This document is an attachment providing drawings and specifications for a federal contract opportunity to repair two ammunition depot buildings, B1910 and B1911, located in Young Cheon, Korea. The scope of work includes repairing the concrete canopy, replacing the roof, gutters, downspouts, and exterior lighting; upgrading the interior of the main office and locker room areas with new flooring, walls, ceilings, doors, and lighting; and installing a new HVAC system. Site work also involves installing a new water line from an adjacent bathroom building to provide water for a purifier in the main office. The related federal contract opportunity is Solicitation Number W90VN924R0078 issued by the Department of the Army Materiel Command, Army Contracting Command, to repair the two ammunition depot buildings. A site visit is scheduled for April 19, 2024 at 10:00 AM.

View the file

Other files

File Type Posted
Solicitation W90VN924R0078-0002.pdf PDF
SolicitationW90VN924R0078-0001.pdf PDF
SolicitationW90VN924R0078.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEWR NO. : K9-00001-3J, REPAIR B1910 & 1911 (AMMO DEPOT #2).

LOCATION : YOUNG CHEON.

1/11

AMMO DEPOT #2, YOUNG

CHEON

LOCATION PLAN

NTS

13840

9840 19804880 7350

14210

B1911

B1910

Main Office

Leader’s Office

Locker room Office

“Working area #1”

“Working area #2”

General Note

SITE LAYOUT

NTS

The COR shall coordinate work performance schedule between the contractor and using agency and phase work might be required to be coordinated with using agency.

The contractor should coordinate any salvageable and recyclable materials within project limit with COR carefully to determine proper material handing methods.

FEWR NO. : K9-00001-3J, REPAIR B1910 & 1911 (AMMO DEPOT #2).

LOCATION : YOUNG CHEON.

2/11

Mech Rm

Rest Rm UNIT : mm

5. Replace 6ea windows

7. Replace wood door

Main Office Leader’s Office

1. Install the concrete pad (2’ x 4’ x 6” thk) for condensing unit of heat pump.

2. Replace the DECO tiles in main office and leader’s office.

3. Replace the gypsum wall board, metal studs/runners, wood base board and insulation in main office and leader’s office.

4. Replace the acoustical ceiling tiles, suspended ceiling system and insulation in main office and leader’s office.

5. Replace 6ea aluminum sliding windows, blinds and security bars in main office and leader’s office.

6. Replace the steel flush single door, metal frame and Lockset (F08) for main office entrance door.

7. Replace the wood hollow core single door, metal frame and lockset (F82) for leader’s office.

8. Install the caulking for doors, windows, base boards, wall, ceiling and etc in main office and leader’s office.

9. Paint the interior wall, base board, doors and etc in main office and leader’s office.

6. Replace steel door

1. New concrete pad

FLOOR PLAN FOR B1910

NTS

FEWR NO. : K9-00001-3J, REPAIR B1910 & 1911 (AMMO DEPOT #2).

LOCATION : YOUNG CHEON.

Scope of work

3/11

1. Repair existing 1ea steel pillar of concrete canopy.

2. Replace existing all soffit/fascia boards.

3. Replace existing all rain gutters and downspouts.

4. Replace existing all sheet metal flashing of roof.

5. Paint the exterior wall, canopy, fascia/soffit boards, gutters/downspouts, sheet metal flashing, window security bars and etc.

3. Rain gutter 3. Downspout 2. Fascia/soffit board

1. Canopy

4. Sheet metal flashing

Roof line

Wall line

14920

FEWR NO. : K9-00001-3J, REPAIR B1910 & 1911 (AMMO DEPOT #2).

LOCATION : YOUNG CHEON.

Scope of work

ROOF PLAN FOR B1910

NTS 4/11

1. Replace existing ceiling lights with new 3ea LED lighting fixtures (2’ x 4’), recessed type, power line and switch in main office.

2. Replace 2'x4' LED lighting fixture with new, recessed type with EM battery pack and power line in main office.

3. Install a LED lighting fixture (1’ x 4’) with EM battery pack, recessed type and power line in leader’s office.

4. Replace a LED lighting fixture (1’ x 4’), recessed type, power line and switch in leader’s office.

5. Install 1ea EXIT lights with power line at above the main entrance door.

6. Replace a LED exterior lighting fixture and switch with power line and switch.

1. Replace lighting fixtures

5. Install EXIT light

6. Replace exterior lighting fixture

Main Office Leader’s Office

Existing Panel board (P/N) s s s

3. Install the lighting fixture

4. Replace lighting fixtures

LEGEND

: PANEL BOARD (P/N)

: ELECTRIC WIRES (3-#12 IN ½”c)

: 1’ X 4’ LED LIGHTING FIXTURE WITH EM battery pack (Recessed type)

: 2’ X 4’ LED LIGHTING FIXTURE WITH EM battery pack (Recessed type)

S : TOGGLE SWITCH 15A

EXIT

2. Replace lighting fixtures

FEWR NO. : K9-00001-3J, REPAIR B1910 & 1911 (AMMO DEPOT #2).

LOCATION : YOUNG CHEON.

Scope of work

ENLARGED LIGHTING PLAN FOR B1910

NTS 5/11

: 2’ X 4’ LED LIGHTING FIXTURE (Recessed type)

: LED EXTERIOR LIGHTING FIXTURE

: 1’ X 4’ LED LIGHTING FIXTURE (Recessed type)

EXIT : EXIT light

1. Remove existing safety switch (S/S) with power line in main office.

2. Install the safety switch (S/S) 3P-30A with power line in main office

3. Replace 6ea outlets (110V) and power line in main office and leader’s office.

4. Replace 3ea outlets (220V) and power line in main office and leader’s office.

5. Install 2ea new outlets (220V) with power line in main office.

6. Install 4ea electric conduits (3/4”DIA), 4ea Jacks (2 port, CAT6 RJ-45 ) and 4ea LAN cables (The LAN cable is provided by the user).

7. Replace the heat pump unit 23 Pyong (Condensing unit and indoor unit).

2. Safety switch 3P-30A

Existing panel board (P/N)

7. Condensing unit

4. New outlet

Main Office Leader’s Office

7. Indoor unit

4ea LAN Cables

3-#12 in ½”C

4. New outlet

3. Replace 6ea outlets (110V)

3. Replace 3ea outlets (220V)

6. Install LAN cable

1. Remove existing S/S

FEWR NO. : K9-00001-3J, REPAIR B1910 & 1911 (AMMO DEPOT #2).

LOCATION : YOUNG CHEON.

LEGEND

: NEW LAN/TELEPHONE OUTLET

: RECEPTACLE, DUPLEX, 2P-3W-110V-20A, GRD’G TYPE

: NEW RECEPTACLE, DUPLEX, 2P-3W-220V-20A, GRD’G TYPE

: SAFETY SWITCH 3P-30A, FUSIBLE TYPE, NEMA 3R

: EXISTING RECEPTACLE, DUPLEX, 2P-3W-220V-20A, GRD’G TYPE

Scope of work

POWER AND HEAT PUMP PLAN FOR B1910

NTS 6/11

: PANEL BOARD (P/N)

: ELECTRIC WIRES (3-#12 IN ½”c)

1. Install 2ea concrete pads (2’ x 4’ x 6” thk) for condensing units of heat pump.

2. Remove existing raised (500mm high) wood/concrete floor, wall board, metal studs/runners, insulation, base boards and ceiling system in locker room.

3. Remove existing floor tiles, wall board, metal studs/runners, insulation, base boards and ceiling system in main office.

4. Install 100 mm thk. concrete floor slab with 2-ply wire mesh (WWF #8-150 x 150) at locker room and main office.

5. Install the DECO tiles in locker room and main office.

6. Install the gypsum board wall, metal studs/runners, wood base board and insulation (100mm thk) in locker room and main office.

7. Install the acoustical ceiling tile system (Height from floor- to- ceiling : 8 FT) in locker room and main office.

8. Repair existing 200mm thk insulation on the ceiling in locker room and main office.

9. Replace 7ea aluminum sliding windows, blinds and security bars in locker room and main office.

10. Replace the steel flush single door and steel frame, lockset (F08), hinges, door closer, kick plate, door stopper with hook, alum. threshold and weather strip at main office entrance door.

11. Replace the wood hollow core single door and steel frame, bored type lockset (F82), hinges, door holder, kick plate, aluminum threshold and door closer at locker room entrance door.

12. Install the caulking for doors, windows, base board, ceiling, wall and etc in locker room and main office.

13. Paint the interior wall, base boards, doors and etc in locker room and main office.

Main office Locker room

1. New concrete pad 1. New concrete pad

9. Replace 7ea windows

11. Replace wood door

10. Replace steel door

FEWR NO. : K9-00001-3J, REPAIR B1910 & 1911 (AMMO DEPOT #2).

LOCATION : YOUNG CHEON.

FLOOR PLAN FOR B1911

NTS

Scope of work

7/11

1. Replace existing all fascia/soffit boards.

2. Replace existing all rain gutters and downspouts.

3. Replace existing all sheet metal flashing at roof.

4. Replace asphalt shingle roof canopy above main entrance door.

5. Paint the exterior wall, fascia/soffit boards, canopy, window security bars and etc.

2. Rain gutter2. Downspout 1. Fascia/soffit board

4. Canopy

Roof line

3. Sheet metal flashing

Wall line

14740

FEWR NO. : K9-00001-3J, REPAIR B1910 & 1911 (AMMO DEPOT #2).

LOCATION : YOUNG CHEON.

8/11

Scope of work

ROOF PLAN FOR B1911

1. Replace 3ea LED lighting fixtures (1’ x 4’), recessed type, power line and switch in locker room.

2. Replace 1ea LED lighting fixtures (1’ x 4’), EM battery pack, recessed type, and power line in locker room.

3. Replace 6ea LED lighting fixtures (1’ x 4’), recessed type, power line and switch in main office.

4. Replace 4ea LED lighting fixtures (1’ x 4’), EM battery pack, recessed type, and power line in main office.

5. Replace a LED exterior lighting fixture, power line and switch at above the main entrance door.

6. Install 2ea EXIT lights with power line (3-#12”in ½”C) at above the main entrance door and locker room door.

LEGEND

: PANEL BOARD (P/N)

: ELECTRIC WIRES (3-#12 IN ½”c)

: 1’ X 4’ LED LIGHTING FIXTURE (Recessed type) : 1’ X 4’ LED LIGHTING FIXTURE, EM BATTERY PACK TYPE (Recessed type)

S : TOGGLE SWITCH 15A

Main office Locker room

S

S

3. Replace exterior lighting fixture 4. Install EXIT light

S

Existing P/N

EXIT

EX

IT

FEWR NO. : K9-00001-3J, REPAIR B1910 & 1911 (AMMO DEPOT #2).

LOCATION : YOUNG CHEON.

9/11

Scope of work

LIGHTING PLAN FOR B1911

: LED EXTERIOR LIGHTING FIXTURE

Main office Locker room

1. Extend the power line (3-#12 in ½”C) from existing outlet (220V) to new safety switch for heat pump in locker room.

2. Install an outlet (220V) with power line for water purifier in Main office.

3. Install 2ea safety switch 3P-30A with power line (3-#10 in ½”C) in locker room and main office.

4. Install 8ea electric conduits (3/4” Dia) with 8ea LAN outlets (Dual modular type, CAT6 RJ-45 W/wall plate 2 port) and LAN cables (The LAN cable is provided by the user) in main office.

5. Replace 11ea outlets (110V), 3ea outlets (220V) and power line in main office to locker room

6. Relocate the existing heat pump unit located in main office to locker room.

7. Install a new heat pump unit in main office.

2. 3-#12 in ½”C

2. Outlet (220V)

Safety switch 5, 6. Condensing unit

5. Indoor unit

5. Condensing unit

3. Safety switch

Concrete foundation (2’ x 4’ x 6” thk) Conc. foundation (2’x4’x6”thk)

6. Indoor unit

Existing P/N

1. 3-#10 in ½:”C

4. Install 8ea LAN cables

POWER PLAN FOR B1911

FEWR NO. : K9-00001-3J, REPAIR B1910 & 1911 (AMMO DEPOT #2).

LOCATION : YOUNG CHEON.

NTS

10/11

Scope of work

LEGEND

: NEW LAN/TELEPHONE OUTLET

: RECEPTACLE, DUPLEX, 2P-3W-110V-20A, GRD’G TYPE

: NEW RECEPTACLE, DUPLEX, 2P-3W-220V-20A, GRD’G TYPE

: NEW SAFETY SWITCH 3P-30A, FUSIBLE TYPE, NEMA 3R

: PANEL BOARD (P/N)

: EXISTING RECEPTACLE, DUPLEX, 2P-3W-220V-20A, GRD’G TYPE

: ELECTRIC WIRES (3-#12 IN ½”c)

POWER AND HEAT PUMP PLAN FOR B1911

B1913

(BATHROOM)

Existing water meter

16mm new water pipe

1. Replace the existing concrete pavement (900mm W x 285mm thk) from near B1913 to B1911 to install the water line.

2. Excavate and backfill a trench (900mm wide x 1000mm deep) from near B1913 to B1911.

3. Install 19 LM 16mm dia. stainless steel water pipe with 50mm thk pipe insulation from near B1913 from B1911 for water purifier at B1911.

4. Install the concrete encasement (420mm W x 420mm H) from near B1913 from B1911 for 16mm water pipe.

B1912 B1910

B1911 Existing water purifier

11/11

FEWR NO. : K9-00001-3J, REPAIR B1910 & 1911 (AMMO DEPOT #2).

LOCATION : YOUNG CHEON.

Scope of work

PLUMBING PLAN

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9
Slide Number 10
Slide Number 11

File details come from the government source that posted it. Updated .