W9115118C0013 TEAS PWS 29NOV23.pdf

PDF 555 KB Posted

Attached to
W9115118C00013 Sources Sought Notice and Notice of Intent to Sole Source
Solicitation number
W9115118C0013P00079
Issued by

About this file

This is a Performance Work Statement (PWS) for Test Engineering and Analysis Services at White Sands Missile Range (WSMR). The contractor shall provide non-personal services for test engineering, analysis and support of the WSMR mission, its tenants and ATEC Organizations.

The PWS outlines requirements for test planning, coordination, execution, reporting, data collection/analysis, engineering support, software development, data management, Manpower and Personnel Integration (MANPRINT), foreign national/media escorts, access monitoring, program management, flight safety and systems engineering services. Key qualifications include personnel with engineering degrees or equivalent experience, security clearances, and specific certifications. The scope includes support across WSMR's 40x100 mile range and various locations including Ft. Bliss, with potential CONUS/OCONUS travel. The contractor must establish systems for safety, security, quality control, and property management while maintaining 95% staffing levels. Notable requirements include management of test data, development of test plans and reports, software analysis, network engineering, and resource management tools like PMM and ADSS. The contract has historically been a cost-plus-award-fee contract awarded competitively as an 8A, comprising approximately 50% of the Materiel Test Directorate workforce.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDED 29 November 2023

WHITE SANDS MISSILE RANGE

TEST ENGINEERING

AND ANALYSIS

SERVICES

PERFORMANCE WORK STATEMENT

29 November 2023

TEST ENGINEERING AND ANALYSISSERVICES

Table of Contents

C.1 GENERAL INFORMATION

C.2 DEFINITIONS AND ACRONYMS

C.3 GOVERNMENT FURNISHED PROPERTY AND SERVICES

C.4 CONTRACTOR SERVICES

C.5 PERFORMANCE REQUIREMENTS

C.6 TEST ENGINEERING AND ANALYSIS SUPPORT SERVICES

C.6.4 APPLICABLE DOCUMENTS

PERFORMANCE WORK STATEMENT (PWS)

C.1 GENERAL INFORMATION

C.1.1 SCOPE OF WORK The contractor shall provide non-personal services for test engineering, analysis and support of the White Sands Missile Range (WSMR) mission, its tenants and ATEC Organizations. The contractor shall furnish services to include test planning;

coordination; execution; and reporting of test results, data collection, entry and analysis, engineering and technical support, software analysis, software development, data Management, Manpower and Personnel Integration (MANPRINT), Foreign National/media escorts, access monitors, program management, flight safety and systems engineering support services necessary for and incident to the performance of the requirements set forth in accordance with this performance work statement and the priorities established by the Government.

C.1.2 MISSION VISION and VALUES

C.1.2.1 MISSION White Sands Missile Range is a Major Range and Test Facility Base providing long-range open-air developmental, operational, and environmental testing; training support; live fire support; and other defense services in support of our Nation’s National Security Strategy.

C.1.2.2 VISION White Sands Missile Range as a vibrant and collaborative community of organizations; safely and sustainably providing a broad range of critical testing, training, and live fire support for the Department of Defense, other government agencies, and private industry; a recognized leader of providing cost-effective, value-driven, and high quality services; a fully- integrated and mutually supportive family of Soldiers, Sailors, Airmen, and Civilians; and an installation of choice for residents, tenants, and customers.

C.1.2.3 VALUES: In addition to the Army’s core values of loyalty, duty, respect, selfless service, honor, integrity, and personal courage in the team’s leadership philosophy, we will emphasize customer service, teamwork and stewardship.

C.1.3 CONTRACT BACKGROUND The TEAS contract has historically been a cost-plus-award-fee contract awarded competitively as an 8A using best value procedures in 1997. The contract support comprises approximately 50% of the workforce of the Materiel Test Directorate of the White Sands Test Center among support to other tenant and organizations on WSMR. The work assignment orders have generally been stable across the described service areas with some variance based on particular test programs and short-term temporary requirements.

C.1.4 LOCATION Headquarters, WSMR is located about 25 miles east of Las Cruces, New Mexico and 50 miles west of Alamogordo, New Mexico and 50 miles north of El Paso Texas.

The range is about 40 miles wide and 100 miles long, not including range extension areas. There are many WSMR organizations and tenants, located primarily in the Headquarters area, with diverse requirements for support services. The majority of the support services requirements will be stationed within the Headquarters region. However, the test mission and support requirements will require the contractor to be prepared to provide defined services across the breadth of the range at disparate temporary and permanent locations, remote sites in the region, as far south as Ft. Bliss Texas and as far north as launch complex 94 and various CONUS and OCONUS locations in direct support of the WSMR mission on temporary duty status. The contractor shall be prepared to provide and manage support personal at duty stations including main post or headquarters region, Stallion Range Center, mid-range Tularosa Gate, Holloman Air Force Base area and Ft. Bliss on a regular basis and in an efficient and effective manner.

