21-R-0055 Amendment released.pdf
PDF 444 KB Posted
- Attached to
- Sound Abatement for Bldg 1650, Cp Henry
- Solicitation number
- W90VN921R0055
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21-R-0055 Amendment 0002 Released.pdf | ||
| Carpet and Soundproofing measurements.pdf | ||
| RFQ W90VN921R0055 Sound Abatement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011666434
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose for this amendment is to provide pictures regarding the carpet/w all panel colors and dimensions for each of the three rooms.
All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Jul-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W90VN921R0055
X 9B. DATED (SEE ITEM 11)
09-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Jul-2021
CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO DAEGU, UNIT #15682
APO AP 96218-5682
UNITED STATES
W90VN9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W90VN921R0055
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 23-Jul-2021 12:00 PM to 30-Jul-2021 01:00 PM.
The following have been modified:
SECTION L - INSTRUCTIONS, COND
NOTE:
FUNDS ARE NOT CURRENTLY AVAILABLE FOR THIS ACQUISITION. NO CONTRACT AWARD
WILL BE MADE UNTIL APPROPRIATED FUNDS ARE MADE AVAILABLE.
Contractor's Proposal Validity time line should be 180 days from the date of proposal after solicitation
GENERAL INFORMATION - ROK LOCAL VENDORS
All sources may submit a proposal or quote as applicable. However, the Republic of Korea (ROK)-United States (U.S.) Status of Forces Agreement (SOFA) does not permit the U.S. Government to grant Invited Contractor or Technical Representative Status to any offeror for this requirement. All sources submitting a proposal or quote, as applicable, including U.S. source, must already have, or obtain the requisite business licenses directly from the ROK Government, and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any contractor not already doing business in Korea must submit adequate verification in its initial proposal or quote that it has the requisite business licenses directly from the ROK Government to perform the contract and the capacity to conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. If the initial proposal does not fully demonstrate this authorization and capacity, it will not be further considered for award.
Whether an offeror demonstrates this authorization and capacity shall be determined by the Contracting Officer.
LOCAL CONTRACTORS: The proposed acquisition will be limited to local contractors. All required material, labor, transportation, and facilities and these supply items are available locally. There is nothing inherently difficult about the project that requires the presence of invited contractors.
Proposed price shall be provided by local currency (Korean Won). A quote or proposal submitted in currency other than Korean Won will not be considered for award.
INSTRUCTION TO OFFERORS
Addendum to Instructions to Offerors
OFFERORS MUST COMPLY WITH THE FOLLOWING:
The Government intends to award without discussion, but reserves the right to conduct discussions if deemed necessary and to establish a competitive range for efficiency in accordance with FAR 52.215-1(f)(4). Offeror(s) may, at the discretion of the Government, be asked to provide more information and clarification regarding their proposals. The Government may make a final determination as to whether an offer is acceptable or unacceptable solely based on the proposals as submitted, without requesting any further information. However, if it is deemed necessary the Government may, at its sole discretion, request additional information clarifying but not substantially changing any proposal as submitted.
* The Government requests all questions be emailed to MSG Christie England, Contract Specialist at christie.l.england.mil@mail.mil within 3 calendar days after the site visit had been conducted.
* No questions will be allowed after the 3 calendar days and respective proposals are to be received by 30 July 2021, 13:00 hrs. (Korean Local Date/Time).
SUBMISSION OF PROPOSAL
SUBMISSION REQUIRED: Offers shall be submitted to MSG Christie England, Contract Specialist at christie.l.england.mil@mail.mil CLOSING DATE: The electronic offer shall be submitted by the due date specified in the page # 1, Block # 13 of this RFP.
Section M - Evaluation Factors for Award
EVALUATION FACTORS & SUBMISSION REQUIREMENTS
Evaluation Factors for Award: Electronic offers submitted by 1300 hours (1PM) Local on the closing date of RFP shall be considered timely
PRICING PROPOSAL: The pricing proposal must clearly indicate prices for each Contract Line Item Number in Section B - Supplies or Services and Prices. The offeror quotation must demonstrate a clear understanding of the solicitation requirement. Failure to provide a complete proposal may reflect lack of understanding of the requirements and may result in a determination that the offeror is technically unacceptable.
3. The offeror(s) shall submit the following requirements IAW para. 1 above.
Price Schedule: The offerors shall submit a completed pricing schedule.
b. Technical Proposal: Specification for the proposed items.
Failure to submit the above requirements may be grounds for determining the proposal to be non- compliant to the RFQ and ineligible for contract award.
4. Clause 5152.204-4032, FAR 52.212-1, 2 and 3: The terms “Quotation” and “Quote” shall be substituted for “Offer” and “Offeror.”
DETAILED OFFER BREAKDOWN: The detailed offer breakdown must clearly identify all costs that can materially impact the statement of work.
SECTION K - Representations, Certifications and Other Statements of Offerors
SECTION K-TAXES: Offerors must complete all tax portions of SECTION K. The offeror shall review all expenses to ensure that all applicable taxes are excluded from the overall price. In addition, offerors shall propose exemptions of specific ROK taxes that are legitimate, attributable to the contract, and authorized by the applicable stated references.
SECTION K-OTHER: Offerors must complete all Non-Tax related portions of SECTION K.
COMPLIANCE WITH SOLICITATION: Failure to submit the above requirements under SECTION L may be grounds for determining the proposal to be non-compliant. For example, if a detailed offer breakdown is not submitted, the contracting officer will be unable to find the offeror's pricing proposal acceptable and the offeror's proposal will be ineligible for award. Non-compliance will only be cured if the government holds discussions as detailed in SECTION L.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .