Drawing_1_(Mechanical).pdf
PDF 3 MB Posted
- Attached to
- Repair Heating System, Building 3008, Camp Casey
- Solicitation number
- W90VN819R0022
About this file
DRAWINGS - MICHANICAL
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Drawing_2_(Electrical).PDF | ||
| W90VN8-19-R-0022.pdf | ||
| Submittal_Register.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M-1
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
MECHANICAL MATERIAL INDICATIONS &
M E C H A N I C A L M A T E R I A L I N D I C A T I O N S & S Y M B O L S
NTS
PD
Pa
OS&Y
OXY
OD
OAIL
OA
QT
PRV
PPM
POL
POC
PLMB
PH
PG
RT
RPM
RH
RDTR
RA
R12, R22
QTY
A B B R E V I A T I O N S
SBM
SAN
SA
SCH
FLOWMETER, ORIFICEBUTTERFLY
REFRIGERANT LIQUID
CHILLED WATER SUPPLY
CHILLED WATER RETURN
AIR COOLED CONDENSING UNIT
AIR CONDITION UNIT (S)
APPARATUS DEW POINT
AIR CONDITION (-ING,-ED)
CHILLED/HOT WATER RETURN
AMERICAN WIRE GAUGE
PRESSURE, BAROMETRIC
CUBIC METER PER HOUR
CHILLED/HOT WATER SUPPLY
CAPACITYCAP
CONNECTION
CONTINUE
COMPRESSOR
CUBIC METER
CPRSR
CONN
CONT
CU M
CHILLED WATER
CAST IRON PIPE
CIRCUIT
CLASSIFICATION
COOLING LOAD
COEFFICIENT
COUNTER CLOCKWISE
CLASS
CLG LOAD
COEF
CMH
CIP
CCW
CHW
CKT
ACV ALARM CHECK VALVE
AVERAGEAVG
BOILING POINT
CENTIGRADE
BAROMETER(-TRIC)
BRAKE HORSEPOWER
BP
BHP
C
BARO PR
AWG
BARO
ALUMINUM
ALTITUDE
AMBIENT
AIR HANDLING UNIT
AMPERE(AMP, AMPS)
APPROXIMATEAPPROX
ALT
AMB
AMP
AIR COND
ADP
AL
AHU
AIR COOLED
ACCU
ACLD
ACU
CHR
C/HWR
C/HWS
CHS
RL
D DRAIN
DIAMETER, INSIDE
ISOMETRIC
IRON PIPE SIZE
JOULE
THERMAL CONDUCTIVITY
KILOGRAM
KILOGRAM PER SQ. CENTIMETER (GAUGE)
KILOGRAM PER SQ. CENTIMETER
KILOGRAM PER SQ. CENTIMETER (ABSOLUTE)
KILOCALORIE PER HOUR
EXPANSION JOINT
EXPLOSION PROOF
FIRE HOSE CABINET
FULL LOAD AMPERES
ENTERING WATER TEMP
EVAPORAT (-E,-ING,-ED,-OR)
EXTERNAL STATIC PRESSURE
FACE AREA OR FRESH AIRFA
FHC
FHY
FLA
FIRE HYDRANT
ESP
EXPJT
EWT
EVAP
EP
EQPT
ENT
EFF
EQUIPMENT
ENTERING
EFFICIENCY
KG/SQ CM
KG/SQ CM A
KG/SQ CM G
KG
KCAL/HR
J
K
ID
ISO
IPS
NO
N.O.
NIC
NPT
MPS
NC
N/A
N.C.
MAX
MIN
MPH
MM
NOT IN CONTRACT
NATIONAL TAPER PIPE (THREAD)
NUMBER
NORMALLY OPEN
MINIMUM OR MINUTE
METERS PER HOUR
METERS PER SECOND
NORMALLY CLOSED
NOISE CRITERIA
NOT APPLICABLE
MAXIMUM
MILLIMETER R
FEMALE PIPE THREAD
FUEL OIL
GALVANIZED STEEL
GAGE OR GAUGE
FIXTURE
FEED WATER PUMP
FACE VELOCITY
FLUSH VALVE
FREQUENCY
FIBERGLASS REINFORCED PLASTIC
HORIZONTAL
HOT WATER HEATER
HOT WATER
HOUR(S)
HORSEPOWER
MERCURY
HEAD
HOSE BIBB
HERTZ
GRAMS
FRPCWP CIRCULATING WATER PUMP
DIRECT EXPANSION
DRY PIPE VALVE
EQUIVALENT DIRECT RADIATION
ENTERING AIR TEMPERATURE
DOUBLE POLE DOUBLE THROW
DEWPOINT TEMPERATURE
DRY BULB TEMPERATURE
DECIBEL OR DRY BULB
DIESEL OILDO
ECON
ECC
EAT
EDR
DX
DPV
DPDT
DPT
ECONOMIZER
ECCENTRIC
o
DEG or °
DIFF
DIAG
DIA or
DIV
DBT
DB
DIFFERENCE
DIAGRAM
DIAMETER
DIVISION
DEGREE
HR
HORIZ
HWH
HW
HZ
HP
HG
HD
HB
GALVS
GA
GR
FXTR
