A21_RFQ.W90VN918T0003.pdf
PDF 633 KB Posted
- Solicitation number
- W90VN9-18-T-0003
About this file
Please see the attached solicitation no. W90VN9-18-T-0003.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A21_Amendment_0004.W90VN918T0003.pdf | ||
| A21_Amendment_0003.W90VN918T0003.pdf | ||
| A21_Amendment_0002.W90VN918T0003.pdf | ||
| A21_Amendment_0001.W90VN918T0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W90VN9-18-T-0003 20-Apr-2018
b. TELEPHONE NUMBER
053-470-8372
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 18 May 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W90VN99. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MS. CHONG, HYE-YONG
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
0011113766
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO DAEGU, UNIT #15682
APO AP 96218-5682
UNITED STATES OF AMERICA (THE)
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE WT4KB6 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
DPW, USAG DAEGU
AN, YONG CHOL
ATTN: IMKO-ADP-F
UNIT #15746
APO AP 96218-5746
UNITED STATES OF AMERICA (THE)
TEL: 768-6442 FAX: 768-6455
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$38,500,000
NAICS:
562219
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF61
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA FAR (48 CFR) 53 212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W90VN9-18-T-0003
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 30,000 Kilogram Paper Shredding Service for DPW-Daegu
FFP
Paper Shredding Service in support of DPW USAG-Daegu. The Contractor shall provide all necessary resources for this requirement and perform in accordance with (IAW) the attached Performance Work Statement (PWS), and terms and conditions of this contract contained herein.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011113766
PSC CD: R614
NET AMT
0002 1 Each Estimated War Losses is
FFP
Zero (0) FOB: Destination
0003 1 Job Accounting for Contract Services (CMR)
FFP
The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract in accordance with the Performance Work Statement (PWS).
1001 30,000 Kilogram OPTION Paper Shredding Service for DPW-Daegu
FFP
Paper Shredding Service in support of DPW USAG-Daegu. The Contractor shall provide all necessary resources for this requirement and perform in accordance with (IAW) the attached Performance Work Statement (PWS), and terms and conditions of this contract contained herein.
1002 1 Each OPTION Estimated War Losses is
FFP
Zero (0)
1003 1 Job OPTION Accounting for Contract Services (CMR)
FFP
The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract in accordance with the Performance Work Statement (PWS).
2001 30,000 Kilogram OPTION Paper Shredding Service for DPW-Daegu
FFP
Paper Shredding Service in support of DPW USAG-Daegu. The Contractor shall provide all necessary resources for this requirement and perform in accordance with (IAW) the attached Performance Work Statement (PWS), and terms and conditions of this contract contained herein.
2002 1 Each OPTION Estimated War Losses is
FFP
Zero (0)
2003 1 Job OPTION Accounting for Contract Services (CMR)
FFP
The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract in accordance with the Performance Work Statement (PWS).
3001 30,000 Kilogram OPTION Paper Shredding Service for DPW-Daegu
FFP
Paper Shredding Service in support of DPW USAG-Daegu. The Contractor shall provide all necessary resources for this requirement and perform in accordance with (IAW) the attached Performance Work Statement (PWS), and terms and conditions of this contract contained herein.
3002 1 Each OPTION Estimated War Losses is
FFP
Zero (0)
3003 1 Job OPTION Accounting for Contract Services (CMR)
FFP
The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract in accordance with the Performance Work Statement (PWS).
4001 30,000 Kilogram OPTION Paper Shredding Service for DPW-Daegu
FFP
Paper Shredding Service in support of DPW USAG-Daegu. The Contractor shall provide all necessary resources for this requirement and perform in accordance with (IAW) the attached Performance Work Statement (PWS), and terms and conditions of this contract contained herein.
4002 1 Each OPTION Estimated War Losses is
FFP
Zero (0)
4003 1 Job OPTION Accounting for Contract Services (CMR)
FFP
The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract in accordance with the Performance Work Statement (PWS).
SPECIAL NOTE
NOTICE TO BE INSERTED IN LOCAL SOURCE REQUIREMENTS:
1. All sources may submit a proposal or quote as applicable. However, the Republic of Korea (ROK)-United States (U.S.) Status of Forces Agreement (SOFA), precludes the U.S. Government from granting Invited Contractor or Technical Representative status to any offeror, for this requirement. All sources submitting a proposal or quote, as applicable, including U.S. sources, must already have, or obtain the requisite business licenses directly from the ROK Government, and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any contractor not already doing business in Korea as a local source, must submit adequate verification in its initial proposal or quote, that it has the requisite authorization and capacity to compete for the requirement as a local source, and to perform the contract as a local source. If an initial proposal does not fully demonstrate this authorization and capacity, it will not be further considered for award. Whether an offeror qualifies as a local source shall be determined by the Contracting Officer.
2. LOCAL CONTRACTORS:
The proposed acquisition will be limited to local contractors. All required material, labor, transportation, and facilities and these services are available locally. There is nothing inherently difficult about the project that requires the presence of invited contractors.
3. The Price Proposal should be Korea Won (₩).
4. The following quantities of each CLIN are estimated because it cannot predetermine the precise quantities of service. Individual delivery order will be issued based on actual quantities provided from Requiring Activity (RA).
5. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.
PWS
Performance Work Statement (PWS) For
Paper Shredding Service at Area IV (Camp Henry, Walker and Carroll)
1. Introduction. This is a non-personal services contract to provide paper shredding service. The Government will not exercise any supervision or control over the contract service providers. The Contractor shall perform to the standards specified in this Performance Work Statement (PWS). Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1. Background. The paper shredding truck is required to shred paper documents. The contractor shall perform paper shredding services at Camps Walker, Henry, George, Carroll, BSF, and Pier #8 in USAG Daegu, located in South Korea.
1.2. Objectives. The Contractor shall ensure all work accomplished in the performance of this PWS meets all applicable Federal, State, and local laws, regulations, and directives to include, but not limited to, applicable publications in Paragraph 9.
The Contractor shall compile historical data, prepare required reports, and submit all information as specified by the Deliverables presented in the contract. The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance, conforms to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract.
The intent is to establish work requirements that are performance-based and results-oriented. The Contractor shall determine the best and most cost effective ways to fulfill paper shredding services and their component needs, emphasizing innovation and commercial best practices.
1.3. The Contractor’s daily performance report, deficiency list, Quality Control Plan (QCP) and other related documents shall be maintained by the Contractor. The documents shall be readily available to the Government at any time during the term of the contract.
1.4. Quality Assurance: The Contractor shall comply with the Government’s quality assurance program as defined in the Quality Assurance Surveillance Plan. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable quality level(s) (AQL). Government surveillance of contractor performance is not limited to the Performance Objectives as outlined in this PWS. The Government reserves the right to conduct compliance surveillance of any contractual requirement of this acquisition.
1.4.1. The Government reserves the right to inspect the Contractor’s performance. The Government will record all surveillance observations. When an observation indicates defective performance, the Contracting Officer’s Representative (COR) will request the Contactor’s representative to initial the observation.
1.4.2. Performance Rating: The COR will evaluate Contractor’s performance based on the checklist, USFK Form173-R-E or web based performance rating in Contracting Officer’s Representative Tool (CORT). The Contractor’s performance rating will be prepared and submitted to the Contracting Officer (KO) by the 7th of each month.
1.5. Type of Contract: The Government will award a requirement type contract from this solicitation as a Requirement type.
1.6. Security Requirements: Resigned
1.6.1. Physical Security: The Contractor shall safeguard all Government equipment, information and property provided for Contractor use. Contractor shall maintain a physical security checklist/log which will be forwarded to the COR on a monthly or quarterly basis. At the close of each work period, Government facilities, equipment, and materials shall be secured.
1.7. Sanitation Requirements: Cleaning of Surrounding Service Area – Upon completion of work, the Contractor shall clean shredding area within a ten (10) foot radius after the performance of work. The Contractor shall submit to the COR a report of all working areas cleaned the 1st Monday of each month.
1.8. License Requirements: The prime Contractor be licensed and registered by ROK Government for general business (일반사업자등록증). No special license is required to perform this work under this contract.
1.9. Contractor Prior Experience: The Contractor shall have at least two (2) year of relevant experience within the last five (5) years in performing paper shredding services in U.S Government or Commercial Industry. Relevant past performance shall be the “same or similar” services on size, scope and complexity. The Contractor shall provide all necessary information of prior experience as a part of technical evaluation factor when submit proposal.
The experience of a subcontractor cannot be substituted for the prime Contractor’s experience.
1.10. Base Passes and Vehicle Permits
1.10.1. Contractor employees and representatives shall be required to have proper identification prior to entering each Government installation. Such identification shall be controlled as prescribed by the Security Section, Provost Marshal, or equivalent security control authority at the installation concerned.
1.10.1.1. Base Pass: Upon notice of award, the Contractor shall obtain all passes and necessary vehicle permits required for entry by authorized Contractor personnel IAW base policy, and the point of contact information for this action will be provided upon contract award. All Contractor employees and representatives shall have in their possession a Korean Citizen Identification Card during performance under this contract.
1.10.2. The Contractor shall ensure that employees have a current and valid driver’s license before allowing the employee to operate a Contractor-owned vehicle on the base. The Contractor and its employees shall comply with all security requirements imposed by the local installation commander at all times while on the military installation.
Any Contractor traffic violations may result in the denial of driving privileges on the installations. A copy of all licenses shall be provided to the COR within seven (7) days after contract award.
1.10.3. All Contractor employees shall abide by all Government installation regulations during performance under this contract.
1.10.4. The Contractor will be authorized escort privileges only for people working under this contract and only during hours stated under this contract.
1.11. Antiterrorism (AT) and Operations Security (OPSEC)
1.11.1. AT Level I Training: This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility, or area. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the Contracting Officer (KO), if a COR is not assigned within 30 calendar days after completion of training by all employees and subcontractor personnel.
1.11.2. Access and General Protection/Security Policy and Procedures: This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility, or area.
Contractor and all associated sub-contractors’ employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshall Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.11.3 iWATCH Training. The Contractor shall brief the local iWATCH program (training standards provided by the RA’s Anti-Terrorism Officer (ATO)) to all of the Contractor’s employees and associated subcontractors. This training is used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR/ACOR. The Contractor shall complete the training within thirty (30) calendar days of contract award and newly hired employees shall complete iWATCH Training within thirty (30) calendar days and report to the COR.
2.0. Requirements; Description of Services.
2.1. Non-Personal Services. The personnel rendering the services are not subject; either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government in accordance with (IAW) Federal Acquisition Regulation (FAR) Subpart 37.104, under general contracting authority, and do not require specific statutory authorization.
2.2. General Information.
2.2.1. Period of Performance (PoP). The period of performance shall be for one (1) Base Year with four (4) Option Years as follows:
Base Year: 1 June 2018 thru 31 May 2019 1st Option Year: 1 June 2019 thru 31 May 2020 2nd Option Year: 1 June 2020 thru 31 May 2021 3rd Option Year: 1 June 2021 thru 31 May 2022 4th Option Year: 1 June 2022 thru 31 May 2023
2.3. Hours of Operation: The Contractor is responsible for conducting business, between the hours of 0800-1700 hours, Monday through Friday except Korean holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
2.4. Place of Performance: The work to be performed under this contract will be performed at Camps Walker, Henry, George, Carroll, BSF, and Pier #8 in USAG Daegu.
2.5. Emergency Service
2.5.1. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the KO or COR/ACOR immediately, not later than (NLT) two (2) hours of the incident.
2.5.2. The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel.
2.6. Contract Administration and management.
2.6.1 Post Award Conference/Performance Evaluation Meetings. The Contractor shall attend the post award conference convened by the contracting activity or contract administration office IAW FAR Subpart 42.5. The KO and COR/ACOR will meet quarterly with the Contractor to review the Contractor's performance. Written minutes of meetings will be recorded by the Government and signed by both the Contract Manager and the KO. The written minutes will be distributed within five (5) workdays after the meeting. If the Contractor does not concur with any portion of the minutes, recorded by the Government, the non-concurrence shall be provided in writing to the KO within two (2) calendar days following receipt of the minutes.
2.6.2. Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.
2.6.3. The following provides the roles and their respective authority during the performance of the contract:
2.6.3.1. Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO. In the event the Contractor makes any change at the direction of any person other than the KO, the change shall be considered to have been made without authority and solely at the risk of the Contractor. All contract administration will be effected by the KO. Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes in or deviation from the terms and conditions shall be affected, without a written modification to the contract, executed by the KO authorizing such changes.
2.6.3.2. Contracting Officer’s Representative (COR). The KO will appoint a COR during the performance of this contract. Additional Government personnel may be assigned to assist in contract oversight IAW AR 70-13, Management and Oversight of Service Acquisitions. Other surveillance personnel may be designated as COR or ACOR, and shall be trained and appointed IAW DoDI 5000.72, DoD Standard for Contracting Officer’s Representative (COR) Certification and DFARS 201.602-2. The ACOR will serve as on-site representatives of the COR in performance of actual contract surveillance, if they meet all COR training, experience requirements, and are appointed by the KO as an ACOR. The COR/ACOR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR/ACOR will perform IAW the responsibilities and duties identified in the appointment letter.
2.6.3.2.1. COR Authority. A letter of designation will be issued to the COR/ACOR by the KO. A copy of the letter will be sent to the Contractor. The letter of designation states the responsibilities and limitations of the COR/ACOR, especially with regard to changes in cost, price estimates, or changes in delivery dates. The COR/ACOR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order.
2.6.3.3. The Contractor shall not be in any way represent the United States (U.S.) Government, or that it has the authority to contract or procure supplies for the account of the United States of America (USA).
2.7. COR/ACOR Functions. The COR/ACOR monitors all technical aspects of the contract and assists in contract administration. The COR/ACOR is authorized to perform the following functions: assure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance;
maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements; monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government-Furnished Property, and coordinate site entry of Contractor personnel.
2.8. Quality Control (QC). Quality Control is the responsibility of the Contractor. The Contractor shall submit to the KO a Quality Control Plan (QCP) within thirty (30) calendar days after award. The Contractor shall provide and maintain a QCP that is acceptable to the KO. Changes to the Contractor’s QCP shall be submitted to the KO for review and approval within seven (7) business days prior to implementation.
2.9 The Contracting Officer Representative Tracking (CORT) Tool (https://wawf.eb.mil/xhtml/auth/home/home.xhtml#) shall be used for nomination, tracking, documentation, and management of CORs IAW DoDI 5000.72, DFARS 201.602-2 and PGI 201.602-2.
2.10. Contractor Employees; Key Personnel.
2.10.1. The Contractor shall provide a Contract Manager who is responsible for the performance of the work. The Contract Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract. The Contractor shall provide the name of the Contract Manager to the KO. The Contract Manager shall be available between 0800 - 1700 hours, Monday through Friday except Korean holidays or when the Government facility is closed for administrative reasons.
2.10.2. Contractor Identification. The Contractor shall ensure all personnel be identified as a Contractor to distinguish themselves (e.g., badge, company logo, or uniform) from Government employees. The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed.
2.10.3. Standards of Conduct. Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure all personnel present a professional appearance while working on the Government installation. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove, from the job site, any employee for reasons of misconduct or security. The Contractor shall ensure employee conduct complies with 41 USC 423, Procurement Integrity. The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation.
2.10.4. Contractor Hiring Restrictions. The Contractor shall not hire or sub-contract with off duty or former Government employees whose employment would result in a conflict with AR 600-50, Standards of Conduct.
2.11 Business Relations. The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement of this PWS. The Contractor shall manage the timeliness, completeness, and quality of problem identification to a degree acceptable to the Government. The Contractor shall provide to the COR/ACOR corrective action plans, timely identification of issues, and effective management of subcontractors within five (5) working days or at a mutually agreed upon date. The Contractor shall ensure customer satisfaction and professional and ethical behavior of all Contractor personnel.
2.12. Safety. The Contractor shall safeguard and maintain all Government and Contractor property, as well as provide for the safety and well-being of personnel employed under this contract. The Contractor shall comply with AR 385-10, The Army Safety Program.
2.12.1. Safety Plan. The Contractor shall develop and implement a safety program for its employees. The Contractor shall submit the Safety Plan to the KO for review and acceptance within thirty (30) days after contract award. Revisions shall be submitted five (5) calendar days prior to the effective date of change.
2.12.2. Occupational Safety and Health. The Contractor shall comply with the Occupational Safety and Health Administration (OSHA) standards. The Contractor shall comply with all applicable Federal, State, and local laws, regulations, and directives.
2.13. Environmental Requirements.
2.13.1. Green Procurement. Section 6002 of the Resource Conservation and Recovery Act of 1976 (RCRA) requires the use of recycled and recovered products identified in the EPA’s Comprehensive Procurement Guidelines.
2.13.2. The Contractor shall use these recycled or recovered products unless they cannot be procured within a reasonable period of time not to exceed seven (7) calendar days; at prices not to exceed five (5) percent of prevailing rates; or the product(s) does not meet technical or performance standards. EPA Guidelines are the minimum requirement. The Contractor shall use materials and products commonly used in industry. The Contractor shall maintain records and submit an annual report to the COR/ACOR, along with the annual certification required by FAR 52.223-9 (Certification and Estimate of Percentage of Recovered Material Content for EPA Designated Items), upon completion of the base year and each option year.
2.13.3. Environmental Compliance. The Contractor shall comply with all Federal, State, local, and installation environmental laws, rules, plans, and policies. The Contractor shall use and store all materials, chemicals, and equipment used in the performance of services on the installation IAW with industry standards, local, State and Federal laws, and according to manufacturers' recommendations. The Contractor shall be financially responsible for all fines and associated costs for hazardous waste management, transportation, and disposal of waste due to the Contractor's non-compliance. The Contractor shall submit Safety Data Sheets (SDS) for approval on all materials, five (5) days before delivery of the material, to the COR/ACOR. The Contractor shall provide upon request from the COR/ACOR all required data to meet environmental-mandated reporting requirements (e.g., air emission data, hazardous material storage/usage, herbicide/pesticide usage, solid/hazardous waste generation). The Contractor shall provide data to meet reporting deadlines and during compliance inspections upon request from the
COR/ACOR.
3.0. Performance Requirements and Standards.
3.1. Contractor Manpower Reporting Application (CMRA).
3.1.1. Reporting Labor Hours. The Office of the Assistant Secretary of the Army (Manpower and Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report all Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor shall completely fill in all the information in the format using the following web address: https://CMRA.ARMY.MIL.
The required information includes the following:
a. Names of the KO and COR;
b. Contract number, including task and delivery order number;
c. Beginning and ending dates covered by reporting period;
d. Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data;
e. Estimated direct labor hours (including subcontractors);
f. Estimated direct labor dollars paid this reporting period (including subcontractors);
g. Total payments (including subcontractors);
h. Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each subcontractor if different);
i. Estimated data collection cost;
j. Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity
(RA) (the Army RA is responsible for providing the Contractor with its UIC for the purposes of reporting this information);
k. Locations where Contractor and subcontractors perform the work (specified by zip code in the U.S. and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);
l. Presence of deployment or contingency contract language; and
m. Number of Contractor and subcontractor employees deployed in theater this reporting period (by country).
As part of its submission, the Contractor shall provide the estimated total cost incurred to comply with this reporting requirement.
Reporting period shall be the PoP not to exceed twelve (12) months ending thirty (30) September of each Government FY and must be reported by 31 October of each calendar year. The Contractor shall use a direct data transfer to the database server or fill in the fields on the website. The direct transfer is a format for transferring files from a Contractor’s system to the secure website without the need for separate data entries for each required data element at the website. The Contractor shall report the required information to the CMR system’s secure database.
The COR/ACOR is responsible for verifying that the Contractor has reported the required data.
4.0. Performance Requirements Summary (PRS) Matrix.
The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Required Services
Performance Standard
Acceptable Quality Level
(AQL)
Method of Surveillance Incentive (Positive and/or Negative)
Shredding/Transportatio n/Disposal of Papers & Documents and Cleaning of Service Area PWS Para. 5.2.
Complete shredding of all papers/docume nts at the time of the performance.
100% Random inspections with Validated User or Customer’s Complaint.
Payment of the invoice will be deducted by the percentage of below AQL
4.1. Quality Assurance. The Government will evaluate the Contractor’s performance under the contract IAW the Government’s Quality Assurance Surveillance Plan (QASP). QASPs are considered to be "living documents," dynamic, adaptable, and subject to modification based on Contractor performance surveillance results. The QASP is not part of the PWS and will not be issued with the solicitation. The QASP focuses on the procedures and processes the Government will implement to assure the Contractor is performing IAW the performance standards within the PWS. The Government plan defines the criteria of how the Contractor’s performance will be evaluated, the frequency of surveillance, and the items to be inspected. Although the Government will develop a QASP, Government surveillance of Contractor performance is not limited to the QASP, or the performance objectives, outlined in the Performance Requirements Summary (PRS). The Government retains the right to evaluate all services required by the contract. The Government will perform inspections and tests in a manner that will not unduly delay the work. If any of the services performed do not conform to contract requirements, the Contractor shall perform the services again at no additional cost to the Government.
4.2. Quality Control Plan (QCP). Quality control is the responsibility of the Contractor. The Contractor shall develop, implement, and maintain an effective quality control program which shall be documented in a QCP to ensure services are performed IAW this PWS. The Contractor shall develop and implement procedures to identify and prevent the recurrence of defective services. The Contractor’s QCP is the means by which they assure themselves that the work conforms to contract requirements. The basic principle of the plan is that the Contractor is responsible for quality control. The QCP shall be constructed in such a manner that each Common Level of Support (CLS) service can be extracted and used for that function only and not contain extraneous information. The Contractor's QCP shall include a separate section, which addresses the Contractor's method of managing quality of work. The QCP shall include a description of the inspection system to address services listed in this PWS, and a description of the methods to be used for identifying and preventing defects in the quality of services performed.
The plan shall include a description of the Contractor’s inspection system to include specifics as to areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the Contractor’s inspectors. No lead person or first line supervisor shall be considered a Quality Control Inspector. The Contractor shall develop, maintain, and submit a QCP to the KO for acceptance within thirty (30) calendar days after the contract is awarded. The Contractor shall submit any proposed changes in the QCP to the KO for written approval five (5) working days prior to implementation.
5. SPECIFIC TASKS:
5.1. The Contractor shall perform the contracted services upon issuance of a task/delivery order. The COR will notify the Contractor when any papers/official documents are ready for shredding. Notification shall occur no less than fourteen (14) calendar days prior to the required performance date. The Contractor shall notify the COR no less than 48 hours prior to the start of work performance. The Contractor shall perform the services only in the presence of the Government representative, inspector or COR.
5.2. After receiving a task/delivery order, the Contractor shall perform the following services:
5.2.1. The Contractor shall shred all papers and official documents using a shredding truck at the designated point(s) by COR.
5.2.2. The shredding truck must be equipped with recording devices (CCTV) to monitor the shredding status during the work being performed.
5.2.3. Upon completion of shredding, the Contractor shall provide certificate of destruction, security statement and progress report to the COR. The Contractor shall clean surrounding service area within ten (10) foot radius after completion of work and is required to acquire the COR’s statement that work has been performed satisfactorily.
5.2.4. The Contractor shall record the quantity of shredded papers and documents completed.
5.2.5. The Contractor shall dispose of shredded papers to the off-post disposal facility IAW ROK Environmental Laws and Regulations.
5.3. Transfer of Ownership: The transfer of ownership from the Government to the Contractor is effective immediately after the shredded papers are loaded into the Contractor’s containers and the quantities have been verified and released by the COR or his/her designated representative. After the transfer of ownership, the Contractor shall assume full accountability and physical custody for all the wastes removed under this contract.
5.4. Invoices: The Contractor shall provide an invoice for services rendered. The Contractor shall provide a monthly report listing all transactions for the prior month by the 5th day of each month. Report shall contain at a minimum a date, time and total weight of shredded papers. The Contractor shall keep this record on file for a period of one (1) year after the contract expiration date, including any option period exercised.
5.5. Inspection and Search: The Government may search the Contractor, Contractor’s employees, its vehicles, conveyances and facilities to ensure that only defined items under this contract are being removed.
5.6. Illicit Acts
5.6.1. The Contractor shall assume full responsibility for any illicit act committed by its employees while performing under this contract.
5.6.2. For the purpose of this contract, illicit acts include the commission of fraud, theft, bribery, extortion, receiving stolen property, and acknowledged offence.
5.6.3. The Contractor shall ensure complete supervision over its personnel who are engaged in the performance of this contract.
5.6.4. Violation of the above requirement by the Contractor or its agent may result in temporary suspension of the Contractor.
5.7. Environmental Management System (EMS) Requirement (Per USAG Daegu EMS Manual Document 10.1.1):
5.7.1. The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection.
The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract.
5.7.2. In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective action and notifying the COR and the EMS Manager. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the EMS Manager.
5.7.3. All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange EMS training for appropriate staff.
5.7.4. Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.
5.7.5. The responsibilities of all contractor personnel include, but are not limited to:
(1) Recycling all eligible material, including glass, paper (including magazines), plastic, aluminum, and cardboard to the maximum extent practicable;
(2) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content;
(3) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling; and
(4) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.
5.7.6. Any questions regarding EMS may be directed to the Installation EMS Manager or COR.
6.0. Common Levels of Support (CLS).
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions of the Base Operations specified below. This shall be done IAW all the terms, conditions, general and special provisions, specifications, drawings, attachments, and exhibits contained herein or incorporated by reference.
The Contractor shall ensure that all work meets or exceeds the specifications for the listed CLS.
CLS Service Title Attachment No.
403 Solid Waste Management Attachment XX
7.0. Deliverables
DELIVERABLE FREQUENCY # OF COPIES SUBMIT TO
Quality Control Program Para. 2.8.
Within 30 calendar days after contract award and within 7 working days when changes are made thereafter
2 Paper Copies KO/COR
License & Certificate Para. 1.8.
With Proposal Submittal Electronic & Paper Copy
KO/COR
Personnel Qualification Para. 1.9.
With Proposal Submittal Electronic & Paper Copy
KO/COR
Driver’s License Para. 1.10.2.
Within 7 calendar days after contract award
Electronic & Paper Copy
COR
DELIVERABLE FREQUENCY # OF COPIES SUBMIT TO
Safety Plan Para. 2.12.1
Within 30 calendar days after contract award
Electronic & Paper Copy
COR
AT Level I Training Certificate Para. 1.11.1.
Within 30 calendar days of contract award
Electronic & Paper Copy
COR
iWATCH Training Certificate Para. 1.11.3
Within 30 calendar days of contract award
Electronic & Paper Copy
COR
8. Related documents; Definitions and Acronyms
8.1. Definitions.
8.1.1. Acceptable Quality Level (AQL). The AQL is the maximum percent defective (or the number of defects per hundred units) for the purposes of sampling inspection can be considered satisfactory.
8.1.2. Alternate Contracting Officer’s Representative (ACOR). An employee of the U.S. Government provided by the RA and appointed by the KO to provide support to CORs in monitoring and documenting the Contractor’s performance. These alternate surveillance support personnel will serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR training, experience requirements, and are appointed by the KO as an ACOR.
8.1.3. Contract Discrepancy. A failure of the Contractor to perform IAW contract requirements and specifications, e.g., a failure of the Contractor to provide, or provide on time, the required contract products or services; or it may result because delivered products or services do not meet specific contract requirements.
8.1.4. Contract Discrepancy Report (CDR). A report used to document other than satisfactory Contractor performance. The CDR requires the Contractor to explain, in writing, why performance is other than satisfactory;
how performance shall be returned to satisfactory levels; and how recurrence of the problem shall be prevented in the future.
8.1.5. Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
8.1.6. Contracting Officer (KO). A person with authority to enter into, administer, modify, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
8.1.7. Contracting Officer’s Representative (COR). An employee of the U.S. Government appointed by the KO to help administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
8.1.8. Debris. Includes, but is not limited to, paper, cans, bottles, cigarette butts, cardboard, plastic, limbs and branches, pine straw and pine cones, leaves, rocks, and other similar items.
8.1.9. Defective Service. A service output that does not meet the standard of performance associated with the PWS.
8.1.10. Deliverable. Anything that can be delivered; can include non-manufactured things, such as meeting minutes or reports.
8.1.11. Equipment. A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale, and does not ordinarily lose its identity or become a component part of another article, when put into use. Equipment does not include material, real property, special test equipment or special tooling.
8.1.12. General Fund Enterprise Business System (GFEBS). GFEBS is the U.S. Army's web-based enabled financial, asset, and accounting management system that standardizes, streamlines, and shares critical financial data across the Active Army, the Army National Guard, and the Army Reserves. GFEBS is the work management system that the Directorate of Public Works uses for all order types and projects.
8.1.13. Government-Furnished Property (GFP). Property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes Contractor-acquired property if the Contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
8.1.14. Government Property. All property owned or leased by the Government. Government property includes both Government-furnished property and Government purchased Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
8.1.15. Hazardous Material. Any item or chemical, which is a “health hazard”, or “physical hazard”, as reflected in Federal Standard (FED-STD) 313 Material Safety Data and Disposal Data for Hazardous Materials Furnished to Government Activities, defined in OSHA 29 CFR 1910, and pursuant to FAR 23.301 (Hazardous Materials) Definition. It also includes any other material designated by a Government COR/technical representative as potentially hazardous and requiring safety controls (e.g., pesticides, fertilizers).
8.1.16. Key Personnel. Contractor personnel evaluated in a source selection process and are used in the performance of a contract. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons who are listed in the proposal. The prime Contractor is responsible for performance of all subcontractors.
8.1.17. Non-Personal Services. The personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.