Solicitation W90VN720R0025 Hood and Duct Cleaning 03 Aug 2020.pdf
PDF 1 MB Posted
- Attached to
- Hood and Duct Cleaning (Korean Vendors Only)
- Solicitation number
- W90VN7-20-R-0025
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Hood and Duct Checklist.pdf | ||
| Hood and Duct File.pdf | ||
| Site Visit Questions from Contractors - Hood and Ducts.docx | DOCX document | |
| Hoods and Ducts Drawings.pdf | ||
| Solicitation W90VN720R0025 Hood and Duct Cleaning 27 July 2020.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
1. REQUISITION NUMBER
F2L3CE0133AW01-1
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
W90VN720R0025 27-Jul-2020
7. FOR SOLICITATION a. NAME b. TELEPHONE NUMBER (No Collect Calls) 8. OFFER DUE DATE/LOCAL TIME
INFORMATION CALL: SSG MORRIS, RYAN B. 315-755-9317 01:00 PM 27 Aug 2020
9. ISSUED BY CODE W90VN7 10. THIS ACQUISITION IS X UNRESTRICTED OR SET ASIDE: % FOR:
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO KUNSAN, UNIT #2112
APO AP 96264-2112
SMALL BUSINESS
HUBZONE SMALL
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
NAICS:
TEL: 0503-354-9930
FAX:
11. DELIVERY FOR FOB DESTINA-
12. DISCOUNT TERMS
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
EDWOSB
8(A)
13b. RATING
561790
SIZE STANDARD:
$8,000,000
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
15. DELIVER TO
8 CES
TSGT LOUIS A. ALMAGUER
8 CES/CEOS, BLDG 702
KUNSAN AIR BASE KOREA
APO AP 96264
KOREA, SOUTH
TEL: 782-5128 FAX:
17a.CONTRACTOR/ CODE
OFFEROR
CODE F2L3CE
FACILITY
CODE
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
16. ADMINISTERED BY
18a. PAY MENT WILL BE MADE BY
14. METHOD OF SOLICITATION
RFQ IFB
X RFP
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
SUCH ADDRESS IN OFFER BELOW IS CHECKED SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
ADDENDA
ARE
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 2 29. AWARD OF CONTRACT: REF.
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND OFFER DATED . Y OUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
(SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER
(TYPE OR PRINT)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
TEL:
EMAIL:
(TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
X
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
36. PAYMENT
COMPLETE PARTIAL FINAL
37. CHECK NUMBER
PARTIAL FINAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
Section SF 1449 - CONTINUATION SHEET
Monthly Hoods and Ducts Cleaning (B387)
FFP
Monthly Hoods and Ducts Cleaning, Base Year(1 Oct 20 to 30 Sept 21) Building:
387, Surface Area: 680 Square Feet
FOB: Destination
MFR PART NR: Null
PURCHASE REQUEST NUMBER: F2L3CE0133AW01-1
PSC CD: S299
NET AMT
Monthly Hoods and Ducts Cleaning (B510)
Monthly Hoods and Ducts Cleaning, Base Year(1 Oct 20 to 30 Sept 21) Building:
510, Surface Area: 162 Square Feet
FOB: Destination
MFR PART NR: Null
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
0001 12 Months
0002 12 Months
Monthly Hoods and Ducts Cleaning (B550)
Monthly Hoods and Ducts Cleaning, Base Year(1 Oct 20 to 30 Sept 21) Building:
550, Surface Area: 2845 Square Feet
FOB: Destination
MFR PART NR: Null
Monthly Hoods and Ducts Cleaning (B1025)
Monthly Hoods and Ducts Cleaning, Base Year(1 Oct 20 to 30 Sept 21) Building:
1025, Surface Area: 1994 Square Feet
FOB: Destination
MFR PART NR: Null
0003 12 Months
0004 12 Months
Monthly Hoods and Ducts Cleaning (B1027)
Monthly Hoods and Ducts Cleaning, Base Year(1 Oct 20 to 30 Sept 21) Building:
1027, Surface Area: 644 Square Feet
FOB: Destination
MFR PART NR: Null
Monthly Hoods and Ducts Cleaning (B1057)
Monthly Hoods and Ducts Cleaning, Base Year(1 Oct 20 to 30 Sept 21) Building:
1057, Surface Area: 684 Square Feet
FOB: Destination
MFR PART NR: Null
0005 12 Months
0006 12 Months
Monthly Hoods and Ducts Cleaning (B1102)
Monthly Hoods and Ducts Cleaning, Base Year(1 Oct 20 to 30 Sept 21) Building:
1102, 1526 Square Feet
FOB: Destination
MFR PART NR: Null
Monthly Hoods and Ducts Cleaning (B2548)
Monthly Hoods and Ducts Cleaning, Base Year(1 Oct 20 to 30 Sept 21) Building:
2548, Surface Area: 2115 Square Feet
FOB: Destination
MFR PART NR: Null
0007 12 Months
0008 12 Months
OPTION Monthly Hoods and Ducts Cleaning (B387)
Monthly Hoods and Ducts Cleaning, Option year 01 (1 Oct 21 to 30 Sept 22)
Building: 387, Surface Area 680 Square Feet
FOB: Destination
OPTION Monthly Hoods and Ducts Cleaning (B510)
Monthly Hoods and Ducts Cleaning, Option year 01 (1 Oct 21 to 30 Sept 22)
Building: 510, Surface Area: 162 Square Feet
OPTION Monthly Hoods and Ducts Cleaning (B550)
Monthly Hoods and Ducts Cleaning, Option year 01 (1 Oct 21 to 30 Sept 22)
Building: 550, Surface Area: 2845 Square Feet
1001 12 Months
1002 12 Months
1003 12 Months
OPTION Monthly Hoods and Ducts Cleaning (B1025)
Monthly Hoods and Ducts Cleaning, Option year 01 (1 Oct 21 to 30 Sept 22)
Building: 1025, Surface Area: 1994 Square Feet
OPTION Monthly Hoods and Ducts Cleaning (B1027)
Monthly Hoods and Ducts Cleaning, Option year 01 (1 Oct 21 to 30 Sept 22)
Building: 1027, Surface Area: 644 Square Feet
1004 12 Months
1005 12 Months
OPTION Monthly Hoods and Ducts Cleaning (B1057)
Monthly Hoods and Ducts Cleaning, Option year 01 (1 Oct 21 to 30 Sept 22)
Building: 1057, Surface Area: 684 Square Feet
OPTION Monthly Hoods and Ducts Cleaning (B1102)
Monthly Hoods and Ducts Cleaning, Option year 01 (1 Oct 21 to 30 Sept 22)
Building 1102, Surface Area: 1526 Square Feet
1006 12 Months
1007 12 Months
OPTION Monthly Hoods and Ducts Cleaning (B2548)
Monthly Hoods and Ducts Cleaning, Option year 01 (1 Oct 21 to 30 Sept 22)
Building: 2548, Surface Area: 2115 Square Feet
Monthly Hoods and Ducts Cleaning, Option year 02 (1 Oct 22 to 30 Sept 23)
Building: 387, Surface Area: 680 Square Feet
1008 12 Months
2001 12 Months
Monthly Hoods and Ducts Cleaning, Option year 02 (1 Oct 22 to 30 Sept 23)
Building: 510, Surface Area: 162 Square Feet
Monthly Hoods and Ducts Cleaning, Option year 02 (1 Oct 22 to 30 Sept 23)
Building: 550, Surface Area: 2845 Square Feet
Monthly Hoods and Ducts Cleaning, Option year 02 (1 Oct 22 to 30 Sept 23)
Building: 1025, Surface Area: 1994 Square Feet
2002 12 Months
2003 12 Months
2004 12 Months
Monthly Hoods and Ducts Cleaning, Option year 02 (1 Oct 22 to 30 Sept 23)
Building: 1027, Surface Area: 644 Square Feet
Monthly Hoods and Ducts Cleaning, Option year 02 (1 Oct 22 to 30 Sept 23)
Building: 1057, Surface Area: 684 Square Feet
2005 12 Months
2006 12 Months
Monthly Hoods and Ducts Cleaning, Option year 02 (1 Oct 22 to 30 Sept 23)
Building: 1102, Surface Area: 1526 Square Feet
Monthly Hoods and Ducts Cleaning, Option year 02 (1 Oct 22 to 30 Sept 23)
Building: 2548, Surface Area: 2115 Square Feet
2007 12 Months
2008 12 Months
Monthly Hoods and Ducts Cleaning, Option year 03 (1 Oct 23 to 30 Sept 24)
Building: 387, Surface Area: 680 Square Feet
Monthly Hoods and Ducts Cleaning, Option year 03 (1 Oct 23 to 30 Sept 24)
Building: 510, Surface Area: 162 Square Feet
3001 12 Months
3002 12 Months
Monthly Hoods and Ducts Cleaning, Option year 03 (1 Oct 23 to 30 Sept 24)
Building: 550, Surface Area: 2845 Square Feet
Monthly Hoods and Ducts Cleaning, Option year 03 (1 Oct 23 to 30 Sept 24)
Building: 1025, Surface Area: 1994 Square Feet
Monthly Hoods and Ducts Cleaning, Option year 03 (1 Oct 23 to 30 Sept 24)
Building: 1027, Surface Area: 644 Square Feet
3003 12 Months
3004 12 Months
3005 12 Months
Monthly Hoods and Ducts Cleaning, Option year 03 (1 Oct 23 to 30 Sept 24)
Building: 1057, Surface Area: 684 Square Feet
Monthly Hoods and Ducts Cleaning, Option year 03 (1 Oct 23 to 30 Sept 24)
Building: 1102, Surface Area: 1526 Square Feet
3006 12 Months
3007 12 Months
Monthly Hoods and Ducts Cleaning, Option year 03 (1 Oct 23 to 30 Sept 24)
Building: 2548, Surface Area: 2115 Square Feet
Monthly Hoods and Ducts Cleaning, Option year 04 (1 Oct 24 to 30 Sept 25)
Building: 387, Surface Area: 680 Square Feet
3008 12 Months
4001 12 Months
Monthly Hoods and Ducts Cleaning, Option year 04 (1 Oct 24 to 30 Sept 25)
Building: 510, Surface Area: 162 Square Feet
Monthly Hoods and Ducts Cleaning, Option year 04 (1 Oct 24 to 30 Sept 25)
Building: 550, Surface Area: 2845 Square Feet
4002 12 Months
4003 12 Months
Monthly Hoods and Ducts Cleaning, Option year 04 (1 Oct 24 to 30 Sept 25)
Building: 1025, Surface Area: 1994 Square Feet
Monthly Hoods and Ducts Cleaning, Option year 04 (1 Oct 24 to 30 Sept 25)
Building: 1027, Surface Area: 644 Square Feet
Monthly Hoods and Ducts Cleaning, Option year 04 (1 Oct 24 to 30 Sept 25)
Building: 1057, Surface Area: 684 Square Feet
4004 12 Months
4005 12 Months
4006 12 Months
Monthly Hoods and Ducts Cleaning, Option year 04 (1 Oct 24 to 30 Sept 25)
Building: 1102, Surface Area: 1526 Square Feet
Monthly Hoods and Ducts Cleaning, Option year 04 (1 Oct 24 to 30 Sept 25)
Building: 2548, Surface Area: 2115 Square Feet
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government N/A Government
0002 Destination Government N/A Government 0003 Destination Government N/A Government
4007 12 Months
4008 12 Months
0004 Destination Government N/A Government
0005 Destination Government N/A Government
0006 Destination Government N/A Government
0007 Destination Government N/A Government
0008 Destination Government N/A Government
1001 Destination Government N/A Government
1002 Destination Government N/A Government
1003 Destination Government N/A Government
1004 Destination Government N/A Government
1005 Destination Government N/A Government
1006 Destination Government N/A Government
1007 Destination Government N/A Government
1008 Destination Government N/A Government
2001 Destination Government N/A Government
2002 Destination Government N/A Government
2003 Destination Government N/A Government
2004 Destination Government N/A Government
