SOLICITATION for CY 18 LCS, MLWR19-1023, Renovate Readiness & Emergency Management Facility
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W90VN719R0003_Combined_Drawing.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F2L3CE8134A101
CY 18 LCS, MLWR19-1023, Renovate Readiness & Emergency Management Facility
THIIS A WORK PLAN TASK ORDER FOR THE FOLLOWING MATOC CONTRACTORS ONLY. ONLY Proposals for this requirement are being solicited from the MATOC contractors for the follow ing MATOC contracts issued by 411th Contracting Support Brigade (CSB).
Proposals from offerors other than these MATOC Contractors w ill not be considered for aw ard.
Contract Number: W91QVN-18-D-0100,0102, 0103,0104, 0105, 0107, 0109, 0111, 0112, 0134, 0135, 0136 and 0137.
A. Site Visit: Offerors w ho intend to propose on this solicitation are strongly encouraged to attend site visit. See site visit clause FAR 52.236-27 in Section L. Offerors are required to have a valid Korean Identif ication card w hen attending the site visit orientation.
B. This solicitation is conducted under the LCS program and w ill result in a contract betw een the Government of the Republic of Korea (ROK) and the contractor. ROK w ill directly pay the contractor. No appropriated funds of the United States (US) shall be obligated for payment due under this contract. See Section L, Instructions to Offerors, for submission requirements related to LCS solicitations.
MS. CHOI, HYUN K. 755-9312
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
04-Oct-2018
(RFP)
(IFB)
X
CALL:
RENOVATE READINESS & EMERGENCY MANAGEMENT FACILITY
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________180 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________05 Nov 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO KUNSAN, UNIT #2112
APO AP 96264-2112
UNITED STATES
W90VN7
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
MLWR19-1023
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: 0503-354-9930 TEL: FAX:
W90VN719R0003 50
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W90VN719R0003
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each
Renovate Management Facility
FFP
MLWR19-1023, Renovate Readiness & Emergency Management Facility FOB: Destination
PURCHASE REQUEST NUMBER: F2L3CE8134A101
PSC CD: Z2QA
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Estimated War Hazard Amount is
FFP
Zero (0) FOB: Destination
NET AMT
Section C - Descriptions and Specifications
STATEMENT OF WORK
DETAILED-SPECIFICATION
The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea”, dated Jan 2014, located on the 411th CSB Web Page, https://www.usfk.mil/ Resources/ContractingwithUSFK.aspx. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader software.
INDEX
SECTION NO TITLE
DIVISION 01 - GENERAL REQUIREMENTS
013000 Administrative Requirements 013300 Submittal Procedures 013526 Government Safety Requirements 013529 Heath and Emergency Response Procedures for Contaminated Sites 014200 Sources for Reference Publications 014500 Quality Control 015000 Temporary Construction Facilities 015720 Environment Protection 015800 Project Identification 017800 Closeout Submittals 017823 Operation and Maintenance Data
DIVISION 02 – EXIST CONDITIONS
024100 Demolition and Deconstruction 028100 Transportation and Disposal of Hazardous Material
DIVISION 03 – COCNRETE
031113 Structure Cast-In-Place Concrete Forming 036113 Concrete Accessories 032000 Concrete Reinforcing
DIVISION – MASORNY
042000 Masonry
DIVISION 05 – METALS
050523 Welding, Structural 051200 Structural Steel 055013 Miscellaneous Metal Fabrications
DIVISION 06 –WOOD, PLASTICS AND COMPOSITES
061000 Rough Carpentry 062000 Finish Carpentry
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
072116 Mineral Fiber Blanket Insulation 074113 Metal roof Panel 076000 Flashing and Sheet Metal 079200 Joint Sealing
DIVISION 08 - OPENINGS
081113 Steel Doors and Frames 081400 Wood Doors 085113 Aluminum Windows 097100 Door Hardware 088100 Glazing
DIVISION 09 - FINISHES
092200 Support for Plaster and Gypsum Board 092236 Lath 092423 Stucco 092900 Gypsum Board 093000 Ceramic Tile, Quarry Tile and Paver Tile 095100 Acoustical Ceiling 096500 Resilient Athletic Flooring 099000 Paints and Coatings
DIVISION – SPECICLTIES
101402 Interior Signage 102113 Toilet Compartments
DIVISION – FURNINGS
123600 Countertops
DIVISION – PLUMBING
220000 Plumbing, General Purpose
DIVISION – HEATING, VENTILATION, AND AIR CONDITIONING
230000 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
230300 BASIC MECHANICAL MATERIALS AND METHODS
236300 COLD STORAGE REFRIGERATION SYSTEMS
238202 UNITARY HEATING AND COOLING EQUIPMENTDIVISION
NOTE: Wherever "Special Clause" or "Special Provisions" appears in OM&A sections substitute "clauses and/or special provisions of this contract."
