RFI QUESTIONS and GOVERNMENT RESPONSES Project 18-B-0042 Install Fire Suppression System
BLDG. 121
Site Visit: August 24, 2018 @ 9:30 AM
1. Where will the new fire sprinkler lead in be located?
Mechanical room 117, based on the exact location of the new fire riser and determined by the Fire Protection Engineer.
2. Where will the new riser be located?
See A-101A, Note 5B. Location is NE corner of Mechanical room 117.
3. Where will the new fire alarm and mass notification panels be located?
See A-101A, Note 4A. Location is NE corner of Mechanical room 117.
4. Will all the ceiling be taken down for pipe installation?
Only remove ceiling as needed for pipe insulation. Patch ceiling where taken down.
5. Will the building be occupied?
No, building will be unoccupied during project duration.
6. Will floor tile be required to be replaced where walls are to be demo’d?
No, floor tile will not be required to be replaced where walls are to be demolished.