2005 Destination Government N/A Government
2006 Destination Government N/A Government
2007 Destination Government N/A Government
2008 Destination Government N/A Government
3001 Destination Government N/A Government
3002 Destination Government N/A Government
3003 Destination Government N/A Government
3004 Destination Government N/A Government
3005 Destination Government N/A Government
3006 Destination Government N/A Government
3007 Destination Government N/A Government
3008 Destination Government N/A Government
4001 Destination Government N/A Government
4002 Destination Government N/A Government
4003 Destination Government N/A Government
4004 Destination Government N/A Government
4005 Destination Government N/A Government
4006 Destination Government N/A Government
4007 Destination Government N/A Government 4008 Destination Government N/A Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-OCT-2020 TO
30-SEP-2021
N/A 8 CES
TSGT LOUIS A. ALMAGUER
8 CES/CEOS, BLDG 702
KUNSAN AIR BASE KOREA
APO AP 96264
KOREA, SOUTH
782-5128
FOB: Destination
F2L3CE
0002 POP 01-OCT-2020 TO
30-SEP-2021
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
0003 POP 01-OCT-2020 TO
30-SEP-2021
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
0004 POP 01-OCT-2020 TO
30-SEP-2021
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
0005 POP 01-OCT-2020 TO
30-SEP-2021
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
0006 POP 01-OCT-2020 TO
30-SEP-2021
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
0007 POP 01-OCT-2020 TO
30-SEP-2021
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
0008 POP 01-OCT-2020 TO
30-SEP-2021
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
1001 POP 01-OCT-2021 TO
30-SEP-2022
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
1002 POP 01-OCT-2021 TO
30-SEP-2022
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
1003 POP 01-OCT-2021 TO
30-SEP-2022
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
1004 POP 01-OCT-2021 TO
30-SEP-2022
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
1005 POP 01-OCT-2021 TO
30-SEP-2022
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
1006 POP 01-OCT-2021 TO
30-SEP-2022
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
1007 POP 01-OCT-2021 TO
30-SEP-2022
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
1008 POP 01-OCT-2021 TO
30-SEP-2022
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
2001 POP 01-OCT-2022 TO
30-SEP-2023
N/A (SAME AS PREVIOUS LOCATION)
F2L3CE
2002 POP 01-OCT-2022 TO
30-SEP-2023
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
2003 POP 01-OCT-2022 TO
30-SEP-2023
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
2004 POP 01-OCT-2022 TO
30-SEP-2023
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
2005 POP 01-OCT-2022 TO
30-SEP-2023
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
2006 POP 01-OCT-2022 TO
30-SEP-2023
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
2007 POP 01-OCT-2022 TO
30-SEP-2023
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
2008 POP 01-OCT-2022 TO
30-SEP-2023
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
3001 POP 01-OCT-2023 TO
30-SEP-2024
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
3002 POP 01-OCT-2023 TO
30-SEP-2024
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
3003 POP 01-OCT-2023 TO
30-SEP-2024
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
3004 POP 01-OCT-2023 TO
30-SEP-2024
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
3005 POP 01-OCT-2023 TO
30-SEP-2024
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
3006 POP 01-OCT-2023 TO
30-SEP-2024
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
3007 POP 01-OCT-2023 TO
30-SEP-2024
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
3008 POP 01-OCT-2023 TO
30-SEP-2024
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
4001 POP 01-OCT-2024 TO
30-SEP-2025
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
4002 POP 01-OCT-2024 TO
30-SEP-2025
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
4003 POP 01-OCT-2024 TO
30-SEP-2025
N/A (SAME AS PREVIOUS LOCATION)
4004 POP 01-OCT-2024 TO
30-SEP-2025
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
4005 POP 01-OCT-2024 TO
30-SEP-2025
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
4006 POP 01-OCT-2024 TO
30-SEP-2025
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
4007 POP 01-OCT-2024 TO
30-SEP-2025
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
F2L3CE
4008 POP 01-OCT-2024 TO
30-SEP-2025
N/A (SAME AS PREVIOUS LOCATION)
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
Cleaning
Hoods and
Ducts at
Kunsan AB
Part 1
General Information
1. GENERAL: This is a services contract to provide cleaning service for hoods and ducts systems on Kunsan AB, Korea. The Government shall not exercise any supervision or control over the contract service providers performing the services herein.
Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform cleaning of hoods and ducts at dining facilities as defined in this Performance Work Statement. The contractor shall perform to the standards in this contract.
1.2 Background: The number of dining facilities on Kunsan AB is eight (8) buildings and each dining facility has different brand of ventilation hood system as well as different size. The provided Technical Exhibit#1 & attachment #1 shall be used only as roughly estimated workloads for contractors.
1.3 Objectives: To provide cleaning kitchen hoods and ducts system service at Kunsan AB.
1.4 Scope: The contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, expendable materials, and other items and services necessary to clean kitchen hoods and ducts as defined in this Performance Work
Statement (PWS) except for those items specified as Government furnished property and services. The contractor shall be responsible to perform the requirements and services of this PWS to the levels and standards in strict accordance with all of the terms and conditions of this contract hereinafter specified and ROK Government Laws and
Regulations.
1.5 Period of Performance: The period of performance shall be for one (1) Base Year of
12 months and four (4) 12- month option years. The Period of Performance reads as follows:
Base Year : 01 Oct 2020 ~ 30 Sep 2021
Option Year I : 01 Oct 2021 ~ 30 Sep 2022
Option Year II : 01 Oct 2022 ~ 30 Sep 2023
Option Year III : 01 Oct 2023 ~ 30 Sep 2024
Option Year IV : 01 Oct 2024 ~ 30 Sep 2025
1.6 General Information
1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract.
The Contractor is required to submit a Quality Control Plan within 10 calendar days after the contract award date. An updated copy of the Contractor’s plan shall be provided to the Contracting Officer and COR as changes occur. The contractor shall at minimum use the format below tomeasure each line item in the Performance Requirements Summary
(PRS) table. For any changes to the original QC plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.
Objective PERFORMANCE
STANDARD
What level of performance is required to meet the
Performance Objective or Task?
CONTRACTOR
PERFORMANC
E STANDARD
What level of performance is required to meet the Performance
Objective or
Task?
Performance
Threshold
Contractor
WHAT/DATA
SOURCE
What are you going to inspect?
HOW/
METHOD OF
ASSESSMEN
T
How are you going to inspect
Contractor
CALCULATION
How will you determine if the
AQL and
Standard are being achieved?
Quality 1.6.1 Quality Control Contractor 100% Contractor 100% Pass/Fail
Control Plan Plan (QCP) and the submit based on submits based Inspection quality control actions PWS on PWS required to requirement requirement.
successfully meet the term of the PWS.
1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the
Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3 Recognized Holidays: The contractor is not expected to perform normal cleaning services on the holidays listed below. The contractor shall not receive any compensation from the Government for work performed on a
Saturday, Sunday, or holiday, unless the Contracting Officer issued a prior written request for that work.
ROK Legal Holidays
(1) 1 and 2 January (New Year)
(2) Lunar New Year (31 December, 1 and 2 January on the Lunar Calendar)
(3) 1 March (Independence Movement Day)
(4) 1 May (Labor Day)
(5) 5 May (Children's Day)
(6) Buddha's Birthday (8 April on the lunar calendar)
(7) 6 June (Memorial Day)
(8) 17 July (Constitution Day)
(9) 15 August (Liberation Day)
(10) Chu-Suk (14, 15, and 16 August on the Lunar Calendar)
(11) 3 October (National Foundation Day)
(12) 25 December (Christmas Day)
U.S. Federal Holidays
New Year’s Day - 1 January
Martin Luther King Day - 3rd Monday in January
Washington’s Birthday - 3rd Monday in February
Memorial Day - last Monday in May
Independence Day - 4 July
Labor Day - 1st Monday in September
Columbus Day - 2nd Monday in October
Veteran’s Day - 11 November
Thanksgiving Day - 4th Thursday in November
Christmas Day - 25 December
1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0700-0030 hours, Monday thru Friday except for days when Government facilities area closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor shall not be reimbursed when the government facility is closed for the above reasons.
The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons
1.6.6 Environmental Requirement
Contractor shall ensure all workers are familiar with the goals of the Kunsan AB Environmental Management
System (EMS) as stated in the installation’s Environmental Policy Statement and have an awareness of EMS.