DIVISION 1 GENERAL REQUIREMENTS
SECTION 1A STATEMENT OF WORK
INDEX
1A-1 DESCRIPTION OF WORK
1A-2 PRINCIPAL FEATURES
1A-3 PROJECT DURATION
1A-4 LIST OF DRAWINGS
1A-5. PROJECT DURATION
1A-5 GENERAL CONDITIONS
1A-7 CONTRACT DATA REQUIREMENTS LIST (CDRL)
1A-8. ENVIRONMENTAL PROTECTION SPECIFICATION
1A-1. Description of Work: The Contractor shall provide all labor, tools, equipment, transportation, materials and other necessary resources for Project MLWR19-1023, Renovate Readiness & Emergency Management Facility in accordance with the Statement of Work (SOW), technical detail specifications, drawings, and terms and conditions of this task order.
Unless otherwise specified in this task order, the contractor shall comply the terms and conditions of Indefinite Delivery, Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) issued by 411th CSB, Korea. CONTRACT TYPE: This is an individual WORK PLAN TASK ORDER of Indefinite Delivery, Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) issued by 411th CSB, Korea.
TECHNICAL DETAIL SPECIFICATIONS
DRAWINGS
LIST OF REFERENCE DRAWINGS
STATEMENT OF WORK
PROJECT NO TITLE LOCATION
MLWR19-1023 Renovate Readiness & Emergency Management Facility KUNSAN AB
A. DESCRIPTION: The Contractor shall provide all labor, tools, equipment, transportation, materials and other necessary resources to accomplish the scope of work in accordance with the drawings, statement of work, technical detail specifications and terms and conditions of this task order.
B. Other Government Documents and Publications.
a. UFC 4-022-01, Security Engineering Entry Control Facilities/Access Control Points.
b. UFC 4-022-02, Selection and Application of Vehicle Barrier.
c. UFC 3-120-01, Sign Standard, dated 1 March 2014.
d. UFC 3-201-01, Civil Engineering, dated 1 June 2013.
e. UFC 1-200-01 Unified Facilities Criteria Design: General Building Requirements dated 1 July 2013.
f. UFC 3-101-01, Unified Facilities Criteria Design: Fire Protection Engineering for Facilities: Architecture, dated 26 September 2006, including Change 3, I March 2013.
g. UFC 4-010, DoD Unified Facilities Criteria: Minimum Antiterrorism Standards for Buildings, dated 9 February 2012, Change 1, dated 1 October 2013.
h. TI 800-01, Technical Instructions Design Criteria, dated 20 July 1998 with revision thru 16 Sep 2005.
i. NEPA 101, Life Safety Code, 2012 Edition.
j. International Building Code (IBC), 2012 Edition.
k. Engineering Regulations.
ER 1110-345-100: Design Policy for Military Construction.
ER 1110-345-700: Design Analysis.
ER 1110-345-720: Specifications
l. DoD ABAAG, Department of Defense Architectural Barrier Act Accessibility Guidelines, 31 October 2008.
m. Occupational Safety and Health Standards (29 CFR Parts 1910, OSHA).
n. Standard Technical Specifications for OMA Projects, Korea
o. Architectural Compatibility and Design Guide of Kunsan Air Base, ROK (I Jun 2009).
1A-2. Principal Features: The description of the work is includes the principal features only.
This general outline does not in anyway limit the responsibility of the contractor from performing all work indicated herein and on the drawings.
A. SCOPE OF WORK
2.1. CIVIL WORK
2.1.1 Replace existing concrete sidewalk with new 6” thick concrete floor slab including 6” thick base course for new canopy as shown on the drawing (refer C-2).
2.2. ARCHITECTURAL WORKS
2.2.1 Replace existing concrete floor slab including floor with new 4” thick concrete floor , 6” thick base course, welded fabric wire (WWF), vapor barrier and insulate in room 110, 111 and 112 as shown on the drawings (Refer A-1, A-2 and A-4).
2.2.2 Replace existing floor tile with new ceramic mosaic tile (CMT) and mortar bed/grouting in room 110 and 111 as shown on the drawings (Refer A-1, A-2 and A-4).
2.2.3 Install new vinyl composition tile (VCT) and vinyl cove base (VCB) in room 111 (Storage Rm) as shown on the drawings (Refer A-1, A-2 and A-4).
2.2.4 Replace existing vinyl cove base (VCB) with new 100mm thick natural oak wood base to entire building as required as shown on the drawing (Refer A-1, A-2 and A-4).
2.2.5 Replace existing glazed ceramic wall tile (GCWT) with new GCWT including vapor barrier, mortar bed, wire mesh, mortar bed and grouting (full height) in room 110 and 111 (Men’s and Women’s latrines) as shown on the drawings (Refer A-1, A-2 and A-3).
2.2.6. Install new 5/8” thick gypsum board wall including metal stud and furring after to be removed not necessary items (example steel pipes and conduits, etc.) in room 112 (Storage Rm).
