Amendment_0003.docx
DOCX document 12 KB Posted
- Attached to
- Remove and Replace Boilers In BLDG 36000 Federal contract opportunity
- Solicitation number
- W91151-19-B-0009
About this file
RFI Question
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Sing_in_Sheet_W91151-19-B-0009.pdf | ||
| Signed_Bid_Abstract_W91151-19-B-0009.pdf | ||
| W91151-19-B-0009_Amendment_0003.pdf | ||
| Amendment_of_Solicitation_W91151-19-B-0009_and_RFI_Questions.pdf | ||
| HAZMAT_Survey.pdf | ||
| W91151-19-B-0009_Amendment_0001.pdf | ||
| Attachment_1-Appendix_A_01-11-2016.pdf | ||
| TECH_EXHIBIT_A_-_AD009747P_-_CONVERT_HPS_TO_HW_-_BLDG_36000_(2).pdf | ||
| Solicitation_W91151-19-B-0009.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0003
RFI:
Question: Reference Sheet MC-400. What is the government's intent on re-using vs. providing new DDC controls for the AHU coils, boilers, hx's?
Answer: Intent is to re-use the existing AHU controllers that controlled the steam valve and just re-tune the PID loop to control the new hot water valve. For the new equipment (ie Boilers, heat exchangers, etc) contractor should provide either new LON or new BACnet controllers (based on current capabilities of the existing Jace) and tie that back into the existing Tridium Niagara Jaces.