The Environmental Policy Statement commits the installation 1) to compliance with the requirements of USFK regulation 201-1 and other applicable legal and policy requirements, 2) for continued environmental improvement and pollution prevention, 3) to reduce risk from environmental impacts of base activities, and 4) understanding that everyone on the installation is responsible for complying with the environmental regulations.
The Contractor's work under this contract shall conform with all operational controls identified in Kunsan AB EMS and provide monitoring and measurement information necessary for the Government to address environmental performance relative to the goals of the EMS.
Where environmental training is required for contractor employees to complete contract tasks, the Contractor shall provide proof of completion of training to the contracting officer when requested.
1.6.6.1 Air Emission
Dust Control: The Contractor shall take appropriate measures to minimize the generation of dust as a result of their works, operations and activities IAW Korea Environmental Governing Standard (KEGS) Section 2-3.l during and after construction until the site is reclaimed. These measures shall include regular and effective treatment of gravel roads and working areas as shows below in KEGS Table 2-7 ‘ Best Management Practice for Dust Reduction’, use of dust extractors on drilling equipment, wet drilling equipment and operation, water sprays on aggregate crushing and screening operation etc. Dump trucks to be used in the transportation of materials are to be fitted with tarpaulins to prevent dust or other material spilling during transportation.
Best Management Practices for Dust Reduction
No. Discharge Process Standards for installation & necessary measures
1 Field storage (when powdery material is stored in the field)
a. Field stored material shall be covered by anti-dust cover.
b. Anti-dust cover wall of 1/3 of field storage height shall be installed and anti-dust net (screen) of 1.25 times the height of storage shall be installed. For construction site, landscaping site, and demolition site, the boundary shall be guarded with anti-dust wall of 1.8m or more. When two or more sites are adjacent to each other, the inner boundary does not need a wall.
c. Field stored material shall have water content of 7-10% and sprinkler shall be installed to maintain the water content. (For iron scrap site, this does not apply)
d. When the same measures equivalent to or better than a – c are taken, those measures may substitute a – c.
2 Loading/unloading criteria for potential dust-generating activities, such as those involving soil, coal, and concrete/cement
a. Install portable dust booth or spraying dust booth to control flying dust produced during the work processes (limited to coal manufacturing industry, iron/steel industry, and grain transportation industry).
b. Install and use fixed or portable water sprays (spraying radius ≥ 5 m andwater pressure ≥ 3 kg/cm2) to control flying dust (grain processing and loading facilities are excluded).
c. Stop working when wind velocity ≥ 8 m/sec (~18 miles per hour).
d. If current actions are more effective than a – c, then implementation of a – c is exempted.
3 Transportation
[cement, coal, soil, feeds, grain, scrap iron are limited to a, b, f, g and wood is limited to g and h]
a. Cover the loaded materials.
b. Loaded materials shall not extend above 5 cm (~2 inches) below the top of the truck bed.
c. If 10 or more residences are located with 500 meters of the road, pavement, temporary pavement or appropriate covering (with water spray application) shall be provided on the unpaved roads within the
1 km radius.
d. One of the following will be made available:
(1)Automatic wheel washer
(2)Automatic wheel washer with a water containment basin with the following specifications:
(a)Area of basin: ≥ 1.2 times area of the truck
(b)Depth of basin: ≥ 20 cm (~8 inches)
(c) Length of basin: ≥ 2 times of truck length
(d) Equipment to assure continuous water flow within the basin
e. Install side water sprinkler IAW the following criteria:
(1) Water sprinkler should reach bottom of wheels to lower portion of truck bed.
(2) Length: ≥ 1.5 times of truck length
(3)Pressure of water spray: 3 kg/cm2
f. Truck sides and wheels must be washed before exiting site
g. Speed limits within work site shall not exceed 20 km/hr to prevent excessive dust.
h. The work site shall be sprayed at least once a day while there is traffic.
4 Conveyance a. Outdoor conveyance equipment shall be covered and sealed to prevent the release of dust.
b. Appropriate dust booths shall be installed at the entrance, exit, falling points, and ventilation areas.
c. Water spray or other dust control measures shall be available using non-mechanical devices.
d. If current actions more effective than a through c are being practiced, then implementation of a through c is exempted.
5 Outdoor cutting a. It is recommended that iron scrap cutting be conducted indoors.
b. Partitions will be installed for dust control when outdoor cutting is necessary.
c. Stop working when wind velocity ≥ 8 m/sec (~18 miles per hour);
for ship industries, stop working when wind velocity ≥ 10 m/sec
(~22 miles per hour).
d. If current actions more effective than a through c are being practiced, then implementation of a through c is exempted.
6 Outdoor media blasting
a. Media blasting will be conducted indoors if the length of an object is less than 15 cm (~6 inches).
b. Install partitions for dust control.
c. Use portable dust booths if conducting outdoor media blasting. If dust booths are not feasible, media blasting area will be cleaned with vacuum truck.
d. Blasting media, dust, and debris will be contained to prevent dust.
e. Stop working when wind velocity ≥ 8 m/sec (~18 miles per hour); for ship industries, stop working when wind velocity ≥ 10 m/sec (~22 miles per hour).
f. If current actions more effective than a through e are being practiced, then implementation of a through e is exempted.
