W90VN719R0003_Combined_Drawing.pdf
PDF 4 MB Posted
- Solicitation number
- W90VN7-19-R-0003
About this file
Combined Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W90VN719R0003_Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRANSIENT PAD
PANTON PAD
ROKAF
NORTH
LOOP
NORTH DV PAD
SOUTH DV PAD
WRM PARKING AREA
TREE
AREA
JUVAT
PAD
SOUTH
LOOP
EMERGENCY MANAGEMENT FAC
NOT TO SCALE
NORTH
SHT. NO. REF. NO. DESCRIPTION
DRAWING SCHEDULE
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DRAWING NO:
PROJECT NO:
REF. NO:
AS SHOWN
KUNSAN AB, KOREA
LOCATE MAP
MLWR19-1023
YUN
LOCATION MAP
RENOVATE READINESS & EMERGENCY MANAGEMENT FAC
MLWR19-1023
SHEET 1 OF 22
C-1
NEW SITE PLAN FOR CANOPY AND WALKWAY
EXIST AND REMOVE FLOOR PLAN
C-1
C-2
A-1
BASE HOSPITAL
BASE CIVIL ENGINEER
ENGINEERING FLIGHT
CONSTRUCTION MANAGEMENT
YUN
KYH
UNITED STATES AIR FORCE
8th CIVIL ENGINEER SQUADRON
KUNSAN AIR BASE, REPUBLIC OF KOREA
THIS PROJECT
B-567
MAIN GATE
ARCH DRAWINGS
NEW FLOOR PLAN
A-24 OF 22
NEW INTERIOR AND EXTERIOR FINISH SCHEDULE
A-35 OF 22
NEW ELEVATIONS
A-46 OF 22
RENOVATE READINESS AND
A-57 OF 22
DOOR ELEVATIONS AND TYPES
AS-BUILT DRAWING FOR SITE PLAN
AS-BUILT DRAWING FOR DOOR AND WINDOWS
A-6
AS-BUILT DRAWING FOR FLOOR PLAN AND INTERIOR FINISH SCHEDULE
AS-BUILT DRAWING FOR FOUNDATION PLAN
AS-BUILT DRAWING FOR ELEVATIONS AND SECTIONS (1)
1414 4F 22
AS-BUILT DRAWING FOR STRUCTURE SECTIONS
AS-BUILT DRAWING FOR COLUMN SECTIONS
NEW ROOF PLAN
AS-BUILT DRAWING FOR ELEVATIONS AND SECTIONS (2)
M-118 OF 22
AS-BUILT DRAWING FOR HVAC FLOOR PLAN
AS-BUILT DRAWING FOR EXISTING LIGHTING PLAN
AS-BUILT DRAWING FOR EXISTING POWER PLAN
M-2
E-1
E-2
NEW FLOOR PLAN FOR LIGHTING AND POWER PLAN
E-322 OF 22
AS-BUILT DRAWINGS FOR HEATING, A/C PLAN & EQUIPMENT SCHEDULE
DETAILS FOR DOOR AND WINDOW
A-79 OF 22
DOOR AND WINDOW DETAILS
1/5
SCALE:
A-7
HEAD/ JAMB
1A
HEAD / JAMB1M
R O
SEALANT
DOOR
R O
WOOD SOLID CORE
R O
METAL FRAME
W/ ANCHOR CLIP
(4 PER JAMB ONLY)
1J HEAD/ JAMB
1K S I L L
VERIFY WALL THK
D O
O R
D
I M
152 OR 200
(VERIFY WALL THK)
D O
M
VERIFY WALL THK
R
SEALANT
M
I N
WOOD SHIM
METAL TRIM
FINISH PER
R O
SCHEDULE
HEAD / JAMB1C
1D S I L L
PER SCHEDULE
SOUND PROOF SEAL
AL THRESHOLD PER
W/ 6 DIA EXP BOLTS
@ 300 OC
HARDWARE SCHEDULE
SEALANT(TYP)
WOOD SOLID
CORE DOOR
OR METAL DOOR
FINISH PER
SCHEDULE
90 THK FIBER
GLASS INSUL
(32kg/m ) UP TO
ROOF (TYP)
PAINT 15 THK GWB
ON 92 MET STUD
@ 400 OC
OR EXISTING WALL
WOOD DOOR
SOLID CORE
PAINT EXISTING
GWB
PAINT 15 THK GWB
ON 92 METAL STUD
@ 400 OC UP TO
CONC SLAB
6.75 THK
LAMINATED GLASS
6.75 THK
LAMINATED GLASS
S I L L
WOOD SHIM
D O
M
1F HEAD/ JAMB
R O
152 OR 200
VERIFY WALL THK
PAINT
EXISTING
GWB
GCWT ON BOND COAT
CEMENT MORTAR
ON METAL LATH
ON EXISTING CONC WALL
PAINT METAL TRIM
WOOD SOLID DOOR
OR METAL HOLLOW
CORE DOOR
METAL FRAME
W/ 9 DIA EXP BOLTS
(4 PER JAMB ONLY)
W/ SOLID GROUT
SEALANT
METAL TRIM
FCT ON CEMENT
MORTAR BED
AL THRESHOLD
W/6 DIA EXP BOLT
@ 300 OC(MAX)
WOOD SOLID DOOR
OR METAL HOLLOW
CORE DOOR
SEALANT(TYP)
FINISH PER
SCHEDULE
ADJUSTABLE ASTRAGAL1N
1G S I L L
M
I N
AL FRAME
W/9 DIA BOLTS
& NUTS (4 PER JAMB)
SEALANT
R O
R O
@ 400 OC
ON 92 MET STUD
PAINT 15 THK GWB
(4 PER JAMB ONLY)
W/ ANCHOR CLIP
METAL FRAME
R O
CORE DOOR
WOOD SOLID
1E HEAD/ JAMB
VERIFY WALL THK
GCWT ON BOND COAT
ON 12 THK CEMENT MORTAR
ON METAL STUD
(W244C-13)
90 THK FIBER
GLASS INSUL
(32kg/m ) UP TO
CONC SLAB (TYP)
EXISTING EIFS
DOTTED LINE
FOR JAMB
ONLY
INSULATED/ LAMINATED
GLASS
AL DOOR RAIL
(TOP/SIDE)
SEALANT
FINISH PER
SCHEDULE
AL DOOR BOTTOM RAIL
L-45x45x3 SST ANGLE
W/ 6 DIA AHR ROD
@ 450 OC
AL THRESHOLD
W/ 6 DIA EXP BOLTS
@ 300 OC
INSULATED
GLASS
FINISH PER
SCHEDULE
SEALANT(TYP)
AL THRESHOLD PER
HARDWARE SCHEDULE
W/ 6 DIA EXP BOLTS @
300 OC
AUTOMATIC
DOOR BOTTOM
SOUND PROOF SEAL
PER SCHEDULE
METAL FRAME
W/ 9 DIA EXP BOLTS
(4 PER JAMB ONLY)
SEALANT
METAL TRIM
(COLOR MATCH
TO FRAME)
WOOD SHIM
ALUMINUM DOOR
SIDE RAIL
ADJUSTABLE
ASTRAGAL
1B
EXISTING FLOOR
FLOOR FINISHEXISTING FLOOR
FLOOR FINISH
1H S I L L
R O
CORE DOOR
WOOD SOLID
FCT ON CEMENT
MORTAR BED
WOOD SHIM
D O
M
1L HEAD/ JAMB
VERIFY WALL THK
GCWT ON BOND COAT
CEMENT MORTAR
ON METAL LATH
ON EXISTING CONC WALL
PAINT METAL TRIM
WOOD SOLID DOOR
OR METAL HOLLOW
CORE DOOR
METAL FRAME
W/ 9 DIA EXP BOLTS
(4 PER JAMB ONLY)
W/ SOLID GROUT
SEALANT
METAL TRIM
EXISTING
GCWT
HEAD/JAMB1P
SEALANT
R O
INSECT
SCREEN
GLASS
INSULATED
FINISH PER
SCHEDULE
18 THK OAK
WOOD TRIM
(NATURAL FINISH)
R=5 (TYP)
SEALANT
AL WINDOW
FRAME
(THERMAL
BREAK TYPE)
MINI-BLIND
ON SEALANT TAPE
ON CONC
TO EIFS)
(COLOR MATCH
(BY WINDOW MFR)
AL FLASHING
SEALANT
R O
S I L L 1Q
WOOD SHIM (FILL
URETHANE FORM
INSULATION)
FINISH PER
SCHEDULE
EXISTING
EIFS
EXISTING
EIFS
INSECT SCREEN
INSULATED GLASS
SEALANT
Xref .\13-1013G-BS1---.dwg
SCALE
EXST POWER ONE LINE DIAGRAM
: NOT TO SCALE
SCALE
EXST LIGHTING PLAN FOR DEMOLITION
: NOT TO SCALE
SCALE
EXST PANEL BOARD RELOCATION PLAN
: NOT TO SCALE
VOID
EXST POWER PLAN FOR DEMOLITION
: NOT TO SCALE
NEW FLOOR PLAN FOR LIGHTING/POWER PLAN
1/50mm
| 1_MLWR19-1023C-1, Location Map-Layout1 |
| 2.MLWR 19-1023C-2, New Site Plan-Layout1 |
| 3_MLWR19-1023A-1, Exist & Removae Floor Plan-Layout1 |
| 4_MLWR19-1023A-2, New Floor Plan-Layout1 |
| 5_MLWR19-1023A-3, Elevations-Layout1 |
| 6_MLWR19-1023A-4, New Interior & Exterior Finish Schedule-Layout2 |
| 7_MLWR19-1023A-5, New Roof Plan-Layout1 |
| 8_MLWR19-1023A-6, Door Elev & types-SHEET |
| 9_MLWR19-1023A-7 (Door and Window Details)-Layout1 |
| 10_MLWR19-1023, As-built Drawing for Site Plan |
| 11_MLWR19-1023, As-built Drawing for Doors and Windows (1) |
| 12_MLWR19-1023, As-built Draiwing for Floor Plan & Interior Finish Schedule |
| 13_MLWR19-1023, As-built Drawings for Foundation Plan |
| 14_MLWR19-1023, As-built Drawing for Elevations and Sections (1) |
| 15_MLWR19-1023, As-built Drawing for Elevations and Sections (2) |
| 16_MLWR19-1023, As-built Drawing for Sructure Sections (9) |
| 17_MLWR19-1023, As-built Drawing for Colunm Sections (7) |
| 18_MLWR19-1023M-1 (As-built Drawing for Heating, AC Plan)-Layout1 |
| 19_MLWR19-1024M-2 (As-built Drawing for HVAC Floor Plan)-Layout1 |
| 20_MLWR19-1023E-1 (EXST LIGHTING PLAN) |
| 21_MLWR19-1023 (E-2 EXST POWER PLAN) |
| 22_MLWR19-1023 (E-3 ELECTRICAL FLOOR PLAN) |
File details come from the government source that posted it.