Amendment_0001.pdf
PDF 473 KB Posted
- Solicitation number
- W90VN9-17-T-0081
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ_W90VN9-17-T-0081_(Released)_.pdf | ||
| RFQ_W90VN917T0081.pdf | ||
| Site_Map_(Attachment_to_RFQ).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W90VN9-17-T-0081
411TH CSB, KOREA - RCO DAEGU
POC: MR. YU, CHU HYONG
TEL: 053-470-8107
CHUHYONG.YU.LN@MAIL.MIL
APO AP 96218-5682
UNITED STATES OF AMERICA (THE)
0010985536
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See next page for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 30
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Jul-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W90VN9-17-T-0081
X 9B. DATED (SEE ITEM 11)
03-Jul-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Jul-2017
CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO DAEGU, UNIT #15682
APO AP 96218-5682
UNITED STATES OF AMERICA (THE)
W90VN9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W90VN9
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT NO. 0001
1. The purpose of this amendment is to accomplish the following things:
a. The unit of issue for SUBCLIN 0001AC has changed from Cubic Inches to Cubic Meter.
b. Frequency of performance has been added to the List of Buildings in Appendix A.
c. "Issued by Kyongbuk-Do or Daegu City" has been deleted from paragraph 1.6.7.2 in Performance Work Statement.
d. Unit for Item No.3, Contaminated Sand/Soil in Technical Exhibit 3 (Estimated Workload Data) has changed from Liter to Cubic Meter.
2. All other terms and conditions remain the same.
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
SUBCLIN 0001AC
The unit of issue has changed from Cubic Inches to Cubic Meter.
The following have been modified:
APPENDIX A
List of Buildings
Note: The quantities and frequencies specified in the list of buildings are estimate.
Base Period
CLIN 0001, Daegu Area
Bldg No.
SUBCLIN 0001AA
(Oil)
SUBCLIN 0001AB
(Water)
SUBCLIN 0001AC
(POL-Laden Sediment, etc.)
SUBCLIN 0001AD
(Cleaning Separators)
Total Qty (Liter)
Frequency (Qty x Times)
Total Qty (Liter)
Frequency (Qty x Times)
Total Qty (Cubic Meter)
Frequency (Qty x Times)
Total Qty (Square Foot)
Frequency (Qty x Times)
20 (Camp Walker) 1,136 568 x 2 2,270 1,135 x2 2.2 1.1. x 2 300 150 x 2 200 (Camp Walker) 1,362 682 x 2 2,728 1,364 x 2 6.6 3.3 x 2 300 150 x 2 215 (Camp Walker) 2,000 1,000 x 2 6,840 3,420 x 2 6.6 3.3 x 2 856 428 x 2 430 (Camp Walker) 1,136 568 x 2 2,270 1,135 x2 8.2 4.1 x 2 300 150 x 2 431 (Camp Walker) 1,136 568 x 2 2,270 1,135 x2 2.2 1.1. x 2 300 150 x 2 440 (Camp Walker) 3,408 1,704 x 2 6,810 3,405 x 2 12.6 6.3 x 2 600 300 x 2 325 (Camp Walker) 12 6 x 2 1001 (Camp Henry) 1,136 568 x 2 2,270 1,135 x2 6.2 3.1 x 2 300 150 x 2 1415 (Camp Henry) 1,136 568 x 2 2,270 1,135 x2 8.2 4.1 x 2 300 150 x 2 1541 (Camp Henry) 1,136 568 x 2 2,270 1,135 x2 8.2 4.1 x 2 300 150 x 2
TOTAL 13,586 29,998 73 3,556
CLIN 0002, Camp Carroll
SUBCLIN 0002AA
SUBCLIN 0002AB
SUBCLIN 0002AC
etc.)