Ozone Depleting Substance (ODS) Control: The Contractor is prohibited from installing any new equipment using
Class I & II ODS. The contractor shall not intentionally release any Class I or Class II ODS refrigerant in the course of maintaining, servicing, repairing, or disposing of appliances, industrial process refrigeration units, air conditioning units, or motor vehicle air conditioners.
Contractor shall collect refrigerant from all potential sources, including, but not limited to, air conditioners, refrigerators, freezers, and chillers, found remaining in the work areas prior to commencing removal or demolition.
If collection is not possible, all equipment containing chemical refrigerants shall be appropriately moved and placed into segregated storage areas for either re-use or recycling.
Volatile Organic Compound Control: The contractor shall use low concentration volatile organic compound (VOC) materials where possible to reduce/minimize VOC emissions, and maintain fossil fuel burning equipment to reduce nitrogen oxides emissions in an effort to not increase ambient ozone levels
1.6.6.2 Storm water Pollution Prevention Measures
The Contractor shall ensure all workers are familiar with the applicable Storm water Pollution Prevention Best
Management Practices in KEGS Section 4-3.f (1) and Table 4-8. Hazardous materials must be stored indoors, in non-rusty drums or under a man-made cover sufficient to provide protection from sun, wind, and precipitation events and painting clean-up materials (thinners, reinstates) must be captured. Oil leaks or spills from all equipment and vehicles must be captured using drip pans. Spill response pads and booms must be available where hazardous materials, including fuel, are stored, used and transferred. Sediment, trash, litter, wash water and any solid objects must be kept out of the storm water sewers. Contractors will implement Air Force Civil Engineer Support Agency
(AFCESA) ETL 03-1, Storm Water Construction Standards, specifically Sections 7, 8, 9 & 10, excluding CONUS requirements in 8.5, 8.5.1, 8.5.2.
1.6.6.3 Erosion and Sediment Control
Contractor is required to submit an erosion control plan to 8 CES/CEIE for approval prior to any site work. The erosion control plan is required to implement erosion control IAW the KEGS, the Kunsan AB Storm Water
Pollution Prevention Plan and the Kunsan AB Integrated Natural Resources Management Plan, including site stabilization in accordance with KEGS Section 13-3, j. Key elements to address are the control of dust, prevention of sediment leaving the site and on roads, vegetation cover and slope stabilization. Some examples of control methods include silt fences, terraces, interceptor channels, sediment traps, inlet and outfall protection, diversion channels and sedimentation basins. Any temporary measures shall be removed after the area has been stabilized. 8
CES/CEIE will inspect construction sites to ensure the approved erosion control measures are implemented, adequate and effective.
1.6.6.4 Hazardous Materials
The Contractor using hazardous materials (HAZMAT) on base must comply with the authorization procedures IAW
AFI 32-7086, Hazardous Materials Management.
Prior to commencement of the project, the Contractor shall submit the information and AF Form 3952, Chemical
Hazardous Material Request Authorization (including Safety Data Sheets, formally known as material safety data sheets, written in English and Hangul) to obtain HAZMAT usage approval from the CE Environmental Office.
The Contractor shall submit a current monthly quantitative and qualitative inventory of all HAZMAT brought onto the installation to Environmental Office beginning within 5 days after the first HAZMAT are delivered. The monthly inventory must include the following: name of HAZMAT and a common name, if applicable; major use of
HAZMAT (paint, lubricant, adhesive, etc.); quantity (number of containers and volume of each container); and verification that the shelf-life has not expired. The approved AF Form 3952, and SDSs for all HAZMAT must be on file near the HAZMAT storage area.
After the contracted work is completed and before contract closeout, the Contractor must remove all HAZMAT from the installation and arrange a final environmental site-visit so 8 CES/CEIE personnel can inspect the area for
HAZMAT spills or solid waste violations.
The Contractor is required to store HAZMAT in accordance with requirements in Chapter 5 of the KEGS and other
DoD policies including the Joint Service Publication on Storage and Handling of Hazardous Materials and AFMAN
23-209.
Common storage requirements include keeping the storage area neat and orderly and ensuring incompatible materials (for example, flammables and oxidizers) are not stored together. All HAZMATs must be stored in a locked enclosure with a current inventory posted nearby.
A sign with emergency response actions in English and Hangul must be posted where HAZMAT is stored.
Containers of hazardous materials must be legibly labeled and closed when not in use.
Appropriate spill kits and fire extinguishers must be located near the HAZMAT storage areas.
1.6.6.5 Waste Management and Disposal
Disposal of Hazardous Waste:
Contractors are prohibited by 10 U.S.Code 2692 from storage, treatment, or disposal of any contractor owned hazardous waste (HW) on the installation. Contractors shall manage HW generated on the installation IAW KEGS
Chapter 6. Contractors may seek approval from the HW Program Manager, 8 CES/CEIE, for HW accumulation at a hazardous waste accumulation point (HWAP) on the installation if the waste will be or has been generated on-site in connection with a contract activity. When the contractor obtains approval for a HWAP on the installation, he/she shall: be responsible for ensuring compliance with all US Air Force, KEGS, and host nation HW laws and regulations.
Ensure HW are managed and transported IAW the KEGS and local requirements to a certified disposal facility.
Ensure proper labeling, handling, segregation, collection and accumulation of HW IAW Hazardous Waste
Management Plan of Kunsan Air Base.
Ensure all personnel are properly trained for handling the HW they generate.
Provide proper documentation for HW disposal to the installation Environmental Office.
Disposal of Electric Light Fixtures, Ballasts and Polychlorinated biphenyls (PCB) transformers:
The Contractor shall segregate the light bulbs and ballasts by brand and type. Florescent lights containing mercury shall be disposed of in accordance with the KEGS.
Removed PCB containing equipment shall be turned in to the Kunsan AB Hazardous Waste Storage Area (Bldg.
843). The contractor shall comply with United Nations UN Standards for Performance Oriented Packaging (POP) and any additional requirements established by DLA. For example; PCB Transformers shall be set on a drip pan large enough to hold 125% of the remaining liquid and crated by processed wood packaging materials IAW DoD
Directive 4140.1.
Disposal of PCB items shall only be conducted through the servicing DLA IAW DOD 4160.21-M. Disposal of
PCBs within Korea requires coordination with and concurrence of appropriate Korean authorities.
Historical & Archeological Finds:
All items having any apparent historical or archeological interest, which are discovered in the course of any construction activity shall be carefully preserved and reported to the Environmental Office through the Contracting
Officer.
Natural Resources:
The Contractor shall perform all work and take such steps required to minimize interference with or disturbances to flora and fauna. Protected species, which include the Narrow-mouthed Frog and the Korean Golden Frog, are present on Kunsan AB. If trees and bushes interfere with the construction work and need to be relocated or removed, consult with the installation Environmental office for proper clearance prior to relocating or removing.
Polychlorinated Biphenyls (PCB) Free Equipment:
The Contractor is required to assure that all electrical equipment including, but not limited to transformers, capacitors, circuit breakers, recloses, voltage regulators, switches, electromagnets, and cable, shall be PCB free or not be contaminated with PCBs in detectable concentrations in accordance with the KEGS. In addition, newly procured transformers and equipment shall have permanent labels affixed stating they are PCB free (no detectable
PCBs). The contractor shall submit PCB Free certification prepared by the manufacturer for the equipment installed under the project to the Kunsan AB Environmental Office.
Lead Based Paint:
The Contractor is required to use “lead free” coatings (liquid paints or coatings with less than 0.05 percent lead by weight of the non-volatile solids) during project execution. The Contractor shall provide a certificate or SDS, written in English, from the manufacturer showing the product is lead free.
Spill Prevention and Response Planning:
In the event of a fuel or other hazardous substance spill during the performance of this contract, the Contractor shall be responsible for its containment, clean up, and related disposal costs. Maximum effort must be made to keep the spill from reaching the storm water or sanitary sewers and the contractor must have sufficient spill containment supplies readily available on vehicles and/or at the work site to contain any spillage. Refer to the installation Spill
Prevention, Control, and Countermeasure (SPCC) Plan.
In the event of a Contractor-related release, the Contractor shall immediately notify the Fire Department (911), Environmental Office (DSN 782-6240/3701 or 063-470-6240/3701), and the Contracting Officer and take appropriate actions to correct its cause and prevent future recurrence.
The Contractor will submit a completed spill report within 24 hours to the installation Environmental Office detailing the spill location, type of material and quantity spilled, the cause of the spill and description of the event, whether the spill reached the storm water or sanitary sewer, the containment and cleanup actions and the POC and contact number.
Conflicts:
In case of a conflict or discrepancy between environmental regulations or laws and the contract specifications, the
Contractor shall immediately submit the matter in writing to the Contracting Officer for a determination. Without such determination any actions taken shall be at the Contractor’s own risk and expense.
1.6.7 Safety Requirement: The Contractor shall comply with EM 385-1-1, US Army Corps of Engineers Safety and
Health Requirements Manual, Revised Version dated Sep 08. English versions are available for reference in the 8th
CES, Operation Support Office (CEOS), and Building 702.
The Contractor shall be responsible for ensuring that all work performed under this contract is accomplished in a safe manner. The Contractor shall ensure that all employees are instructed on accident prevention and safety.
Special emphasis shall be placed on the safe operation of equipment and safe working conditions. Training shall be conducted for all employees by the Contractor on appropriate safety measures and on the employee's obligation to obey all existing base safety regulations.
1.6.8 Security Requirements:
1.6.8.1 PHYSICAL Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. The Contractor and employees shall comply with all security requirements imposed by the local installation commander at all times while on this military installation.
1.6.8.2 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons.
NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality
Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the
Contracting Officer.
1.6.8.3 In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the
Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the
Contractor.
1.6.8.4 The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the
Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.
1.6.9 Antiterrorism (AT) and Operations Security (OPSEC): The contractor shall take an AT level 1 training
(general) within 60 days of contract award and shall get access and general protection policy and procedures. The contractor may be or may not be eligible for CAC but requires access to DoD facility or installation. The contractor shall take an iWATCH training and shall get Threat Awareness Reporting Program.
1.6.10 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:
perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.11 Qualification Requirement:
1.6.11.1 Contractor: The contractor shall maintain the respective qualifications throughout the life of the contract. If the prime contractor use subcontractor or Other Teaming Arrangement (OTA) to perform on this requirement, the prime contractor shall submit a signed subcontract or OTA agreement. Also, the subcontractor or OTA shall submit documentation demonstration same qualification as prime contractor.
1.6.11.2 Prime Contractors Business Registration Certificate or the Sub Contractor’s business registration certificate (사업자 등록증) shall have valid business registration issued by the Republic of Korea (ROK) Government to clean, remove, dispose of all Hoods and Ducts waste or related cleaning service (후드/덕트 청소나 그밖에 청소에
관련된 사업자등록증). Also, the contractor shall have a valid public sanitation control business permission
(위생관리용역 신고증) issued by the ROK Government and 2020-Sanitary training certificate (2020 년도
위생교육증) provided by organizations/associations permitted by the Minister of Health and Welfare. The Contractor shall, throughout the contract period, obtain and maintain all required certificate/permission by the ROK Authorities to do the work specified hereinafter.
1.6.11.3 Key Personnel: The follow personnel are considered key personnel by the government; Contract Manager.
1.6.11.4 Before removing, replacing, or diverting any of the listed or specified key personnel, the Contractor shall:
(1) Notify the Contracting Officer reasonably in advance within 14 calendar days prior to anticipate start date of the new personnel.
(2) Submit justification (including proposed substitutions with resumes of equal qualifications stated in this section
1.6.11.4) to the COR in sufficient detail to permit evaluation of the impact on this contract. The 8 CES has the right to review/accept proposed substitutions with resumes first and should report to KO in case of any job qualification discrepancies are found; and
(3) Obtain the Contracting Officer's written approval. Notwithstanding the foregoing, if the Contractor deems immediate removal or suspension of any member of its management team is necessary to fulfill its obligation to maintain satisfactory standards of employee competency, conduct, and integrity under the clause at 48 CFR
970.5203–3, Contractor's Organization, the Contractor may remove or suspend such person at once, although the
Contractor shall notify the Contracting Officer prior to or concurrently with such action.
1.6.11.5 Contract Manager (CM): The Contractor shall provide a Contract Manager (CM) who shall be responsible for the performance of this work. The CM shall have full responsibility to act for the Contractor on all contract matters relating to daily/weekly/monthly operations of this contract. The CM shall be an individual who is capable of conversing in and understanding English. This is the requirement of this contract. During this time the CM and
COR shall discuss the daily requirements of the contractor’s work schedule to coordinate what work is being completed that day. The CM shall receive any pertinent information as to the day’s activities which might affect the scheduled services. The contract Manager shall schedule and arrange work so as to cause the least interference with the normal occurrence of Government business and mission. In those cases where interference may be essentially unavoidable, the contract manager shall be responsible to make every effort to minimize the impact of the interference, inconvenience, equipment downtime, interrupted service, customer discomfort, etc. The contract manager shall notify the custodian of any work to be performed kitchen hoods/ducts equipment under this contract that would tend to disrupt the conduct of normal Government business.
1.6.11.6 Availability: The CM shall be available to meet the COR within one (1) hour during normal duty hours from Monday through Friday to meet with the Contracting Officer’s Representative (COR) to discuss work related issues. After normal duty hours, the CM shall be available within two (2) hours. The CM shall be available by cell phone and shall provide their cell phone number to the Contracting Officer and COR.
1.6.12. Contractor Employees: The contractor's personnel shall present a neat appearance and be easily recognized.
This shall be accomplished by wearing appropriate badges that contain the company name and the employee's name.
Such badges shall be furnished and controlled by the contractor. The contractor shall require each employee to display an approved identification badge at all times during performance of work under this contract. The CM shall submit a sample badge to the COR for approval prior to use. The contractor shall provide the COR with a complete list of all employees, by name and ROK ID number, who shall be performing the requirements of this contract. This list shall be provided to the COR before the contractor performs any contract requirements. When changes of personnel occur, the contractor shall provide updates as required. The contractor shall exercise full control over all of his employees at all times. The contractor shall ensure that all contractor employees shall perform this contract's work in accordance with and pursuant to instructions from their own management and supervision, and shall not accept from any Government personnel additional tasking or changes in tasking. The contractor's employees shall report any special request for services to the CM who shall immediately report these requests to the COR. The CM shall provide the COR with the facility number, the name of the individual and the nature of the special request. The contractor shall not employ any person for work on this contract if such employee is identified to the CM by the KO as a potential threat to the health, safety, security, general wellbeing or operational mission of the installation and its population. The CM shall ensure all employees have adequate knowledge of the proper procedures for using chemicals, tools, and equipment necessary to complete assigned tasks. The contractor shall ensure employees have current and valid driver's licenses before allowing the employees to operate contractor-owned vehicles on Kunsan
Air Base.
1.6.13 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal
Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other
Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.14 Base Passes: It is the Contractor’s responsibility to arrange for base passes and necessary vehicle permits required for entry onto this installation prior to starting any work.