A03_SUBMITTAL-REGISTER.xls
XLS spreadsheet 41 KB Posted
- Attached to
- Repaint Base Roads at Osan AB
- Solicitation number
- W90VN619R0039
About this file
submittal-register
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A21_W90VN6-19-R-0039.pdf | ||
| A03_Drawing.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal Register
| TITLE: | 2014-OMA-SPECIFICATIONS_REVISION1_2015_WORKING-2 | SUBMITTAL REGISTER | ||||||||||||||||||
| JOB NAME: | REPAIR ROADS/SIDEWALKS, AIRMEN DORM/ MSN SUPPORTING AREA | |||||||||||||||||||
| LOCATION: | OSAN AB | |||||||||||||||||||
| CONTRACT NO: | ||||||||||||||||||||
| CONTRACTOR: | ||||||||||||||||||||
| CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |||
| Line | Activity # | Trans-mittal # | Specification Section | SD # | Submittal Description | Item Submitted | Paragraph # | Classification: GOVT or A/E Revwr | Submit | Approval Needed By | Material Needed By | Action Code | Date Of Action | Date FWD to APPR / Auth Date RCD From CONTR | Date FWD To Other Revwr | Date RCD From Other Revwr | Action Code | Date Of Action | Mailed To CONTR/ Date RCD From APPR Authority | Remarks |
| 1 | 01 32 01.00 10 | 01 | Preconstruction Submittals | Preliminary Project Schedule | 3.4.1 | G | ||||||||||||||
| 2 | 01 32 01.00 10 | 01 | Preconstruction Submittals | Initial Project Schedule | 3.4.2 | G | ||||||||||||||
| 3 | 01 32 01.00 10 | 01 | Preconstruction Submittals | Periodic Schedule Updates | 3.4.3 | G | ||||||||||||||
| 4 | 01 33 00 | 01 | Preconstruction Submittals | Submittal register | 1.8 | G | ||||||||||||||
| 5 | 01 35 26 | 01 | Preconstruction Submittals | SAFETY PLAN /ACCIDENT PREVENTION PLAN (APP) | 1.6 | |||||||||||||||
| 6 | 01 35 26 | 01 | Preconstruction Submittals | Phasing Plan | G | |||||||||||||||
| 7 | 01 35 26 | 01 | Preconstruction Submittals | Activity Hazard Analysis (AHA) | 1.7 | |||||||||||||||
| 8 | 01 45 00.00 10 | 01 | Preconstruction Submittals | Quality Control Plan | 3.2 | G | ||||||||||||||
| 9 | 33 82 00 | 07 | Certificates | Key Personnel Resume | 1.6.2.2 | G | ||||||||||||||
| 10 | 01 50 00 | 01 | Preconstruction Submittals | Construction site plan | 1.4 | G | ||||||||||||||
| 11 | 01 58 00 | 02 | Shop Drawings | Construction Project Sign | 1.2.1 | G | ||||||||||||||
| 12 | 02 81 00 | 07 | Certificates | Certificates of Disposal | 3.2.5 | |||||||||||||||
| 13 | 02 65 00 | 01 | Preconstruction Submittals | Work Plan | 1.4.4 | G | ||||||||||||||
| 14 | 02 82 14.00 10 | 02 | Shop Drawings | Detailed Drawings | 1.3 | G | ||||||||||||||
| 15 | 01 | Product Data | Marking Paint Material | G | ||||||||||||||||
| 16 | 02 | Test Reports | Marking Paint Material | G | ||||||||||||||||
| 17 | 32 12 11 | 06 | Test Reports | Aggregate Gradation Tests | 1.4.2 | |||||||||||||||
| 18 | 32 12 15.13 | 03 | Product Data | Contractor Quality Control | 3.1 | G | ||||||||||||||
| 19 | 32 12 16 | 06 | Test Reports | Moisture Content of Mixture | 3.10.3.5 | |||||||||||||||
| 20 | 33 70 02.00 10 | 02 | Shop Drawings | As-Built Drawings | 1.4.2 | G | ||||||||||||||
| 21 | 01 78 00 | 11 | Closeout Submittals | Checklist for Form DD1354 | 1.9 | G |
&RPage &P of &N
File details come from the government source that posted it.