Amendment W90VN6-24-R-0021-0001.pdf

PDF 297 KB Posted

Attached to
Construct Infrastructure for OSS RSS at Osan AB, Korea (MATOC Work Plan only)
Solicitation number
W90VN6-24-R-0021
Issued by

About this file

This document is an Amendment to Solicitation W90VN6-24-R-0021 for the construction of infrastructure for an OSS RSS at Osan Air Base, Korea. The amendment is issued to existing MATOC Work Plan contractors in Area III (Osan and Suwon AB). Key details include:

The solicitation is a Request for Proposal (RFP) with a proposal submission deadline of 1300 hours on the closing date. The required proposal elements are: Pricing Proposal, Cost Breakdown, Design Data, and completion of Section K (Contractor's Tax Exemption Declaration). The amendment changes the requirement for "Design Data (100%)" to "Design Data on Submission of Proposal." Offerors are strongly encouraged to attend the scheduled site visit. If unable to submit a proposal, contractors must provide a "No-Offer Letter" by the specified date and time.

View the file

Other files

File Type Posted
Submittal Register.pdf PDF
Project Drawing.pdf PDF
W90VN6-24-R-0021.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

411TH CSB, KOREA - RCO OSAN

POC: MR. OM, IK CHUNG

DSN: 315-757-6005

IKCHUNG.OM2.LN@ARMY.M IL

APO AP 96278- 2039

UNITED STATES

F3J3CE4150AW02 SMYU 22-1054

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provi ded herei n, all t erms and condit ions of t he document refere nced in Item 9A or 10A, as heretofore change d, remai ns unchanged and in ful l force and effect .

15A. NAME AND TIT LE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

ST ANDARD FORM 30 (Rev. 10-83) Prescr ibed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to change 3.(2).c.from Design Data (100%) to Design Data on Submission of Proposal.

1. CO NTRACT ID CODE P AGE OF P AGES

J 1 2

16A. NAME AND T ITLE OF CONTRACTING OFFICER (Type or print)

16C. DAT E SIGNED

BY 18-Jul-2024

16B. UNITED ST AT ES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contract ing Officer )(Signature of person authorized t o sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Count y, Stat e and Zip Code) X W90VN624R0021

X 9B. DAT ED (SEE IT EM 11)

10-Jul-2024

10B. DAT ED (SEE IT EM 13)

9A. AMENDMENT OF SOLICITAT ION NO.

11. THIS IT EM ONLY APPLIES T O AMENDMENT S OF SOLICITATIONS

X The above numbered soli cit ati on i s amended as set forth in It em 14. The hour and date specified for rece ipt of Offer is ext ended, X is not extended.

Offer must acknowl edge rece ipt of t his amendment pri or to the hour and date specified in the sol ici tat ion or as amended by one of t he fol lowing methods:

(a) By compl eti ng Items 8 and 15, and returning copi es of the amendment ; (b) By acknowledgi ng recei pt of thi s a mendment on each copy of t he offer submit ted;

or (c) By s epara te let ter or t elegram whi ch i ncludes a refe rence t o t he s olic ita tion and amendment numbers . FA ILURE OF YOU R A CKNOWLEDGMENT TO BE RECEIVED AT TH E P LACE D ESIGNATED FOR TH E RECEIPT OF OFFERS P RIO R TO THE HOUR AN D DATE SP ECIFIED MA Y RESULT IN

REJECTIO N OF YOUR OFFER. If by vir tue of thi s amendment you desire t o change an offer already submit ted, s uch c hange ma y be made by t ele gram or let ter, provided each t elegram or l ett er makes reference to the sol ici tat ion and this amendment , and is re ceived prior to the openi ng hour and dat e speci fi ed.

12. ACCOUNTING AND APPROPRIATION DAT A (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE

CONT RACT ORDER NO. IN ITEM 10A.

B. T HE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED T O REFLECT THE ADMINIST RATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORT H IN ITEM 14, PURSUANT TO T HE AUTHORITY OF FAR 43.103(B).

C. T HIS SUPPLEMENT AL AGREEMENT IS ENT ERED INTO PURSUANT TO AUTHORITY OF:

D. OT HER (Specify type of modification and authorit y)

E. IMPORTANT: Contract or is not, is required to sign this document and return copies t o the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/cont ract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/ MODIFICATION NO. 5. P ROJECT NO .(If appli cable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Jul-2024

CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCO OSAN, UNIT #2039

APO AP 96278-2039

UNITED STATES

W90VN6 7. AD MINISTERED BY (If other t han item 6)

4. REQUISITION/PU RCHASE REQ. NO.

CODE W90VN6

FACILITY CODECODE

EMAIL:TEL:

W90VN624R0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required performance has changed from 1. This is a Request of Proposal (RFP) issued to existing MATOC WORK PLAN Contractors only of Area III, Osan and Suwon AB as follows;W91QVN-24-D-0022, -0023, -0024, -0025, -0026, -0027, -0028, -0030, -0031, -0033, -0035, -0036, -0038, -0080, -0083 & -0109.2. Site Visit:

Offerors who intend to propose on this solicitation are strongly encouraged to attend the site visit. See site visit clause in Section L for the schedule.3. Submission of Proposal(1) Proposals Packet: It shall be submitted by 1300 hours on the closing date of RFP via email.(2) Pricing & Technical Proposala. Pricing Proposalb. Cost Breakdownc.

Design Data (100%)d. Completion of Section K (Contractor's Tax Exemption Declaration)4. If the contractor is unable to submit the proposal in response to the RFP, the contractor shall submit a "No-Offer Letter" by the date and time specified in this solicitation. to 1. This is a Request of Proposal (RFP) issued to existing MATOC WORK PLAN Contractors only of Area III, Osan and Suwon AB as follows;W91QVN-24-D-0022, -0023, -0024, -0025, - 0026, -0027, -0028, -0030, -0031, -0033, -0035, -0036, -0038, -0080, -0083 & -0109.2. Site Visit: Offerors who intend to propose on this solicitation are strongly encouraged to attend the site visit. See site visit clause in Section L for the schedule.3. Submission of Proposal(1) Proposals Packet: It shall be submitted by 1300 hours on the closing date of RFP via email.(2) Pricing & Technical Proposala. Pricing Proposalb. Cost Breakdownc. Design Datad.

Completion of Section K (Contractor's Tax Exemption Declaration)4. If the contractor is unable to submit the proposal in response to the RFP, the contractor shall submit a "No-Offer Letter" by the date and time specified in this solicitation..

(End of Summary of Changes)

File details come from the government source that posted it. Updated .