C.1.4.1 MISSION HOURS OF OPERATION The majority of the WSMR workforce work a compressed work schedule consisting of four 9-hour days with core hours between 7:00 AM – 4:30 PM Monday thru Thursday an 8 hour day on the first Friday of the pay period with core hours between 0700 and 1530 with the second Friday of the pay period as a non-work day.

However, based on the test mission requirements, the work schedule may revert to standard 8-hour days 5 days a week with a standard work week or one that includes Sunday through Thursday or out to Tuesday through Friday as required to accomplish the mission in a safe and effective manner. The majority of the WSMR mission personnel are on a variable tour where regular work hours and days may vary by mission support requirements and in some cases require shifts to provide the necessary support. Missions requiring variances in workdays and hours are generally known well in advance of the week the work will be performed as directly coordinated by the Government. The contractor shall be prepared to support these working hours and schedule accordingly and commensurate with the Government personnel support schedule by test program requirement. Though overtime will be required on an occasional basis (approximately 10%), the contractor management policies shall minimize the need for overtime through productivity and application of work hours and schedules as to maximize effectiveness and safety of the workforce and minimize cost. The contractor support on overtime will be as required to support the mission, requested and approved by the administrative contracting officer representative, contracting officer and director of the supported organization. Policies and procedures may vary slightly with the contractor required to comply accordingly. Outside normal working hours, some facilities may not be accessible, and assistance from WSMR personnel may be limited. Additionally, access roads to and within the boundaries of White Sands Missile Range are subject to closing for live missile firings or other military operations.

Roadblocks are normally one to two hours in duration. The contractor must monitor and plan accordingly as the roadblocks or limited access does not relieve the contractor from performance of any contractual duties. Occasional rescheduling of work requirements may result due to missile firings or other military operations. It is the contractor’s responsibility to reschedule any and all work requirements due to roadblocks and evacuations. Roadblock information may be obtained by calling (575) 678-1178; information is prerecorded and subject to change without notice.

C.1.5 SAFETY AND ACCIDENT PREVENTION Contractors are responsible for implementing a safety program to ensure that all operations and activities are in compliance with Occupational Safety and Health Act (OSHA) standards and any other applicable safety and health standards. Contractor shall designate an employee as Safety Administrator who shall be.

thoroughly familiar with all safety and health requirements of this contract. Contractor shall prepare and submit a Safety and Accident Prevention Plan as part of the contractor’s Management Plan as discussed in Section C.5. The contractor is responsible for complying with WSMR R 385-18 and all reference documents noted in the document. Additionally, compliance with AR 190-5 (Motor Vehicle Traffic Supervision), and CSP 03-01-003 (OSHA Voluntary Protection Plan (VPP) Processes and Procedures) is required. The contractor key personnel and designated safety administrator must demonstrate an understanding of and be able to describe the fundamental principles of OSHA’s VPP. The fundamental elements of the VPP are:

a. Management Leadership and Employee Involvement

b. Worksite Analysis

c. Hazard Prevention and Control

d. Safety and Health Training

Employee rights under VPP and under the OSH Act or 29 CFR 1960 generally states to Employees that:

CONTRACTORS HAVE THE RIGHT TO A SAFE WORKPLACE, OSHA REQUIRES

EMPLOYERS TO PROVIDE A WORKPLACE THAT IS FREE OF SERIOUS RECOGNIZED

HAZARDS AND IN COMPLIANCE WITH OSHA STANDARDS.

Site management must maintain copies of the TCIR (Total Case Incident Rate) and DART (Days Away/Restricted/Transferred) rate data for all applicable contractors based on hours worked at the site. The 3-year TCIR and DART rates must be below at least 1 of the 3 most recent years of specific industry national averages for nonfatal injuries and illnesses at the most precise level published by the Bureau of Labor Statistics (BLS).

C.1.6 ENVIRONMENTAL All personnel performing work on WSMR, including contractor personnel working on behalf of the Government, must comply with all applicable environmentally related Federal, State, local, Department of Defense and Army laws, regulations, and policies. Compliance includes, but is not limited to adherence to the current WSMR Environmental Policy and Environmental Management System (EMS) requirements.

C.1.6.1 HAZARDOUS MATERIALS The contractor shall be required to have all hazardous material purchased through or shipped to:

Supply Service Activity Building 1870 Aberdeen Rd White Sands Missile Range, NM 88002 ATTN: Contractor name of POC

Once the material has been processed through the Supply Service activity (SSA) and the Hazardous Materials Pharmacy (HAZMART), the contractor may receive the material and must adhere to applicable regulations and policies concerning safe use and disposition of the materials.

Use and disposition of hazardous materials may include the need for and operation of a satellite accumulation point (SAP). The requirement for and establishment of an SAP and procedures for disposal shall be coordinated with and approved by the government prior to establishment or co-use of a government provided SAP. Excess material that can still be used but is not needed anymore will be taken back to the HAZMART for redistribution. Additionally, the contractor may use the HAZMART to receive free issue items that can be used for work to fulfill the contract needs. The contractor shall ensure that all hazardous material is recorded on an inventory list (HAZMART Label Request Form) and that inventory list shall be provided to the government. The hazardous material inventory shall be updated at least annually or when changes occur and dated to reflect the review date. The most current version of the material safety data sheet (MSDS) will be available to all personnel on all shifts at all times either electronically or by hard copy. MSDS will also be available for all inspectors. It is the responsibility of the contractor to obtain the MSDS for each hazardous material in the inventory.

The MSDS will be provided to the WSMR Test center environmental representative electronically and the HAZMART.

C.1.7 GENERAL SECURITY REQUIREMENTS Contractor and all associated sub-contractor employees shall comply with applicable installation, facility, work area and programmatic access and security policies and procedures. In order to meet installation access requirements, the contractor shall provide all information required for employee background checks as required by installation Provost Marshal Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. In relation to the contractor performance requirements delineated in section C.6, Test Engineering Analysis and Support, one hundred percent (100%) of deliverables are subject to inspection by the Administrative Contractor Representative (or Technical Inspector), Test Officer (TO), KO or Test Center Security. The contractor shall have zero (0) security violations in a twelve (12) month period and shall report all violations to the appropriate personnel/organizations, to include the COR/TO within one hour of knowledge of the violation and with a written report describing all known details of the violation incident within five (5) days. At a minimum, all reports/reporting concerning security shall be within stated time 95% of the time.

C.1.7.1 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND

PROCEDURES. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

a. Scheduling. Contractors should work closely with the CO and/or the COR who has access to the installation training schedule. Work/deliveries should be scheduled accordingly by the Contractor.

b. Exercises. Contractors may as part of the exercise be required to provide an accountability of personnel to the CO and/or the COR of numbers of employees on hand and locations.

c. Unauthorized weapons/firearms. Contractor, contractor employees, all associated sub-contractors, and subcontractor employees are not permitted to bring Privately Owned Weapons/Firearms on the installation.

d. Search and Seizure. Contractor personnel and property shall be subject to search and seizure upon entering, while on and upon leaving the confines of WSMR and areas the contractor is providing official support duties.

e. Operational delays as a result of Threat, Disaster, Weather, or Operational

Testing. The Senior Mission or Garrison Commander as a result of an increase in threat, disaster, inclement weather or operational testing may require the installation curtail operations, limiting access to essential government employees only, block/restrict movement on major roads on or leading to WSMR, or close the installation. The contractor cannot hold the US Government or the Command at the installation responsible for cost overruns as a result of these operational decisions.

C.1.7.2 ACCESS FOR CONTRACTOR REQUIRING COMMON ACCESS CARD

(CAC) Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management

C.1.7.3 ACCESS FOR CONTRACTORS THAT DO NOT REQUIRE CAC, BUT

REQUIRE ACCESS TO DOD FACILITY OR INSTALLATION. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

C.1.7.4 HANDLING, ACCESS, AND OR STORAGE OF CLASSIFIED INFORMATION

Contractor shall comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified “Confidential,” “Secret,” or “Top Secret” and requires contractors to comply with— (1) The Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-M); any revisions to DOD 5220.22-M, notice of which has been furnished to the contractor. (2) The Contract Security Classification Specification (DD Form 254). (3) AR 380-5, Department of the Army Information Security Program.

a. Personnel Security Clearances. The contractor shall apply for security clearances for contractor personnel within 10 workdays after contract award for all personnel that are required to perform services at the confidential level or above. Contractor shall initiate security clearance action in accordance with DoD 5220.22.M (National Industrial Security Program Operating Manual (NISPOM). Employees that do not require access to classified are not required to be processed for a clearance. Employees with security clearances must maintain the clearance level throughout the duration of their employment. Personnel who have not received security clearances will not:

• Be granted access to classified information

• Be allowed to perform classified work.

• Be granted access to restricted areas, unless escorted by a person having proper clearance and authorization.

• Handle AA&E material, AA&E keys or AA&E data.

Failure of the contractor to manage or maintain personnel with proper security clearances does not relieve the contractor from providing sufficient personnel with expertise to perform the services required by the Performance Work Statement (PWS).

The FSO of the parent company will provide the WSTC Personnel Security Manager (PSM) with a list of all personnel, "Owned" or "Serviced" through the Joint Personnel Adjudication System (JPAS) and assigned to this contract within 10 workdays after contract award. A monthly update to the list will be provided to the COR and WSTC PSM by the first Wednesday of each month.

The FSO will maintain an "Owning" relationship with all personnel employed by the parent company and a "Servicing" relationship with all subcontractor personnel. These relationships will be maintained for personnel in possession of a security clearance as well as for those personnel that do not have a clearance but have undergone a NACI background check for the purpose of being vetted for CAC issuance.

C.1.7.5 SECURITY DOCUMENTS, REGULATIONS, AND REQUIRED TRAINING

a. Contractor shall comply with the Antiterrorism/Force Protection (AT/FP) requirements

IAW AR 525-13, WSMR Installation AT Plan, WSTC AT Plan, and approved supplemental

AT/FP guidance or any AT/FP Plan, Regulation or supplemental guidance that supersedes the above mentioned documents. These requirements include, but are not limited to, annual AT Level 1 training (Via ATEC Training Tracker Module), OCONUS Travel Briefs, preparation of Organizational Consolidated Force Protection, Security, and Evacuation Plans, and the conduct of the WSMR/WSTC Random Antiterrorism Measure Program. These publications may be provided at the contractor’s request.

b. The contractor and all associated sub-contractors shall brief all employees on the local iWatch program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the appropriate personnel. This training shall be completed within 30 calendar days of contract award and within 15 calendar days of new employees commencing performance with the results reported to the COR NLT 45 calendar days after contract award.

c. Personnel involved with Arms Ammunition and Explosives (AA&E) tasks and services must comply with regulations AR 190-11, AR 190-13, AR 190-51, DA PAM 190-51 and WSMR Reg. 190-6. These publications shall be provided at the contractor’s request.

d. Contractor shall comply with conventional key and lock requirements under AR 190-

51 and WSMR Reg. 190-6 for those facilities and areas that are not governed by AA&E or NISPOM Requirements (i.e. office space that does not process or store classified or AA&E material.). These publications shall be provided at the contractor’s request.

e. Government furnished and required security training includes Initial (New Hire) and

Annual Information Assurance, iWATCH, Antiterrorism, OPSEC, Threat Awareness and Reporting Program (TARP) Training, and any other command mandated training. These trainings may be tracked or documented using either hard copy sign in sheets, online automated tracking programs, or Common Access Card (CAC) Verification. The method of tracking will be identified to the contractor through the COR prior to start of the training activity. There are program specific trainings in the area of AA&E, INFOSEC, COMSEC and other security disciplines that will be identified and tracked by the program/project manager.

(1) Part and full time permanent employees requiring either WSMR Network access, installation access in excess of six months or both will be required to complete all security mandated trainings which will be assigned and tracked through the ATEC Training Tracker Module (ATTM).

(2) Casual, temporary, and those employees that do not have WSMR Network access will be required to complete all assigned security trainings assigned through the ATTM to those employees identified above. However, the delivery and tracking method will be coordinated by the FSO and the WSTC Industrial Security Officer (ISO). Annually (last week of August) a report of all such employees, identifying the completion date of each training event by each employee will be provided to the WSTC ISO.

(3) New hire security training will be completed by all new hires to the command.

For the purposes of security training events a new hire will be defined as an employee that is newly hired to the command or is returning after a break in service/employment in excess of one year. If an employee was previously a service member, civil servant, or employed with another contractor assigned to or contracted by the WSMR/ATEC Command and did not have a break in service in excess of one year they will not be considered a new hire. Coordination between the FSO and ISO to identify and track these personnel is required.

C.1.7.6 COMMUNICATIONS SECURITY (COMSEC) The contractor may be required to become a COMSEC sensitive item holder for managing cryptographic security equipment and material IAW AR 380-40. All applicable guidance, regulations, accountability, documentation, and training will be completed and retained as required.

C.1.7.7 OPERATIONS SECURITY Contractor shall comply with the Operations Security (OPSEC) requirements IAW AR 530-1, WSMR OPSEC Standard Operating Procedure (SOP), WSTC OPSEC Plan, US ATEC Policy Bulletin 14-12, and approved supplemental OPSEC guidance or any OPSEC Plan, SOP, Regulation or supplemental guidance which supersedes the above mentioned documents. These requirements include, but are not limited to, annual OPSEC Awareness training, OPSEC review and approval of government/RDT&E information prior to its public release. These publications may be provided at the contractor’s request.

The contractor shall develop an OPSEC SOP/Plan within 90 calendar days of contract award for all areas the contractor is responsible for, to be reviewed and approved by the responsible Government OPSEC officer, per AR 530-1, Operations Security. This SOP/Plan will include the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. In addition, the contractor shall identify an individual who will be an OPSEC Coordinator. The contractor shall provide input to and comply with all government OPSEC SOPs for common or shared facilities and areas of operation.

C.1.7.8 INFORMATION SYSTEMS

Information Assurance (IA) / Cybersecurity (CS) Training (User Level Access) All Contractor personnel with access to Government information systems and networks shall successfully complete all required IA / CS awareness training as specified in AR 25-2 and as specified by the Government requiring activity. This includes training mandated in Army CIO / G6 ALARACT message 293/2007, subject: Implementation of Standard DoD IA Awareness Training, dated 261800Z Dec 07. Training is available at https://ia.signal.army.mil.