FWP
FVEL
FV
CUBIC MILLIMETER
CLOCKWISE OR COLD WATER
COEFFICIENT, VALVE FLOWCv
CU MM
CW
PLUG VALVE
THREE WAY
FPT
FO
FREQ
GATE, ANGLE
GATE, GLOBE
GLOBE
GATE
CONTROL
KJ KILOJOULE
LH
LT
LWT
LPS
M
LL
LPD
LPH
LM
LAV
LAT
LBS
LG
KW
KWH
L
LATENT HEAT
LEAVING WATER TEMPERATURE
LITERS PER HOUR
LITERS PER SECOND
LAUNDRY TRAY
METERS
LIQUID LINE
LITERS PER DAY
LINEAR METER
LEAVING AIR TEMPERATURE
LAVATORY
POUNDS
LENGTH
KILOWATT
KILOWATT HOUR
LITERS
P
FLOWMETER, VENTURI
FLOW SWITCH
PRESSURE SWITCH
PRESSURE GAUGE AND COCK
PUMP (INDICATE USE)
STRAINER
STRAINER, BLOW OFF
KG/SM
KG/SM A
KG/SM G
PS
P
OFM
FS
VFM
KILOGRAM PER SQ. METER
KILOGRAM PER SQ. METER (ABSOLUTE)
KILOGRAM PER SQ. METER (GAUGE)
JACKET WATER RETURN
MEDIUM PRESSURE STEAM
MEDIUM PRESSURE CONDENSATE
LOW PRESSURE STEAM
LOW PRESSURE CONDENSATE
BOILER BLOW DOWN
PUMPED CONDENSATE
JACKET WATER SUPPLY
VACUUM PUMP DISCHARGE
FUEL OIL TANK VENT
CONDENSATE WATER SUPPLY
CONDENSATE WATER RETURN
MEDIUM TEMPERATURE HOT WATER SUPPLY
MEDIUM TEMPERATURE HOT WATER RETURN
LOW TEMPERATURE HOT WATER SUPPLY
LOW TEMPERATURE HOT WATER RETURN
PIPE TO BE REMOVED
REFRIGERANT DISCHARGE
REFRIGERANT SUCTION
LPS
CONTROL AIR MAIN
air conditioning and refrigeration
RD
RS
(NAME)E
(NAME)
M
EXISTING PIPE
COMPRESSED AIR
VACUUM (AIR)
HWR
VAC
A
MTWS
MTWR
HWS
FOD FUEL OIL DRAIN
FOR
CS
CR
FOV
FOG
FOS FUEL OIL SUPPLY
FUEL OIL RETURN
FUEL OIL GAUGE
PC
VPD
MU
LPC
BBD
MAKE UP WATER
MPS
MPC
JWR
JWS
heating
PIPING
CHECK, SWINGSANITARY DRAIN
PITCH OR PIPE, UP(U), DOWN(D)
FLOOR SINK (200mm x 200mm)
PIPE SLEEVE WITH FIRE STOPPING
VENT THRU ROOF
BFP
60°C
82°C valves : (for selective actuators)
PLAN
HOT WATER (82°C)
HOSE BIBB
AIR LINEA
BALL
ELEV.
HOT WATER (60°C)
BACKFLOW PREVENTER
PIPE SLEEVE
(NAME)
ACID
200mm x 200mm
SURFACE CLEANOUT
FLOOR CLEANOUT
FLOOR DRAIN
CHEMICAL SUPPLY PIPES
FUNNEL DRAIN, OPEN
FCO
FD
SCO
FLOOR OR GRADE
FLOOR OR GRADE
CONDENSATE DRAIN BELOW
CONDENSATE DRAIN ABOVE
ACID WASTE
GASG
CD
CD
AIR VENT, MANUAL
AIR VENT, AUTOMATIC
W/ MEASURING TAP
EXPANSION LOOP
EXPANSION JOINT
BALL JOINT
ANCHOR, MAIN
ANCHOR, INTERMEDIATE
ALIGNMENT GUIDE
AIR SEPARATOR
FLEXIBLE CONNECTOR
SQUARE HEAD BALANCING COCK
EJ
S
MV
AVV
CHECK, NON-SLAM
CONTROL, ELECTRIC-PNEUMATIC
CONTROL, PNEUMATIC-ELECTRIC
QUICK OPENING
PRESSURE REDUCING
NEEDLE
LOCK SHIELD
HOSE END DRAIN
SAFETY
RELIEF
SQUARE HEAD BALANCING COCK
QUICK CLOSING, FUSIBLE LINK
R
S
PE
EP
plumbing
COLD WATER
HOT WATER RETURN
HOT WATER SUPPLY
VENT
MOTOR ELECTRIC
DIAPHRAGM
valves, special duty :
SOLENOIDS
valve actuators
M
FDAD
SUCTIONQUANTITY SUCT
TONS OF REFRIGERATION
TEMPERATURE DIFFERENCE
HEAT TRANSFER COEFFICIENT
SANITARY
SUBMERSIBLE
SUPPLY AIR
SCHEDULE
RADIATOR
REFRIGERATION TON
REVOLUTIONS PER MINUTE
RELATIVE HUMIDITY
RETURN AIR
THERMAL RESISTANCE
REFRIGERANT (12, 22, ETC)
TYPICALTYP
URINAL
UNIT HEATER
UR
UH
U
THERMOSTAT
THICKNESS
THERMOMETER
TEMPERATURE
SYMBOL
TSTAT
TONS
THERM
THK
TEMP
TD
SYM
SINGLE POLE DOUBLE THROW
LPH, STANDARD CONDITIONS
LPS, STANDARD CONDITIONS
LPD, STANDARD CONDITIONS
SAYBOLT SECONDS UNIVERSAL
SAYBOLT SECONDS FUROL
SENSIBLE HEATOUTSIDE AIR INTAKE LOUVER SH
PRESSURE DROP OR DIFFERENCE
PRESSURE REDUCING VALVE
PHASE (ELECTRIC)
PERCENT
PARTS PER MILLION
POINT OF CONNECTION
PLUMBING
PETROLEUM, OIL AND LUBRICANTS
QUART
OUTSIDE SCREW & YOKE
DIAMETER, OUTSIDE
PRESSURE GAGE
POLE
PASCAL
OXYGEN
SPRINKLERSPR
STEEL
STANDARD
STEAM
SQUARE
STAINLESS STEEL
STORAGESTOR
STL
STD
ST
SSU
SST
SSF
SQ
SENSIBLE LOAD
STATIC PRESSURE
SQUARE METER
SPECIFICATION
SPDT
SPEC
SM
SP
SLPH
SLPS
SLPD
SL
ALARM CHECK VALVE
SIDEWALL SPRINKLER
PENDENT SPRINKLER
UPRIGHT SPRINKLER
FIRE DEPARTMENT CONNECTION
PRE-ACTION VALVE
NOT TO SCALE
OUTSIDE AIR
(2-WAY SHOWN)
DRY-PIPE VALVE
SECOND
SAFETY FACTOR
SPECIFIC GRAVITYSG
SF
SEC
VARIABLE AIR VOLUMEVAV
VENTILATION
PRESSURE, DYNAMIC(VELOCITY)
WATER-COOLED
WATER CLOSET
WATTHOUR OR WATER HEATER
WET BULB TEMPERATURE
WATERPROOF
WSHR
WCLD
WTRPRF
WH
WT
W/
WD
WC
WBT
WEIGHT
WITH
WASHER
WIDTH
VP
VOL
WB
W
VISC
VERT
VENT
VEL
VOLUME
WET BULB
WATT
VISCOSITY
VERTICAL
VELOCITY
MANUAL VOLUME DAMPER
SMOKE DAMPER (PROVIDE ACCESS DOOR)
PNEUMATIC OPERATED DAMPER
VLV
V
VAC
M
VALVE
VOLT
VACUUM
SPLITTER DAMPER
SD
AD
VD
grilles, registers and diffusers :
SG
SR
600/300
300x150
200mm NCD
FIGURE IS ON TOP
810mm x 400mm dampers
ELBOW, TURNED DOWN
REDUCER, CONCENTRIC
REDUCER, ECCENTRIC (STRAIGHT, INVERT)
REDUCER, ECCENTRIC (STRAIGHT, DOWN)
TEE, OUTLET DOWN
TEE, SINGLE SWEEP
sprinkler
UNION, SCREWED
UNION, FLANGED
TEE, OUTLET UP
TEE
LATERAL
CONNECTION, BOTTOM
CONNECTION, TOP
ELBOW, TURNED UP
BUSHING
ELBOW, 45°
ELBOW, 90°
CAP
WELDED
FLANGED
SOLDERED
SCREWED BELL AND SPIGOT
SOLVENT CEMENT
SOUND ATTENUATOR
DETECTORS, FIRE AND/OR SMOKE
ELECTRIC MOTOR OPERATED DAMPER
FIRE DAMPER (PROVIDE ACCESS DOOR)
BACKDRAFT DAMPER
BDD
S
TRANSITION
TURNING VANES
SF
CHANGE OF ELEVATION, RISE(R), DOWN(D)
DUCT SECTION, NEGATIVE PRESS., FIRST
ACCESS DOOR, VERTICAL OR HORIZONTAL
COWL, (GOOSENECK) AND FLASHING
ACOUSTICAL LINING
FLEXIBLE DUCT
FLEXIBLE CONNECTIONFC
FIGURE IS ON TOP
R
AD
47.2
TG
94.4
UC 13mm
DG
500/300L
DUCT WORK
810mm x 400mm
810mm x 400mm
THERMOSTAT, ELECTRIC
TRAP, ELECTRIC (INDICATE TYPE)
fitting :
R
THERMOMETER
EXHAUST AIR GRILLE OR REGISTER, CEILING
DUCT SECTION, POSITIVE PRESS., FIRST
DIRECTION OF FLOW
SR
DIFFUSER, LINEAR
RETURN AIR GRILLE OR REGISTER, CEILING
CEILING DIFFUSER, SQUARE TYPE
CEILING DIFFUSER, ROUND TYPE (200mm
(600mm x 300mmH, 472 LPS)
UNDERCUT DOOR (13mm, 47.2 LPS)
DOOR GRILLE (300mmx150mmH)
NECK DIAMETER)
TRANSFER GRILLE ASSEMBLY
LOUVER, DOOR OR WALL
(500mmWx300mmH, 94.4 LPS)
RG
RR
SUPPLY AIR GRILLE OR REGISTER, SIDEWALL
EXHAUST AIR GRILLE OR REGISTER, CEILING
SUPPLY AIR GRILLE OR REGISTER, CEILING
ER
SG
EG
EXISTING WORK TO BE REMOVED.