SUBCLIN 0002AD
(Liter) Frequency
(Qty x Times)
Total Qty (Liter)
Frequency (Qty x Times)
Total Qty (Cubic Meter)
Frequency (Qty x Times)
Total Qty (Square Foot)
Frequency (Qty x Times)
326 C (R) 520 1,560 0.52 84 326 D (S) 12,400 3,100 x 4 18,600 9,330 x 2 6.2 3.1 x 2 1,800 900 x 2 326 E 300 5,780 0.3 84 326 F (F) 500 3,700 0.3 76 326 G (F) 500 3,700 0.3 76 326 H (F) 500 3,700 0.3 76 327 A (F) 11,200 2,800 x 4 16,800 8,400 x 2 2.00 1.0 x 2 1,600 800 x 2
370 DPW 1,000 11,300 1.0 150
402 501st SD 800 16,200 1.0 119
403 6TH ORD 800 16,200 1.0 119
405 DSU (S) 2,400 8,600 1.0 350
405 ORG MAINT (N) 500 14,300 0.5 76
405 DSU (N) 500 40,900 1.0 76
510 MAD 2,000 9,600 2.0 300
520 168TH MED 500 17,600 0.5 76
562, DRMO 2,000 1,000 x 2 5,000 2,500 x 2 8 4.0 x 2 672 336 x 2
601 C & P, MSC-K 800 6,900 0.8 119
665 Combat, HED, MSC-K
800 200 x 4 7,400 3,700 x 2 0.4 0.2 x 2 608 304 x 2
658 C&P, MSC-K 2,000 500 x 4 16,600 8,300 x 2 2.0 1 x 2 304 152 x 2 675 HED, MSC-K 20,000 5,000 x 4 80,400 40,200 x 2 10.0 5 x 2 4,472 2,236 x 2
712 16TH MED LOG
(REIM)
500 10,500 1.0 76
817 APS#4(E) 3,800 1,900 x 2 19,400 9,700 x 2 4.0 2 x 2 700 350 x 2 817 APS#4(W) 5,000 2,500 x2 25,400 12,700 x 2 4.0 2 x 2 900 450 x 2
825 COSIS, MSC-K 8,000 2,000 x 4 48,000 24,000 x 2 5.6 2.8 x 2 1,200 600 x 2
845 C & P, MSC-K 430 6,900 1.3 70
915 A (F), TMP 200 6,300 0.5 35
915 B (F), TMP 2,800 8,400 2.8 400
915 C (R), TMP 200 13,600 0.2 35
938 C & P, MSC-K 500 8,000 0.5 76
970 4-5 ADA Bn 1,000 37,000 1.0 150 396 501st SD 1,000 10,000 1.0 150 Area D 300 2,000 0.2 42 958, MSC-K 780 390 x 2 3,920 1,960 x 2 2.0 1 x 2 60 987, C&P Maint Shop, MSC-K
2,000 500 x 4 11,600 5,800 x 2 1.4 0.7 x 2 62
TOTAL 86,530 515,860 65.00 15,193
CLIN 0003, Busan Area
SUBCLIN 0003AA
SUBCLIN 0003AB
SUBCLIN 0003AC
etc.)
SUBCLIN 0003AD
Frequency
(Qty x Times)
Total Qty (Liter)
Frequency (Qty x Times)
Total Qty (Cubic Meter)
Frequency (Qty x Times)
Total Qty (Square Foot)
Frequency (Qty x Times)
1348, BSF 415 2,480 2 200
1385, BSF 3,300 29,700 3 654
2650, Pier#8 3,300 29,700 3 654
TOTAL 7,015 61,880 8 1,508
1st Option Period
CLIN 1001, Daegu Area
SUBCLIN 1001AA
SUBCLIN 1001AB
SUBCLIN 1001AC
etc.)
SUBCLIN 1001AD
Frequency (Qty x Times)
Total Qty (Liter)
Frequency (Qty x Times)
Total Qty (Cubic Meter)
Frequency (Qty x Times)
Total Qty (Square Foot)
Frequency (Qty x Times)
20 (Camp Walker) 1,136 568 x 2 2,270 1,135 x2 2.2 1.1. x 2 300 150 x 2 200 (Camp Walker) 1,362 682 x 2 2,728 1,364 x 2 6.6 3.3 x 2 300 150 x 2 215 (Camp Walker) 2,000 1,000 x 2 6,840 3,420 x 2 6.6 3.3 x 2 856 428 x 2 430 (Camp Walker) 1,136 568 x 2 2,270 1,135 x2 8.2 4.1 x 2 300 150 x 2 431 (Camp Walker) 1,136 568 x 2 2,270 1,135 x2 2.2 1.1. x 2 300 150 x 2 440 (Camp Walker) 3,408 1,704 x 2 6,810 3,405 x 2 12.6 6.3 x 2 600 300 x 2 325 (Camp Walker) 12 6 x 2 1001 (Camp Henry) 1,136 568 x 2 2,270 1,135 x2 6.2 3.1 x 2 300 150 x 2 1415 (Camp Henry) 1,136 568 x 2 2,270 1,135 x2 8.2 4.1 x 2 300 150 x 2
CLIN 1002, Camp Carroll
SUBCLIN 1002AA
SUBCLIN 1002AB
SUBCLIN 1002AC
etc.)