2.2.7 Replace existing acoustical ceiling with new 24 x 24” x ¾” thick semi-exposed acoustical ceiling including main/cross tee, and hanger wire in room 101, 102, 103, 104, 104A/B, 105, 106, 107, 108 and 109.
2.2.8 Replace existing gypsum board ceiling with new ½” thick water proof gypsum board ceiling including suspend system and access door as required in room 110 and 111 (Men’s and Women’s latrines) as shown on the drawings (Refer A-1, A-1, A-2 and A-4).
2.2.9. Install new 24 x 24” x ¾” thick semi-exposed acoustical ceiling including main/cross tee, and hanger wire in room 112 (Storage Rm) as shown on the drawings (Refer A-1, A-2 and A-4).
2.2.10 Replace existing single and double wood doors and frames and new natural oak solid wood doors and metal frames including hardware set as shown on the drawings (Refer A- 1 and A-2).
2.2.11 Replace existing double metal doors and frames with new insulated metal doors and metal frames including hardware set as shown on the drawings (Refer A-1 and A-2).
2.2.12 Replace existing aluminum windows and frames with new aluminum sliding window and alum frame including 1” thick insulated/laminated glass and insect screen to entire building as shown on the drawings (Refer A-1, A-2, A-6 and A-7).
2.2.13 Replace existing metal roofing panel with new standing sim metal roof (SSMR) panel system and 30K-250mm thick insulation including vapor barrier and chicken wire to entire building as shown on the drawings (Refer A-4, A-3 and A-5).
2.2.14 Replace existing metal gutter with new metal gutter including support structure to entire building as shown on the drawings (Refer A-2, A-3 and A-5).
2.2.15 Replace metal downspout with new metal downspout including support structure as shown on the drawings (Refer A-3 and A-5).
2.2.16 Install new canopy to connect building 567 and building 564 with standing sim metal roof system, roof structure, steel columns and foundation, 6” thick concrete slab and metal gutter/downspout including concrete splash blocks as shown on the drawing (Refer C-2, A-2 and A-3).
2.2.17 Install standing sim metal roof canopy and support structure at main entrance of east as shown on the drawing (Refer A-2).
2.2.18 Replace existing toilet partition, urines, mirrors, toilet accessories with new toilet partition- Type-II, toilet tissue dispenser, paper towel dispenser w/receptacle-SST, soap dispenser-SST recess type, mirrors glass w/assemble (450 x 750), lavatory support urinal baffle, vanity for wall and base cabinet and toilet accessories in room 110 and 111 (Men’s and Women’s latrines).
2.2.19 Install new fire extinguisher cabinets and singe plate (acrylic plaque) for building.
2.2.20 New 2-coats paint to interior of gypsum board wall and ceiling (Federal Standard 595B Colors: 27779, beige) and exterior of exterior insulation and finish system (Federal Standard 595B Colors: 33617, dark beige) in accordance with base standard color skim to entire building.
2.2.21 Block-up ducts, pipes and louver opening after remove with new back-up material and exterior insulation and finish system (EIFS) as required.
2.2.22 Restore any damaged materials caused by this work to its original condition.
2.2.23 Remove and dispose of all construction rubbish and debris, off Kunsan Air Base, at the contractor’s own expense, in strict accordance with existing Korean/U.S. Environmental Laws and Regulations.
2.2.24 Contractors shall submit the report on the weight of Construction and Demolition (C&D) debris diverted and the weight of C&D debris disposed to COR in accordance with section 3.3.2 and 3.8.1.4. of the AFI 32-7042, data on the weight of C&D debris diverted and the weight of C&D debris disposed must be documented and reported. All C&D debris disposal contracts must be reviewed to ensure this requirement is being met. This information must be reported to 8th Civil Engineering Squadron Environmental Flight
2.3 MECHANICAL WORKS
2.3.1. Remove existing supply, return duct, diffusers, and fresh air intake duct with louver as shown on construction drawing.
2.3.2. Remove existing wall ventilators in men’s latrine and women’s latrine as shown on construction drawing.
2.3.3. Remove existing plumbing fixtures in men’s latrine and women’s latrine as shown on construction drawing.
2.3.4. Remain existing indoor units and outdoor unit of heat pump system as shown on construction drawing.
2.3.5. Remain existing domestic hot water heater and piping in mechanical room as shown on construction drawing.
2.3.6. Remove existing fin tube radiator and hot water supply/return pipe in men’s latrine as shown on construction drawing.
2.3.7. Install new wall ventilators in men’s latrine and women’s latrine as shown on construction drawing.
2.3.8. Install new plumbing fixtures with mixing valves, and angle valves in men’s latrine and women’s latrine as shown on construction drawing.
2.4. ELCTRICAL WORKS
2.4.1 Removal Work
2.4.1.1 Remove all of existing lighting fixtures with associated wires, conduits, and toggle switches. The existing lighting fixtures are shown on the reference drawing E-1.
2.4.1.2 Remove all of existing wall mounted receptacles with associated wires and conduits. The existing receptacles are shown on the reference drawing E-2.