POINT OF CONNECTION NEW TO EXISTING
OR END OF DEMOLITION WORK
EXISTING WORK TO REMAIN.(E)
REMOVE EXIST WORK.(R)
1 5
SYMBOLS AND ABBREVIATIONS
CHONG, ST
BLDG NO. S-3008
REPAIR HEATING SYSTEM,
CAMP CASEY
207902
M-2
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
GENERAL NOTES & SCOPE OF WORK
5. CONCRETE REMOVAL AND RESTORATION SHALL CONFORM TO SPECIFICATION.
NECESSARY DUCT CONNECTION(S) TO FUNCTION AS ORIGINALLY INTENDED.
12. PRIOR TO INSTALLING NEW HVAC AND PLUMBING PIPING CONTRACTOR MUST
COORDINATE WITH EXISTING DUCTWORK AND PIPING ELEVATION/LOCATION.
IF EXISTING DUCT ELEVATION IS CONFLICTED WITH NEW PIPING INSTALLATION,
REMOVE EXISTING DUCTWORK AND INSTALL NEW DUCTWORK AND MAKE ALL
CONTRACTING OFFICER FOR APPROVAL.
CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITIONS AND SUBMITTED TO THE
FIELD CONDITIONS. SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE
11. SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACT
SUCH AS ANCHORS, HANGERS/SUPPORT, ETC.
10. ALL HVAC PIPING/DUCTWORK TO BE REMOVED SHALL INCLUDE ALL IT'S ACCESSORIES
9. ANY OPENING RESULT FROM THE REMOVAL WORK THAT'S NOT TO BE RE-USED
SHALL BE PATCHED OR RESTORED TO MATCH ADJACENT SURFACE OR AREA.
GENERAL NOTES
PER SPEC.
THIS CONTRACTOR.
AND SHALL BE VERIFIED AT THE JOB SITE.
CORRECTIONS FOR CONTRACTING OFFICER'S APPROVAL.
7. ALL WALL/FLOOR/ROOF OPENINGS RESULTED FROM THE REMOVAL OF PIPING AND
4. ANY PIPES THAT PENETRATE FIRE RATED WALL (EXISTING/ NEW) SHALL BE SEALED
6. NO MECHANICAL WORK CAN BE STARTED WITHOUT AN APPROVED SHOP DRAWINGS.
SHOP DRAWING SHALL NOT BE THE EXACT DUPLICATION OF THE CONTRACT DRAWING.
2. LOCATION AND SIZES OF EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC. APPROXIMATE
OFFICER'S REPRESENTATIVE ATTENTION WITH RECOMMENDATIONS FOR PROPER
IF ANY DISCREPANCY IS DETECTED, IT SHOULD BE BROUGHT TO THE CONTRACTING
THE EXISTING CONDITIONS, EQUIPMENT, FINISHES, ETC., PRIOR TO START OF WORK.
1. THE CONTRACTOR SHALL VISIT THE SITE AND SHALL FAMILIARIZE HIMSELF WITH
THE WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED BY
THE EXISTING EQUIPMENT ANY EQUIPMENT, DUCT WORK, PIPING ETC. DAMAGED DUE TO
3. CONNECT TO EXISTING SYSTEM SHALL BE DONE IN SUCH A MANNER AS NOT DAMAGE
THE REQUIREMENTS OF SEAL CLASS C.
8. ALL SUPPLY, RETURN AND EXHAUST AIR DUCTWORK SHALL BE CONSTRUCTED
ACCORDING TO SMACNA STATIC PRESSURE CALSS 500PA AND DUCTWORK SHALL MEET
DUCTWORK SHALL BE PATCHED OR RESTORED TO MATCH ADJACENT SURFACE OR AREAS.
SCOPE OF WORK
13.
CHANGES REQUIRED TO MAKE THIS
CONTRACTOR SHALL PROVIDE NECESSARY SHOP DRAWINGS FOR ANY
REQUIREMENT FOR GAS ONLY BURNERS MAY BE JUSTIFIABLE. THE
PACKAGE, PRIOR TO THE START OF CONSTRUCTION, THEREFORE THE
PROVIDE NATURAL GAS ACCESS TO THE BUILDING UNDER THIS DESIGN
CONCURRENT NATURAL GAS CONVERSION PROJECT PACKAGES MAY
HEATING SYSTEMS WITH DPW PRIOR TO THE START OF CONSTRUCTION.
AND OIL) BURNERS FOR HEATING HOT WATER AND DOMESTIC HOT WATER
THE CONTRACTOR SHALL COORDINATE THE USAGE OF DUAL FUEL (GAS
REPAIR AND MAINTENANCE WORK
HVAC SYSTEM
1.
2.
4.
5.
PLUMBING WORK
1.
2.
REPAIR BY REPLACEMENT OF EXISTING DETERIORATED DOMESTIC HOT WATER STORAGE TANK,DOMESTIC HOT WATER CIRCULATION PUMP, REPAIR BY REPLACEMENT OF EXISTING DETERIORATED ALL INSULATION IN MECH ROOM WITH NEW.
STRAINER AND HVAC PIPING WITH NEW AS INDICATED ON THE DRAWING.
REPAIR BY REPLACEMENT OF EXISTING DETERIORATED GATE VALVES, THERMOMETERS, SUCTION DIFFUSERS, CALIBRATED TRIPLE DUTY VALVE, 6.
REPAIR BY REPLACEMENT OF EXISTING DETERIORATED HOT/CHILLED WATER CIRCULATION PUMPS, CONC. PAD, CONTROL ASSOCIATED PIPING WITH NEW.
REPAIR BY REPLACEMENT OF EXISTING DETERIORATED EXPANSION TANKS, CONC. PAD AND ASSOCIATED PIPING WITH NEW.
DOMESTIC HOT WATER RE-CIRCULATION PUMP, EXPANSION TANK, CONC. PAD, THERMOSTATIC MIXING VALVE AND ASSOCIATED ACCESSORIES WITH NEW.
CONC. PAD, CONTROL AND FLUE VENT WITH NEW.
REPAIR BY REPLACEMENT OF EXISTING DETERIORATED GAS TYPE HOT WATER BOILER, ASSOCIATED GAS PIPING, COMBUSTION AIR INTAKE WITH WIRE MESH, CONC. PAD, CONTROL AND FLUE VENT WITH NEW.
REPAIR BY REPLACEMENT OF EXISTING DETERIORATED GAS TYPE DOMESTIC HOT WATER HEATER, ASSOCIATED GAS PIPING, COMBUSTION AIR INTAKE WITH WIRE MESH, DURING CONSTRUCTION.
CONTRACTOR SHALL INSTALL AND OPERATE THE TEMPORARY HEATING SYSTEM INCLUDING HOT WATER BOILER AND DOMESTIC HOT WATER HEATER TO SUPPLY HOT WATER
CHONG, ST
BLDG NO. S-3008
REPAIR HEATING SYSTEM,
M-3
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
DOMESTIC HOT WATER SYSTEM DIAPHRAGM TYPE
(PSI)
MAX. WORKING
PRESSURE
MAX. WORKING
HORIZONTAL TYPE
REMARKS
ALL BRONZE CONSTRUCTION
ALL BRONZE CONSTRUCTION
(PSI)
PRESSURE
REMARKS
MOTOR
VOLT/PH/HZHP
HEADCAPACITY
115/1/60
TYPESERVICE
BASE MOUNTED END SUCTION
CENTRIFUGAL TYPE
CENTRIFUGAL TYPE
PIPE MOUNTED IN-LINE
PIPE MOUNTED IN-LINE
CENTRIFUGAL TYPE
Q'TY
P
P
ITEM NO
P
HOT WATER CIRC. PUMP
CIRC. PUMP
DOMESTIC HOT WATER
PUMPS
RECIRC. PUMP
DOMESTIC HOT WATER
REMARKS
TANK SIZE
ACCEPTANCE VOLUME
TYPE
BLADDER TYPE
TANK
SERVICE
TYPE
CAPACITY
ET
ITEM NO
Q'TY
DT
ITEM NO
Q'TY
EXPANSION TANK
HOT WATER SYSTEM
DOMESTIC HOT
WATER SYSTEM
SERVICE
DOMESTIC HOT WATER STORAGE TANK
BASE MOUNTED END SUCTION
CENTRIFUGAL TYPE
P
CHILLED WATER CIRC. PUMP
ET
M E C H A N I C A L E Q U I P M E N T S C H E D U L E
1,200
(GAL) (INCH DIA x INCH LONG)
48" x 167"
(GPM) (FT)
496 80
5 22
5 7 115/1/60
W/INSULATION
CEMENT LINED
TYPE
GAS FIRED DOMESTIC HOT WATER HEATER
ITEM NO SERVICE
Q'TY
11,531.2
HEAT
RECOVERY
447 6
ELEC. POWER
36.56 120/1/60 60.0 16.7
SUPPLY
TEMP RISE
TEMP
REMARKS
EFFICIENCY
97.0
CASCADE
SYSTEM1
DWH BLDG. DOMESTIC
HOT WATER SYSTEM
CMHkW
OUTPUT
GROSS
CMH
GAS
INPUT
VOLT/PH/HZFLA
CSA CERTIFY PRODUCT OR APPROVED EQAL.
NAVIEN CONDENSING WATER HEATER MODEL NPE-240S X 8EA,
CMH
GAS FIRED HOT WATER BOILER
B
ITEM NO
BLDG. HEATING SYSTEM1
SERVICEQ'TY TYPE
VOLT/PH/HZ
120/1/60
ELEC. POWER
77.13
GAS
INPUT
kW
OUTPUT
GROSS
FLA
SUPPLY
80.0
WATER TEMP
kPa
WORKING
PRESS REMARKS
92.0
EFFICIENCY
CASCADE
SYSTEM
206.85
CSA CERTIFY PRODUCT, ASME CERTIFY PRODUCT OR APPROVED EQAL.
NAVIEN CONDENSING BOILER MODEL NCB-210 X 18EA,
(GAL)
125100
ELECTRIC UNIT HEATER
AIR CAP.(LPS) VOLT/PH/HZHPRPM
1,600 208/1/601/100165.2
FAN CAPACITYITEM
DASCHARGE
T Y P E
HORIZONTAL
QTY
MECH ROOM
SERVICE
TYPE
REMARKS
208/1/60
VOLT/PH/HZ
HEATING ELEMENT CAP
POWER(KW)
PROVIDE UNIT MOUNTED DISCONNECT SWITCH
AND UNIT MTD. THERMOSTAT.
NO
EUH
CIRCUIT BREAKER
ENCLOSED
2P-100AF-20AT
NEMA 1 ENCL.
MECHANICAL EQUIPMENT SCHEDULE
MECHANICAL
1/4
1/2
208/3/60
480/3/60
CHONG, ST
BLDG NO. S-3008
REPAIR HEATING SYSTEM,
M-4
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
SUPPORT AT THIS LOCATION
PROVIDE ADDITIONAL PIPE
(TYP.)
SUCTION
RATE OF PUMP)
DISCHARGE
(BALANCE TO FLOW
CALIBRATED
TRIPLE DUTY VALVE
MOTOR
DISCHARGE
INCREASER
LEG SUPPORT
ADJUSTABLE
PER MFG.
FLEXIBLE CONNECTION
SUCTION
DIFFUSER
THERMOMETER
SUCTION
GATE VALVE
PRESS. GAGE
PRESS. GAGE (TYP)
6 SHUT-OFF COCK (TYP)
ANCHOR BOLT
NEOPRENE PAD
115 DIAL, 0-60 PSI
THERMOMETER
FLOW RATE OF PUMP)
CALIBRATED TRIPLE
DUTY VALVE (BALANCE TO
FRONT ELEVATION
PUMP
ANCHOR BOLT
BEDPLATE
SIDE ELEVATION
SEE FRONT ELEVATION
BASE MOUNTED CIRC. PUMP PIPING
LINE SIZE)
(SIZE SAME AS
B
GAS LEAK DETECTION
400mmDIA COMBUSTION AIR
INTAKE (W/ STS WIRE MESH)
350 (STS PIPE)
MECH
ROOM
DWH
DOMESTIC
HOT WATER HEATER
250 (STS PIPE)
400mm STS FLUE VENT
UP THRU ROOF SEE DETAIL
CHR
CHR
CHS
HWR
HWS
H W
R
C H
R
C H
R
M
H W
S
H W
R
H W
S C
H R
C H
S
G
G G
DTDOMESTIC HOT
WATER STORAGE TANK
HOT WATER BOILER
G
DOMESTIC HOT WATER
CIRC. PUMP 3
P
P
P
CIRC. PUMP
CHILLED WATER
CIRC. PUMP
HOT WATER
FILTER(E)
GAS REGULATOR(E)
GAS METER(E)
AUTOMATIC SHUT OFF VALVE(E)
CONTROL PANEL(E)
GAS ALARM GONG(E)
CONC. PAD
CONC. PAD
REPLACE EXISTING DETERIORATED ALL INSULATION
IN MECH ROOM WITH NEW.
DOMESTIC HOT WATER
P
RE-CIRC. PUMP
CONC. PAD
CONC. PAD
POC
POC
POC
POC
CIRCULATION PUMPS, CONTROL ASSOCIATED PIPING WITH NEW.
REPAIR BY REPLACEMENT OF EXISTING DETERIORATED HOT/CHILLED WATER
PRESS GAGES, STRAINERS AND HVAC PIPING WITH NEW.
THERMOMETERS, SUCTION DIFFUSERS, CALIBRATED TRIPLE DUTY VALVES,
REPAIR BY REPLACEMENT OF EXISTING DETERIORATED GATE VALVES,
ET EXPANSION
TANK
ET EXPANSION
TANK
CONC. PAD
CONC. PAD
M4
MECH RM PARTIAL PLAN
SCALE : 1 / 50
- M4
2 BASE MOUNTED CIRC. PUMP PIPING
NOT TO SCALE
1.
NOTES:
CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION
2. CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR HVAC PIPING SYSTEM
AND PLUMBING PIPING IN MECH. ROOM.
CIRC. PUMP PIPING AND NOTES
MECH RM PARTIAL PLAN, BASE MOUNTED
OF HVAC SYSTEM AND PLUMBING SYSTEM IN MECH ROOM.(TYP)
EUH
ELEC. UNIT HEATER(TYP)
CHONG, ST
BLDG NO. S-3008
REPAIR HEATING SYSTEM,
CAMP CASEY
3. TURN IN TO SUPPLY DISVISION(HEATING BOILER, DOMESTIC HOT WATER HEATER,
HOT & COLD CIRCULATION PUMPS)
M-5
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
NOT TO SCALE
CONNECTION POINT DIAGRAM FOR NEW HOT WATER BOILER(TYPICAL)
HOT WATER BOILER
GAS FIRED CONDENSING
B
SUNSHIELD
(W/REMOTE BULB)
OUTDOOR AIR THERMOSTAT
T O
E
HWR
HWS
HWR
HWS
HEATING SYSTEM
FROM/TO BLDG.
PRESSURE REDUCING
BACK FLOW PREVENTER
MAKE UP COLD WATER
CONTROL PANEL
H W
R
H W
S
EXISTING HOT WATER
EXPANSION
ASSEMBLY (E)
(E)
VALVE (E)
O
SENSER (PT1000)
T
EXISTING SUNSHIELD
O.A. TEMP.
RESET SCHEDULE AS INDICATED.
SUPPLY TEMPERATURE SETPOINT SHALL BE DETERMINED FROM A LINEAR
MAINTAIN HOT WATER SUPPLY TEMPERATURE AT SETPOINT. THE HOT WATER
THE BOILER BUILT-IN CONTROL SHALL MODULATE THE BOILER CONTROL TO
2. HOT WATER TEMPERATURE RESET CONTROL
1.1
1.
SET BOILER B-1 "HAND-AUTO" SWITCH TO AUTO POSITION, BOILER STARTS WHEN
WINTER SEASON
POSITION, PUMP STARTS AND RUNS CONTINOUSLY WHEN O.A. THERMOSTAT
SET EXISTING HOT WATER CIRC PUMP "HAND-OFF-AUTO" SWITCH TO "AUTO"
DROPS BELOW IT'S SETPOINT OF 15.6 DEG.C.