SUBCLIN 1002AD
Frequency (Qty x Times)
Total Qty (Liter)
Frequency (Qty x Times)
Total Qty (Cubic Meter)
Frequency (Qty x Times)
Total Qty (Square Foot)
Frequency (Qty x Times)
326 C (R) 520 1,560 0.52 84 326 D (S) 12,400 3,100 x 4 18,600 9,330 x 2 6.2 3.1 x 2 1,800 900 x 2 326 E 300 5,780 0.3 84 326 F (F) 500 3,700 0.3 76 326 G (F) 500 3,700 0.3 76 326 H (F) 500 3,700 0.3 76 327 A (F) 11,200 2,800 x 4 16,800 8,400 x 2 2.00 1.0 x 2 1,600 800 x 2
370 DPW 1,000 11,300 1.0 150
402 501st SD 800 16,200 1.0 119
403 6TH ORD 800 16,200 1.0 119
405 DSU (S) 2,400 8,600 1.0 350
405 ORG MAINT (N) 500 14,300 0.5 76
405 DSU (N) 500 40,900 1.0 76
510 MAD 2,000 9,600 2.0 300
520 168TH MED 500 17,600 0.5 76
562, DRMO 2,000 1,000 x 2 5,000 2,500 x 2 8 4.0 x 2 672 336 x 2
601 C & P, MSC-K 800 6,900 0.8 119
665 Combat, HED, MSC-K
800 200 x 4 7,400 3,700 x 2 0.4 0.2 x 2 608 304 x 2
658 C&P, MSC-K 2,000 500 x 4 16,600 8,300 x 2 2.0 1 x 2 304 152 x 2 675 HED, MSC-K 20,000 5,000 x 4 80,400 40,200 x 2 10.0 5 x 2 4,472 2,236 x 2
712 16TH MED LOG
(REIM)
500 10,500 1.0 76
817 APS#4(E) 3,800 1,900 x 2 19,400 9,700 x 2 4.0 2 x 2 700 350 x 2 817 APS#4(W) 5,000 2,500 x2 25,400 12,700 x 2 4.0 2 x 2 900 450 x 2 825 COSIS, MSC-K 8,000 2,000 x 4 48,000 24,000 x 2 5.6 2.8 x 2 1,200 600 x 2
845 C & P, MSC-K 430 6,900 1.3 70
915 A (F), TMP 200 6,300 0.5 35
915 B (F), TMP 2,800 8,400 2.8 400
915 C (R), TMP 200 13,600 0.2 35
938 C & P, MSC-K 500 8,000 0.5 76
970 4-5 ADA Bn 1,000 37,000 1.0 150 396 501st SD 1,000 10,000 1.0 150 Area D 300 2,000 0.2 42 958, MSC-K 780 390 x 2 3,920 1,960 x 2 2.0 1 x 2 60 987, C&P Maint Shop, MSC-K
CLIN 1003, Busan Area
SUBCLIN 1003AA
SUBCLIN 1003AB
SUBCLIN 1003AC
etc.)
SUBCLIN 1003AD
Frequency (Qty x Times)
Total Qty (Liter)
Frequency (Qty x Times)
Total Qty (Cubic Meter)
Frequency (Qty x Times)
Total Qty (Square Foot)
Frequency (Qty x Times)
1348, BSF 415 2,480 2 200
1385, BSF 3,300 29,700 3 654
2nd Option Period
CLIN 0001, Daegu Area
SUBCLIN 2001AA
SUBCLIN 2001AB
SUBCLIN 2001AC
etc.)
SUBCLIN 2001AD
Frequency (Qty x Times)
Total Qty (Liter)
Frequency (Qty x Times)
Total Qty (Cubic Meter)
Frequency (Qty x Times)
Total Qty (Square Foot)
Frequency (Qty x Times)
20 (Camp Walker) 1,136 568 x 2 2,270 1,135 x2 2.2 1.1. x 2 300 150 x 2 200 (Camp Walker) 1,362 682 x 2 2,728 1,364 x 2 6.6 3.3 x 2 300 150 x 2 215 (Camp Walker) 2,000 1,000 x 2 6,840 3,420 x 2 6.6 3.3 x 2 856 428 x 2 430 (Camp Walker) 1,136 568 x 2 2,270 1,135 x2 8.2 4.1 x 2 300 150 x 2 431 (Camp Walker) 1,136 568 x 2 2,270 1,135 x2 2.2 1.1. x 2 300 150 x 2 440 (Camp Walker) 3,408 1,704 x 2 6,810 3,405 x 2 12.6 6.3 x 2 600 300 x 2 325 (Camp Walker) 12 6 x 2 1001 (Camp Henry) 1,136 568 x 2 2,270 1,135 x2 6.2 3.1 x 2 300 150 x 2 1415 (Camp Henry) 1,136 568 x 2 2,270 1,135 x2 8.2 4.1 x 2 300 150 x 2
CLIN 2002, Camp Carroll
SUBCLIN 2002AA
SUBCLIN 2002AB
SUBCLIN 2002AC
etc.)
SUBCLIN 2002AD
Frequency (Qty x Times)
Total Qty (Liter)
Frequency (Qty x Times)
Total Qty (Cubic Meter)
Frequency (Qty x Times)
Total Qty (Square Foot)
Frequency (Qty x Times)
326 C (R) 520 1,560 0.52 84 326 D (S) 12,400 3,100 x 4 18,600 9,330 x 2 6.2 3.1 x 2 1,800 900 x 2 326 E 300 5,780 0.3 84 326 F (F) 500 3,700 0.3 76 326 G (F) 500 3,700 0.3 76 326 H (F) 500 3,700 0.3 76 327 A (F) 11,200 2,800 x 4 16,800 8,400 x 2 2.00 1.0 x 2 1,600 800 x 2
370 DPW 1,000 11,300 1.0 150
402 501st SD 800 16,200 1.0 119
403 6TH ORD 800 16,200 1.0 119
405 DSU (S) 2,400 8,600 1.0 350
405 ORG MAINT (N) 500 14,300 0.5 76
405 DSU (N) 500 40,900 1.0 76
510 MAD 2,000 9,600 2.0 300
520 168TH MED 500 17,600 0.5 76
562, DRMO 2,000 1,000 x 2 5,000 2,500 x 2 8 4.0 x 2 672 336 x 2
601 C & P, MSC-K 800 6,900 0.8 119
665 Combat, HED, 800 200 x 4 7,400 3,700 x 2 0.4 0.2 x 2 608 304 x 2
MSC-K
658 C&P, MSC-K 2,000 500 x 4 16,600 8,300 x 2 2.0 1 x 2 304 152 x 2 675 HED, MSC-K 20,000 5,000 x 4 80,400 40,200 x 2 10.0 5 x 2 4,472 2,236 x 2
712 16TH MED LOG
(REIM)
500 10,500 1.0 76
817 APS#4(E) 3,800 1,900 x 2 19,400 9,700 x 2 4.0 2 x 2 700 350 x 2 817 APS#4(W) 5,000 2,500 x2 25,400 12,700 x 2 4.0 2 x 2 900 450 x 2 825 COSIS, MSC-K 8,000 2,000 x 4 48,000 24,000 x 2 5.6 2.8 x 2 1,200 600 x 2
845 C & P, MSC-K 430 6,900 1.3 70
915 A (F), TMP 200 6,300 0.5 35
915 B (F), TMP 2,800 8,400 2.8 400
915 C (R), TMP 200 13,600 0.2 35
938 C & P, MSC-K 500 8,000 0.5 76
970 4-5 ADA Bn 1,000 37,000 1.0 150 396 501st SD 1,000 10,000 1.0 150 Area D 300 2,000 0.2 42 958, MSC-K 780 390 x 2 3,920 1,960 x 2 2.0 1 x 2 60 987, C&P Maint Shop, MSC-K
CLIN 2003, Busan Area
SUBCLIN 2003AA
SUBCLIN 2003AB
SUBCLIN 2003AC
etc.)
SUBCLIN 2003AD
Frequency (Qty x Times)
Total Qty (Liter)
Frequency (Qty x Times)
Total Qty (Cubic Meter)
Frequency (Qty x Times)
Total Qty (Square Foot)
Frequency (Qty x Times)
1348, BSF 415 2,480 2 200
1385, BSF 3,300 29,700 3 654
PWS
PERFORMANCE WORK STATEMENT (PWS)
FOR
Removal/Transportation/Disposal of Contaminated Oil/Water/POL USAG Daegu
PART 1
GENERAL INFORMATION
1. GENERAL: This is service contract to provide remove/transport/dispose contaminated oil/water mixture and POL-laden sediment/sand/soil from various oil/water separators at U.S installations in USAG Daegu. The Government will not exercise any supervision or control over the Contractor’s performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1. Description of Services/Introduction: The Contractor shall provide required all personnel, equipment, tools, supplies, supervision, transportation, and any other resources necessary to remove/ transport/dispose contaminated & used oil/water mixture and POL-laden sediment/sand/soil from oil water separators at various locations in USAG Daegu in accordance with the local environmental law, standards, and all other terms and conditions contained herein. The collection points are in Attachment (Site Maps).
1.2. Background: This is service contract to remove/transport/dispose contaminated oil/water mixture and POL-laden sediment/sand/soil from various oil/water separators at U.S installations in USAG Daegu.
1.3. Objectives: Remove all contaminated & used oil/water mixture and POL-laden sediment/sand/soil from all collection points in Daegu/Carroll/Busan area.
1.4. Scope: The Contractor shall provide all personnel, equipment, labor, supplies, tools, material, supervision, licenses and permits, and any other resource necessary for removal, transportation, and disposal of contaminated oil/water mixture and POL-laden sediment/sand/soil from various oil/water separators at U.S Installations in Daegu area, Camp Carroll area and Busan area (refer to Appendix A), in strict compliance with all the provisions of the contract as specified in Section C of this solicitation/contract as well as in accordance with the applicable laws and regulations in stipulated in documents listed in Part 6. Applicable Publications.
1.5. Period of Performance: The period of performance shall be for one (1) Base Year and two (2) Option Years.
The Period of Performance will be as follows:
Base Year 15 August 2017 – 14 August 2018 Option Year I 15 August 2018 – 14 August 2019 Option Year II 15 August 2019 – 14 August 2020
1.6. General Information
1.6.1. Hours of Operation: The Contractor is responsible for conducting business, between the hours of 0700-1800 hrs Monday through Saturday except Korean holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
1.6.2. Place of Performance: The work to be performed under this contract will be performed at Daegu, Camp Carroll and Busan Areas.
1.6.3. Quality Control Program (QCP): The Contractor shall develop and maintain an effective QCP to ensure services are performed in accordance with (IAW) this PWS. The QCP must be forwarded to and accepted by the KO and Contracting Officer’s Representative (COR). The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of deficiencies. The Contractor’s QCP is the means by which the Contractor assures that the work complies with the requirement of the contract. The QCP should be submitted within seven (7) days after award and revised QCP shall be provided to KO within three (3) working days when changes are made thereafter. After acceptance of the QCP the Contractor shall receive the contracting officer’s acceptance in writing of any proposed change to the QCP. At minimum, the QCP will include the following:
1.6.3.1. An inspection system covering all the services required under the terms and conditions of the contract. It must specify the areas to be inspected on both a scheduled or unscheduled basis, how often inspections will be conducted, and the title of the individual(s) who shall perform the inspections.
