H03_Drawing.pdf
PDF 410 KB Posted
- Solicitation number
- W90VN919R0049
About this file
Please see attached RFP #W90VN9-19-R-0049. The closing date/time is on 5 July 2019, 01:00 PM (Korea local date/time)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A21_Amendment_0001.W90VN919R0049.pdf | ||
| A21_RFP-W90VN919R0049.MATOCONTRACTORONLY.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE LOCATION (S-563 SATCOM BUILDING)
LIGHTNING PROTECTION PLAN (S-563 SATCOM BUILDING)
NOTE:
1. Existing LPS Air Terminal spacing exceeds the 20ft and must be corrected (20ft or less) in the contractor’s new LPS design that will replace the existing LPS.
2. Install cross conductors at 35’ (or less) from last conductor.
3. Install air terminals at 18’ (or less) intervals along conductors. Cross conductors air terminals can be spaced 35’ (or less).
4. Install down conductors at 85’ (or less) and at corners. Down conductors need protected to a height of 6’ using PVC or metallic guards. Down conductors need connected to EGS through paved and unpaved areas.
5. Completely remove old system and fill all holes.
6. Longest dimensions (135’x134’) total square footage ~12,750
7. All equipment material and workmanship shall comply with all the requirements of National Electrical Code latest edition, National Electrical Safety Code and NFPA 780
GND. ROD COPPER
CLAD STL. ¾”Ф x
10’LG. (TYP.)
BLDG. RING GND. WIRE #4/0. “BC”
GND. TEST WELL
20’ MAX
(TYP.)
6 CROSS CONDUCTORS SHORTER
THAN 150’, SPACED 35’ FROM
PERIMETER
#2/0 AWG, STRANDED
COPPER CABLE (TYP.)
AIR TERMONAL 24” TALL ½” DIA, CU
(TYP. QTY AS REQUIRED)
LPS DETAIL (S-563 SATCOM BUILDING)
EGS DETAIL (S-563 SATCOM BUILDING)
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
File details come from the government source that posted it.