Drawigns.pdf

PDF 4 MB Posted

Attached to
Repair Dinosaur Park at Osan AB (MATOC Work Plan only)
Solicitation number
W90VN624R0022
Issued by

About this file

This document appears to be a set of drawings related to the Repair Dinosaur Park at Osan AB project, which is a federal contract opportunity under Solicitation Number W90VN624R0022. The drawings provide details on the site layout and existing infrastructure for the park, including the soccer field, playground, storm drainage, and utilities.

The federal contract opportunity is a MATOC (Multiple Award Task Order Contract) work plan for existing contractors in Area III, Suwon AB and Osan AB, Korea. The scope of work includes replacing the existing playground with a new playground apparatus, adding a covering over the playground, repairing the sidewalk and stairs, removing and replacing various site elements, and making other site improvements. A site visit is scheduled for July 11, 2024, and proposals are due by 2:00 PM on the closing date. The contracting agency is the Department of the Army Materiel Command Army Contracting Command.

View the file

Other files

File Type Posted
W90VN624R0022.pdf PDF
SUBMITTAL-REGISTER.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOCCER FIELD

SOCCER FIELD

DWG NO. C-01LOCATION MAP

PLAY GROUND

PLAY GROUND

SMYU 21-4026 REPAIR DINOSAUR PARK

PROJECT SITE

1378995880U

CUI

1378995880U

CUI

DWG NO. C-02SITE LAYOUT PLANSMYU 21-4026 REPAIR DINOSAUR PARK

• Replace existing playground w/ new (MFG/MODEL: JAEUN/SG-601A Combination PLAYGROUND APPARATUS OR APPROVED EQUAL) Note: minimum 2% slope to drain

• Place a covering over the playground to protect from sun and rain to enable more play space in all weather

• Provide in-ground slides with rails (Additionally see note 2.1.5)

• Cover the exposed pipes on the wall

• Remove existing sidewalk, six path lights, BBQ pit, flower beds, benches and tables, block paving, and railing etc. excluding trees

• Place the sidewalk to match the existing sidewalk with concrete curb on both sides

• Repair existing stairs and provide a hand railing

• Remove lighting fixtures and patch the damage

• Make the ground surface even for strollers to access between parking lot and playground

• Clean out sediment and debris in the existing underground concrete storm drain

• Provide safety net with 3x 100mm galvanized steel posts and concrete footings

• Extend the soccer field fence with 1.5m opening

• Provide three trash cans (MFG/MODEL:

Rubbermaid FG396400BLA Plaza Dark Green Square Container with Side Opening 50 Gallon

OR APPROVED EQUAL)

• Curb and bricks will stay as are and extend the curb where BBQ Pit is removed

• Benches to remain

• Remove existing two benches

1378995880U

CUI

DWG NO. C-03SITE LAYOUT PLANSMYU 21-4026 REPAIR DINOSAUR PARK

• SOLID SODDING AREA

1378995880U

CUI

DWG NO. C-04EXISTING COMM SYSTEMSMYU 21-4026 REPAIR DINOSAUR PARK

CUI

DWG NO. C-05EXISTING ELECTRICAL SYSTEM

PLAY GROUN

SMYU 21-4026 REPAIR DINOSAUR PARK

1378995880U

CUI

DWG NO. C-06EXISTING FUEL SYSTEMSMYU 21-4026 REPAIR DINOSAUR PARK

CUI

DWG NO. C-07EXISTING SEWER SYSTEMSMYU 21-4026 REPAIR DINOSAUR PARK

CUI

DWG NO. C-08EXISTING STORMWATER SYSTEMSMYU 21-4026 REPAIR DINOSAUR PARK

CUI

DWG NO. C-09EXISTING WTER SYSTEMSMYU 21-4026 REPAIR DINOSAUR PARK

CUI

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9

File details come from the government source that posted it. Updated .