W90VN6-23-R-0018-0003.pdf

PDF 462 KB Posted

Attached to
Custodial Service at Osan Air Base
Solicitation number
W90VN6-23-R-0018
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

411TH CSB, KOREA - RCO OSAN

POC: MR. OM, IK CHUNG

DSN: 315-757-6005

IKCHUNG.OM2.LN@ARMY.MIL

APO AP 96278-2039

UNITED STATES

F3J3CE2362AW01

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. The purpose of this amendment is to change the evaluation factors for Technical and Instructions to Offerors for documents submittal.

2. All other terms and conditions are same.

1. CONTRACT ID CODE PAGE OF PAGES

1 35

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Jun-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W90VN623R0018

X 9B. DATED (SEE ITEM 11)

24-Apr-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Jun-2023

CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCO OSAN, UNIT #2039

APO AP 96278-2039

UNITED STATES

W90VN6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W90VN6

FACILITY CODECODE

EMAIL:TEL:

W90VN623R0018

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 23-May-2023 01:00 PM to 10-Jul-2023 07:00 AM.

The following have been modified:

ADDENDUM TO 52.212-1

ADDENDUM TO FAR 52.212-1 INSTRUCTION TO OFFEROR – COMMERCIAL ITEMS (NOV 2021)

NOTICE TO OFFERORS

All sources may submit a proposal as applicable. However, the Republic of Korea (ROK) – United States (U.S.)

Status of Forces Agreement (SOFA), precludes the U.S. Government from granting Invited Contractor or Technical Representative status to any Offeror for this requirement. All sources submitting a proposal, including U.S. sources, must already have, or obtain the requisite business licenses directly from the ROK Government and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any Contractor not already doing business in Korea must submit adequate verification in its initial proposal that it has the requisite authorization and capacity to compete for this requirement, and to conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. If an initial proposal does not fully demonstrate this authorization and capacity, it will not be further considered for award. Whether an Offeror qualifies shall be determined by the Contracting Officer. All Offeror(s) interested in competing for this requirement are required to submit their price proposal in Korean won only. A proposal submitted in currency other than Korean won will not be considered for award.

1. CONTRACT AWARD

1.1 The Government intends to execute a Requirements with Firm Fixed Price CLINs/Sub-CLINs contract. In accordance with FAR Parts 12 and 13.5, this award will be made to the responsible Offeror submitting the Lowest Priced Technically Acceptable (LPTA) offer that satisfies all terms and conditions of the solicitation. Offers will be evaluated for acceptability, but not ranked using the non-price factors/subfactors. All non-price factors and subfactors will be rated as either “Acceptable” or “Unacceptable”. In other words, a rating of “Unacceptable” for any factor or subfactor will result in the entire offer being rated as “Unacceptable”.

The following ratings will be used in evaluating all non-price factors and subfactors except Past Performance:

Adjectival Rating Description Acceptable Proposal meets the requirements of the solicitation.

Unacceptable Proposal does not meet the requirements of the solicitation.

1.2 In accordance with FAR 52.212-1, Instructions to Offerors – Commercial Items (NOV 2021), the Government reserves the right, based on the Government’s best interests, to make a determination to: 1) Award without discussions; 2) Make a single award for this requirement; 3) Establish a competitive range in order to conduct discussions; and/or 4) Make no award if, upon evaluation, none of the offers are deemed likely to meet the requirements.

2 General Instructions:

1274307826.LN

Highlight

2.1 Offerors are cautioned to submit adequate information to enable the Government team to fully ascertain each Offeror’s capability to perform all of the requirements identified in the solicitation. All commitments made in the proposal shall become a part of the resultant contract.

2.2 Offerors are required to submit the complete offers (Technical Data Past Performance Information, and Pricing) by e-mail to Contract Specialist, Mr. Om, Ikchung at ikchung.om2.ln@army.mil and Contracting Officer, Ms.

Lillian Parhm at lillian.d.parhm.civ@army.mil no later than 13:00 hours Local Standard Time (KST) on the closing date of the SF 1449. All questions shall be submitted via email to the same personnel via e-mail within three (3) days after Day 2 site visit. Questions received after this date may not be answered. Failure to submit offers via email as required in this solicitation shall be grounds for determining the offer to be ineligible for contract award.

The Offeror(s) SHALL submit Technical, Past Performance, and Price as SEPARATE attachments.

The Offeror(s) shall round up/down all unit prices to the nearest whole Korean Won (KRW) thereby eliminating the use of any decimal points.

****The Contracting Officer will evaluate the following data consist with FAR Provision 52.212-2 Evaluation- Commercial Items***

Volume I – Technical Capability.

FACTOR A - TECHNICAL CAPABILITY:

(1) Sub-factor 1- The Contractor shall have either a business registration in custodial service or related service and/or a valid / current public hygiene management business permission (위생관리용역업 신고증) issued by ROK Government

(2) Sub-factor 2- One key person shall have a current year sanitary training certificate (2022년도 위생교육증) provided by organizations/associations permitted by the Minister of Health and Welfare..

Volume II – Cost/Price

FACTOR B – Cost/Price Proposal

(a) The offeror shall provide complete CLINs identified for base period plus four (4) options. The proposed price will be reviewed to determine if the proposal is adequate, complete, and reasonable to assess the offeror understanding of the solicitation.

(b) Proposed Prices – Price is not scored. The Government will review the price proposal to determine the extent to which it is reasonable, realistic, and consistent with the technical proposal.

As part of price evaluation, the Government will evaluate its option to extend services (FAR Clause 52.217-8 - Option to Extend Services) by adding one-half of the Offeror’s final option period prices to the Offeror’s total price.

Volume III – Past Performance

FACTOR C – Past Performance

The Past Performance evaluation will be accomplished by reviewing aspects of an Offeror's recent and relevant Past Performance, focusing on and targeting performance which are recent and relevant to the effort as it directly relates to the services being procured under this solicitation. This volume shall contain past performance information regarding similar recent and relevant contracts. This volume shall not exceed 10 pages. Offerors shall submit all Government and/or commercial contracts for the prime offeror and each major subcontractor in performance or awarded during the past five years, from the issue date of this RFP, which are relevant to the efforts required by this solicitation. In conducting the Past Performance evaluation, the Government reserves the right to use both the information provided in the offeror’s Past Performance Volume and information obtained from other sources, such as the Past Performance Information Retrieval System (PPIRS) or similar systems, Defense Contract Management Agency (DCMA) and commercial sources. Offerors are reminded that both independent data and data provided by offerors in their proposals may be used by the Government to evaluate offeror past performance. However, the burden of providing thorough, complete, and current past performance information as requested in this paragraph remains with the offerors. Proposals that do not contain the information requested by this paragraph risk rejection or a less than acceptable performance rating by the Government. All past performance comments received will be taken into account and could affect the overall rating. The overall past performance evaluation is a subjective decision based on the whole of all data received.

(1) Section 1 – Contract Descriptions. This section shall include the following information in the following format.

(a) Contractor/Subcontractor place of performance, CAGE Code and UEI Number. If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization (name, and current address, e-mail address, and telephone and fax numbers).

(b) Government contracting activity, and current address, Procuring Contracting Officer’s name, e-mail address, telephone and fax numbers.

(c) Government’s technical representative/COR and current email address, telephone, and fax numbers.

(d) Government contract administration activity and the Administrative Contracting Officer’s name, current e-mail address, telephone, and fax number.

(e) Government contract administration activity’s Pre-Award Monitor’s name, and current e-mail address, telephone, and fax numbers.

(f) Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase Agreements, include Delivery Order Numbers.

(g) Contract Type (specific type such as Fixed-Price (FP), Cost Reimbursement (CR), Time & Material (T&M), etc.). In the case of Indefinite Delivery contracts, indicate the specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc.).

(h) Awarded price/cost.

(i) Final or projected final price/cost.

(j) Original delivery schedule, including dates of start and completion or work.

(k) Final or projected final, delivery schedule, including dates of start and completion of work.

(2) Section 2 – Performance. Offerors shall provide a specific narrative explanation of each contract listed in Section 1, Contract Description, describing the objectives achieved and detailing how the effort is relevant to the requirement of this RFP.

(a) For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The offerors shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary.

SITE VISIT :

Offerors are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the price of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Attendees must bring a photo identification card (주민등록증 또는 운전면허증) to attend the site visit. The site visit orientation information and schedule is as follows:

‐ Date & Time: 3 May 2023 (Wednesday) at 09:00 hours ‐ Place: Morin Gate at Osan Air Base ‐ POC: Mr. No, Hyong Ho ‐ Tel No.: DSN: 784-6644 / Comm: 0505-784-6644 and 784-5889 / 0505-784-5889 ‐ Email Address: hyong.no.kr@us.af.mil

It is anticipated that it will take entire day to conduct the site visit based on the locations.

NOTE: Any offeror(s) who are interested in participation of the site visit shall be present at the meeting location specified above no later than the above indicated date and time, and also provide a list of attendant’s information (Company Name and Name(s) of attendees) to the POC via email No Later Than 2 May 2023 by 10:00 am for the installation access process. A maximum of two (2) individuals per offeror will be allowed to attend the briefing at Morin Gate, Osan Air Base. However, one (1) offeror will be allowed to escort to site location. Personnel from the 51st Civil Engineer Squadron, will escort and provide transportation for member’s from the gate to the site location as personal vehicles will not be allowed.

“Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available"

APPENDICES of this RFP are as follows:

APPENDIX A - Air Force Custodial Standards

-Level 1 Cleaning (Prestige) -Level 2 Cleaning (Basic) -Level 3 Cleaning (Academic Facilities – AETC Technical Training Schools and US Air Force Academy) -Level 4 Cleaning (Special Requirements)

-- Child Development Centers -- Youth Centers, Teen Center -- School Age Programs -- Fitness Centers

-Level 5 MFH (NOT IN CONTRACT) -Level 6 AMC Passenger Terminals -Requirement Portion

APPENDIX B - Estimated Square Footages and Cleaning Level

APPENDIX C – Performance Work Statement (PWS)

**************Contractor’s Checklist for Submittal********************

1. Contractor’s TAX exemption Declaration

2. Local Clause 5152.229-4015

3. Signed Solicitation and Amendment: Offerors shall sign the first page of the solicitation (SF1449) and shall also sign each amendment (SF30) (if any amendments were issued)

4. A copy of business registration in custodial service or related service and/or a valid / current public hygiene management business permission (위생관리용역업 신고증) issued by ROK Government.

5. Copy of the key person current year sanitary training certificate (2022년도 위생교육증) provided by organizations/associations permitted by the Minister of Health and Welfare.

6. Price Proposal in Excel

7. Past Performance Information reflective of 5 years performing the same or similar type of custodial services.

End of FAR 52.212-1, INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (NOV 2021)

PERFORMANCE OF WORK

PERFORMANCE WORK STATEMENT (PWS) FOR CUSTODIAL SERVICES

Part 1

General Information 22 June 2023

1. General. The Contractor shall provide all management, tools, equipment, and labor necessary to ensure that custodial services are performed at OSAN AB, Korea in a manner that will maintain a satisfactory facility condition and present a clean, neat and professional appearance. The contractor shall accomplish all cleaning tasks and be required to provide and replenish soap and paper products in all restrooms identified in Appendices A and B, in order to meet the requirements of this PWS and the Performance Requirements Summary (PRS). Minimum cleaning frequencies are established in Appendix A, Air Force Custodial Common Output Level Standards. Facility cleaning levels and estimated square footages are established in Appendix B, Estimated Square Footages and Cleaning Level. All work performed by the contractor shall be performed in accordance with all applicable laws, regulations, HAF (Headquarters Air Force) standards, instructions, and commercial practices.

1.1. Background. Custodial services are required on every Air Force Installation. This PWS outlines the current requirements at Osan AB.

1.2. Scope of Work. The Contractor shall perform custodial services to the standards in this contract and in a manner that will maintain a satisfactory facility condition and present a clean, neat, and professional appearance.

Services include but are not limited to cleaning rest rooms, remove trash, sweeping, moping, vacuum, spot clean, dusting.

1.3. Period of Performance:

Phase-In 1 Oct 2023 – 31 Oct 2023 Base Year 1 Nov 2023 – 30 Sep 2024 1st Option Year 1 Oct 2024 – 30 Sep 2025 2nd Option Year 1 Oct 2025 – 30 Sep 2026 3rd Option Year 1 Oct 2026 – 30 Sep 2027 4th Option Year 1 Oct 2027 – 30 Sep 2028

1.4. Special Expertise

1.4.1. Prior Experience as Prime Contractor. The Contractor shall have experience providing custodial service. The experience of a subcontractor cannot be used as substitute for the prime contractor’s experience.

1.4.2. Business Registration. The Contractor shall maintain either a business registration in custodial service or related service and or a valid and current public hygiene management business permission (위생관리용역업

신고증) issued by ROK Government and one of key personnel shall have a current year sanitary training certificate (2022년도 위생교육증) provided by organizations/associations permitted by the Minister of Health and Welfare.

1.4.3. Subcontracting. At no time will the Prime Contractor be allowed to subcontract with another contractor or any work projects unless authorized in this contract or otherwise approved by the Contracting Officer.

1.4.4. Staffing Plan. The contractor shall provide the COR with a staffing plan prior to executing any services under this contract. The plan which should clearly demonstrates how the contractor shall perform the requirements for Custodial Service for Osan AB. The offeror shall clearly identify the number of custodial workers that will be used in each location to perform custodial tasks. In addition, their backup policy to account for lost workers, retention policy and any other information pertinent to the execution of this requirement. The feasibility of the proposed Staffing Plan will be assessed against the contractor's overall technical and management approach to ensure the offeror has proposed adequate qualified personnel in appropriate labor categories to satisfy all PWS requirements. The Offeror shall provide a written staffing plan and provide manning charts showing a proposed organizational structure to meet the requirements in the PWS

1.4.5. Contract Manager (CM). The Contractor shall establish and maintain an office through which the contract manager can be contacted during work hours. The contract manager shall be available during normal duty hours to meet on the installation within one (1) hour with the government personnel designated by the COR to discuss problem areas. The contract manager shall have full responsibility to act for the contractor on all contract matters relating to daily/monthly/suddenly operations of this contract. The contract manager shall have a minimum two (2) years experiences as a CM and shall be an individual who is capable of conversing in and understanding English. The Contractor shall provide the COR with contact information where validation results and complaints can be reported. The Contractor shall also provide to the COR with the names and contact information of Contractor POCs for after business hours including nights, weekends, and holidays. This information shall be kept updated by the Contractor whenever personnel changes occur. The contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to the daily operation of this contract.

1.4.6. Personnel. Contractor personnel shall present a neat appearance. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, overcoats, or hats, bearing the company name or logo. The coloring or design of the items selected should be such that identifies personnel easily and quickly for reasons of safety and personal protection. The government is authorized to restrict the employment under the contract of any Contractor employee or prospective Contractor employee, who is identified as a potential threat to the health, safety, security, general well- being, or operational mission of the installation and its population.

1.4.7. Key Control. The Contractor shall establish and implement methods of making sure all keys/combinations issued to the Contractor by the government are not lost or misplaced and are not used by unauthorized persons.

The Contractor shall not duplicate any keys issued by the government. The Contractor shall immediately report to the Contracting Officer Representative (COR) any occurrences of lost or duplicated keys. In the event keys, other than master keys, are lost or duplicated, the Contractor may be required, upon written direction of the COR, to re- key or replace the affected lock or locks without cost to the government. The government may, however, at its option, replace the affected lock or locks or perform re-keying and deduct the cost of such from the monthly payment due the Contractor. In the event a master key is lost or duplicated, the government shall replace all locks and keys for that system, and the total cost will be deducted from the monthly payment due the Contractor.

1.4.8. Schedules. The contractor shall submit an monthly schedule for services described in PWS paragraphs and Appendices A and B to the COR for approval at the pre-performance conference, identifying facilities by building number in numerical order, and approximate time cleaning will occur. The contractor shall be allowed 30 days to adjust work schedules based on inspections, use, traffic, special requirements identified in Appendix A. A One time (non-permanent) schedule changes due to customer requests or base exercises shall be submitted to the COR for approval.

1.4.9. Existing Facility Floor Plan Changes. Modifications for a price increase or decrease to the contract shall only be made when the overall identified “cleaning area” square footage, as identified in Appendix B, of a facility increases or decreases or a frequency of cleaning service changes.

1.4.10. New Facility and/or New Facility Addition. Modifications for a price increase to the contract shall only be made when a new facility or addition is officially added to the contract and identified in Appendix A and B, with all information agreed upon.

1.4.11. Special Event Cleaning. (This is Requirement Portion Item)

This service is issued as a task order and must be completed within nominated workdays from the issued date of task order. This Special Event Cleaning Designated shall be applicable any Military exercises and Military functional events. The estimated square footages are established in Appendix B. This service is issued as a task order and must be completed within the designated schedule.

1.5. Security Requirements.

The contractor and his employees must comply with all security requirements imposed by the local installation commander at all times while performing the requirements of this contract on this military installation.

1.5.1. Base Passes. The contractor shall have responsibility to arrange for base passes and necessary vehicle permits required for entry onto this installation prior to performing any work under this contract. The COR will not be responsible for providing escorts for the contractor.

1.5.2. Escort Privileges. Escort privileges will be authorized only for the CM with a limit of three (3) persons per USFK REG 190-7. It is the contractor’s responsibility to ensure that the escorting official has full control over all escorted individuals at all times. Any individual removed from this installation will not be authorized further access to this installation.

1.6. Safety.

1.6.1. General. The Contractor must perform all operations in a prudent, conscientious, safe and professional manner to comply with the provisions of the Occupational Safety and Health Standards Act (OSHA) and applicable Korean Laws and Regulations. At a minimum, Contractor’s personnel and equipment shall comply with applicable Korean Laws and regulations. The Contractor shall ensure that its agents, employees perform in a safe manner. The Contractor shall ensure that all personnel involved in handling and packaging the oil/water mixture be trained for the level of expertise required for proper performance of the task and, in particular, in the area of chemical incompatibility, general first aid procedures and spills. Handling and personnel protective equipment shall be provided by the Contractor and must be appropriate to ensure safe handling of these mixtures.

1.6.2. Equipment. All Contractor equipment shall be subject to function and safety inspections by the Government. Equipment considered not SAFE or functional shall be removed from the job site. The Contractor shall take all safety measures.

1.6.3. The contractor shall insure that safety precautions are taken during the performance of this contract to protect the lives of contractor personnel, the property of the U.S. Government, the Republic of Korea, as well as the private individuals and firms who may be exposed to or endangered by the contractor’s actions to maintain minimal accidents/incident, zero loss of life and minimal damage to property. The contractor shall provide a written safety plan with policies, procedures and safety checklist within 30 days after contract award. The safety plan shall be confirmed by the COR then accepted by the KO within five (5) working days if there is any changes after award. The safety program shall comply with the Korean Occupational Safety and Health Act (KOSHA).

The Contractor agrees to comply with its written program for the life of the contract. Any changes or modification to its safety program will be coordinated and reviewed by the COR, or his/her duly authorized representative.

1.6.4. Safety Training. Contractor shall provide regular safety awareness training to its employees. Additionally, select employees shall attend advanced Safety training courses including courses on OSHA Safety Requirements and Working aloft Safety Procedures.

1.6.5. Risk Management Process. The safety plan shall include detailed job related hazards and controls for each work activity. The plan shall include an Activity Hazard Analysis (AHA) for each work activity. The AHA shall include at a minimum the name of the activity/job, the job steps, the job hazards, the tools or equipment required to perform the job, control measures to eliminate or reduce the hazard(s), and a Risk Assessment Code (Risk Assessment Code is an assessment of the probability of the hazard occurring and its potential impact). The contractor shall assure that the safety control measures are implemented. The contractor may use the sample AHA forms in http://www.usace.army.mil/SafetyandOccupationalHealth/ActivityHazardAnalysis.aspx or develop their own.

1.6.6. Accident investigations, reports, and logs: The safety plan shall include a copy of the contractor’s accident investigation reporting format, and logs. Report all accidents as soon as possible but not more than four (4) hours of accident occurrence to the Contracting Officer/Representative (KO/COR). The contractor shall thoroughly investigate the accident and submit the findings of the investigation along with appropriate corrective actions to the KO/COR in the accident investigation reporting format as soon as possible but no later than five (5) working days following the accident. Implement corrective actions as soon as reasonably possible. The accident investigation reporting format shall include at a minimum:

(1) Contract number and contract name/description.

(2) Name of contractor

(3) Date/time of accident

(4) Date report was completed

(5) Detail description of events that lead to the accident

(6) Root cause of accident

(7) Contributing factors

(8) Corrective action(s) to prevent recurrence

1.6.7. The following require immediate accident notification and written accident report:

(1) A fatality;

(2) A permanent total or permanent partial disability;

(3) The hospitalization of three or more people resulting from a single occurrence;

(4) Property damage of $200 or more.

1.7. Antiterrorism (AT) and Operations Security (OPSEC)

1.7.1. The contractor and all associated sub-contractors will practice Operations Security. The contractor should not talk about work outside of the work area nor discuss the work being performed on social media. The contractor shall not take pictures/video of or inside sensitive locations without prior coordination with the organization’s OPSEC representative and contracting officer representative. It will be the responsibility of the contractor to safeguard all documents provided. Document will be stored away from view when not being used.

Documents, media, drawings, and other associated material that are no longer needed must be destroyed via approved methods.

1.8. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.9. Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:

perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. An COR appointment letter issued by the KO, a copy of which is sent to the Contractor, reflects the responsibilities and limitations of the

COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract or any resulting order.

1.10. General Information

1.10.1. Hours of Operation. The contractor shall perform the services required under this contract during the following hours. The contractor is not required to perform services on Federal and Korean Holidays.

1.10.1.2. Normal Base Hours. Base hours of operation are normally 06:00 am thru 17:00 pm. The contractor may find it necessary to deviate from the normal base hours of operation, to ensure timely completion of work under this PWS at no additional cost to the government. The contractor shall fill out the cleaning checklist upon request.

1.10.1.3. Base Wide Facilities, Hours of Operation. The contractor shall perform facility cleaning, restroom/locker room cleaning services, and periodic cleaning services under this contract during the following shift hours

Day Shift - Monday-Friday, if applicable Saturday and Sunday 07:30 am thru 16:30 pm

1.10.1.4. Child Development Center (CDC), Hours of Operation. All cleaning requirements will be performed either before or after CDC operational duty hours except for any cleaning requirement standard performed more than one (1) time daily. For those specific cleaning requirements of 2 or more times daily at least one cleaning will be performed during operational duty hours. Daily floor cleanings shall be accomplished during operational duty hours as indicated in Appendix A.

1.10.1.4.1. CDC Hours of Operation Other Than Normal. There will be mission situations that require the contractor to work other than normal hours. Some of these situations are military exercises, contingency operations, or weather emergencies. Days of service could include weekends. The Facility Manager or Supervisor shall notify the QAP at least one week prior to a scheduled exercise requesting service for hours of operation other than normal.

1.10.2. Holidays. The contractor is not required to provide service on Korean national and U.S federal holidays, except in emergency situations; the holidays are:

U.S. Government legal holidays

(1) 1 January (New Year's Day)

(2) 3rd Monday, January (Dr. King’s Birthday)

(3) 3rd Monday, February (President's Day)

(4) Last Monday, May (Memorial Day)

(5) 19 June (Juneteenth Day)

(6) 4 July (Independence Day)

(7) 1st Monday, September (Labor Day)

(8) 2nd Monday, October (Columbus Day)

(9) 11 November (Veterans' Day)

(10) 4th Thursday, November (Thanksgiving Day)

(11) 25 December (Christmas Day)

ROK Legal Holidays

(1) New Year’s Day - 1 January

(2) Lunar New Year - 3 days

(3) Independence Movement Day – 1st March

(4) Labor Day – 1st May

(5) Children’s Day – 5th May

(6) Buddha’s Birthday – 12th May

(7) Memorial Day – 6th June

(8) Liberation Day – 15th August

(9) Hangul Proclamation Day – 9th Oct

(10) Chu Sok – 3 days

(11) National Foundation Day – 3rd Oct

(12) Christmas – 25th December

If these U.S. holidays fall on Saturday, the preceding Friday will be observed. If these holidays fall on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the Contractor will be responsible for rescheduling services for the first day post the holiday observance. The contractor is required to provide service on Korean national holiday for Child Development Centers, Youth Center, Teen Center, School Age Program, Navy Federal Credit Union and Air Mobility Command Passenger Terminal, and the contractor is required to provide service on U.S federal holidays for Fitness Centers and Air Mobility Command Passenger Terminal

1.10.3 Base Closures. Work scheduled but not accomplished because of base closure due to weather, exercises, or actual alert, will be accomplished as soon as possible after reopening the base.

1.11. Performance of Services During Crisis Declared by the National Command Authority or Overseas Combatant Commander. According to Department of Defense Instruction (DoDI) 3020.37, Continuation of Essential DoD Contractor Services During Crises, and the Air Force implementation thereof, unless otherwise directed by an authorized government representative, it is determined that Custodial Services requirements under this PWS are essential to be performed during a crisis.

1.12. Contractor/Employee Base Pass and Identification, Special Clearances and Vehicle Passes. The contractor shall comply with all requirements and procedures IAW AFFAR 5353.242-9000, Contractor Access to Air Force Installations. All documentation shall be submitted at the pre-performance conference.

1.13. Hazardous Material Identification. Material Safety Data Sheets (MSDS) are required as specified in the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract) for any other material designated by a government technical representative as potentially hazardous and requiring safety controls. MSDSs must be submitted by the Contractor upon contract award. Failure to provide MSDSs or certificate when requested could result in the Contractor being considered non-responsive and result in termination of the contract.

1.14. HAZMART. The government (HAZMART personnel) will inventory all chemicals that the Contractor brings on to Osan AB or any property under the control of Osan AB. Any products that meet the criteria of “Hazardous Waste” must be bar coded and tracked until permanently removed from government property. The inventory will be performed prior to commencement of work. Criteria for identifying hazardous waste, is contained in Subpart C of 40 CFR, Part 261.

1.15. Spill Response. The Contractor will be briefed on OSAN AB spill response procedures at the pre-performance conference. The Contractor is responsible to report and promptly cleanup all spills in a manner consistent with current environmental regulations, in the event that it is necessary to utilize government material, equipment or personnel to clean up a Contractor caused spill, the Contractor shall be required to reimburse the government for all associated costs.

1.16. Hazardous Material/ Waste Management. The Contractor will be briefed on OSAN AB Hazardous Material / Waste Management Plan at the pre-performance conference.

1.17. Hazardous Material Handling. The Contractor shall have approval from the base Bio-Environmental (BEE) and HAZMART sections prior to purchasing, handling, using, and storing any chemicals, solvents, lubricants, and other products that require MSDSs. The Contractor shall identify these materials and products on Air Force Form 3952 Chemical/Hazardous Material Authorization Request, Process Identification Form, and

Shop Disposal Form. The Contractor shall provide one copy of the MSDSs for each item to BEE and HAZMART sections for review prior to any chemicals being brought onto OSAN AB. The Contractor shall maintain one copy of the MSDSs for each hazardous material line item used within the work center.

The Contractor shall not use products that are or contain Toxic 17 chemicals, Extremely Hazardous Substances (EHS), Ozone Depleting Substances (ODS), and/or Persistent Bioaccumulative and Toxic (PBT) chemicals.

Any HM containing one of these banned substances will not be allowed on base.

1.18. Training. The Contractor shall ensure all employees complete the local Air Force Hazardous Communication, HAZMART, and hazardous waste training. The Contractor shall appoint a primary and alternate HAZMART and Hazardous Waste monitor. Monitors are responsible for training all Contractor personnel regarding hazardous material containers maintained within OSAN AB and complete MSDSs immediately upon receipt of new chemicals, products, or materials. The Contractor shall submit MSDSs to HAZMART as required.

1.19. Traffic Laws. The Contractor and its employees shall comply with base traffic regulations.

1.20. Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their Contractor-owned or privately owned vehicle while on OSAN AB.

1.21. For Official Use Only (FOUO). The Contractor shall comply with DoD 5400-7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.

1.22. Reporting Requirements. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, Contractor personnel, resources, and classified or unclassified defense information.

1.23. Physical Security. The Contractor shall be responsible for safeguarding all government property and controlled forms provided for Contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.

PART 2

DEFINITIONS & ACRONYMS

2 DEFINITIONS AND ACRONYMS:

2.1 Definitions.

2.1.1 CLEANING CHECKLIST. The cleaning checklist is a document indicating the cleaning date and cleaning status.

2.1.2 CONTRACTOR. A supplier or vendor having a contract to provide specific supplies or service to the government. The term used in the contract refers to the prime.

2.1.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5 DELIVERABLE. Anything that can be physically delivered but may include non-physical things such as meeting minutes.

2.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8 QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9 QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements. Records of inspections shall be kept and made available to the Government throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract. The contractor shall provide written Quality Control Guide (QCG) that should support the major functional areas of performance.

2.1.11 SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have probity of contract with the subcontractor.

2.1.12 WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.13 WORK WEEK. Is defined as Monday through Friday, unless specified otherwise.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial Off the Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation

HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Plan TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3 GOVERNMENT FURNISHED PROPERTY AND SERVICES

3.1. Government Furnished Facilities.

3.1.1 Janitorial Closets. Janitorial closets will be available for use by the Contractor, without cost, for the purpose of storing materials and equipment, excluding flammable materials. The Contractor shall be required to maintain odorless and clean closets. Closets shall be kept free of clutter and debris. Cleaning supplies and tools shall be stored and organized in such a manner as to allow easy access and movement in closet. Closets provided for janitorial service use shall be locked if locks are available. The government will not be responsible for Contractor’s stored supplies or equipment kept in the building or janitor’s closets or for the Contractor’s employees’ personal belongings.

3.2. Government Furnished Supplies and Equipment. None.

3.3. Government Furnished Utilities. The Government will furnish electricity, water and sewage service as necessary for accomplishment of work in accordance with this contract.

3.3.1. Utility Conservation. The Government will furnish electricity, water, and sewage as necessary for accomplishment of work in accordance with this contract. All areas do not receive the same utility services.

The Contractor shall not change or modify any utility system or component; or connect any Contractor property, equipment or system without prior Contracting Officer’s representative review and approval. The contractor shall practice energy conservation in the Government provided facilities.

3.4. Security, Fire and Medical Services. The Government will provide police and fire protection. In the event of a medical emergency, base ambulance service for transporting an injured employee to a local hospital is available on a cost reimbursement basis.

3.5. Solid Waste Collection and Disposal. The government will permit the contractor to use dumpsters located on the facilities listed under this contract. The Contractor shall be responsible for bringing refuse to the identified dumpsters. The Contractor shall not dispose of flammable liquids, mineral spirits, oil, lubricants and other flammable or hazardous material in base dumpsters. The Contractor shall comply with all installation recycling programs.

3.6. Pest Management Services. The government will provide insect and rodent control for all government-furnished facilities. The Contractor shall notify civil engineer service call when an insect or rodent problem is detected.

3.7. Medical. In the event of a severe emergency, during hours of operation, Osan Emergency Services will respond to the incident (by dialing 911, if necessary). The Contractor shall reimburse the government for all expense to these services.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4 CONTRACTOR PROVIDED EQUIPMENT AND SUPPLIES

4.1. Contractor-Furnished Equipment/Vehicles. The contractor shall provide and maintain all equipment and vehicles necessary to perform the requirements of this contract. The contractor may perform cleaning, minor repair and other normal maintenance requirements of equipment on site. Maintenance and repair of contractor vehicles or their privately owned vehicles shall not be accomplished on site. Contractor vehicles shall have the company name prominently displayed on both sides of the vehicle and be maintained to present a neat, professional appearance. Contractor vehicles shall be used solely for the intended purpose of performing services in this performance work statement during normal hours of operation.

4.1.1 All equipment used in the performance of this contract shall be in good operable condition and carry a U/L (Underwriters Laboratory) listing. Equipment found to be unsafe and unable to function as designed, shall not be used in performance of this contract. The contracting officer or designated representative may inspect the contractor’s equipment and vehicles at any time and direct the removal of any unsafe or unusable equipment or vehicle from the installation.

4.1.2 The contractor shall provide adequate numbers of equipment items and vehicles to effectively fulfill the scope of this contract. In addition, the contractor shall maintain or have backup capability to provide continued service in the event primary equipment or vehicles are down for extended maintenance or repairs. Equipment failure shall not alleviate the contractor from performing any requirement contained in this contract.

4.2. Contractor Furnished Restroom Supplies.

Plastic Trash Can Liners/Bags: Suitable and Transparent plastic bag for the type of trash receptacle.

Toilet Tissue: Two-ply.

Paper Towels: Bi-Fold, Tri-Fold, Dispenser type.

Hand Soap: Liquid anti-bacterial soap for installed liquid soap dispensers, and/or hand size…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .