SEE ADDENDUM
(No Collect Calls)
W90VN923R0072 15-Jun-2023
b. TELEPHONE NUMBER
315-763-5685
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 17 Jul 2023
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W90VN99. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MR. HONG, YUN PYO
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SJ06053067TTPR
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO DAEGU, UNIT #15682
APO AP 96218-5682
UNITED STATES
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE SJ0605 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
DEFENSE LOGISTICS AGENCY ENERGY-KOREA
PAK, SON YONG
UNIT #15015
APO AP 96218-5015
UNITED STATES
TEL: 315-743-1019 FAX: 764-0331
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$30,000,000
NAICS:
484230
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF80
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W90VN923R0072
Section SF 1449 - CONTINUATION SHEET
PWS
PERFORMANCE WORK STATEMENT
TANK TRUCK BULK PETROLEUM DELIVERY SERVICE, USFK WIDE
1. GENERAL: This is a services contract to provide bulk petroleum distribution by tank truck vehicles throughout the South Korean peninsula. The Government will not exercise any supervision or control over the contract service providers performing the services herein. The prime contractor shall ensure the subcontractor meets all contractual requirements.
1.1. Description of Services/Introduction: This Performance Work Statement (PWS) is the Government’s requirement for tank truck transportation of Defense Logistics Agency (DLA) Energy owned fuel products, specifically aviation turbine, diesel fuel and gasoline fuel within the South Korean peninsula. The Contractor shall provide fuel delivery services as described below and shall be responsible for and furnish, as required, all personnel, equipment, material, and/or facilities necessary for providing these services. No Government equipment or facilities will be provided to the Contractor who shall be completely responsible, at its expense, for operation and maintenance of assets utilized to meet the contractual performance requirements identified herein.
1.2. Background: Tank Truck Distribution of bulk petroleum has been a mission of DLA Energy for many years.
This transportation service requires commercial transportation companies to deliver and recover fuel at any location designated by Contract Line Item Number (CLIN) on the South Korean peninsula.
1.3. Objectives: Contract to be awarded is for the purpose of tank truck fuel distribution throughout the South
Korean peninsula. This will provide a means for transportation of U.S Government owned fuel and subsequent distribution in the Republic of Korea from one point to another based on an estimated delivery schedule as listed in the applicable Contract Line Item Number (CLIN).
1.4. Scope: The contractor shall furnish all labor, equipment, and vehicles necessary for transporting and handling of U.S Government-owned petroleum fuel products to various Korea-wide area locations in accordance with contract terms and conditions, applicable Republic of Korea (ROK) laws, regulations, and applicable U.S laws, rules, regulations, policy, and procedure. DLA Energy Korea will place delivery orders through the 411th
Contracting Support Brigade, Korea.
1.5. Quality Control (QC) & Safety Plan: The contractor shall perform all services in a safe, prudent, and professional manner, accepting full and sole responsibility for the prompt and proper delivery of services. The contractor shall develop a Quality Control & Safety Plan acceptable to the Government for monitoring overall contract performance. The plan shall follow established commercial quality control standards recognized by the transportation industry. It is the contractor’s responsibility to protect U.S. Government fuel and equipment from any damage resulting in off-specification status, contamination, or loss. Tank Trucks must be maintained, kept clean and mechanically safe for operation, and safe to guarantee no contamination to U.S. Government fuels. In the case of off-specification product, contamination, or loss due to negligence the contractor shall reimburse the U.S.
Government. The plan shall include procedures for the following operations: Subcontractor Management Plan, Truck Maintenance/Inspection, Loading/ Offloading, Spill/ Emergency, Product Log Sheet, Training, Requested
Reports and Corrective action. The contractor shall submit the finalized QC & Safety Plan to the KO and COR for review and acceptance within ten (10) working days after the contract is awarded. Additionally, changes to the QC
& Safety plan shall be submitted to the KO and COR within five (5) working days when changes are made thereafter.
1.5.1. The contractor shall keep records of inspections and make them available to the Government throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract. The contractor shall collect data, perform self-evaluation, and document performance against standards associated with each specific requirement.
1.5.2. Safety Program: The contractor shall ensure that safety precautions are taken during the performance of this contract to protect the lives of contractor personnel, the property of the U.S. Government, the Republic of Korea, as well as the private individuals and firms who may be exposed to or endangered by the contractor’s actions to maintain minimal accidents/incident, zero loss of life and minimal damage to property. Safety is the highest priority entrusted to the contractor under this contract. The contractor shall perform all services in a safe, prudent, and professional manner accepting full and sole responsibility for the prompt and proper delivery of services. Upon
Government request, the Contractor shall provide a copy of its written safety plan and policies for inspection and acceptance. The contractor shall provide a written safety plan with policies, procedures, and safety checklist within
10 working days after contract award. The program shall comply with the Korean Occupational Safety and Health
Act (KOSHA). The Contractor agrees to comply with its written program for the life of the contract. Any changes or modification to its safety program will be coordinated and reviewed by the COR, or his/her duly authorized representative.
1.5.2.1. Risk Management Process. The safety plan shall include detailed job-related hazards and controls for each work activity. The plan shall include an Activity Hazard Analysis (AHA) for each work activity. The AHA shall include at a minimum the name of the activity/job, the job steps, the job hazards, the tools/equipment required to perform the job, control measures to eliminate or reduce the hazard(s), and a Risk Assessment Code (Risk
Assessment Code is an assessment of the probability of the hazard occurring and its potential impact). The contractor shall assure that the safety control measures are implemented. The contractor may use the sample AHA forms in http://www.usace.army.mil/SafetyandOccupationalHealth/ActivityHazardAnalysis.aspx or develop their own.
1.5.2.2. Accident investigations, reports, and logs: The safety plan shall include a copy of the contractor’s accident investigation reporting format, and logs. Report all accidents as soon as possible but not more than 4 hours of accident occurrence to the Contracting Officer/Representative (KO/COR). The contractor shall thoroughly investigate the accident and submit the findings of the investigation along with appropriate corrective actions to the
KO/COR in the accident investigation reporting format as soon as possible but no later than five (5) working days following the accident. Implement corrective actions as soon as reasonably possible. The accident investigation reporting format shall include at a minimum:
(1) Contract number and contract name/description.
(2) Name of contractor
(3) Date/time of accident
(4) Date report was completed
(5) Detail description of events that lead to the accident
(6) Root cause of accident
(7) Contributing factors
(8) Corrective action(s) to prevent recurrence
1.5.2.3. The following require immediate accident notification and written accident report:
(1) A fatality;
(2) A permanent total or permanent partial disability;
(3) The hospitalization of three or more people resulting from a single occurrence;
(4) Property damage of $200 or more.
1.6. Quality Assurance: The government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the
Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s) per month.
1.7. Contracting Officer Representative (COR): The (COR) will be appointed by separate letter by the contracting officer. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the contractor concerning technical aspects of the contract, notify both the Contracting Officer http://www.usace.army.mil/SafetyandOccupationalHealth/ActivityHazardAnalysis.aspx and contractor of any deficiencies, coordinate availability of government furnished property, and provide site entry of contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.8. Key Personnel: The following personnel are considered key personnel by the government: Commander, Deputy Commander, Logistics Division Chief at DLA Energy Korea and the COR for the contract. The contractor shall provide the names of Contract Manager (CM) and QC manager who shall be responsible for the performance of the service. The CM, QC manager and alternates names who will act on behalf of the contractor shall be designated in writing to the contracting officer. The CM and QC manager shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM and QC manager shall be available between 8:00 a.m. to 17:00 p.m. Monday thru Friday except Korean Holidays.
1.9. Environmental Protection and Regulatory Requirements:
1.9.1. The contractor shall ensure that all existing U.S Federal and ROK local environmental laws and regulations including the Environmental Governing Standards in USFK Reg. 201-1, Korean Environmental Governing
Standards, are strictly complied with. The contractor shall ensure all appropriate environmental permits have been obtained and made available to the government for inspection upon request.
1.9.2. Notification of Environmental Spills. The contractor shall report any petroleum spills or leaks while in the execution of this contract immediately to the KO and the COR. If the contractor spills or releases any substance contained in 40 CFR 302 into the environment, the contractor shall immediately report the incident to the COR. The liability for the spill or release of such substances rests solely with the contractor. If the spill is on U.S Government
Property, the U.S. Government representative will notify spill response teams and follow the applicable policies and procedures. Direct coordination with the contractor and DLA Logistics Division is required within two (2) hours of the spill on incident.
1.9.3. Include a clause in all subcontracts to require subcontractors to comply with the safety provisions of this contract as applicable.
1.10. Clearance, Licensing and Insurance: All contractor personnel shall obtain base entry passes for issuing fuel to
U.S Military Installations. The contractor shall ensure all contractor operated vehicles and tank trucks are insured with a ROK accredited insurance company and shall submit proof of insurance upon Gov’t request.
1.11. Contractor’s Qualification Requirement:
1.11.1. Special Expertise. The prime contractor shall have a minimum of three (3) years experience of Tank Truck bulk fuel delivery services to U.S. military bases, ROK military bases or local commercial market. The experience of a subcontractor cannot be substituted for the prime contractor’s experience.
1.11.2. The prime contractor shall provide the following documents to be qualified to perform the Tank Truck bulk fuel delivery services as follows:
(a) Cargo Vehicle Transportation Business Permission Certificate (화물자동차운송사업허가증)
(b) Cargo Vehicle Transportation Forwarder Business Permission Certificate (화물 자동차 운송주선사업
허가증)
(c) Moving Tank Storage Completion Inspection Certificate (이동탱크저장소 완공검사필증)
(d) Vehicle ownership by presenting the vehicle registration (자동차등록원부)
(e) Vehicle ownership by presenting the vehicle registration (자동차등록원부)
(f) Employment Certificate of Contract Manager and Quality Control Manager (계약 관리자와 품질 관리
책임자의 재직증명서)
1.11.3. The contractor shall not use subcontractors without prior written coordination with the KO. The contractor shall ensure that the subcontractors meet the standards required by this contract to perform the service. The prime contractor is responsible for the performance of the subcontractors.
Note: DLA Energy Korea WILL NOT work directly with the subcontractors. The contractor must demonstrate a legal binding relationship with any entity subcontracted to perform under this contract. The contractor is required to submit the Sub-Contract Agreement.
1.11.4. Mandatory Qualification Requirement Prior to The First Delivery: The contractor shall submit the four digits of Standard Carrier Alpha Codes (SCAC) and a Truck Gallon Meter Calibration Sheet or Certificate (트럭
갤런 미터기 교정성적서 또는 교정증명서) prior to the first delivery. The SCAC code is assigned by National
Motor Freight Traffic Association (NMFTA). U.S. government agencies require carriers and transportation companies to apply for and renew their SCAC codes annually. The SCAC will be used as a carrier code when the fuel transactions are processed in DLA Energy Korea Fuel Automated System.
1.11.5. Personnel Qualification: The contractor shall provide a Contract Manager (CM), a Quality Control Manager
(QC Manager) and qualified drivers(s) for the performance of services required under this contract. Personnel working on this contract shall be fluent in the English language as exemplified in their written and verbal skills.
Government will assess language skills of all Contract employees who are required by terms of this PWS to be proficient at speaking English through performance of services. If the Government, at its sole discretion, determines that the language skills of a contractor employee does not meet the language proficiency skills required of the position, the Government reserves the right to require the Contractor to provide a new Contract employee that does possess the required language proficiency skills required of the position, at no additional cost to the Government.
Resumés for each individual shall clearly identify type of experience, length of work experience, employer and any other relevant information that demonstrates experience required in this solicitation as listed below:
(a) Contract Manager (CM) and Quality Control Manager (QC Manager): The contractor shall appoint a
CM and QC manager who shall be responsible for all services performed under this contract. The CM shall conduct overall management coordination and the QC manager shall be the central point of contact for all related parties
(U.S. military, ROK military, and other contractors including subcontractors) for performance of all work under this contract. The CM or QC manager shall be available at all times during the work week to discuss with the KO or
COR matters regarding emergencies, severe weather notification, or other similar, urgent, or non-routine matters, e.g. traffic accidents. The CM or QC manager shall be immediately available to go to the scene of a major accident or other emergency. The CM and QC manager shall be individuals who are capable of conversing in and comprehending English.
(b) Cargo Truck Transportation Driver(s): The cargo truck transportation drivers shall have the following certificate and license, the contractor shall submit the following documents:
(i) Cargo Truck Transportation Engagement Qualification Certificate(s) (화물운송종사 자격증)
(ii) Hazardous Material Transportation Driver License(s) (위험물 운송자 자격증)
1.11.6. Safety is the highest priority entrusted to the contractor under this contract. The Contractor shall perform all services in a safe, prudent and professional manner accepting full and sole responsibility for the prompt and proper delivery of services. Upon Government request, the Contractor shall provide a copy of its written safety plan and policies for inspection and acceptance.
1.11.7. The contractor shall have and maintain through the complete performance period(s) of the awarded contract, all licensing and certification(s) required by local and Korean Law for the types of services for which the contract will be awarded.
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor having a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide advice to the contractor as long as that advice is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the
Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-physical things such as meeting minutes.
2.1.6. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.7. QUALITY ASSURANCE (QA). The government procedures to verify that services being performed by the contractor are performed according to acceptable standards annotated on the contract.
2.1.8. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.9. QUALITY CONTROL (QC). All necessary measures taken by the contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.10. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privities of contract with the subcontractor.
2.1.11. WORK HOURS. The number of hours per day the contractor provides services in accordance with the contract.
2.1.12. WORK WEEK. Is defined as Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACM Alternate Contract Manager
ACOR Alternate Contracting Officer Representative
CFR Code of Federal Regulations
CLIN Contract Line Item Number
CM Contract Manager
COR Contracting Officer Representative
DA Department of the Army
DD 1149 Department of Defense Form 1149 (Requisition and Invoice/Shipping Document)
DD1348-7 Department of Defense Form 1348-7 (DOD MILSPETS DFSP Shipment and Receipt Document)
DFARS Defense Federal Acquisition Regulation Supplement
DFSP Defense Fuel Support Point
DLA Defense Logistics Agency
DOD Department of Defense
FAR Federal Acquisition Regulation
FPCON Force Protection Condition
KO Contracting Officer
MILSPETS Military Standard Petroleum System
OCONUS Outside Continental United States (includes Alaska and Hawaii)
OT/RQ On Time/ Right Quantity
POC Point of Contact
PRS Performance Requirements Summary
PWS Performance Work Statement
QAR Quality Assurance Representative
QASP Quality Assurance Surveillance Plan
QC Quality Control
SCAC Standard Carrier Alpha Code
TT Tank Truck
USFK United States Forces Korea
WAWF Wide Area Work Flow
3. GOVERNMENT FURNISHED ITEMS: The U.S Government will provide seals to secure open inlet and outlet compartments for tank trucks hauling fuel off the installation to another installation or at fuel pick up locations as required by DLA Energy Korea. DD Form 1149 and DD Form 1348-7 (See Para 7.4, 7.5 Attachment 2 and 3) will also be provided by the U.S Government.
4. SPECIFIC TASKS:
4.1. The contractor shall provide fuel tank trucks, all manpower, supervision, equipment, tools and supplies to perform the U.S. Government owned bulk fuel delivery services to designated permanent and temporary U.S.
storage tanks, tank bags or refueling trucks positioned at the destinations on the South Korean peninsula listed in the
CLIN schedule, except Government Furnished Items. It is anticipated a certain number of trucks will be loaded daily at each Defense Fuel Support Points (DFSP) and after loading, sent straight to the receiving activity. The prime contractor must ensure the availability of trucks, sufficient to meet the daily load requirement, including a replacement truck if needed.
4.2. The contractor shall deliver bulk fuel to the designated delivery place(s) and date(s) according to the delivery schedule. The scheduler at DLA Energy Korea will schedule the deliveries by contacting the QC manager by e-mail or telephone and will provide the delivery schedule in writing to the CM and QC manager with the customer’s name & telephone number, type of product(s), quantities, delivery date(s) and delivery location(s) at 16:00 every working day (NLT sixteen (16) hours prior to the performance). The contractor shall successfully integrate and coordinate all related parties needed to execute the required deliveries. The contractor shall be responsible for the receipt of the confirmed schedule. The tank trucks shall be designed to transport bulk liquid fuels between 1,000 gallons and 8,600 gallons per truck, shall be marked for the product on board (e.g. Gasoline, Diesel or Jet Fuel), and shall be ROK safety certified. Recurring delivery amounts shipped may vary from any designated point to another throughout the contract period. Amounts shipped can be for removal or delivery of U.S Government fuel products in
South Korean peninsula. (See Para 7.3. Attachment #1)
4.2.1. Sale – The Sale is a Defense Working Capital Fund (DWCF) fuel transfer from one DLA Energy Defense
Fuel Support Point (DFSP) to an end user/customer. Accounting delivery relative to sale shall be documented (DD
Form 1149). The contractor should provide 100% on-time/right truck QTY (OT/RQ) delivery services with a truck gallon meter for exercise support.
4.2.2. Shipment – The Shipment is a DWCF fuel transfer from one DLA Energy DFSP to another DLA Energy
DFSP. Accounting delivery relative to shipment shall be documented (DD Form 1348-7).
4.2.3. Surge Support – The Surge support will be required for unserviceability of existing commercial pipeline, American Petroleum Institute (API) 653 tank cleaning projects, alternate receiving capability test, and unexpected malfunction of DFSP’s facility etc. The contractor shall ensure on-time pickup and delivery of U.S Government owned bulk fuel on the scheduled date between 0800 to 1600 hours. The contractor shall provide an adequate number of tank trucks to support surge requirements. The estimated delivery amounts can range from zero to
2,500,000 gallons per year. Delivery quantities and locations may vary throughout the contract period.
4.3. The contractor shall transport bulk fuel in cases of emergency during non-duty hours (besides normal working hours; nighttime, weekends or ROK holidays) within six (6) hours notification of the emergency requirements from the COR. The contractor is hereby notified that there is a potential impact on contractor performance during increased FORCE Protection Condition (FPCON). During FPCON Delta, services may be discontinued / postponed due to higher threat. Services will resume when FPCON level is reduced to level Charlie or lower.
4.4. The contractor shall remove tank bottom product from DFSP tanks as required. An additional charge may be applied to any tank bottom removal which takes more than two (2) hours.
4.5. The contractor shall provide the required tank truck assets to successfully perform the contractual requirements identified herein. The trucks will be initially inspected and accepted by DLA Energy Korea Quality Assurance
Representatives (QARs) prior to use under the contract, using tank truck inspection checklist. After tank truck cleaning, the contractor shall provide the cleaning certificate which states how the truck was cleaned and the assets must be re-inspected, prior to further use. (See Para 4.7. and Para 7.7. Attachment #5)
4.6. The contractor shall provide tank truck cleaning service to remove sludge, solids, and contaminants from tank bottoms for deliveries and have the capability to store various types of petroleum products in accordance with the latest revised MIL-STD-3004-1A TABLE XXIII, (Product Conversion Chart) for deliveries and have the capability to store various (different) types of petroleum products. The contractor shall contact DLA Energy Korea QARs for additional cleaning instructions. (See Para 7.6. Attachment #4)
4.7. Prior to the loading of bulk fuel, a joint inspection shall be conducted to determine that the conveyance is clean, dry, and suitable to load required product to prevent any fuel damage or loss. Representatives of the consignee and the contractor shall conduct this inspection. Any truck not suitable to load product will be rejected and turned away.
Rejected trucks will not be used until inspected and approved by DLA Energy QARs.
4.8. If for any reason the Bulk Fuel sale or shipment cannot be delivered as required, the contractor shall immediately contact the COR (the same business day).
4.9. If make-up service cannot be accomplished within the same business day, the contractor shall submit a revised schedule to COR for acceptance. Rescheduling to provide make-up service shall not be a basis for permission to alter other regularly scheduled services.
4.10. The contractor shall be responsible for the loading and unloading of the bulk fuel at the pick-up and delivery destinations. The contractor shall take all necessary safety precautions to safely load and off load bulk fuel. The contractor shall provide tank trucks equipped with safety grounding cables and clamp connectors (aluminum clips) to minimize static electricity while loading and offloading bulk fuel. Seal rings and attachment points must be welded or permanently installed to preclude the possibility of disengaging the seal from the sealing points without breaking the seal. The contractor shall ensure all compartments and possible access points are sealed prior to departure from the loading DFSP and remain sealed until removed by U.S. Government representatives at the delivery destination.
4.11. The contractor shall verify that the loading quantity, truck numbers and seal serial numbers are correctly annotated on all issue documents (DD Form 1149 & DD Form 1348-7). When the contractor delivers bulk fuel, the contractor shall transport all issue documents and loading rack metered tickets (if provided) from the loading DFSP to the delivery destinations. The completed issue documents (DD Form 1149 & DD Form 1348-7 with three signatures – Issuer, Deliverer & Receiver) shall be used for payments.
4.12. Upon arrival at the destination, the contractor shall report to the consignee to inform them of the sale or shipment arrival. The consignee will inform the contractor where the truck(s) should be placed for inspection and off-loading and provide specific receiving instructions.
4.13. If the contractor’s loaded vehicle arrives at a destination and is unable to reach the designated discharge point within the installation, the contractor shall discharge the freight at an alternate discharge point within the installation, as designated by the consignee. In such instances, the contractor shall be paid the same amount as if the delivery had been made.
4.14. If for reasons not attributable to the contractor, the loaded vehicle is rejected (or returned) wholly or in part by consignee at the time of tender of delivery at destination, the undelivered amount of fuel returned by the consignee should be returned to the point of origin or other destination upon direction of the DLA Energy Korea transportation team. In such instances, the contractor shall be paid the same amount as if the delivery had been made and the actual amount of product returned. If the quantity transported is less than the minimum gallons stated, the minimum
1,000 gallons shall apply to payment. (See Para 4.2)
4.15. The contractor shall provide their employee proper training to perform assigned tasks under this PWS. If necessary, the training records will be requested by the COR. Acceptable records shall include a copy of the training material, photos with a date stamp, and a list of attendees.
4.16. The contractor shall use the Wide Area WorkFlow (WAWF) instruction for invoicing purposes. Each invoice should contain copies of all completed issue documents.
4.17. When the contractor is requested by the COR to provide a Truck Maintenance Report, Product Log Sheet, and reports for all services performed, the contractor shall furnish the report to the COR within two (2) working days.
The report shall include identifying information, general observations and conclusions or recommended actions, and any additional information in English and Korean. The report format will be approved by the COR.
4.18. The contractor shall ensure each driver/employee has a USFK Base ID card and permissioned Entry
Authorization List (EAL) for all bases/installations where they will pick-up or deliver bulk fuel. The COR will assist the contractor in obtaining theses USFK ID cards, USFK Vehicle Registration Decal and EAL during Phase-
In.
The prime contractor shall be responsible for all passes issued to his/her own or subcontractor’s employees under this contract. If a contractor USFK ID card or USFK Vehicle Registration Decal is lost, stolen, or destroyed, the contractor shall immediately report to the COR and the local U.S. military law enforcement desk. The contractor shall return all applicable passes to the USFK Pass Section, upon termination of employment or completion of this contract.
4.19. When corrective actions are not being implemented IAW the accepted corrective action plan, the contractor will be notified in writing and requested to submit a revised corrective action plan within two (2) working days. If the contractor fails to respond within two (2) working days or the resubmitted response is still found to be insufficient, the COR should elevate an additional corrective action request to the KO.
5. PERFORMANCE REQUIREMENTS SUMMARY
PERFORMANCE
OBJECTIVE
PERFORMANCE
STANDARD
PERFORMANCE
THRESHOLD
METHOD OF
SURVEILANCE
CORRECTIVE
ACTION
(1) Delivery of
Bulk Fuel by
Tank Truck, Ref PWS, Para 4.2, 4.8
& 4.9.
On-time/right truck QTY
(OT/RQ) delivery place(s) and date(s) according to the delivery schedule from the
DLA Energy Korea
Transportation Team.
96% of actual delivery per month
100% Provide same day notification with corrective action plan.
(2) Exercise
Support, Ref, PWS, Para
4.2.1
The contractor should provide On-time/right truck
QTY (OT/RQ) delivery place(s) and date(s) according to the delivery schedule from the DLA
Energy Korea Transportation
Team with a truck gallon meter.
100% of actual delivery per month
100% Provide same day notification with corrective action plan.
(3) Emergency fuel delivery, Ref, PWS, Para 4.3.
On-time/right truck QTY
(OT/RQ) within 6 hours of notification of emergency delivery during Non-duty hours.
100% of actual delivery per month
100% Provide same day notification with corrective action plan.
(4) Tank Bottom
Removal, Ref, PWS Para 4.4.
Contractor shall remove tank bottom product, using the truck suction pump if necessary, from DFSP tanks as required. An additional charge shall be applied to any tank bottom removal which takes more than two (2) hours.
100% of Tank
Bottom Removal
100% Provide same day notification with corrective action plan.
(5) Tank Truck
Inspection, Ref, PWS
Para 4.5, 4.7
& 4.10.
Contractor’s trucks will be inspected and accepted by
DLA Energy Korea Quality
Assurance Representatives
(QARs).
1. Initially, prior to use under the contract.
2. After tank truck cleaning.
3. If conveyance is rejected by loading DFSP.
100% of TT inspection
100% Re-accomplished to meet DLA
Standard.
(6) Tank Truck
Cleaning, Ref, PWS Para 4.6.
In accordance with the latest revised MIL-STD-3004-1A
TABLE XXIII (Product
Conversion Chart)
100% of TTs
Cleaned
100% Re-accomplished to meet DLA
Standard.
(7) Unexpected situation at the destination, Ref, PWS
Para 4.12,
4.13 & 4.14.
Contractor should follow the consignee’s specific receiving instructions and if for reasons not attributable to the contractor, the loaded vehicle is rejected (or returned) wholly or in part by consignee at the time of tender of delivery at destination, the undelivered amount of fuel returned by the consignee should be returned to the point of origin or other destination upon direction of the DLA Energy
Korea transportation team.
100% of actual delivery per month
100% Provide immediate notification and resolve the situation according to the direction of the
DLA Energy
Korea transportation team within 24 hours.
(8) Contractor’s
Training, Ref, PWS Para
4.15.
Contractor shall provide their employee proper training to perform assigned tasks under this PWS. If necessary, the training records will be requested by the COR.
98% of contractor’s
Quality Control
Plan
100% Re-accomplished to meet contractor’s QCP
(9) Truck
Maintenance
Report, Product Log
Sheet, and
Reports for all services performed, Ref, PWS
Para 4.17.
Contractor shall furnish the report to the COR within two
(2) working days.
98% of contractor’s
Quality Control
Plan
100% Re-accomplished to meet contractor’s QCP
6. TECHNICAL EXHIBITs/ ATTACHMENT LISTs:
6.1. Technical Exhibit 1 – Data Deliverables Schedule
DELIVERABLE FREQUENCY ACCEPTABLE
QUALITY
LEVEL
# OF COPIES
& MEDIUM/
FORMAT
SUBMIT TO REMEDY OF
FAILURE
(1) Issue documents
& Loading Rack
Metered Tickets, PWS Para 4.11.
Per Delivery 2 defects per month
One (1) hard copy for the receiving destination.
Each DFSP Fuel
Operators or
Authorized Unit
Representatives
Re-submit documents with corrections within the same working day.
(2) Completed Issue documents with
Invoice, PWS
Para 4.11. &
4.16.
Per Month 2 defects per submission
One (1) electric copy
Copy shall be attached to invoice in
WAWF
Re-submit documents with corrections within two (2) working days.
(3) Truck
Maintenance
Report, Product
Log Sheet, and
Reports for all services performed, PWS
Para 4.17.
Per requested, within two (2) working days.
2 defects per submission
One (1) electric copy
Copy to COR Re-submit report with corrections within one (1) working days.
(4) Status Report of
USFK Base ID card and permissioned
EAL for all bases/installatio ns, PWS Para
4.18.
Per requested, within two (2) working days.
2 defects per submission
One (1) electric copy
Copy to COR Re-submit report with corrections/ corrective action plan within two (2) working days.
(5) Standard Carrier
Alpha Codes
(SCAC), PWS
Para 1.11.4.
One time, prior to the first delivery.
0 defects per submission
One (1) electric copy of screenshot
Copy to COR Not Allowed
(6) Truck Gallon
Meter
Calibration
Sheet or
Certificate, PWS
Para 1.11.4.
One time, prior to the first delivery.
0 defects per submission
One (1) electric copy
Copy to COR Not Allowed
(7) Finalized QC
Plan, PWS Para
1.5.
One time, within ten (10) working days after the contract is awarded.
2 defects per submission
One (1) electric copy
Copy to KO &
COR
Re-submit report with corrections within five (5) working days.
(8) Finalized Safety
Plan, PWS Para
1.5.2.
One time, within ten (10) working days after the contract is awarded.
2 defects per submission
One (1) electric copy
Copy to KO &
COR
Re-submit report with corrections within five (5) working days.
6.2. Technical Exhibit 2 – Annual Estimated Workload Data
BASE YEAR FROM 01 NOV 23 THROUGH 31 OCT 24
ITEM SERVICES PRODUCT ESTIMATED
DELIVERY
QTY (GL) PER
TRUCK
ESTIMATED
MAX
DELIVERY
QTY (GL)
Bulk Fuel Delivery Service - SALE
0001 Yechon / Pohang to Camp Carroll Jet Fuel 2,000 200,000
0002 Exercise Support Jet Fuel/ Gasoline/ Diesel 1,500 100,000
Bulk Fuel Delivery Service-SHIPMENT
0003 CP Humphreys to Dongduchon Jet Fuel 8,450 700,000
0004 CP Humphreys to K-16 Jet Fuel 8,450 700,000
Surge Support (Tentative Schedule):
Daegu to Osan (2,000,000 gallons)
CP Humphreys to
Daegu/Gwangju/Gimhae/Suwon/Kunsan/
Osan (200,000 gallons)
Jet Fuel/ Gasoline/ Diesel 8,000 2,500,000
ITEM SERVICES ESTIMATED
MAX TIME
PER YEAR
0006 Cleaning Tank Per One Tank Truck 10 Times
Additional Charge Per One Tank Truck for Tank Bottom Removal / Emergency Bulk
Fuel Delivery Service (during Non-duty hours) 30 Times
OPTION YEAR I FROM 01 NOV 24 THROUGH 31 OCT 25
DELIVERY
QTY (GL) PER
TRUCK
ESTIMATED
MAX
DELIVERY
QTY (GL)
Bulk Fuel Delivery Service - SALE
1001 Yechon / Pohang to Camp Carroll Jet Fuel 2,000 200,000
1002 Exercise Support Jet Fuel/ Gasoline/ Diesel 1,500 100,000
Bulk Fuel Delivery Service-SHIPMENT
1003 CP Humphreys to Dongduchon Jet Fuel 8,450 700,000
1004 CP Humphreys to K-16 Jet Fuel 8,450 700,000
Surge Support (Tentative Schedule):
CP Humphreys to
Daegu/Gwangju/Gimhae/Suwon/Kunsan/
Osan (200,000 gallons)
Jet Fuel/ Gasoline/ Diesel 8,000 2,500,000
ITEM SERVICES ESTIMATED
MAX TIME
PER YEAR
1006 Cleaning Tank Per One Tank Truck 10 Times
Additional Charge Per One Tank Truck for Tank Bottom Removal / Emergency Bulk
OPTION YEAR II FROM 01 NOV 25 THROUGH 31 OCT 26
DELIVERY
QTY (GL) PER
TRUCK
ESTIMATED
MAX
DELIVERY
QTY (GL)
Bulk Fuel Delivery Service - SALE
2001 Yechon / Pohang to Camp Carroll Jet Fuel 2,000 200,000
2002 Exercise Support Jet Fuel/ Gasoline/ Diesel 1,500 100,000
Bulk Fuel Delivery Service-SHIPMENT
2003 CP Humphreys to Dongduchon Jet Fuel 8,450 700,000
2004 CP Humphreys to K-16 Jet Fuel 8,450 700,000
Surge Support (Tentative Schedule):
CP Humphreys to
Daegu/Gwangju/Gimhae/Suwon/Kunsan/
Osan (200,000 gallons)
Jet Fuel/ Gasoline/ Diesel 8,000 2,500,000
ITEM SERVICES ESTIMATED
MAX TIME
PER YEAR
2006 Cleaning Tank Per One Tank Truck 10 Times
Additional Charge Per One Tank Truck for Tank Bottom Removal / Emergency Bulk
6.3 Attachment# 1: HISTORICAL WORKLOAD DATA: Attachment #1 is separately attached.
6.4. Attachment #2: DOD MILSPETS DFSP SHIPMENT AND RECEIPT DOCUMENT - DD Form 1348-7
6.5. Attachment #3: REQUISITION AND INVOICE/SHIPPING DOCUMENT –DD FORM 1149
6.6. Attachment #4. MIL-STD-3004-1A, TABLE XXIII (20 January 2022)
6.7. Attachment #5. DLA ENERGY KOREA TANK TRUCK INSPECTION CHECKLIST
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 200,000 Gallon SALE-Yechon/Pohang to Camp Carroll
FFP
Jet Fuel
Refer to Paragraph 7.2. Technical Exhibit 2 - Annual Estimated Workload Data in the PWS for details.
FOB: Destination
PURCHASE REQUEST NUMBER: SJ06053067TTPR
PSC CD: V129
NET AMT
0002 100,000 Gallon SALE-Exercise Support
FFP
Jet Fuel/Gasoline/Diesel
Refer to Paragraph 7.2. Technical Exhibit 2 - Annual Estimated Workload Data in the PWS for details.
FOB: Destination
0003 700,000 Gallon SHIPMENT-CP Humphreys to Dongduchon
FFP
Jet Fuel
Refer to Paragraph 7.2. Technical Exhibit 2 - Annual Estimated Workload Data in the PWS for details.
FOB: Destination
0004 700,000 Gallon SHIPMENT-CP Humphreys to K-16
FFP
Jet Fuel
Refer to Paragraph 7.2. Technical Exhibit 2 - Annual Estimated Workload Data in the PWS for details.
FOB: Destination
0005 2,500,000 Gallon SHIPMENT-Surge Support
FFP
Jet Fuel/Gasoline/Diesel
Refer to Paragraph 7.2. Technical Exhibit 2 - Annual Estimated Workload Data in the PWS for details.
FOB: Destination
0006 10 Each Cleaning Tank Per One Tank Truck
FFP
Refer to Paragraph 7.2. Technical Exhibit 2 - Annual Estimated Workload Data in the PWS for details.
FOB: Destination
0007 30 Each Additional Charge Per One Tank Truck
FFP
Refer to Paragraph 7.2. Technical Exhibit 2 - Annual Estimated Workload Data in the PWS for details.
FOB: Destination
1001 200,000 Gallon OPTION SALE-Yechon/Pohang to Camp Carroll
FFP
Jet Fuel
Refer to Paragraph 7.2. Technical Exhibit 2 - Annual Estimated Workload Data in
1002 100,000 Gallon OPTION SALE-Exercise Support
FFP
Jet Fuel/Gasoline/Diesel
Refer to Paragraph 7.2. Technical Exhibit 2 - Annual Estimated Workload Data in
1003 700,000 Gallon OPTION SHIPMENT-CP Humphreys to Dongduchon
FFP
Jet Fuel
Refer to Paragraph 7.2. Technical Exhibit 2 - Annual Estimated Workload Data in
1004 700,000 Gallon OPTION SHIPMENT-CP Humphreys to K-16
FFP
Jet Fuel
Refer to Paragraph 7.2. Technical Exhibit 2 - Annual Estimated Workload Data in
1005 2,500,000 Gallon OPTION SHIPMENT-Surge Support
FFP
Jet Fuel/Gasoline/Diesel
1006 10 Each OPTION Cleaning Tank Per One Tank Truck
FFP
Refer to Paragraph 7.2. Technical Exhibit 2 - Annual Estimated Workload Data in
1007 30 Each OPTION Additional Charge Per One Tank Truck
FFP
Refer to Paragraph 7.2. Technical Exhibit 2 - Annual Estimated Workload Data in
2001 200,000 Gallon OPTION SALE-Yechon/Pohang to Camp Carroll
FFP
Jet Fuel
Refer to Paragraph 7.2. Technical Exhibit 2 - Annual Estimated Workload Data in
2002 100,000 Gallon OPTION SALE-Exercise Support
FFP
Jet Fuel/Gasoline/Diesel
Refer to Paragraph 7.2. Technical Exhibit 2 - Annual Estimated Workload Data in
2003 700,000 Gallon OPTION SHIPMENT-CP Humphreys to Dongduchon
FFP
Jet Fuel
Refer to Paragraph 7.2. Technical Exhibit 2 - Annual Estimated Workload Data in
2004 700,000 Gallon OPTION SHIPMENT-CP Humphreys to K-16
FFP
Jet Fuel
Refer to Paragraph 7.2. Technical Exhibit 2 - Annual Estimated Workload Data in
2005 2,500,000 Gallon OPTION SHIPMENT-Surge Support
FFP
Jet Fuel/Gasoline/Diesel
2006 10 Each OPTION Cleaning Tank Per One Tank Truck
FFP
Refer to Paragraph 7.2. Technical Exhibit 2 - Annual Estimated Workload Data in
2007 30 Each OPTION Additional Charge Per One Tank Truck
FFP
Refer to Paragraph 7.2. Technical Exhibit 2 - Annual Estimated Workload Data in
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
0005 Destination Government Destination Government
0006 Destination Government Destination Government
0007 Destination Government Destination Government
1001 Destination Government Destination Government
1002 Destination Government Destination Government
1003 Destination Government Destination Government
1004 Destination Government Destination Government
1005 Destination Government Destination Government
1006 Destination Government Destination Government
1007 Destination Government Destination Government
2001 Destination Government Destination Government
2002 Destination Government Destination Government
2003 Destination Government Destination Government
2004 Destination Government Destination Government
2005 Destination Government Destination Government
2006 Destination Government Destination Government
2007 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-NOV-2023 TO
31-OCT-2024
N/A DEFENSE LOGISTICS AGENCY ENERGY-
KOREA
PAK, SON YONG
UNIT #15015
APO AP 96218-5015
UNITED STATES
315-743-1019
SJ0605
0002 POP 01-NOV-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 01-NOV-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 01-NOV-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 01-NOV-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
0006 POP 01-NOV-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
0007 POP 01-NOV-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 01-NOV-2024 TO
31-OCT-2025
N/A (SAME AS PREVIOUS LOCATION)
1002 POP 01-NOV-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1003 POP 01-NOV-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1004 POP 01-NOV-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1005 POP 01-NOV-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1006 POP 01-NOV-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1007 POP 01-NOV-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 01-NOV-2025 TO
31-OCT-2026
N/A (SAME AS PREVIOUS LOCATION)
2002 POP 01-NOV-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
2003 POP 01-NOV-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
2004 POP 01-NOV-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
2005 POP 01-NOV-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
2006 POP 01-NOV-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
2007 POP 01-NOV-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011
52.204-13 System for Award Management Maintenance OCT 2018
52.212-4 Contract Terms and Conditions--Commercial Products and
Commercial Services
DEC 2022
52.225-14 Inconsistency Between English Version And Translation Of
Contract
FEB 2000
52.228-4 Workers' Compensation and War-Hazard Insurance Overseas APR 1984
52.232-23 Assignment Of Claims MAY 2014
52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.237-3 Continuity Of Services JAN 1991
52.243-1 Changes--Fixed Price AUG 1987
52.246-4 Inspection Of Services--Fixed Price AUG 1996
252.201-7000 Contracting Officer's Representative DEC 1991
252.216-7003 Economic Price Adjustment - Wage Rates or Material Prices
Controlled by a Foreign Government
MAR 2012
252.216-7008 Economic price adjustment--wage rates or material prices controlled by a foreign government--representation
MAR 2012
252.225-7041 Correspondence in English JUN 1997
252.225-7042 Authorization to Perform APR 2003
252.228-7000 Reimbursement for War-Hazard Losses DEC 1991
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.233-7001 Choice of Law (Overseas) JUN 1997
252.243-7001 Pricing Of Contract Modifications DEC 1991
CLAUSES INCORPORATED BY FULL TEXT
52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
(MAR 2023)
(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code(s) and small business size standard(s) for this acquisition appear elsewhere in the solicitation.