EXISTING HOT WATER CIRC PUMP IS ENERGIZED. BOILER PACKAGE CONTROL SHALL
SEQUENCE OF OPERATION
1.3
BOILER SYSTEM CONTROL EQUIPMENT SCHEDULE
1. O.A. THERMOSTAT:
SPDT SWTCH WHICH MAKES CIRCUIT ON TEMPERATURE FALL,
REMOTE BULB ELECTRIC TYPE THERMOSTAT, STANDARD RESPONSE
CONTROL RANGE 0-100 DEG F, 5 FEET COPPER CAPILLARY TUVBING,
DIFF= 1.0 DEG.F. ADJ. AND 8 AMPS AT 120VAC.
MAINTAIN BOILER HOT WATER SUPPLY TEMPERATURE AT 80 DEG. C.
MOTOR STARTER
CIRC. PUMP
TANK
1.
NOTES:
CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION
2. CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR HVAC PIPING SYSTEM
OF ALL HVAC SYSTEM AND PLUMBING SYSTEM IN MECH ROOM.(TYP)
AND PLUMBING PIPING IN MECH. ROOM.
M5
HOT WATER BOILER AND NOTES
CONNECTION POINT DIAGRAM FOR NEW
CHONG, ST
BLDG NO. S-3008
REPAIR HEATING SYSTEM,
M-6
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
DOMESTIC HOT WATER SYSTEM CONTROL DIAGRAM
- NOT TO SCALE
NH
1PH 120VAC
L4080
(BUILT IN CONTROL)
DOM H.W. HEATER
RELAY
STORAGE TANK
DOMETIC HOT WATER
COPPER WELL
AQUASTAT
DT
SET AT 43.3 DEG. C
WELL
THERMOSTAT 26.7 DEG C. TO 82.2 DEG C . RANGE,
T-# SHALL BE A REMOTE BULB
CONTROL
TRANSFORMER
O/L
120V
FOR P-2
G
C
MOTOR STARTER
HOLDING COIL
FUSE
SEE ELECTRICAL
DRAWING
O
A
P
N O T E ;
H
TYPICAL
T-1
1.66 DEG C. DIFFERENTIAL, WIRE TO MAKE ON FALL.
MOUNT ON DOMESTIC HOT WATER
MOUNT IN HWR PIPING (P-3)
8 FL AMPS AT 120VOLTS.
STORAGE TEMP(P-2).
T-2 AQUASTAT
SET AT 37.8 DEG. C.
RECIRC. PUMP
DOMESTIC H.W.
T-1COPPER WELL
P
ET
P
P DOMESTIC H.W.
CIRC. PUMP
P
GROUNDLIGHT
P
TO MAINTAIN ITS SET POINT,
P
2 CONTROL
SEQUENCE OF OPERATION
SHALL BE SIMILAR.
T-1
T-2
AS FOLLOWS ;
PUMP
AQUASTAT SHALL CONTROL PUMP
140 DEG F FOR PUMP P-2
100 DEG F FOR PUMP P-3
GREEN PILOT
SEQUENCE OF OPERATION
NOTE :
REQUIREMENT.
REMOTE BULB THERMOSTAT T-1 SHALL CONTROL PUMP P-2 TO MAINTAIN ITS SETPOINT.
IN ACCORDANCE WITH THE TEMPERING VALVE MANUFACTURER'S INSTALLATION INSTRUCTIONS
THE TEMPERING VALVE IN CONJUNCTION WITH HOT WATER RECIRCULATION SYSTEM SHALL BE
T-1 SHALL BE PROVIDED WITH A COPPER CAPILLARY. T-1 SHALL HAVE A RANGE OF APPROX.
FOR 8 FLA AT 120 VAC. T-2 & P-3 BE SIMILAR.
80 DEG F, 180 DEG F 3 DEG F ADJUSTABLE DIFFERENITAL AND SUITABLE
1.
NOTES:
CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION
2. CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR HVAC PIPING SYSTEM
OF ALL HVAC SYSTEM AND PLUMBING SYSTEM IN MECH ROOM.(TYP)
AND PLUMBING PIPING IN MECH. ROOM.
M6
CONTROL DIAGRAM AND NOTES
DOMESTIC HOT WATER SYSTEM
CHONG, ST
BLDG NO. S-3008
REPAIR HEATING SYSTEM,
M-7
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
FL.
FLASHING CAP
#14GA. SST. STEEL (TYP.)
900 MIN.
CLEAR SNOW
ACCUMULATION LINE
ROOF
GUY WIRE #10-3REQ'D
EQUALLY SPACED (TYP.)
WEATHER CAP #14GA.
SST. STEEL (TYP.)
ROOF FLASHING
BAND TO BE DIVIDED-3 STL.
BAR, 25Wx120mm THK (TYP.)
STAINLESS STEEL
VENT PIPE
COMBUSTION AIR INTAKE &
NEW GAS FIRED
DOMESTIC HOT
WATER HEATER
NEW GAS FIRED HOT
WATER BOILER
EXISTING WALL
W/ WIRE MESH (TYP.)
NOT TO SCALE
EXST CONC FLOOR
CONC PAD
ACTUAL EQUIPMENT SIZE
CONC PAD DETAIL
CROSS WAY ( TOP & BOTTOM )
D13mm @ 250 O.C
4"4"
EXISTING CWB(E)
1/ 2" THK EXPANSION
JOINT ( TYP )
NOT TO SCALE
M7
M7
FLUE VENT DETAIL
DETAIL-1
M7- NOT TO SCALE
T SW
ON-OFF SWITCH
UNIT MOUNTED
THERMOSTAT &
M
GENERAL:
TO 29.4 DEC. C.
SETPOINT. SET THE THERMOSTAT AT 12.7 DEG.C.
THE THERMOSTAT SHALL CYCLE WALL HEATER TO MAINTAIN THERMOSTAT
SEQUENCE OF OPERATION
MANUFACTURER SHALL FURNISH THE CONTROL SYSTEM TO
INCLUDE UNIT MOUNTED THERMOSTAT AND ON-OFF SWITCH.
THE THERMOSTAT SHALL HAVE A TEMPERATURE RANGE OF 12.7 DEC. C
ELECTRIC UNIT HEATER
ELEC. UNIT HEATER CONTROL
CHONG, ST
BLDG NO. S-3008
REPAIR HEATING SYSTEM,
M-8
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
PIPE
DIA 101.6x50t
WEB PL.
PLATE THK.f
12THK. CRADLE
TANK INSULATION
SEE NOTE-1
C150x75x6.5x10 WELDED(AROUND)
STD. PIPE COUPLING
l
CRADLES
WELDED
50x 50x 4THK
10THK CENTER
STANDARD WEIGHT
300 LG(TYP)
T
H K
W E
B
P L A T E d
8THK.
6THK(TYP.)
100x
L75x75x
51502
2-M16HSB (TYP.)
200x
PIPE SUPPORT LEG
STEEL PLATE CUT FROM
C150x75x6.5x10
NOTE :
B B
WELDED(AROUND)
150x 8THK150x
1/4
100LG16 DIA x
B-B ANCHOR BOLT/NUT
12THK BASE PLATE bpt
1. SUPPORT CRADLES(2) SHALL BE LOCATED AT APPROXIMATELY
POINTS OF TANK OVERALL LENGTH.
TANK SUPPORTS - DOMESTIC HOT WATER
H E
IG
H T
M M
STEEL PLATE CUT FROM
M A
X S
U P P
O R
T
BASE MOUNTED CIRC. PUMP PIPING
ANCHOR BOLT
SIDE ELEVATION
SEE FRONT ELEVATION
PER MFG.
BEDPLATE
PUMP
FRONT ELEVATION
REINFORCED CONC. BASE CONSTRUCT
FROM DIMENSION GIVEN ON
APPROVED SHOP DWGS. FOR PUMP
150 ( MIN.)
SUPPORT
FIRST PIPE
SHOWN ON PROJECT PLANS
PIPE SIZE SHALL BE AS
INCREASER
DISCHARGE
115 DIAL, 0-60PSI
DUTY VALVE (BALANCE TO
6 SHUT-OFF COCK (TYP)
PRESS. GAGE (TYP)
CALIBRATED TRIPLE
FLOW RATE OF PUMP)
FLEXIBLE CONNECTION
THERMOMETER
ADJUSTIBLE
LEG SUPPORT
DIFFUSER
SUCTION
SUPPORT
FIRST PIPE
GATE VALVE
SUCTION
NEOPRENE PAD
ANCHOR BOLT
THERMOMETER
PRESS. GAGE
MOTOR
TRIPLE DUTY VALVE
CALIBRATED
SUCTION
(BALANCE TO FLOW
RATE OF PUMP)
DISCHARGE
LINE SIZE)
(SIZE SAME AS
REINFORCED CONC. BASE CONSTRUCT
FROM DIMENSION GIVEN ON
APPROVED SHOP DWGS. FOR PUMP
SHOWN ON PROJECT PLANS
PIPE SIZE SHALL BE AS
AIR VENT
FLOOR OR PAD
GAUGE GLASS
SHOWN. ANGLE IRON LEGS
WITH DRAIN ACCESS OPENING
FLOOR MOUNTING BASE RING
MAY BE USED AS AN OPTION.
FROM SYSTEM
M
BACK-FLOW
PREVENTER
COLD WATER FILL LINE.
SCHEDULE FOR SIZE
SEE EXPANSION TANK
DRAIN
TANK
EXPANSION
(SET AT 5PSI HIGHER THAN PRV SETTING)
PRESS RELIEF VALVE
PRESSURE REDUCING
VALVE
REMOVABLE STRAINER
SUCTION
PRESSURE GAUGE
SHUT-OFF COCK
TYPICAL
VALVE
DISCHARGE
BALANCING
CALIBRATED
IN DISCHARGES
PROVIDE CHECK VALVE
TYPICAL IN LINE PUMP PIPING DETAIL
M8
- M8
- M8
2 EXPANSION TANK & AIR SEPARATOR PIPING DETAIL
- M8
DETAILS-2
CHONG, ST
BLDG NO. S-3008
REPAIR HEATING SYSTEM,
| Bldg# S-3008, Cp Casey (FINAL)-M1 |
| Bldg# S-3008, Cp Casey (FINAL)-M2 |
| Bldg# S-3008, Cp Casey (FINAL)-M3 |
| Bldg# S-3008, Cp Casey (FINAL)-M4 |
| Bldg# S-3008, Cp Casey (FINAL)-M5 |
| Bldg# S-3008, Cp Casey (FINAL)-M6 |
| Bldg# S-3008, Cp Casey (FINAL)-M7 |
| Bldg# S-3008, Cp Casey (FINAL)-M8 |
File details come from the government source that posted it.