Amendment__17-B-0034_Renovation_of_Bldg_42006.pdf
PDF 66 KB Posted
- Attached to
- Renovate Building 42006 Federal contract opportunity
- Solicitation number
- W91151-17-B-0034
About this file
Amendment
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Sign_In_17-B-0034_Renovation_of_Bldg_42006.pdf | ||
| Revised_Drawings_-_17-B-0034_Renovation_of_Bldg_42006.pdf | ||
| Technical_Exhibit_C_-_As_Builts.pdf | ||
| Technical_Exhibit_D_-_BLDG_42007_Floorplan.pdf | ||
| Technical_Exhibit_B_-_Drawings.pdf | ||
| Solicitation_17-B-0034_Renovate_Bldg_42006.pdf | ||
| Attachment_1-Appendix_A_04-Aug-2016.pdf | ||
| Technical_Exhibit_A-Specifications_1-11-16.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011039111 AD010166P
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
A. This amendment is issued to provide Responses to Industry.
B. This amendment is issued to provide revised Draw ings.
C. Thjis amendment is issued to reschedule the Bid Opening date from 14 Sep 2017 at 2:30 p.m. to 18 Sep 2017 at 1:00 p.m.
D. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Sep-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91151-17-B-0034
X 9B. DATED (SEE ITEM 11)
15-Aug-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Sep-2017
CODE
MISSION AND INSTALLATION CONTRACTING
MISSION CONTRACTING OFFICE (MCO)
36000 DARNALL LOOP, ROOM 1300B
FORT HOOD TX 76544-5095
W91151 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91151-17-B-0034
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
RESPONSE TO INDUSTRY QUESTIONS
REQUEST FOR INFORMATION/RESPONSES
W91151‐17‐B‐0034 Renovate Building 42006
Fort Hood, Texas Project No. AD010166P
1. Confirm adequate QC oversight?
Confirmed
2. Drawing G-102: General Project Note # 5 requires the full cleaning of building 42007. Is this correct?
Yes
3. Drawing G-102: General Project Note # 6 requires the contractor to strip and wax all VCT floors in building 42007 prior to project completion. Is this correct?
Yes
4. Are the VCT floors in building 42006 to be stripped and waxed?
No, per note 1 on D-101, VCT is to be demolished.
5. Where is the window on the north/south match line on the north side of the building? It is shown D-101A but not on A-101A. Is it deleted? Not marked for demo.
See revised drawings.
6. Drawing D-101A. Window in the existing kitchen is not marked for demolition. It is not shown on drawing A101A. Is it being demo’ed?
7. Drawing D-101A: The windows in the existing female and male latrines, room 103 and 105, respectively, do not show up on drawing A-101A. Are these windows to be deleted?
8. Drawing D-101A does not show the demo of the slab on grade for the new floor drain and new WC and WHB in new Latrine 103A?
9. Drawing D-101B does not show then demo of the slab on grade for the floor drains, w/c’s, and wash hand basins in the two Latrines 124 A and 123A, and the sink unit in room 124.
10. Drawing A-101A Note 10: The signage information is shown on A-504 not A-501.
11. Ditto drawing A-101B Note 10.
12. Drawings A-101A and A-101B Note 1 indicate fire rating for walls on F-101A and F101B respectively.
Drawing F-101A contains the full building. There is no F-101B.
See revised drawings. There is only F-101
13. Drawing A-101B Note 15: There is no description of material to be used or color for the counter on sheet A-504. Please provide more information.
14. Drawing A-102A Note 2. Provide 1 hour rated ceiling in hallway. Confirm that you are looking for a double layer of 5/8” type X gypboard?
Intent is a 1hr fire rated ceiling assembly.
15. There are no plumbing drawings.
16. Drawing A-501 General note 2: Requires stainless steel push plates. Detail B calls for brass push plate.
Please clarify?
17. Drawing A-602: calls out ACT ceilings for Security 101; Hallway 105; Hallway 109; Hallway 114;
Hallway 115; and Printer 112. Drawing A-102A shows all hallways and printer room to be 1 hour rated gypsum board. Please clarify.
18. Drawing A-603: Door types are called out by letter in door type column, but the door types are shown as 1, 2, 3, 4. Please check the door types again once the letter/number problem is cleared up – especially the doors that require narrow and half lites.
19. Drawing E-102 A: Are the lighting fixtures in rooms 106 (Female Latrine), 107 (Latrine), 108 (Male Latrine) and 110 (Janitor) new? Drawing D-101A states no demolition in these rooms.
Yes, light fixtures are being replaced with new LED fixtures. See revised drawings.
20. Drawing E-102B: Is the light fixture in room 113 (Communications) new? Drawing D-101B states no demo in this room.
Yes, light fixture is being replaced with new LED fixture. See revised drawings.
21. Is Commissioning of HVAC required in this scope of work?
Yes.
22. We are relocating two units from one location to another. Who is responsible for the warranty if something goes wrong with the equipment after relocation?
The equipment in question is not under warranty, there is no warranty required on this equipment.
23. Please provide schedule for new wall mounted exhaust fans?
24. EF-4 is shown on the drawings to be within 10’ of an outside air intake. This is against code and should not be dumping odor from restroom back into the outside air intake. Please confirm this is correct or if EF- 4 needs to be switched to a roof mounted fan?
See revised drawings. EF-4 will be roof mounted fan.
25. Room 113 is switching to a comm’s room. Please confirm that having a diffuser ducted from the unit is going to be OK? When this unit turns into heat it will be dumping heated air into the server area.
The room number is changing, however the room in question already serves as a communications room. No HVAC work is to be done in this room.
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 14-Sep-2017 02:30 PM to 18-Sep-2017 01:00 PM.
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit _ ATTACHMENT 1
APPENDIX A
141 10-MAR-2017
Exhibit _ TECHNICAL EXHIBIT
A - SPECIFICATIONS
3313 11-JAN-2016
Exhibit _ TECHNICAL EXHIBIT
C - AS BUILTS
44 25-JUN-2009
Exhibit _ TECHNICAL EXHIBIT
B - DRAWINGS
35 18-APR-2017
Exhibit _ TECH EXHIBIT D –
B42007 FLOOR PLAN
1 24-JUN-2014
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Revised Drawings 36 07-SEP-2017
(End of Summary of Changes)
File details come from the government source that posted it. Updated .