This document is an amendment to solicitation W90VN924R0110 for the repair of a deteriorated building for swing space in Bldg. No. S-1715 at Camp Heny. The key changes include:

A. Revised drawings to reflect communication work, including the removal of Drawing E-7 and the addition of Drawings T-1 and T-2.

B. Removal of paragraph 2.a.(1) from Section L, Instructions to Offerors.

C. All other terms and conditions remain unchanged.

The related federal contract opportunity is for the repair of the deteriorated building for swing space in Bldg. No. S-1715 at Camp Heny. This is a Request for Proposal (RFP) issued to existing Area IV General Construction Multiple Award Indefinite Delivery Indefinite Quantity (MAIDIQ) Local Contractors only. A site visit has been scheduled for May 29, 2024, and the solicitation closes on May 21, 2024.

View the file

Other files

File Type Posted
Attachment 1-Drawings (Rev1).pdf PDF
RFP-W90VN924R0110.pdf PDF
Attachment 1-Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

411TH CSB, KOREA - RCO DAEGU

POC: MS. KWON, CHONG-HYON

TEL: 315-763-5693

CHONGHYON.KWON.LN@ARMY.MIL

APO AP 96218-5682

UNITED STATES

0012129240 I1-00055-3J

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See next page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W90VN924R0110

X 9B. DATED (SEE ITEM 11)

21-May-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0001

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-May-2024

CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCO DAEGU, UNIT #15682

APO AP 96218-5682

UNITED STATES

W90VN9 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W90VN9

FACILITY CODECODE

EMAIL:TEL:

W90VN924R0110

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

A. The purpose of this amendment 0001 is to provide the following revised drawings to reflect communication work:

- Remove Drawing E-7, Communication System Diagram and Communication Plan,

- Add Drawings T-1 Legend, Notes, Scope of Works, and Communication Plan and T-2 Communication System Diagram.

From:

Drawing No. Ref. No. Sheet No. Description Date

D-24-15 E - 7 42 of 44 Communication System Diagram and 22 Mar 24 Communication Plan

" E - 8 43 of 44 Fire Alarm Plan "

" E - 9 44 of 44 Fire Alarm Single Line Diagram "

To:

Drawing No. Ref. No. Sheet No. Description Date

D-24-15 E - 7 42 of 45 Fire Alarm Plan 22 Mar 24

" E - 8 43 of 45 Fire Alarm Single Line Diagram "

" T - 1 44 of 45 Legend, Notes, Scope of Works, and Communication Plan "

" T - 2 45 of 45 Communication System Diagram "

B. Remove paragraph 2.a.(1) from Section L, Instructions to Offerors.

C. All other terms and conditions remain unchanged.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The below Table of Contents has been added

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Revised Drawings for Amendment 0001

The following have been modified:

LIST OF APPLICABLE CONTRACT DRAWINGS

PROJECT NO TITLE LOCATION

I1-00055-3J Repair the deteriorated building for swing space in Bldg. No. S-1715 Camp Heny

GENERAL: The work shall conform to the standard detail drawings (dated 30 November 2015, issued by the Department of the Army, Installation Management Agency, Korea Region Office and located USFK’s Web Page http://www.usfk.mil/Resources/Contracting-with-USFK), all of which form a part of the specifications.

Drawing No. Ref. No. Sheet No. Description Date

D-24-15 R - 1 1 of 1 Title Sheet 22 Mar 24

" C - 1 1 of 45 Location Plan "

" C - 2 2 of 45 Removal Plan "

" C - 3 3 of 45 Site Layout Plan "

" C - 4 4 of 45 Enlarged Plan and Sections "

" C - 5 5 of 45 Asphalt Concrete Pavement, Concrete Ramp, Concrete Curb and Concrete Surface Inlet Details "

" C - 6 6 of 45 Handicapped Parking Space W/ Access Aisle and Car Wheel Stops Details "

" C - 7 7 of 45 Water Distribution, Gate Valve, and Concrete Encasement Details "

" C - 8 8 of 45 Water Supply Distribution-Thrust Block "

" A001 9 of 45 General Notes, Specific Notes, Material Notes "

" AD101 10 of 45 Asbestos Removal Plan, Exist / Removal Plan "

" AE101 11 of 45 New Floor Plan, Scope of Work "

" AE102 12 of 45 Building Photo View "

" AE201 13 of 45 Partition Wall Plan, CLJ Detail, Slab Detail, Closet Detail "

" AE202 14 of 45 Partition Wall Details "

" AE203 15 of 45 Partition Floor Plan, Interior Elevations (Rm #105, #106), CMU Wall Opening Detail, CMU Block-Up Detail "

" AE301 16 of 45 Size & Mounting Location of Signage, Interior Wall Mounted Signage Detail, Signage Plan, Building Identification "

" AE302 17 of 45 Door Schedule, Door Types, Door Hardware Schedule, Note "

" AE303 18 of 45 Window Schedule & Type, Note, Door Details (TYP), Door Stop and Holder Details "

" AE304 19 of 45 Interior & Exterior Finish Schedule, Material Color Schedule, Abbreviation, Note, General Notes "

" AE401 20 of 45 Toilet Partition Plan & Elevation (TYP), Toilet Partition Details (TYP), Lavatory Counter Detail (TYP), Paper Towel Despenser & Waste Receptacle Details "