1.6.3.2. On-site records of all inspections conducted by the Contractor and necessary corrective action taken shall be made available to the Government during the term of the contract.
1.6.3.3. Daily performance report, deficiency list, the QCP and other related documents shall be maintained by the Contractor. The documents shall be readily available to the Government at any time during the term of the contract.
1.6.4. Quality Assurance: The Contractor shall comply with the Government’s quality assurance program as defined in the Quality Assurance Surveillance Plan. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable quality level(s) (AQL). Government surveillance of contractor performance is not limited to the Performance Objectives as outlined in this PWS. The Government reserves the right to conduct compliance surveillance of any contractual requirement of this acquisition.
1.6.4.1. The Government reserves the right to inspect the Contractor’s performance. The Government will record all surveillance observations. When an observation indicates defective performance, the COR will request the Contactor’s representative to initial the observation.
1.6.4.2. Performance Rating: The COR will evaluate Contractor’s performance based on the checklist, USFK Form173-R-E or web base performance rating in Virtual Contracting Enterprise (VCE). The Contractor’s performance rating will be prepared and submitted to the contracting officer on a monthly basis.
1.6.4.3. Performance Evaluation Meetings: The contract manager (CM) shall be required to meet bi-weekly with the COR and KO during the first two months of the contract. Meetings will take place as often as necessary thereafter as determined by the COR or KO. The written minutes will be prepared by the Government and these minutes will be signed by the COR.
1.6.5. Type of Contract: The Government will award single requirements contract from this solicitation as a Firm Fixed Price type.
1.6.6. Security Requirements: Contractor personnel performing work under this contract must have the proper level of security at time of the contract start date, and must maintain the level of security required for the life of the contract.
1.6.6.1. Physical Security: The Contractor shall safeguard all government equipment, information and property provided for Contractor use. Contractor shall maintain a physical security checklist/log which will be forwarded to the COR on a monthly or quarterly basis. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.6.7 Special Qualifications: The Contractor shall maintain all required Republic of Korea (ROK) licenses and qualifications for the disposal of used oil/water mixture within the PWS of this contact. The Contractor shall employ personnel who are knowledgeable of all relevant environmental laws and have experience in used oil/water mixture waste management.
1.6.7.1. Sanitation Requirements:
1.6.7.1.1. Collection Vehicles: The Contractor shall submit proposed collection vehicle cleaning procedures within seven
(7) calendar days after contract award and schedules for the COR’s review. Collection vehicle, including the body of the vehicle, used for hauling used oil/water mixture shall be washed as often as necessary to maintain a clean condition at all times. No cleaning facility or area shall be provided by the Government. Cleaning will be in full compliance with applicable ROK environmental laws and regulation. The Contractor shall be responsible for cleaning vehicles, and submit a report for cleaning vehicles to the COR monthly basis on 1st Monday of each month.
1.6.7.1.2. Cleaning of Surrounding Service Area: Upon completion of work, the Contractor shall clean used oil/water mixture pick up area within a ten (10) foot radius after the performance of work. The Contractor shall submit to the COR a report of all working areas cleaned the 1st Monday of each month.
1.6.7.1.3. Spills:
1.6.7.1.3.1. The Contractor shall be responsible for the complete clean-up of all spills caused by the Contractor during the performance of work in this PWS. The Contractor shall submit procedures for cleaning spills to the COR for acceptance.
1.6.7.1.3.2. Contractor’s failure to remedy spills IAW their procedures of the Contracting Officer (KO) within one (1) calendar day after the spill incident may result in a reduction in payment to the Contractor in an amount equal to Government clean up costs.
1.6.7.2. License Requirements: The prime Contractor should be licensed and registered by ROK Government to remove, transport and dispose of the contaminated oil/water/POL (liquid type) under this contract. The Prime Contractor shall possess current and valid all required local ROK licenses for used oil collection and transportation business (폐기물 수집/운반업 허가증, 지정폐기물: 액상 폐유) to remove/transport/dispose the contaminated oil/water/POL identified under this contract.
1.6.7.3. Prior Experience: The prime Contractor shall have at least three (3) years of experience during the last five
(5) years in performing contaminated oil/water/POL removal as specified in the solicitation. The Contractor shall provide all necessary information of prior experience to perform this contract, particularly as it relates to the offeror’s overall abilities.
1.6.7.4. Personnel Qualification Requirements: The Contractor shall provide an on-site Contract Manager (CM) and Alternate CM (ACM) to interact with government representatives and to supervise the Contractor’s performance under this contract. The CM shall have full authority to act for the Contractor on the installation at all times during the performance of the work in order to comply with all requirement of this contract. The CM and ACM shall have a minimum two (2) years experience as a CM or ACM within the last five (5) years in removal, transport and disposal of the contaminated oil/water/POL mixtures services in similar size and same scope by providing resumes.
The CM and ACM should be employed by the prime Contractor. The CM and ACM shall be able to read, write, speak and understand English at a level that will enable them to perform all assigned duties. The Contractor shall notify the COR of any changes in CM or ACM personnel.
1.6.8. Base Passes and Vehicle Permits
1.6.8.1. Contractor employees and representatives shall be required to have proper identification prior to entering each Government installation. Such identification shall be controlled as prescribed by the Security Section, Provost Marshal, or equivalent security control authority at the installation concerned.
1.6.8.1.1. Base Pass: Upon notice of award, the Contractor shall obtain all passes and necessary vehicle permits required for entry by authorized Contractor personnel IAW base policy, and the point of contact information for this action will be provided upon contract award. All Contractor employees and representatives shall have in their possession a Korean Citizen Identification Card during performance under this contract.
1.6.8.2. The Contractor shall ensure that employees have a current and valid driver’s license before allowing the employee to operate a Contractor-owned vehicle on the base. The Contractor and its employees shall comply with all security requirements imposed by the local installation commander at all times while on the military installation. Any Contractor traffic violations may result in the denial of driving privileges on the installations. A copy of all licenses shall be provided to the COR within seven (7) days after contract award.
1.6.8.3. All Contractor employees shall abide by all Government installation regulations during performance under this contract.
1.6.8.4. The COR will not be responsible for providing escorts for the Contractor.
1.6.8.5. The Contractor will be authorized escort privileges only for people working under this contract and only during hours stated under this contract.
1.6.9. Safety
1.6.9.1. Safety Requirements. The Contractor shall exercise safety and health precautions as necessary to prevent safety hazards to personnel, materials, and equipment. Unsafe practices and/or conditions will be immediately called to the attention of the Contract Manager for remedial or corrective action. Conditions beyond the Contractor’s responsibility will be referred to the COR for corrective action. Contractor’s employees shall be thoroughly indoctrinated on safe operating procedures and precautions essential to the accomplishment of their tasks. Safety measures shall be implemented and adhered to by the Contractor and shall be in accordance with EM 385-1-1 Safety and Health Requirements Manual (latest edition). The latest version of the EM 385-1-1 can be found at http://www.usace.army.mil/publications/eng-manuals/em385-1-1/toc.htm.
1.6.9.2. The Contractor shall immediately correct all safety deficiencies upon notification of the deficiencies by the COR and shall notify the COR of the corrective action to be taken. The Contractor shall be responsible for ensuring that all equipment that is utilized during the performance of this contract is functional and is used in a safe manner.
1.6.9.3. The Contractor shall submit the safety plan to the COR for review within seven (7) days after contract award.
1.6.10. Inspection
1.6.10.1. The Contractor shall notify the COR upon the completion of work of all areas in which removal work has been accomplished and is ready for inspection by the COR. The Contractor shall provide its completed work list to the COR daily. If the work has not been performed, or has not been performed satisfactorily, the COR will notify the Contractor immediately. The Contractor shall render immediate corrective action within four (4) hours of notice of non-performance or unsatisfactory performance.
1.6.11. Work Schedule
1.6.11.1. The Contractor shall establish a plan for vehicle routes and collection schedules based on the contaminated oil/water/POL mixture removal points from various locations in Daegu area, Camp Carroll area and Busan area in accordance with Appendix A, List of Oil/Water Separator, and submit to the COR for review and acceptance within seven
(7) calendar days after contract award. The Contractor shall schedule and arrange work to accommodate the normal Government business and mission. The schedule shall not be changed without written acknowledgement of the COR.
1.6.11.2. In the event of inclement weather or Acts of God in which the Contractor has no control and prevents the Contractor from completing trash collection as scheduled, the Contractor shall notify the COR of such conditions immediately. If the Government excuses the Contractor from performing the services due to severe weather or Acts of God, the Contractor shall accomplish missed collections within 24 hours after severe weather or Acts of God have passed. If all make-up collections cannot be made within 24 hours, a revised schedule shall be submitted to the COR for review and acceptance.
1.6.12. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. The KO and the COR shall meet periodically with the contractor to review the contractor's performance. At these meetings the KO will apprise the Contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.
1.6.13. Contracting Officer’s Representative (COR): The COR Management System Tool (Virtual Contracting Enterprise (VCE)-Acquisition Resource Center (ARC) https://arc.army.mil/COR) for nomination, tracking, documentation, and management of CORs will be used. The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: Assure that the Contractor performs the technical requirements of the contract;
perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
http://www.usace.army.mil/publications/eng-manuals/em385-1-1/toc.htm http://www.usace.army.mil/publications/eng-manuals/em385-1-1/toc.htm https://arc.army.mil/COR
1.6.14. Key Personnel. The following personnel are considered key personnel by the Government: Contract Manager (CM)/Alternate Contract Manager (ACM). The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the COR. The contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.
The contract manager or alternate shall be available between 0700-1630 hrs, Monday through Saturday except Korean holidays or when the Government facility is closed for administrative reasons.
1.6.15. Other Direct Costs: All fees associated with disposal are the responsibility of the Contractor.
1.6.16. Antiterrorism (AT) and Operations Security (OPSEC)
1.6.16.1. AT Level I Training: This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility, or area. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within 14 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the KO, if a COR is not assigned within 14 calendar days after completion of training by all employees and subcontractor personnel.
1.6.16.2. Access and General Protection/Security Policy and Procedures: This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility, or area.
Contractor and all associated sub-contractors’ employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshall Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.6.16.3. iWATCH Training: This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 14 calendar days of contract award and within 14 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
1.6.17. Emergency Services
1.6.17.1. The Contractor shall have competent personnel trained and capable of dealing with minor personnel injuries. The Contractor of their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor will, in turn, notify the KO or COR within 30 minutes of the incident.
1.6.17.2. Emergency medical treatment and services for Contractor personnel is the responsibility of the Contractor.
PART 2
DEFINITIONS, ACRONYMS, AND ABBREVIATIONS
2. DEFINITIONS AND ACRONYMS:
2.1. Definitions:
2.1.1. Cannibalize. Remove parts from Government property for use or for installation on other Government property.
2.1.2. Collection Station: The designated point(s) where solid waste will be placed for collection by the Contractor.
This term may also be referred to as collection point, pick-up points, or collection site.
2.1.3. Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.4. Contractor Acquired Property. Property acquired, fabricated, or otherwise provided by the contractor for performing a contract and to which the Government has title.
2.1.5. Contracting Officer (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.6. Contracting Officer’s Representative (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.7. Contract Manager (CM) and Alternate Contract Manager (ACM). The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the COR. The contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. CM and ACM should be employed by the prime contractor. The contractor shall provide any changes of CM or ACM personnel to KO and COR for approval within two (2) working days.
2.1.8. Defective Service. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.9. Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.10. Equipment. A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale, and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, special test equipment or special tooling.
2.1.11. Government Furnished Property. Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
2.1.12. Government Property. All property owned or leased by the Government. Government property includes both Government-furnished property and contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
2.1.13. Loss of Government Property. Unintended, unforeseen or accidental loss, damage, or destruction of Government property that reduces the Government’s expected economic benefits of the property. Loss of Government property does not include occurrences such as purposeful destructive testing, obsolescence, normal wear and tear, or manufacturing defects. Loss of Government property includes, but is not limited to:—
(1) Items that cannot be found after a reasonable search;
(2) Theft:
(3) Damage resulting in unexpected harm to property requiring repair to restore the item to usable condition; or
(4) Destruction resulting from incidents that render the item useless for its intended purpose or beyond economical repair.
2.1.14. Material. Property that may be consumed or expended during the performance of a contract, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end-item.
Material does not include equipment, special tooling, and special test equipment or real property.
2.1.15. Physical Security. Actions that prevent the loss or damage of Government property.
2.1.16. Property. All tangible property, both real and personal.
2.1.17. Property Administrator. An authorized representative of the KO appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a contractor.
2.1.18. Property Records. Records created and maintained by the contractor in support of its stewardship responsibilities for the management of Government property.
2.1.19. Provide. To furnish, as in Government-furnished property, or to acquire, as in contractor-acquired property.
2.1.20. Quality Assurance. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.21. Quality Assurance Surveillance Plan. An organized document written by the government specifying the surveillance methodology used for surveillance of Contractor performance.
2.1.22. Quality Control. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.23. Deficient Services: Daily services found to be incomplete, defective, or not accomplished as scheduled shall be reported to the Contractor for immediate corrective action by the Contractor. Deficient service will be acceptably completed, corrected or re-accomplished no later than four (4) hours from notification by the COR.
2.1.24. Working Procedures: Procedures or processes for pick-up, segregation, transportation of regular trash.
2.1.25. Sensitive Property means property potentially dangerous to the public safety or security if stolen, lost, or misplaced, or that shall be subject to exceptional physical security, protection, control, and accountability. Examples include weapons, ammunition, explosives, controlled substances, radioactive materials, hazardous materials or wastes, or precious metals.
2.1.26. Unit Acquisition Cost means—
(1) For Government-furnished property, the dollar value assigned by the Government and identified in the contract; and
(2) For contractor-acquired property, the cost derived from the contractor’s records that reflect consistently applied generally accepted accounting principles.
2.1.27. Wide Area Work Flow (WAWF): A secure web based system for electronic invoicing, receipt, and acceptance. WAWF allows government vendors to submit and track invoices and receipt/acceptance documents over the web and allows government personnel to process those invoices in a real-time, paperless environment.
2.1.28. Work Day. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.29. Work Week. Monday through Saturday, unless specified otherwise.
2.2. Acronyms:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CAP Contractor Acquired Property CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTS Commercial-Off-the-Shelf DA Department of the Army DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense FAR Federal Acquisition Regulation GFP Government-Furnished Property KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PA Property Administrator PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit WAWF Wide Area Work Flow
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. The Government shall not furnish any materials (unless specified in the contract), equipment or personnel to assist the contractor in the performance of the Contractor’s responsibilities under the terms of the contract. The Contractor understands that any such offers of assistance are unauthorized, and the Contractor shall not accept any such offers.
3.2. The Government will not assume any liability for damage to or loss of Contractor’s property or for injury or death of any person resulting from fire, theft, or any other cause while performance under the Government provided facility. The Contractor shall indemnify the Government from all such potential liability.
3.3. Protection of Government Installations.
3.3.1. While operating on Government installations, the Contractor and/or its representative shall maintain adequate measures and methods to ensure the protection of Government property.
3.3.2. The Contractor shall be held responsible and shall be reimbursing the Government for any of its employees or representative the results in damage, destruction, or theft of Government property.
3.4. Damage to Government Property.
3.4.1. If such damage occurs, the Contractor shall immediately repair at its own expense.
3.4.2. The Contractor’s invoice for that month at KO’s discretion may not be certified until the damage have been repaired and accepted by the COR.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1. General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Part 3, Government Furnished Items and Services of this PWS.
4.2. Vehicle:
4.2.1. The Contractor shall provide vehicles that are equipped with the required safety devices. The Contractor shall not use open-box trucks, with or without canvas cover, except for collection of debris or bulky items. It is the Contractor’s responsibility for loading and off-loading these wastes at removal points within Daegu, Camp Carroll and Busan Area.
4.2.2. The Contractor shall provide and maintain vehicles in an operational condition for transportation to meet the requirements of this contract in accordance with applicable local vehicle standards, USFK Regulation 190-1, Army Installation Regulations.
4.2.3. The Contractor shall display its company name, and telephone number on all vehicles to be used in the performance of removal/transportation/disposal of contaminated oil/water/POL mixtures.
4.2.4. If the vehicle is at any time deemed unsafe or unserviceable by the COR, the Contractor shall remove equipment from the post and replace the defective vehicle with a serviceable one within 24 hours. Vehicular repairs shall not be performed on post.
4.3. Equipment and Tools:
4.3.1. The Contractor shall furnish all equipment and tools necessary to properly perform the work defined in this contract.
4.3.2. The Contractor’s equipment shall be of commercial quality, size, and type suitable for accomplishing the various phases of work specified and shall meet all safety requirements.
4.3.3. The Contractor’s equipment shall be in good operational condition and have the ability to operate efficiently and safely. The Contractor shall provide a list of equipment and tools proposed under this contract to the COR within seven (7) days after contract award.
4.3.4. All equipment and vehicles used under this contract will be subject to inspection by the COR at any time to ensure the all equipment is both operational and safe. The Contractor shall make immediate action to correct all deficiencies found by the COR. The Contractor shall ensure that all equipment utilized during the performance of this contract is in operational and safe condition. Upon completion of the work, the Contractor shall remove all tools from the work area and leave the area disinfected and free of any wastes.
4.3.5. The Contractor shall be responsible for providing and using appropriate safety equipment and gear for performance under this contract to prevent Contractor injuries and warn the general public.
4.4. Transportation Requirements.
4.4.1. All vehicles shall be in operable condition and meet ROK and USFK safety standards.
4.4.2. All vehicles shall be operated in accordance with installation traffic regulations.
4.4.3. All Contractor equipment shall be equipped with proper safety and noise limiting devices and shall be in a safe operating condition at all times. All equipment shall be subject to safety inspections at any time by the COR. Any defective equipment shall be either repaired or removed from the installation when asked by the COR.
4.4.4. Vehicle Maintenance: The Contractor shall be responsible for making all repairs to keep its vehicles in operational condition to meet all requirements of this contract.
4.4.5. Cleaning Requirements: The Contractor shall ensure all vehicles are in a clean condition at all times. No cleaning facilities or areas will be provided by the Government. Cleaning will be conducted in full compliance with applicable Korean Environmental Laws and Regulations.
PART 5
SPECIFIC TASKS
5. SPECIFIC TASKS:
5.1. The Contractor shall perform the contracted services upon issuance of a delivery order. The COR will notify the Contractor when oil/water separator is ready for cleaning. Notification shall occur no less than seven (7) calendar days prior to the required pick-up date. The Contractor shall notify the COR no less than 48 hours prior to the start of cleaning. The Contractor shall perform the services only in the presence of the Government inspector or COR.
5.2. The U.S. Government shall identify the characteristics of the oil in the oil/water separators prior to pick-up by the Contractor. In some instances, the oil must be analyzed from an approved environmental laboratory by U.S.
Government. The characteristics of the oil shall determine the method of disposal required of the Contractor.
5.3. After receiving a delivery order, the Contractor shall perform the following services:
5.3.1. The Contractor shall remove all oil/water mixture from the separator(s) into the tanker truck.
5.3.1.1. The maximum acceptable percentage of water that is included in the oils is 5% of the total accepted volume.
5.3.1.2. The Contractor shall record the quantity of removed oil/water by use of a metering device (pump capacity: 65 GPM or equal, gage reading range: 0 – 4,500 liter or equal) approved by the COR.
5.3.2. After all oil/water mixture is removed from the separator, the Contractor shall then clean by scraping the surface of the oil/water separator.
5.3.3. Sediment/Sand/Soil Removal:
5.3.3.1. Upon completion of oil/water removal from the oil/water separator, the Contractor shall immediately start to remove sediment/sand/soil from the bottom of the designated oil/water separator(s) and…