Item 0002 Submittal Register.pdf

PDF 50 KB Posted

Attached to
Repair Storm Damaged Slope and Fence & Outdoor Pool Renovation, Osan AB (MATOC Work Plan Only)
Solicitation number
W90VN6-25-R-A006
Issued by

About this file

The document is a Submittal Register for an Outdoor Pool Renovation project at Osan Air Base, part of a Multiple Award Task Order Contract (MATOC) work plan. The submittal register details 32 specific submittals required from the contractor across multiple specification sections, including preconstruction submittals, shop drawings, product data, certificates, test reports, and closeout documents. Key submittal categories include project scheduling, safety plans, quality control plans, concrete mix designs, plumbing work details, fence and gate assembly drawings, water service line documentation, and as-built drawings. The document is marked as Revision 1 from 2015 and is specifically for a government review process, with most submittals classified as "G" (Government) review, indicating they require direct government approval before proceeding with work.

View the file

Other files

File Type Posted
Solicitation - W90VN625RA006.pdf PDF
Item 0002 SOW.pdf PDF
Item 0001 Drawings.pdf PDF
Item 0001 Osan AFB Architectural Compatibility Plan 1 Jan 2022.pdf PDF
Item 0002 Drawings.pdf PDF
Item 0001 Submittal Register.pdf PDF
Item 0001 SOW.pdf PDF
Item 0001 Appendix C Boring Log.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Line

Acti vity #

Trans-mittal # Specification Section SD # Submittal Description Item Submitted Paragraph #

Classificati on:

GOVT

or A/E

Revwr

Submit Approval

Needed By

Material

Needed By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date FWD

To

Other

Revwr

Date RCD

From Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From APPR

Authority

Remarks

1 01 32 01.00 10 01 Preconstruction Submittals Preliminary Project Schedule 3.4.1 G

2 01 32 01.00 10 01 Preconstruction Submittals Initial Project Schedule 3.4.2 G

3 01 32 01.00 10 01 Preconstruction Submittals Periodic Schedule Updates 3.4.3 G

4 01 33 00 01 Preconstruction Submittals Submittal register 1.8 G

5 01 35 26 01 Preconstruction Submittals SAFETY PLAN /ACCIDENT

PREVENTION PLAN (APP)

1.6 G

6 01 35 26 01 Preconstruction Submittals Activity Hazard Analysis (AHA) 1.7

7 01 45 00.00 10 01 Preconstruction Submittals Quality Control Plan 3.2 G

8 33 82 00 07 Certificates Key Personnel Resume 1.6.2.2 G

9 01 33 00 02 Shop Drawings 100% Contract Drawing 1.1.1 G

10 02 41 00 01 Preconstruction submittals Existing Condition 1.6 G

11 03 30 00 03 Product Data Ready mix concrete 1.3

12 03 30 00 05 Design data Concrete mix design 1.3 G

13 03 30 00 06 Test report Concrete mix design 1.3 G

14 22 00 00 02 Shop Drawings of Plumbing Work Detail drawings 1.2 G

15 22 00 00 03 Product Data Fixtures, valves, pumps, swimming pool and spa suction fittings

1.2

16 22 00 00 06 Test report Test, flushing and disinfection 1.2

17 22 00 00 07 Certificates Materials and equipment 1.2

18 22 00 00 10 Operation and mantenance data Operation and maintenance manuals 1.2 G

19 32 31 13 02 Shop Drawings Fence assembly 1.2 G

20 32 31 13 02 Shop Drawings Location of gate, corner, end, and pull posts 1.2 G

21 32 31 13 02 Shop Drawings Gate assembly 1.2 G

22 32 31 13 02 Shop Drawings Gate hardware and accessories 1.2 G

23 32 31 13 02 Shop Drawings Erection/installation drawings 1.2 G

24 32 31 13 03 Product Data Fence assembly, gate assembly, gate hardware and accessories, zinc coating, fabric, stretcher bars, concrete, gate posts

1.2

25 32 31 13 07 Certificates Certificates of compliance 1.2 G

26 32 31 13 08 Manufacturer's instructions Fence, gate, hardware assemblies, accessories

1.2

27 33 11 00 03 Product Data Piping materials, water service line, valve box 1.3

28 33 11 00 05 Test report Bacteriological disinfection 1.3 G

29 33 11 00 07 Certificates Water service line 1.3

30 33 11 00 08 Manufacturer's instructions Delivery, storage, and handling, installation procedures for water piping

1.3

31 33 70 02.00 10 02 Shop Drawings As-Built Drawings 1.4.2 G

32 01 78 00 11 Closeout Submittals Checklist for Form DD1354 1.9 G

TITLE: 2014-OMA-SPECIFICATIONS_REVISION1_2015

SUBMITTAL REGISTER

JOB NAME: OUTDOOR POOL RENOVATION

LOCATION: OSAN AB

CONTRACT NO:

CONTRACTOR:

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE DATES CONTRACTOR

ACTION