2.4.1.3 Replace the existing exposed wires and conduits on the walls with new concealed wires and conduits in walls.
2.4.2 Existing Electrical Equipment Relocation Work in Mechanical Room
The existing mechanical room shall be converted to new storage room with new gypsum board wall finish by architectural work. The existing electrical equipment shall be removed and re-installed on new gypsum board wall as below.
2.4.2.1 Remove existing wiring box “WG” in mechanical room.
2.4.2.2 Relocate existing panel board “P”.
2.4.2.3 Remove and re-install existing panel board “PA” and “EM”.
2.4.2.4 Install new wiring box “WB”.
2.4.2.5 Install new wire gutter “WG”.
2.4.2.6 Install new wires and conduits for the relocated panel board “P”, “PA”, and “EM”.
2.4.2.7 Relocate existing junction boxes on the existing walls to new ceiling attic space. For the relocation, install the required wires and conduits.
2.4.2.8 Remove and reinstall existing wall mounted electrical equipment including wires and conduits on new gypsum board walls.
2.4.3 New Lighting Work
2.4.3.1 Install new LED flat panel lights and toggle switches with required wires and conduits in entire interior spaces of the building. The new LED flat panel lights shall be Welluce Model No.
CLBT 2x4, 1x4, and 2x2 or approved equal. The approved equal items shall meet the following requirement.
- Input Voltage: 1 Phase 120V
- Color Temperature: 4000K
- Efficiency: Minimum 120 Lumen/Watt
- UL listed
2.4.3.2 Each room shall meet the following illuminance level.
- Office: 50 foot candles
- Corridor: 30 foot candles
- Toilets: 20 foot candles
- Storage: 20 foot candles
2.4.3.3 Lighting Calculations
The contractor shall perform the lighting simulation and submit the computer-generated photometric plans for each space. The photometric plan shall be included:
- Horizontal illuminance measurements at work plane
- Minimum and maximum illuminance level
- Average maintained illuminance level
- Lighting power density
2.4.3.4 Install new emergency battery units for new LED flat panel lights. The illumination for means of egress shall meet the requirement of NFPA 101 Life Safety Code.
2.4.3.5 Install new LED exterior wall pack lights above exterior access doors.
2.4.3.6 Install new toggle switches.
2.4.4 New Power Work
2.4.4.1 Install new wall mounted duplex receptacles with associated wires and conduits in entire interior spaces. The separation distance of the receptacles shall be a minimum 3.6 meters along the floor line of any wall space. The others requirement of receptacles shall comply with the NFPA 70 National Electrical Code.
2.4.4.2 Install new wires and conduits for new ventilators.
B. Additional Scope of Work Language from OPSEC Cover Sheet
1. AT Level I training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within XX calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within XX calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil
2. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub‐contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204‐9, Personal Identity Verification of Contract or Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
2a. For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014‐05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on‐ site or remotely; (2) Remote access, via logon, to a DoD network using DoD‐approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non‐DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.
2b. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub‐contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC‐III) and Terrorist Screening Database (TSDB) (Army Directive 2014‐ 05/AR 190‐13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
13. Threat Awareness Reporting Program. For all contractors with security clearances. Per AR 381‐12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2‐4b.
1A-3 PERFORMANCE PERIOD: 180 Days
3.1 Highly recommend the contractor to attended site orientation hosted by 8 CES before applying for bid.
3.2 Contractor shall attend pre-construction conference prior to notice to proceed (NTP) being issued and needs to submit construction schedule prior to pre-construction conference.
1A-4 DRAWINGS
CONCEPTUAL DRAWINGS: The contractor shall submit a conceptual drawing set with contractor’s proposal to compete for this work plan task order. The conceptual drawings shall supplement the scope of work, detailed specifications, and reference drawings which are provided by government in this task order. The conceptual drawings shall meet the following “Minimum Requirement for Work Plan” which meets the Government’s design intent and achieves the desired quality end-product.
MINIMUM REQUIREMENT FOR WORK PLAN
1. CIVIL WORK
a. Provide Auto CAD drawings for detail and foundation and concrete floor slab and misc. works for new canopy.
b. Provide Auto CAD drawings for site preparation around building 2901.
2. ARCHITECTURAL WORK
a. Provide Auto CAD drawings to new elevations, sections and details for replace interior gypsum board wall including metal stud and furring at replace gypsum board walls to entire building.
b. Proved Auto CAD drawings to new Standing Seam Metal Roof (SSMR) details for replace/repair existing roofing truss and wood sheathing with new SSMR system, and new details of metal gutter and downspout including concrete splash block.
c. Provide Auto CAD drawings to replace interior and exterior finish schedule including paint.
d. Provide Auto CAD drawings for replace roof insulation including alum foil vapor barrier and chicken wire.
e. Provide Auto CAD drawings to details of new fascia and soffit, etc.
f. Provide Auto CAD drawings for building sections and elevations.
g. Provide Auto CAD drawings for replace ceiling plan.
h. Provide Auto CAD drawings for Men’s and Women’s latrines including toilet partition, vanity/base cabinet and accessories works
i. Provide Auto CAD drawings for new canopy including elevations, sections and details of columns and roof truss structure, etc.
j. Provide AutoCAD drawings for elevation, details and hardware schedule of doors and windows.
k. Proved Auto CAD drawings for wall section, concrete floor of new and new storage room.
3. ELECTRICAL WORK
a. New Lighting Plan.
b. New Power Plan
c. Lighting Calculation including computer-generated photometric plan for each interior space.
FINAL SITE ADAPTED DRAWINGS: The contractor shall complete drawings which consist of preliminary, back check if required and final site adapted drawings with design analysis including engineering calculations and specification. The contractor shall be responsible for its own design, work quality, full compliance with the RFP and its accepted proposal, and shall be liable for its faults. The final site adapted drawings shall be provided by the contractor to supplement the conceptual drawings, scope of work, and specifications within 180 calendar days after issuance of notice to proceed.
TECHNICAL DETAIL SPECIFICATIONS
PROJECT NO. TITLE LOCATION
GENERAL: The specifications are from the "Standard Technical Specifications for OMA Projects, Korea", dated 1 October 2014, issued by the Department of the Army, Installation Management Agency, Korea Region Office. The current specifications are available (for referral purposes only) at the Technical Review Section, Regional Engineer Support Center, IMA- KORO, Unit #15742, APO AP 96205-5742 and also are located on the 411th CSB, Korea’s Web Page https://contracting.korea.army.mil/reference.asp. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.
LIST OF REFERENCE DRAWINGS: The contractor shall provide the conceptual Auto CAD drawings and final site adapted drawings based on the below reference drawings.
ITEM NO TITLE SHT NO.
C-1 Location Map 1 of 12
C-2 New Site Plan for Canopy and Walkway 2 of 22
A-1 Exist and Removal Floor Plan 3 of 22
A-2 New 2nd Floor Plan 4 of 22
A-3 New Elevations 5 of 22
A-4 New Interior and Exterior Finish Schedule 6 of 22
A-5 New Roof Plan 7 of 22
A-6 Door elevation & Types 8 of 22
A-7 Details for Doors and Windows 9 of 22
10 As-built Drawing for Site Plan 10 of 22
11 As-built Drawing for Doors and Windows 11 of 22
12 As-built Drawing for Floor Plan & Interior Finish Schedule 12 of 22
13 As-built Drawing for Foundation Plan 13 of 22
14 As-built Drawing for Elevations and Sections (1) 14 of 22
15 As-built Drawing for Elevations and Sections (2) 15 of 22
16 As-built Drawing for Structure Sections 16 of 22
17 As-built Drawing for Column Sections 17 of 22
M-1 As-built Drawings for Heating, A/C Plan & Equipment Schedule 18 of 22
M-2 As-built Drawing for HVAC Floor Plan 19 of 22
E-1 As-built Drawing for Existing Lighting Plan 20 of 22
E-2 As-built Drawing for Existing Power Plan 21 of 22
E-3 New Floor Plan for New Lighting/Power Plan 22 of 22
1A-5. PROJECT DURATION: 180 Days.
3.1 Highly recommend the contractor to attend the site orientation hosted by 8 CES before applying for bid.
3.2 Contractor hall shall attend pre-construction conference prior to notice to proceed (NTP) being issued and needs to submit construction schedule prior to pre-construction conference.
A1-6. GENERAL CONDITIONS
1. SPECIFICATIONS: The project shall comply with the MLWR 19-1023, Renovate Readiness & Emergency Management Facility, Kunsan AB, Korea, Contract (100%) Submittal Specifications shall comply with the “Standard Technical Specifications for O&MA (Operation & Maintenance Army) Projects, Korea dated 24 January 2014”, “Standard Detail drawings for O&MA Project Korea dated 01 October 2003” are available on the 411th CSB Web Page, https://www.usfk.mil/ Resources/ContractingwithUSFK.aspx or the specification electronic files are available at the 8th Civil Engineering Squadron, Kunsan Air.
2. ALERTS: During military alerts or special operations, anticipated not to exceed forty (40) working days per year of contract duration, the contractor may be denied access to the base or the work areas. When the contractor is prohibited from access to the base or worksite for one (1) day or less per month, no adjustment in the contract time will be made. When the contractor is prohibited access for more than one (1) day per month, an adjustment to the contractor’s schedule will be made by the Contracting Officer (KO).
3. DAILY REPORTING: The contractor Project Manager shall be responsible to report to the COR or Government project inspector at 0800 during normal work days, or at 1700 during night shifts . The contractor project manager shall provide the COR or Government project inspector with a daily report detailing the work which is being accomplished at the worksite. Failure on the project manager’s part to report to the COR or Government project inspector will result in a letter being forwarded to the KO recommending appropriate action by the KO for the contractor’s lack of coordinating the daily work report.
4. NOTIFICATION OF INSPECTIONS: Prior to starting work at the work site, the contractor shall inform the COR of the actual date that the contractor intends to start work. The contractor shall also give the COR or project inspector no less than a seven (7) work day notice prior to each concrete placement, asphalt placement field test, protective coating, or any other work deemed necessary by the COR or project inspector. The contractor shall also give at least a seven (7) work day written notification of the pre-final and final inspections to the COR. The Construction Management Element of the 8th Civil Engineering Squadron is located in building #705, Kunsan Air Base, Korea; base phone extension is 782-6197 or commercial (063) 470-6197
5. CLOSE-OUT/TURNOVER MATERIALS: The contractor shall be responsible for providing the following materials as part of final turnover to the U.S. Government: AS-built drawings shall be submitted to COR for review and acceptance in electronic format utilizing AutoCAD 2010 or higher and submitted on CD/DVD format (3 copies). Operations and Maintenance (O&M) training shall be provided to U.S. Government personnel on new mechanical systems NLT (7) work days, not counting weekends, prior to final acceptance. O&M Manuals shall be submitted in both electronic and hard copy format (3 copies each) (7) work days prior to final acceptance.
Turnover of all new facility keys and salvageable material (if any) shall be submitted to COR or project inspector.
Contractor shall prepare DD form 1354 (Transfer and Acceptance of DOD Real Property) with type and quantity of construction material installed. When all materials have been turned over, the COR or project inspector will notify the KO so that the final payment may be released. Up to fifteen (15%) percent of the total contract amount may be withheld pending complete turnover of material stated in this paragraph
6. AIR FORCE MATERIALS: All salvageable materials removed from the worksite shall remain the property of the U.S. Government. All other such materials shall be disposed of by the contractor IAW AF regulations, upon coordination with the COR or project inspector. Applicable AF regulations include AFI 32-7001 (Environmental Management), AFPAM 32-7043 (Hazardous Waste Management Guide), AFI 32-1052 (Facility Asbestos Management), AFI 32-7042 (Waste Management), UFC 4-451-10N (Hazardous Waste Storage, and UFC 1-900-01 (Methods for the Reduction, Reuse, and Recycling of Demolition Waste) and their source reference documents.
Unclear or conflicting information between these documents can be clarified via RFI from the contractor to 8
CES/CENMC.
7. CONTRACTOR’S EQUIPMENT: All contractor equipment used in the performance of this contract shall be subject to a functional and safety inspection(s) at any time by the COR or project inspector IAW U.S. Air Force Safety Regulations and EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual. Any equipment found not to be functional or safe shall be immediately repaired, replaced, or removed from the worksite by the contractor. Additionally, the contractor will provide the COR or construction inspector a listing of all equipment to be used on site prior to the start of work, NLT (10) days after NTP. Applicable U.S. Air Force Safety Regulations include UFC 3-560-01 (Electrical Safety, O&M; with Change 4), AFI 32-1064 (Electrical Safe Practices), AFI 91-302 (Air Force Occupational and Environmental Safety, Fire Protection, and Health Standards) and AFPAM 91-210 (Contract Safety... although this is more for our use in setting up contracts than for the contractor in executing them) and their source reference documents. Unclear or conflicting information between these documents can be clarified via RFI from the contractor to 8 CES/CEPMC.
8. MATERIAL COMPLIANCE: The contractor shall be responsible to ensure that all materials used in the performances of the contract meet the specifications and requirements of this contract. Material(s) not meeting the specifications or not approved on AF Form 3000, Material Approval Submittal (or shall not be transported to the worksite. The COR or project inspector will be the approving authority for all materials used in the performance of this contract. All material(s) shall be new and the standard product of a manufacturer who is regularly engaged in the manufacturing of such products. Any materials used in the performance of this contract not approved on an AF Form 3000 shall be removed and replaced, at the expense of the contractor, and not the U.S. Government unless the government determines that the item does meet the specifications in the contract.
9. CONTRACTOR-FURNISHED MATERIAL AND CONTRACTOR-FURNISHED EQUIPMENT
(CFM/CFE): All CFM/CFE, including construction equipment, will not be permitted to enter Kunsan Air Base unless each item is approved on a DD Form 1149, Requisition and Invoice/Shipping Document. The contractor shall be responsible to notify the COR or project manager at least three (3) work days prior to the arrival of, or removal of, any CFM/CFE at Kunsan Air Base. DD Form 1149 is available on open source internet (http://www.dcma.mil/dcman/NPP/files/dd1149.pdf).
10. CONTRACTOR’S TEMPORARY FACILITES: Erection of any facility by the contractor shall be coordinated with the COR or project inspector. An approved U.S. Government Real Estate Permit from the Base Civil Engineer (BCE) shall be in the contractor’s possession before erection of any facility. Any contractor erected facility shall be removed and the area cleaned within seven (7) calendar days in normal installation access areas and
(5) duty days in installation restricted areas after completion of the contract requirements and prior to final invoice payment.
11. Air Force (AF) FORM 103, BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST:
Prior to starting any work, The contractor shall be responsible to have a valid AF Form 103, Base Civil Engineering Work Clearance Request (dig permit) in his possession. No work shall be performed under this contract without a valid AF Form 103 in the contract’s possession. Request for a Base Civil Engineering Work Clearance Request shall be submitted to the COR or project inspector a minimum of ten (10) calendar days prior to starting any work under the terms of this contract.
12. SAFETY: AFOSHSTD91-501 (Air Force Occupational and Environmental Safety, Fire Protection, and Health Standard) shall be complied with. All AFOSH standards shall be complied with as applicable. The contractor shall also comply with applicable sections of EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual.
13. FIRE PROTECTION: The contractor shall comply with the provisions of the Base Fire Protection program, 607 AOGI (Air Operations Group Instruction) 32-2001. The contractor shall provide suitable fire extinguishers at any material storage area constructed by the contractor as well as at the work site(s). The contractor shall ensure that all contractor employees understand that there will be no smoking inside or within 50 feet of any U.S. Government facility, at any time, during performance of work under this contract. The COR or project inspector will identify to the contractor the designated smoking area(s) for the contractor’s employees prior to starting any work. The contractor shall ensure that all contractor employees are aware of the designated smoking area(s) and shall ensure that all contractor employees use the designated smoking area. Any contractor employee found smoking in any U.S.
Government facility, at any time, will be removed from the work site by the COR or project inspector. The COR or project inspector will notify the KO of the removal of any contractor employee for violation of the “no smoking” policy.
14. BURNING/WELDING OPERATIONS: The contractor shall be responsible to obtain a burning/ welding permit prior to any burning or welding operation. The contractor shall notify the COR or project inspector not less than five (5) work days prior to such operations and shall return the permit to the U.S. Government inspector at the completion of the permit period. Contractor shall provide fire watch during all open flame/ welding work.
15. VERIFICATION OF ACTUALITIES: (FAR Clause 52.236-2 Site Visit)
16. HOUSEKEEPING: (FAR Clause 52.236-12 Cleaning Up / 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities and Improvement & 52.236-13 Accident Prevention)
17. BASE ACCESS: The contractor shall be required to obtain base access to Kunsan Air Base to perform the requirements of this contract. The contractor shall be responsible to submit a base access request letter no later than five (5) calendar days prior to start this contract. It shall be the responsibility of the contractor to prepare the necessary base access paperwork IAW USFKregulation 190-7, Installation Access Control, and submit it to the COR or project inspector. USFK regulation 190-7 is available on open source internet (http://8tharmy.korea.army.mil/g1_AG/Programs_Policy/PublicationsRecords/Regu lations/USFK/USFK%20Reg%20190-7%20Installation%20Access%20Control2013.pdf
18. REPAIR WORK: It shall be the contractor’s responsibility to repair all areas of patch work to match existing areas. This work shall include all areas inside of the facility as well as any other areas that the contractor may have damaged during the performance of work under the terms of this contract.
19. CONTRACTOR’S RESPONSIBILITIES: It shall be the responsibility of the contractor to have full control of all contractor personnel during the performance of work under the terms of the contract. The contractor shall be responsible to ensure that no contractor personnel receive any instructions for addition/deletion of work from any Government personnel including the COR or project inspector. Any instructions for additional work shall only be issued by the KO. The contractor shall be responsible for any cost incurred for any additional work, which is not identified in the contract documents to include the specifications or on the contract drawings. The contractor shall be responsible to inform the COR or project inspector of any request form any Government personnel for additional work. The contractor shall provide the COR or project inspector with name and office of the individual requesting the additional work and the type of additional work being requested. The COR or project inspector will take the necessary actions to inform the KO to prevent such situation.
20. PROGRESS SCHEDULE: The contractor shall prepare and submit the AF Form 3064, Contract Progress Schedule no later than ten (10) calendar days after notice to proceed is issued. The contractor shall submit three (3) copies of the AF Form 3064 for approval by the COR or project inspector and KO.
21. DRAWING SUBMITTALS: All drawings shall be submitted prior to the start of any work. Any additional drawings (As-built, field changes, etc.) shall be submitted to the COR or project inspector no later than ten (45) calendar days prior to contract completion for delivery orders with period of performances (PoP) less than 180 days and (60) days prior to contract completion delivery orders with PoP’s greater than 180 days. If submittal cannot be submitted within the timeframe the contractor must notify the COR or project inspector in writing why he/she cannot meet the requirement.
22. UTILITY OUTAGES/ROAD CLOSURES: The Contractor shall be the responsibility of the contractor to request, in writing, to the COR or project inspector, a minimum of thirty (30) calendar days in advance for any water outage, electrical outage, or road closure. The contractor shall provide a requested date and estimated time for the water outage, electrical outage, or road closure. The COR or project inspector will be responsible for determining the impact of the water outage, electrical outage, or road closure. The COR or project inspector will also be responsible for the processing of the contractor’s request for a water outage, electrical outage, or road closure. The contractor shall have written approval from the COR or project inspector before any water outage, electrical outage, or road closure.
23. ASBESTOS CONTAINING MATERIALS: No asbestos containing materials (ACM) shall be used under this contract. ACM is any material containing more than 1% asbestos by weight, either along or mixed with other fibrous on non-fibrous materials.
24. OZONE DEPLETING SUBSTANCES: No Class I ODS shall be used in the performance of this contract, nor be provided as a part of the equipment. This prohibition shall prevail over any other provision, specification, drawings or referenced documents.
25. MATERIAL SAFETY DATA SHEETS (MSDS): It shall be the responsibility of the contractor to furnish Material Safety Data Sheets (MSDS), in English and Korean, for all hazardous material(s) used under the terms and conditions of this contract. The type of materials that the contractor shall submit MSDSs for include, but is not limited to, paint, primer, lacquer, stain, joint compound, caulking, exterior insulation systems, emergency exit lights, cleaning fluids, oil, etc., and any other type of product deemed necessary by the Contracting Officer’s Representative (COR) or project inspector, required by U.S. Government Environment Laws and Regulations, or Korean Environmental Laws and Regulations.
a) SUBMITTAL REQUIRMENTS:
(1) The contractor shall be responsible to process these Material Safety Data Sheets (MSDS) on an AF Form 3000, Material Approval Submittal. The AF Form 3000 shall be submitted to the COR or project inspector no later than fifteen (15) calendar days after the Notice to Proceed (NTP) is issued by the Contracting Officer (KO). The contractor shall submit four (4) copies of the AF Form 3000 with carbon paper. The contractor shall submit the AF Form 3000 to the COR or project inspector for review prior to submitting the AF Form 3000 with carbon paper. It will be the responsibility of the COR or project inspector to verify the AF Form 3000 to ensure that all hazardous materials are submitted in the proper format.
(2) It shall be the responsibility of the contractor to list each type of hazardous material on the AF Form 3000. The contractor shall also be responsible to list the quantity, unit of measure (i.e.: each, liter, gallon, etc.), and size of container(s). It will be the responsibility of the COR or project inspector to verify these quantities and containers prior to initialing off on the AF Form 3000.
(3) After verification of all hazardous materials by the COR or project inspector and the contractor, the COR or project inspector will then be responsible to process this AF Form 3000. After receiving approval for all hazardous materials, it will be the responsibility of the COR or project inspector to provide the KO and contractor with a copy of the signed AF Form 3000 for the official files.
(4) After receiving approval of all hazardous materials required under the terms and conditions of this contract, the contractor shall be responsible to process these Material Safety Data Sheets (MSDS) through the HazMart Pharmacy located in building #823, military telephone DSN 782-5247, commercial telephone (063) 470-5247. The HazMart Pharmacy will be responsible to issue a bar code for each hazardous material that shall be affixed to each container by the contractor. The contractor shall be responsible to post an approved copy of the AF Form 3000 at the worksite storage area as well as keep a signed copy by AF Form 3000 in the contractor’s field office.
(5) It shall be the responsibility of the contractor to provide the COR with a new AF Form 3000 for any additional hazardous materials brought onto Kunsan Air Base throughout the term of the contract. This shall include any new materials as well as any additional quantities over and above the originally quantities.
(a) HAZARDOUS MATERIALS STORAGE: The contractor shall be responsible to store all hazardous materials in an approved storage container or storage area. This storage container may be either a metal or wood locker which is capable of being secured when not in use as well as at the end of each workday. The contractor shall be responsible to provide an approved storage location for large quantities of hazardous materials which can also be secured when not in use as well as at the end of each workday. The contractor shall be responsible to keep an approved AF Form 3000 on the inside of the door to the storage container and also keep a copy of the approved AF Form 3000 posted at the storage area
(b) DISPOSAL REQUIREMENTS FOR HAZARDOUS MATERIALS: The contractor shall be the responsibility of the contractor to remove and dispose of any remaining hazardous materials upon completion of the contract to include the removal of hazardous materials from the worksite as well as the contractor’s field office area. The contractor shall be responsible to dispose of these remaining hazardous materials, off the installation, at the contractor’s own expense, in strict accordance with existing Korean Environmental Laws and Regulations. The contractor shall be responsible to notify the COR or project inspector prior to disposing of any hazardous materials off the installation to ensure that all hazardous materials are properly handled and disposed of correctly. After use of final disposal of all hazardous materials, it will be the responsibility of the COR or project inspector to notify the HazMart Pharmacy of the final disposition of the hazardous material in order for the HazMart Pharmacy to update the AF-EMIS database.
(c) HAZARDOUS MATERIAL SPILLS: In the event that the contractor accidentally spills any hazardous materials at the worksite, the contractor shall be the responsibility of the contractor…