W90VN719R0003_Combined_Drawing.pdf

PDF 4 MB Posted

Attached to
Renovate Readiness & Emergency Management Facility at Kunsa AFB
Solicitation number
W90VN7-19-R-0003
Issued by

About this file

Combined Drawings

View the file

Other files

File Type Posted
W90VN719R0003_Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANSIENT PAD

PANTON PAD

ROKAF

NORTH

LOOP

NORTH DV PAD

SOUTH DV PAD

WRM PARKING AREA

TREE

AREA

JUVAT

PAD

SOUTH

LOOP

EMERGENCY MANAGEMENT FAC

NOT TO SCALE

NORTH

SHT. NO. REF. NO. DESCRIPTION

DRAWING SCHEDULE

DRAWN BY:

DESIGNED BY:

CHECKED BY:

SCALE:

DRAWING NO:

PROJECT NO:

REF. NO:

AS SHOWN

KUNSAN AB, KOREA

LOCATE MAP

MLWR19-1023

YUN

LOCATION MAP

RENOVATE READINESS & EMERGENCY MANAGEMENT FAC

MLWR19-1023

SHEET 1 OF 22

C-1

NEW SITE PLAN FOR CANOPY AND WALKWAY

EXIST AND REMOVE FLOOR PLAN

C-1

C-2

A-1

BASE HOSPITAL

BASE CIVIL ENGINEER

ENGINEERING FLIGHT

CONSTRUCTION MANAGEMENT

YUN

KYH

UNITED STATES AIR FORCE

8th CIVIL ENGINEER SQUADRON

KUNSAN AIR BASE, REPUBLIC OF KOREA

THIS PROJECT

B-567

MAIN GATE

ARCH DRAWINGS

NEW FLOOR PLAN

A-24 OF 22

NEW INTERIOR AND EXTERIOR FINISH SCHEDULE

A-35 OF 22

NEW ELEVATIONS

A-46 OF 22

RENOVATE READINESS AND

A-57 OF 22

DOOR ELEVATIONS AND TYPES

AS-BUILT DRAWING FOR SITE PLAN

AS-BUILT DRAWING FOR DOOR AND WINDOWS

A-6

AS-BUILT DRAWING FOR FLOOR PLAN AND INTERIOR FINISH SCHEDULE

AS-BUILT DRAWING FOR FOUNDATION PLAN

AS-BUILT DRAWING FOR ELEVATIONS AND SECTIONS (1)

1414 4F 22

AS-BUILT DRAWING FOR STRUCTURE SECTIONS

AS-BUILT DRAWING FOR COLUMN SECTIONS

NEW ROOF PLAN

AS-BUILT DRAWING FOR ELEVATIONS AND SECTIONS (2)

M-118 OF 22

AS-BUILT DRAWING FOR HVAC FLOOR PLAN

AS-BUILT DRAWING FOR EXISTING LIGHTING PLAN

AS-BUILT DRAWING FOR EXISTING POWER PLAN

M-2

E-1

E-2

NEW FLOOR PLAN FOR LIGHTING AND POWER PLAN

E-322 OF 22

AS-BUILT DRAWINGS FOR HEATING, A/C PLAN & EQUIPMENT SCHEDULE

DETAILS FOR DOOR AND WINDOW

A-79 OF 22

DOOR AND WINDOW DETAILS

1/5

SCALE:

A-7

HEAD/ JAMB

1A

HEAD / JAMB1M

R O

SEALANT

DOOR

R O

WOOD SOLID CORE

R O

METAL FRAME

W/ ANCHOR CLIP

(4 PER JAMB ONLY)

1J HEAD/ JAMB

1K S I L L

VERIFY WALL THK

D O

O R

D

I M

152 OR 200

(VERIFY WALL THK)

D O

M

VERIFY WALL THK

R

SEALANT

M

I N

WOOD SHIM

METAL TRIM

FINISH PER

R O

SCHEDULE

HEAD / JAMB1C

1D S I L L

PER SCHEDULE

SOUND PROOF SEAL

AL THRESHOLD PER

W/ 6 DIA EXP BOLTS

@ 300 OC

HARDWARE SCHEDULE

SEALANT(TYP)

WOOD SOLID

CORE DOOR

OR METAL DOOR

FINISH PER

SCHEDULE

90 THK FIBER

GLASS INSUL

(32kg/m ) UP TO

ROOF (TYP)

PAINT 15 THK GWB

ON 92 MET STUD

@ 400 OC

OR EXISTING WALL

WOOD DOOR

SOLID CORE

PAINT EXISTING

GWB

PAINT 15 THK GWB

ON 92 METAL STUD

@ 400 OC UP TO

CONC SLAB

6.75 THK

LAMINATED GLASS

6.75 THK

LAMINATED GLASS

S I L L

WOOD SHIM

D O

M

1F HEAD/ JAMB

R O

152 OR 200

VERIFY WALL THK

PAINT

EXISTING

GWB

GCWT ON BOND COAT

CEMENT MORTAR

ON METAL LATH

ON EXISTING CONC WALL

PAINT METAL TRIM

WOOD SOLID DOOR

OR METAL HOLLOW

CORE DOOR

METAL FRAME

W/ 9 DIA EXP BOLTS

(4 PER JAMB ONLY)

W/ SOLID GROUT

SEALANT

METAL TRIM

FCT ON CEMENT

MORTAR BED

AL THRESHOLD

W/6 DIA EXP BOLT

@ 300 OC(MAX)

WOOD SOLID DOOR

OR METAL HOLLOW

CORE DOOR

SEALANT(TYP)

FINISH PER

SCHEDULE

ADJUSTABLE ASTRAGAL1N

1G S I L L

M

I N

AL FRAME

W/9 DIA BOLTS

& NUTS (4 PER JAMB)

SEALANT

R O

R O

@ 400 OC

ON 92 MET STUD

PAINT 15 THK GWB

(4 PER JAMB ONLY)

W/ ANCHOR CLIP

METAL FRAME

R O

CORE DOOR

WOOD SOLID

1E HEAD/ JAMB

VERIFY WALL THK

GCWT ON BOND COAT

ON 12 THK CEMENT MORTAR

ON METAL STUD

(W244C-13)

90 THK FIBER

GLASS INSUL

(32kg/m ) UP TO

CONC SLAB (TYP)

EXISTING EIFS

DOTTED LINE

FOR JAMB

ONLY

INSULATED/ LAMINATED

GLASS

AL DOOR RAIL

(TOP/SIDE)

SEALANT

FINISH PER

SCHEDULE

AL DOOR BOTTOM RAIL

L-45x45x3 SST ANGLE

W/ 6 DIA AHR ROD

@ 450 OC

AL THRESHOLD

W/ 6 DIA EXP BOLTS

@ 300 OC

INSULATED

GLASS

FINISH PER

SCHEDULE

SEALANT(TYP)

AL THRESHOLD PER

HARDWARE SCHEDULE

W/ 6 DIA EXP BOLTS @

300 OC

AUTOMATIC

DOOR BOTTOM

SOUND PROOF SEAL

PER SCHEDULE

METAL FRAME

W/ 9 DIA EXP BOLTS

(4 PER JAMB ONLY)

SEALANT

METAL TRIM

(COLOR MATCH

TO FRAME)

WOOD SHIM

ALUMINUM DOOR

SIDE RAIL

ADJUSTABLE

ASTRAGAL

1B

EXISTING FLOOR

FLOOR FINISHEXISTING FLOOR

FLOOR FINISH

1H S I L L

R O

CORE DOOR

WOOD SOLID

FCT ON CEMENT

MORTAR BED

WOOD SHIM

D O

M

1L HEAD/ JAMB

VERIFY WALL THK

GCWT ON BOND COAT

CEMENT MORTAR

ON METAL LATH

ON EXISTING CONC WALL

PAINT METAL TRIM

WOOD SOLID DOOR

OR METAL HOLLOW

CORE DOOR

METAL FRAME

W/ 9 DIA EXP BOLTS

(4 PER JAMB ONLY)

W/ SOLID GROUT

SEALANT

METAL TRIM

EXISTING

GCWT

HEAD/JAMB1P

SEALANT

R O

INSECT

SCREEN

GLASS

INSULATED

FINISH PER

SCHEDULE

18 THK OAK

WOOD TRIM

(NATURAL FINISH)

R=5 (TYP)

SEALANT

AL WINDOW

FRAME

(THERMAL

BREAK TYPE)

MINI-BLIND

ON SEALANT TAPE

ON CONC

TO EIFS)

(COLOR MATCH

(BY WINDOW MFR)

AL FLASHING

SEALANT

R O

S I L L 1Q

WOOD SHIM (FILL

URETHANE FORM

INSULATION)

FINISH PER

SCHEDULE

EXISTING

EIFS

EXISTING

EIFS

INSECT SCREEN

INSULATED GLASS

SEALANT

Xref .\13-1013G-BS1---.dwg

SCALE

EXST POWER ONE LINE DIAGRAM

: NOT TO SCALE

SCALE

EXST LIGHTING PLAN FOR DEMOLITION

: NOT TO SCALE

SCALE

EXST PANEL BOARD RELOCATION PLAN

: NOT TO SCALE

VOID

EXST POWER PLAN FOR DEMOLITION

: NOT TO SCALE

NEW FLOOR PLAN FOR LIGHTING/POWER PLAN

1/50mm

1_MLWR19-1023C-1, Location Map-Layout1
2.MLWR 19-1023C-2, New Site Plan-Layout1
3_MLWR19-1023A-1, Exist & Removae Floor Plan-Layout1
4_MLWR19-1023A-2, New Floor Plan-Layout1
5_MLWR19-1023A-3, Elevations-Layout1
6_MLWR19-1023A-4, New Interior & Exterior Finish Schedule-Layout2
7_MLWR19-1023A-5, New Roof Plan-Layout1
8_MLWR19-1023A-6, Door Elev & types-SHEET
9_MLWR19-1023A-7 (Door and Window Details)-Layout1
10_MLWR19-1023, As-built Drawing for Site Plan
11_MLWR19-1023, As-built Drawing for Doors and Windows (1)
12_MLWR19-1023, As-built Draiwing for Floor Plan & Interior Finish Schedule
13_MLWR19-1023, As-built Drawings for Foundation Plan
14_MLWR19-1023, As-built Drawing for Elevations and Sections (1)
15_MLWR19-1023, As-built Drawing for Elevations and Sections (2)
16_MLWR19-1023, As-built Drawing for Sructure Sections (9)
17_MLWR19-1023, As-built Drawing for Colunm Sections (7)
18_MLWR19-1023M-1 (As-built Drawing for Heating, AC Plan)-Layout1
19_MLWR19-1024M-2 (As-built Drawing for HVAC Floor Plan)-Layout1
20_MLWR19-1023E-1 (EXST LIGHTING PLAN)
21_MLWR19-1023 (E-2 EXST POWER PLAN)
22_MLWR19-1023 (E-3 ELECTRICAL FLOOR PLAN)

File details come from the government source that posted it.