" AE402 21 of 45 Ceiling Details (TYP) "

" AE403 22 of 45 EIFS Details (TYP) "

" M - 1 23 of 45 Legend and Abbreviations "

" M - 2 24 of 45 General Notes "

" M - 3 25 of 45 Equipment Schedule "

" M - 4 26 of 45 Existing / Removal HVAC & Plumbing Plan "

" M - 5 27 of 45 New HVAC Duct Plan "

" M - 6 28 of 45 New HVAC Piping Plan "

" M - 7 29 of 45 New HVAC Flow & Control Diagram "

" M - 8 30 of 45 New Domestic Water, Sewer & Vent Piping Plan "

" M - 9 31 of 45 Detail Drawings - 1 "

" M - 10 32 of 45 Detail Drawings - 2 "

" M - 11 33 of 45 Detail Drawings - 3 "

" M - 12 34 of 45 Detail Drawings - 4 "

" M - 13 35 of 45 Detail Drawings - 5 "

" E - 1 36 of 45 Legend, Notes and Scope of Works "

" E - 2 37 of 45 Lighting Plan and Lighting Fixture Schedule "

" E - 3 38 of 45 Non Standard Lighting Fixture Details "

" E - 4 39 of 45 Power Plan - Receptacle and Mech. Rm and Power Single Line Diagram "

" E - 5 40 of 45 Power Plan - HVAC and Toilet Vent. Fan Control Diagram "

" E - 6 41 of 45 Panel Schedule "MP", "LT", "P1" and Label Detail "

" E - 7 42 of 45 Fire Alarm Plan "

" E - 8 43 of 45 Fire Alarm Single Line Diagram "

" T - 1 44 of 45 Legend, Notes, Scope of Works, and Communication Plan "

" T - 2 45 of 45 Communication System Diagram "

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS TO OFFEROR

1. GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL:

a. Site Visit: Offerors who intend to propose on this solicitation are strongly encouraged to attend the site visit. See site visit Clause FAR 52.236-27. Offerors are required to have a valid Korean Identification card when attending the site visit orientation.

b. Offeror(s) are cautioned to follow the detailed instructions fully and carefully, as the Government reserves the right to make award based on initial offers received, without discussions of such offers.

c. Offeror(s) may, at the discretion of the Government, be asked to provide more information and clarification regarding their proposals. The Government may make a final determination as to whether an offer is acceptable or unacceptable solely based on the proposals as submitted, without requesting any further information. However, if it is deemed necessary the Government may, at its sole discretion, request additional information clarifying but not substantially changing any proposal as submitted. The proposal is intended to be evaluated, and award made, without discussions with the offerors unless discussions are determined to be necessary. If the Government conducts discussions, the Government shall conduct discussions with all offerors in the in accordance with FAR 15.306, Exchanges with offerors after receipt of proposals.

2. SUBMISSION DOCUMENT: Offers shall be via email to chonghyon.kwon.ln@army.mil by the due time and date specified in block 13.A. of this solicitation. All questions are due No Later than 13:00 hours (01:00 PM) Local Time, three (3) workdays after the site visit date specified in Provision FAR 52.236-27 within this solicitation.

a. PRICING PROPOSAL: The pricing proposal shall include the following:

(1) Completed Pricing Schedule: Provide a project specific schedule with the proposed project duration (in calendar days) clearly identified (from Government task order award to closeout documents approval), and with adequate detail in the schedule for the repair/construction action to communicate milestones for this project. A schedule which only states the start and end dates/period for the repair/construction action is not acceptable.

(1) Offer Breakdown: Offerors shall submit an offer breakdown that identifies Materials, Labor, and Transportation and Equipment (T&E), and other resources upon which the offeror intends to rely to perform this contract in accordance with the Statement of Work. The offer breakdown must demonstrate that the offeror understands the requirement in the RFP by listing an appropriate amount of materials, labor, and transportation and equipment required to perform the contract in accordance with the Statement of Work and drawings. The Offeror’s proposal must contain all contractor’s costs including mobilization, demobilization, overhead, profit, insurance, design fee and all other costs including but not limited to compliance with environmental laws, tax laws, protection or moving of Government property, engineering services (to include survey work and drawings) and waste disposal inherent to accomplish the work request. No allowance will be made later for any other purpose whatsoever unless specifically allowed elsewhere in the contract. Offeror shall provide one (1) original offer breakdown with price and one (1) copy of the offer breakdown without price in accordance to the provided template below:

(a) Materials:

(I) Local Materials:

(A) Type of material with item description, capacity or model number;

(B) Quantity

(II) U.S. Origin Materials:

(A) Type of material with item description, capacity or model number;

(b) Quantity Labor:

(I) Category of labor;

(II) Quantity (man-days in each category);

(c) Transportation and Equipment:

(I) Description of all transportation and equipment (category and capacity);

(II) Quantity (per trip or equipment-day);

(d) Other Critical Resource(s): Must be fully described.

(2) Section K: Offerors must complete all portions of Section K. The offeror shall review all expenses to ensure that all applicable taxes are excluded from the overall price. In addition, any proposed exemption of a specific ROK tax shall be legitimate, attributable to the contract, and authorized by the applicable stated references.

Failure to submit the above requirements may be grounds for determining the proposal to be non-responsive and not eligible to be considered for award.

(End of provision)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .