates that are in the past, the contract work that has not been accepted for payment.
4.3.8 Bi-weekly Review: The bi-weekly review will be held on the first Wednesday of the contract period and thereafter on every other Wednesday. The location of the bi-weekly review shall be determined by the Contracting
Officer Representative at a location on Fort Hood, Texas. The bi-weekly review accomplishes the following:
4.3.8.1 The dollar amount for unaccomplished contract work is determined.
4.3.8.2 The Contractor shall submit an updated work plan for approval of the Contracting Officer.
4.3.9 Contractor’s Work Plan: The Contractor's work plan that shall be submitted at each bi-weekly review consists of the following:
4.3.9.1 Using the dollar total of unaccomplished contract work as a basis, the start dates for the necessary number of issued task orders shall be requested for approval.
4.3.9.2 The Contractor will be given latitude to plan the sequencing of accomplishment for task orders that have been issued and that have not received start dates selected by the Government. The Contractor may select start dates for approval that fall any time within the contract period. When the Contractor has received approval for his/her work plan, the Government will not alter the start dates unless there is a noncompliance with 4.2.1 above or there is an emergency condition.
4.3.9.3 The Government reserves the right to select start dates for task orders that have been issued.
4.3.9.4 The Government shall have 3 working days to approve/disapprove the Contractor’s work plan.
4.4 PERFORMANCE PERIOD
4.4.1 Contractor’s proposal shall give a proposed period of performance for each task order base on long lead items, crews, and productivity. Time shall be agreed to by the government and contactor.
4.4.2 Upon accepting a task order, contractor shall obtain a digging permit and approved traffic control plan (when required) from the Government (up to 30 days). This period is included in the period of performance.
---END OF SCOPE OF WORK---
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been added by full text:
RESPONSE TO INDUSTRY QUESTIONS
Solicitation 19-B-0010
Renovation and Repair IDIQ
Government RFI Responses to Contractor Question submitted after Site Visit on 11 June 2019.
1. In the solicitation on page 11 of 62 of the PDF document item 3 Pre-Requisites for Specialty Trades and
Certifications. It states the contractor shall provide documentation to support the qualifications to, or can acquire assets to, demonstrate journeyman (or master license) qualifications in the following trades electrician and Class A Air Conditioning. However, there is no line items of such trades on the
4.2_Technical Exhibit_D_FY17_-_Estimate Sheet_-_Blank document for any of the years. Will the government please provide an updated sheet that includes HVAC Technicians, Electricians, and Low-
Voltage Electricians, and Plumbers, if required, on each of the years of the contract?
Response: No, Bid sheets will not be revised to reflect cost for qualifications of specialized trade. This is no longer a requirement for the Prime Contractor to hire and staff office personnel, i.e. HVAC Technicians, Electricians, and Low-Voltage Electricians, and Plumbers. However, all functions of trade work, (self-performed by in-house or subcontracted) completed, i.e. Mechanical, Electrical, and Plumbing (MEP) and inspected by the Contractor and Government shall be In Accordance With (IAW) applicable design criteria, laws, codes, regulations, statutes, contract specifications, and Fort Hood AR requirements.
2. In the solicitation on page 11 of 62 item 1. It states a draft progress is to be provided with the priced bid.
Does the government have a proposed scenario the bidders can use to provide this draft progress schedule?
Response: Contract work plans and schedules - software programs will be used at the discretion of the
Contractor. The scheduling software utilized to produce and update the schedules required must be capable of meeting all contract requirements. Reports from the programming software shall be formatted to PDF.
Preferred scheduling software Primavera, Microsoft Project, or similar product.
3. The requirements for pricing allow for line items across a wide variety of potential tasks, but is absent
HVAC (Mechanical) and Electrical which is required under the invitation for bid package for licensing and certification - is there a reason for this or can the Government explain how will we accommodate mechanical and electrical work?
Response: Requirement removed for page 11 for contractor to provide certifications with bid. If
Mechanical or Electrical work is needed the Contractor shall utilize Line Item 7300 Unpriced Unit Item to reflect cost for contract work associated and provide certifications on a task order level for review.
4. Do we need to provide resumes or at least licensing and certifications in our bid package? Can this be individuals or does it have to be company held?
Response: Reference RFI response #1. The only resumes and certifications needed for this solicitation required are for the three key personal.
5. Can the Government project how many individual task orders will be issued annually under this contract, and a projected total dollar amount anticipated per year?
Response: Previous contract was issued ~50 task orders however task orders are awarded based on government needed and this may or may not be representative of future work load. Reference the guarantee minimum for this contract in the solicitation.
6. Reference Section 00100, 3. PRE-REQUISITES FOR SPECIALITY TRADE LICENSURE AND
Certification
a. Please confirm that licenses and certs for electricians and Air conditioning will be required as part of this response. The bid sheet does not show these trades to be priced.
Response: Reference RFI response #1.
7. For bidding purposes, we are to provide a unit cost rate that covers Main cantonment, west fort hood and
North fort hood; depending on the task order location this will drive the price up on task orders located in the main cantonment area. Is it not more feasible to provide a unit price for each area?
Response: A single unit price should be provided that cover all of Fort Hood.
8. Is the project manager required to be on site (fort hood) 100% of the time?
Response: No, Non-emergency, Project Manager shall be made available on site within 24 hours. An
Emergency situation, Project Manager shall be made available immediately.
9. What utility services are available at the contractor yard?
Response: All yards may be connected to the electrical system once coordination and an account is set up with DPW to pay for utility.
10. Will there be liquidated damages assigned to task orders?
Response: Yes, they are provided in the contract and will be assess at task order level.
11. What is the progress payment schedule? Monthly? Bi-weekly?
Response: Bi-weekly
12. What percentage of the contract should be assumed nights & weekend work?
Response: Review specification 01 32 01.00 10 section 3.3.8
13. How many Superintendents are assumed to be needed on any given duration? Can 1 superintendent be assigned to multiple task orders?
Response: Superintendents will be assigned a maximum of 5 active Task Orders, all within a 15 minute response time to each site. See revised specification 01 45 01.00 20 section 3.3
14. Can you get clarification on how the bonds will be set for this one? We assume it will be one bond per year
(~5MM in work) as that seems to be how Fort Hood does it. But usually it’s made clear in the doc or sometimes in a Q&A doc. We will need to confirm how this will be set up.
Response: The Bid Guarantee shall be $500,000.00. This is equal to the minimum guaranteed amount of the entire contract. Payment and Performance bonds shall be required for each task order.
15. Do you have any idea how much mold & asbestos remediation there will be as a percentage of the overall work?
Response: Reference quantities on bid sheet.
16. Should dumpsters, trash haul-off, etc. be factored into the line items?
Response: reference Division 1 Specification 01 57 20.00 10 paragraph 3.9.7
17. Should portable restrooms be factored into the line items?
Response: reference Division 1 Specification 01 35 13 paragraph 1.4.5
18. Line Item 0900 Demolition of Gypsum Wallboard. Will the government confirm that this line item is for walls only, or should this include Gypsum Wallboard on Ceilings as well?
Line item used for ceiling and wall, typically 80% will be wall vs ceiling.
19. Line Items 2600 and 2700 Hollow Metal Frames. How many frames should be assumed to be installed into masonry? Installed into stud partitions?
75% of the time will be in studded partitions.
20. Line Item 2800 Cipher Locksets. Should door prep be assumed to be included for this line item?
Yes
21. Painting Line Items 4200, 4300, 4400, 4500, 4600, and 4700. The line items list paint tables that require differing coating systems per paint table. The coatings range from 2 to 5 coats per system. Can the government brake down the line items further per the paint tables?
The maximum level will be 4 otherwise it will be a texture finish.
22. Section 00100 of the solicitation, paragraph 1. States that a draft progress schedule is to be submitted with the bid, what is the basis of this draft project schedule?
Response: Reference RFI response #2.
23. Section 00100 of the solicitation, paragraph 3. States the contractor shall provide licenses for the specialty trades HVAC and Electrical. None of the line items in solicitation require HVAC or Electrical. Will this be required?
Response: Reference RFI response #1.
24. Line Item 6000 and 6100 Horizontal Metal Window Blinds/Vinyl Window Shades. What size should be assumed for the blinds/shades?
Response: Blinds, interior, horizontal, 1" metal 48" wide x 72” high - window opening maximum.
25. Will submittals be required for all task orders in the case of repetitive materials i.e gypsum board, paint
(with exception of color), ceiling tile, etc.
Response: Yes, For Information Only (FIO)
26. Will Joint-Ventures and teaming agreement be allowed?
Response: Joint Ventures may propose, provided they are certified by the SBA as an 8(a) joint venture prior to award. Teaming agreements will be subject to the limitations specified in FAR clause 52.219-14, Limitations on Subcontracting.
27. Unit pricing for exterior work such as painting can be burdened with the use of lifts and or scaffolding, is the expectation of the Government that our unit price include this anticipated cost? Or can will an item like this be negotiated on a per task order basis?
Response: Items should be bid with use of ladders. Other scaffolding or lifts if needed will be paid for under line item 7300.
28. From the site visit meeting - please confirm that 30-50 task orders per year is the Government expectation, with an average monetary value of 10k-250k?
Response: Reference RFI response #5.
The following have been modified:
SPECIAL REQUIREMENTS
SPECIAL REQUIREMENTS
Any bids received in response to this solicitation SHALL carry a 120 day acceptance period before prices need to be verified, extended or re-negotiated
1. SUBMISSION OF BIDS
The priced bid shall be supported by a draft progress schedule that demonstrates the offeror's understanding of the work requirements, phasing of work between buildings, and estimated time frames for ordering and installing equipment. Please fill out the TE C Bid Sheet and attach it with your bid documents.
Bidders are required to provide a CD copy of their bid documents with their IFB submission.
2. PUBLIC BID OPENINGS
Please refer to Block 13A of the 1442. Anyone wishing to attend the bid opening MUST notify the Contracting Officer (jermain.m.compton.civ@mail.mil) and Contract Specialist (deborah.g.scibor.civ@mail.mil) by email no later than 25 June 2019 with a firm commitment to attend.
MAILING ADDRESS
MICC Fort Hood Shoemaker Center ATTN: Construction (CONTRACTING SECTION) 36000 Darnall Loop, Room 1300B
Fort Hood, TX 76544
PUBLIC BID OPENING
MICC Fort Hood Shoemaker Center Classroom 1463 Bldg 36000 Darnall Loop, 16 July 2019 at 1:00 pm
3. PRE-REQUISITES FOR SPECIALITY TRADE LICENSURE AND
CERTIFICATION
The contractor shall provide documentation to support that it possesses the qualifications to, or can acquire assets to, demonstrate journeyman (or master license) qualifications in the following trades, if needed (task order level):
・ Electrician Licensing-Master and Journeyman electricians to work in the State of Texas by the
Texas Department of Licensing and Regulation
・ Class A Air Conditioning and Refrigeration Contractor’s License as regulated by the Texas by the
Texas Department of Licensing and Regulation In responding to task orders, the offeror shall provide copies of certifications/training identified above as a part of the proposal. No substitution of the individual possessing the required pre-qualifications will be authorized without the written approval of the Contracting Officer, and no time will be allowed for the contractor to acquire the required training/certification after the contract is awarded.
4. WORK EXPIERENCE
The prime contractor shall demonstrate that it possesses general construction contract management by providing at least three examples of relevant work and five years of experience in an awarded contract similar to the requirements stated in this solicitation. Documentation shall be submitted with the bid/offer and include the contract number, the date of contract award, the customer's name and contact information, the awarded dollar value, a description of all work elements included in the contract, the number and type of specialty trades needed to complete the contract, and the period of time allocated for completion of the work. Federal work experience is preferred; however, the Government will accept work experience from both State and institutional and commercial contracts as well. No residential work experience will be considered appropriate for this purpose. Failure to provide this documentation will render the bid/offer non-responsive and no further consideration will be given to that bidder for award of this contract.
5. MANDATORY ATTENDANCE PRE-BID AND PRE-CONSTRUCTION CONFERENCES
The Contracting Officer shall conduct a pre-bid/pre-proposal conference in conjuction with the site visit.
Information on the scheduled Site Visit is located in FAR 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) of this solicitation. When such conference is scheduled, all potential bidders/offerors attending the site visit will be required to attend the pre-bid/pre- proposal conference. Space limitations dictate that no more than two representatives from each company attend. The Contracting Officer will review Bid submission requirements, and other administrative matters critical for successful and timely performance of the work.
The Contractor shall attend a Government coordinated pre-construction conference within 10 calendar days of contract award. As a minimum, the conference shall be attended by the contractor’s appointed project manager, the superintendent, the QCM, and administrative personnel responsible for preparation of contract documents, certified payroll records and invoices. The contractor shall deliver letter appointments of its key personnel that include each individual’s duties, roles and responsibilities.
6. SUBCONTRACTOR LIST
Offeror shall submit a list of proposed subcontractors as an attachment to their BID. If offeror does not intend on utilizing subcontractors (self-perform), offeror shall state so in their bid.
7. AMENDMENTS TO SOLICITATION
(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.
(b) Offerors shall acknowledge receipt of any amendment to this solicitation (1) by signing and returning the amendment, or (2) by identifying the amendment number and date in the space provided for this purpose on the form for submitting a quote. The Government must receive the acknowledgment by the date and time specified for receipt of proposals indicated in block 10 of the
SF1442.
8. FALSE STATEMENTS IN BIDS
Offerors must provide full, accurate, and complete information as required by this solicitation and its attachments. The penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001.
9. EXPLANATION TO PROSPECTIVE OFFERORS
Any prospective offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing by the date and time specified in FAR Clause 52.236-27.
Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective offeror concerning a solicitation will be furnished promptly to all other prospective offerors as an amendment to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective offerors.
(End of special requirements)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for—
11 June 2019 at 10:00 am
(c) Participants will meet at—
MICC Fort Hood
Shoemaker Center Classroom 1463 36000 Darnall Loop
Contractors interested in attending the scheduled pre-bid conference and site visit MUST notify the
Contracting Officer of record in this solicitation no later than 7 June 2019 with a firm commitment to attend. Due to heightened security requirements within Department of Defense and Fort Hood, no contractor will be allowed entry to the building without having provided this notification. The notification must include the names and position titles of representatives attending the pre-bid conference; due to space constraints, each contractor is allowed to name two representatives in the notification. Fort Hood is a closed access installation. All visitors must obtain a visitors’ pass at the Main Gate Visitors’ Center before being allowed on post. Consequently, participants should allow at least one hour prior to the site visit for obtaining this pass.
All questions resulting from the site visit must be submitted electronically to the email below prior to 14 June 2019 at 12:00, deborah.g.scibor.civ@mail.mil.
Remarks and explanations made by the government representative during the course of the site visit shall not change or qualify any of the terms or conditions of the solicitation. The solicitation can only be changed by a written amendment issued by a warranted contracting officer. All RFIs and clarifications considered as a result of inquiries from contractors at the site visit will be incorporated in one or more amendments to the solicitation, all of which will be provided to the contractor in sufficient time to allow the contractors to finalize bids prior to submission.
(End of provision)
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 01:
A. The purpose of this amendment is issued to provide Responses to Industry and to include Contrator Yard and
Hauling Maps.
B. The purpose of this amendment is to change the Bid Opening Date and time to 16 July 2019 @ 1:00 P.M. Central
Standard Time.
C. The purpose of this amendment is to change the amount of the bid guarantee to $500,000.00; previous amount was $2,000.00.
D. Technical Exhibit C-Bid Sheet and Technical Exhibit A has been updated.
(End of Provision)
The following have been deleted:
52.236-28 Preparation of Proposals--Construction OCT 1997
52.236-28 Preparation of Proposals--Construction OCT 1997
SECTION 00700 - CONTRACT CLAUSES
The following have been added by reference:
52.219-14 (Dev) Limitations on Subcontracting (DEVIATION 2019-O0003). JAN 2019 mailto:deborah.g.scibor.civ@mail.mil
The following have been deleted:
52.217-5 Evaluation Of Options JUL 1990
52.219-14 Limitations On Subcontracting JAN 2017
(End of Summary of Changes)