Contractor employees and subcontractor employees performing work under this contract who have access to Government information systems and networks shall create a user account and profile in the Army Training and Certification Tracking System website (ATCTS) at https://atc.us.army.mil, in the unit container managed by the COR. Certificates of successful completion of IA/CS training (DoD Cyber Awareness Challenge Training), Acceptable Use Policies(AUP), and DD Form 2875 – System Authorization Access Request (SAAR), shall be uploaded to the ATCTS and provided to the COR for continuous compliance monitoring and reporting.

The Contractor shall ensure that all contractor employees and subcontractor employees requiring IA / CS awareness training, DoD Cyber Awareness Challenge Training, complete the training at the start of work performance on this contract and annually thereafter for the duration of this contract.

Information Assurance Training / Information Technology (IT) Training / Cybersecurity (CS) Training / Certification (Technical Level Access). All Contractor personnel with access to Government information systems and networks shall successfully complete all required IA / CS awareness training, DoD Cyber Awareness Challenge Training, as specified in AR 25-2 and as specified by the Government requiring activity. This includes training mandated in Army CIO/G6 ALARACT message 293/2007, subject: Implementation of Standard DoD IA Awareness Training, dated 261800Z Dec 07. Training is available at https://ia.signal.army.mil.

Contractor employees and subcontractor employees performing work under this contract who have access to Government information systems and networks shall create a user account and profile in the Army Training and Certification Tracking System website (ATCTS) at https://atc.us.army.mil, in the unit container managed by the COR. Certificates of successful completion of IA / CS training (DoD Cyber Awareness Challenge Training), Acceptable Use Policies (AUP), DD Form 2875 – System Authorization Access Request (SAAR)s, Privileged Access Agreement (PAA), Appointment Orders, applicable baseline and computing environment certifications, and continuing professional education credits, as required by DoD 8570.01-M, shall be uploaded to the ATCTS and provided to the COR for continuous compliance monitoring and reporting.

The Contractor shall ensure that all contractor employees and subcontractor employees requiring IA / CS awareness training, DoD Cyber Awareness Challenge Training, complete the training at the start of work performance on this contract and annually thereafter for the duration of this contract.

DFARS clause 252.239-7001 (Information Assurance Contractor Training and Certification) applies to this contract. This contract is subject to the mandates of DoD 8570.01-M, which establishes baseline technical and management IA / CS skills for personnel performing IA / CS functions within DoD. Functions spanning multiple levels require certification of the highest-level functions. Contractor personnel performing functions in multiple categories or specialties shall hold certifications appropriate to the functions performed in each category or specialty.

The Contractor shall ensure its IT (IA / CS) workforce members have the baseline certifications corresponding to their IT (IA / CS) functions, as defined in Chapters 3, 4, 5, 10, and 11, and Appendix 3 of DoD 8570.01-M at work performance start date. Contractors will obtain all required Computing Environment (CE) certificates within 6 months of being engaged. The IAT Level I baseline certification is the minimum requirement for unsupervised privileged access.

The Contractor shall ensure that all employee certifications remain active and are renewed prior to expiration.

The Contractor shall ensure that all employees IA certifications are released to the Department of Defense through the Defense Workforce Certification Application at https://www.dmdc.osd.mil/appj/dwc/index.jsp.

Table 1 reflects the Personnel Security (IT Level) and IA Workforce Specialty requirements, aligning the IA functional responsibilities and access levels to the contract tasks, in accordance with DoD 8570.01-M.

Table 1. Information Technology Access and IA / CS Certification Requirements.

Functional Category

IT Level

(IAW

AR 25-2)

Security Clearance

Investigation Required

IA /CS

Certification Category and Level (IAW DoD 8570.01-M and

BBP 05-PR-M-

0002)

Computing Environment Certifications

Site Management

II

SECRET

NACLC

IAM II

Yes

Technical Support Level I

IAT II

Level II

IAT II

Level III

I

SSBI

IAT III

Supply Technical Support

III

NA

No

Non-Government-owned Computing Systems or Devices: The Contractor shall comply with AR 25-1 and AR 25-2. The Contractor shall not install or connect non-Government-owned computing systems or devices to Government networks without the COR's coordinating and obtaining proper authorization from the appropriate Information Assurance Program Manager (IAPM) / Cybersecurity Management Program Manager (CSPM), ensuring that all software has a Government Certificate of Networthiness. The non-Government-owned computing systems or devices include, but are not limited to, personal or Contractor-owned thumb drives (e.g., memory sticks, flash drives, Universal Serial Bus (USB) drives, jump drives, pen drives), removable or external hard drives, Personal Digital Assistants (PDA), PC Cards/Express Cards, MP3 players, cell phones, digital media, floppy disks, compact disc (CD) /digital video disk (DVD) burners, optical recordings, photo flash cards, laptops, or any devices that can store data.

Protection of Sensitive Unclassified Data / Personally Identifiable Information (PII): The Contractor shall ensure any sensitive information, including, but not limited to, Personally Identifiable Information (PII) and For Official Use Only (FOUO), proprietary, and Law Enforcement Sensitive information residing on Mobile Computing Devices (MCD) or other external media, is protected in accordance with current Data at Rest (DAR) guidelines and requirements. The Contractor shall use an authorized, approved, and prescribed DAR solution.

The MCDs include, but are not limited to, laptop, netbook, notebook, or tablet computers, and Blackberry or equivalent devices. External media include optical disk media such as CDs, DVDs, USB drives (also referred to as flash or thumb drives) (when authorization to use them is restored), floppy disks, and other portable digital storage devices. Guidance for protecting DAR information appears in DoD Policy Memorandum, 3 Jul 07, subject: Encryption of Sensitive Unclassified Data-at-Rest on Mobile Computing Devices and Removable Media and in DoD Component implementing instructions.

C.1.7.9 OCONUS TRAVEL (OFFICIAL AND PERSONAL)

Performance or Delivery in a Foreign Country (Official OCONUS Travel). DFARS

Clause 252.225-7043, Antiterrorism/Force Protection for Defense Contractors outside the US.

This clause applies to both contingencies and non-contingency support. The key AT requirement is for non-local national contractor personnel to comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor’s compliance with combatant commander and subordinate task force commander policies and directives.

AT Awareness Training for Contractor Personnel Traveling Overseas (Personal

OCONUS Travel). All contractor employees and associated sub-contractor employees to make available and to receive government provided area of responsibility (AOR) specific AT awareness training as directed by AR 525-13. Specific AOR training content is directed by the combatant commander with the unit ATO being the local point of contact.

C.1.7.10 DISCLOSURE OF INFORMATION The contractor may be required to access data and information proprietary to another Government agency, another Government contractor, or of such a nature that its dissemination or use other than as specified would be adverse to Government interest. Neither the contractor, subcontractors, partners nor contractor employees shall divulge or release data or information developed or obtained under this contract except to authorized Government personnel or upon written approval of the KO. The contractor shall not use, disclose or reproduce proprietary data that bears a restrictive legend unless explicitly required to do so by the Government in the execution of the assigned task or mission. The contractor shall obtain written permission of the originator prior to releasing any information marked “PROPIN” (proprietary information). Under Title 18, Sections 793 and 798, contractor and contractor employees are liable for any improper release.

C.1.7.10.1 FOREIGN DISCLOSURE Contractor shall comply with Foreign Disclosure and Contacts with Foreign Representatives IAW AR 380-10, DoD 5230.11, Disclosure of Classified Military Information to Foreign Governments and International Organizations, DoD 5230.20, Visits, Assignments, and Exchanges of Foreign Nationals and WSMR SOP, Foreign National Personnel Visits/Foreign Disclosure. These publications shall be provided at the contractor's request. Under no circumstances shall the contractor disclose data or information gathered in the execution of this contract without express written direction or permission from the Government.

C.1.8 VEHICLE OPERATION Contractor employees assigned to operate either government owned or leased vehicles or equipment in performance of this contract shall be certified, by the contractor and at the contractor’s expense, as being fully qualified and properly licensed to operate the vehicles/equipment to which they are assigned. The prime contractor shall document all operator qualifications. This documentation shall be provided to the Administrative Contracting Officer before any contract employee engages in any mode of equipment operation.

C.1.8.1 VEHICLE AND OPERATOR LICENSING Motor vehicles entering WSMR shall have a valid U.S. State license and registration. State license and registration shall be maintained current during the time the vehicle is in use on this installation. Contractor personnel operating motor vehicles on the installation shall have a valid state operator’s license for the category of vehicle being operated, and shall comply with AR 190-5 (Motor Vehicle Traffic Supervision and the Installation Traffic and Mobilization Plan regarding motor vehicles use on the installation).

C.1.8.2 VEHICLE REGISTRATION Contractor and contractor’s personnel shall comply with installation vehicle registration requirements that may be implemented during the life of the contract. At the current time there are no vehicle decals required to access WSMR. Entry to WSMR is granted with a Government CAC card or coordination with a government point of contact and photo identification.

C.1.9 CONTRACTOR WORKFORCE The contractor shall provide a workforce possessing the skills, knowledge, education, expertise and training to perform the services required under the contract. Contractor shall possess a flexible organization and management style to provide a quick-reaction capability to meet last-minute mission changes and requirements. Personnel must be versatile and readily adaptive to mission requirements and factors such as technology or range modernization. To keep pace with a continuously changing technical environment, they must be willing to train and be trained. Contractor personnel shall not be considered employees of the Government and are responsible for ensuring they do not represent themselves or are not perceived as being Government employees or obligating the Government. The contractor shall not employ any current civilian or military employee of the U.S. Government. Such employment would create a real or apparent conflict of interest. The contractor’s staff, direct employees and those of parent companies, partners, subcontractors and reach-back support including temporary employees shall be considered employees of the contractor and are required to abide by the same regulations, contractual requirements and conduct as the primary contractor.

C.1.9.1 CONDUCT Contractor and contractor employees, to include subcontractors, shall adhere to all policies, rules and regulations issued by the local installation commander pertaining to safety, security, fire prevention, sanitation, severe weather, use of tobacco, admission to the installation and conduct of operations. Exceptions or specific guidance on how the policy or regulation may apply differently to the contractor will be provided by the government contracting officer on a case by case basis or on request. The Government may require the contractor to remove any employees from the work site based on misconduct, security violations, use of incapacitating agents, or reasons determined to be in the Government’s best interest. The installation commander has the authority under 18 U.S.C. 1382 (1972) to bar individuals from the installation. Removal of personnel does not relieve the contractor from providing sufficient personnel with requisite expertise to perform the services required by the Performance Work Statement (PWS).

C.1.9.1.1 APPEARANCE AND APPAREL Contractor personnel shall practice high standards of personal hygiene and maintain a clean, neat professional appearance while on duty.

Contractor personnel are not required to wear uniforms; unless requested in a Work Assignment Order (WAO) Statement of Work; however, they shall be dressed appropriately for a professional workplace and as required to ensure personal safety to include personal protective equipment required by test SOP or job hazard analysis.

C.1.9.1.2 SMOKING Smoking is prohibited in all government buildings and vehicles or within 50 feet of bulk fuel storage or generators, AAE and as identified in safety operating procedures applicable to assigned work.

C.1.9.2 NON-PERSONAL SERVICES The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government directly assign tasks to or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Contracting Officer’s Representative (COR), Alternate Contracting Officer’s Representative (ACOR) or the Contracting Officer (KO) immediately. The lead contractor supporting a given work assignment order and those assigned to support a define mission are responsible for coordinating schedules and resources to meet the support requirements defined by the COR.

C.1.9.3 PERSONNEL QUALIFICATIONS The contractor staff and employees must meet or exceed the general qualifications described in this section and those specified in each of the pertinent areas of the PWS describing additional qualifications, skills, education, knowledge, expertise, certification and experience required.

C.1.9.3.1 GENERAL SKILLS Personnel performing work under the contract shall;

• Be able to fluently communicate in the English language to include, being able to read, write, speak, and understand the English language commensurate with the duties of the task or work assignment order. It is acknowledged that not all tasks require each of these skills as mutually exclusive and thus do not exclude hearing impaired personnel from certain tasks, jobs or work assignment orders.

• Possess training, education, certification(s), and experience commensurate with the work they will perform, and level of responsibility they will exercise or as defined in the PWS.

• Possess the physical dexterity and fitness required to perform duties commensurate with the work they will perform and level of responsibilities they will exercise. Most work will be in an office setting while some tasks will require lifting, driving and working in various indoor and outdoor conditions to include some extreme climatic environments or work around tactical vehicles, systems or test sites.

C.1.9.4 CONTRACTOR PERSONNEL IDENTIFICATION

C.1.9.4.1 CONTRACTOR REPRESENTATIVE Contractor shall provide an onsite designated representative whom shall be physically present during normal duty hours to conduct overall management coordination and furnish liaison with the Government. The designated representative shall be the point of contact with the Government and shall have the authority to act or make decisions for the contractor on all matters pertaining to the execution of the contract. The designated representative shall be available during normal duty hours within 30 minutes after notification to meet on the installation with Government personnel designated by the Contracting Officer (KO) to discuss problem areas. After normal hours, the designated or alternate representative shall be available on site within one hour when contract personnel are supporting tests services in the WSMR and Ft Bliss region. The designated contractor representative must be able to proficiently communicate in English.

C.1.9.4.2 ALTERNATE REPRESENTATIVE Contractor shall designate an alternate representative who shall be authorized to act on the contractor’s behalf in the absence of the designated representative. The contractor shall notify the KO when there is a change in primary representative such as when the alternate is acting on the contractor’s behalf. The alternate shall be subject to all requirements and responsibilities of the contractor representative.

C.1.9.4.3 RECALL ROSTER Contractor shall provide name, address, and telephone number for both the designated and alternate representatives to the Contracting Officer’s Representative (COR) within 5 workdays following contract award. Contractor shall verbally notify the COR of changes in the recall roster as they occur and provide written changes no later than 24 hours after effective date of the change. The COR will forward this information to the KO.

C.1.9.4.4 WORKSPACE Contractor workspace (office, laboratory and/or desk) shall contain a sign signifying the space is occupied by “contractor employees(s)” to ensure that Federal employees and the public know that they are not Federal employee. The sign and posting will be commensurate with the facility, area of operations and similar government signage in the assigned facility and approved by the facility custodian or organizational lead.

C.1.9.4.5 WORK ENVIRONMENT AFFILIATION Contractor employees shall identify themselves by name and company affiliation when answering the telephone, presenting briefings, conducting services or in situations such as attending meetings/seminars such that the contractor employee is not mistaken as affiliated with or as an official government employee in order to prevent receipt of unauthorized proprietary or sensitive information or mistaken for committing the government. Situations that arise where the contractor is aware of a mistaken identity shall be reported to the COR immediately.

C.1.9.4.6 WORK CORRESPONDENCE All contractor correspondence (written, facsimile, and email display) shall include the company name. Other documents or reports produced by contractors or with contractor participation and being represented by the contractor shall be disclosed as such and identified accordingly. Contractor products such as report sections, analysis or data produced as input to or in support of the government and combined with government products or approved by the government shall not include the company name or logo.

C.1.9.5 KEY PERSONNEL Certain experienced professional and/or technical personnel are essential for successful accomplishment of the work to be performed under this contract. Such personnel are defined as “Key Personnel” and are those persons whose resumes were submitted for evaluation of the proposal. Prior to beginning performance, the contractor shall submit to the KO a list identifying of all key personnel who will be working under the contract. The list shall include the employee’s:

• Full name

• Citizenship and naturalization number, if applicable

• Work assignment(s)

• Qualifications, including training, certification(s) and experience

C.1.9.5.1 PROGRAM MANAGER - The Program Manager plans, conducts, oversees, and is responsible for all work performed under this contract. The Program Manager shall be a responsible company official with authority to obligate the company with regard to contractual and financial matters. The Program Manager is the primary liaison with designated Government Representatives, and must have a technical and administrative grasp of all contractual requirements. The Program Manager organizes, plans, schedules, and controls all support and engineering work. The Program Manager supervises all contractor personnel engaged on this contract and is responsible for the day-to-day operations including cost control, planning, reporting and project schedules. The Program Manager must manage all resources to implement task orders for their timely and successful completion. The Program Manager must possess the following minimum qualifications:

• Possess a valid Bachelors degree in engineering and/or business from an accredited college or university.

• 10 years of demonstrated engineering and management experience on contracts or projects with organizational responsibilities of a similarly complex nature and financial scope.

• Posses experience working on and demonstrated leadership responsibilities on at least three large projects or programs utilizing mechanical, computer, electrical and electronics engineering disciplines.

• Experience reviewing and approving the work of project managers, engineers, support staff and contract administrative personnel.

• 2 years experience, demonstrated knowledge of or education in the DoD contracting process.

• 2 years experience, demonstrated knowledge of or education in the DoD acquisition process specifically related to the test career field.

• U.S. Citizen whom possess or is able to obtain and maintain a secret level clearance in accordance with DoD regulations.

C.1.9.5.2. CORE TEAM MEMBER OR SUBCONTRACT MANAGERS Should the Contractor’s proposed management team include core partner organizations and/or subcontractors to collectively or substantially provide the services described in the PWS, the personnel (partner organization and subcontractor managers) shall be considered key personnel.

If such an arrangement is proposed, it is expected those key members would manage their respective employees, advise and be capable of representing the Program Manager in day today operations. Those key personnel shall have the following minimum qualifications:

• Possess a valid Bachelors degree in engineering and/or business from an accredited college or university.

• 5 years of demonstrated engineering and management experience on contracts or projects with organizational responsibilities of a similarly complex nature and financial scope.

• Posses experience working on and demonstrated leadership responsibilities on at least two large projects or programs utilizing mechanical, computer, electrical and electronics engineering disciplines.

• Experience reviewing and approving the work of project managers, engineers, support staff and contract administrative personnel.

• 1 year experience, demonstrated knowledge of or education in the DoD contracting process.

• 1 year experience, demonstrated knowledge of or education in the DoD acquisition process specifically related to the test career field or obtain the training within 1 year of contract award and provide documentation of the training to the Government KO.

C.1.9.5.3 ADMINISTRATION, SECURITY, RESOURCE, FINANCIAL, AND

PERSONNEL MANAGEMENT The contractor is responsible for the management of the personnel providing the services described in this PWS as well as reporting and management of resources, logistics, purchasing, security, safety and contracting associated with the execution and operations of the contract. The proposed management team may consist of personnel in each critical area or personnel with responsibilities in more than one area as a function of the abilities and contractors management policies or methodologies. Any personnel proposed to perform these functions must be qualified in the areas for which they are to be assigned and responsible within the contractor management team. Identified personnel must possess the following minimum qualifications:

• Five years experience in the proposed area or areas of responsibility.

C.1.9.5.4 SUBSTITUTION OR REPLACEMENT OF KEY PERSONNEL The contractor shall assign those key persons and subcontractors whose resumes and firms were submitted with the Government’s request for proposals (RFP) and accepted by award of this contract to the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .