Attachment_4_Drawing__514-190011_construct_artifical_turf_next_to_B-2131.pdf
PDF 2 MB Posted
- Attached to
- Repair tennis Court and construct artifical turf
- Solicitation number
- W90VN619R0029
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF 1655
A
FORM
FEB 74
B
C
D
8 7 6 5
CODE IDENT NO.
ENGINEERING DRAWING LAYOUT D
AIR FORCE AUTHENTICATION
AIR FORCE RELEASE
ENG
CHK
DR
SIZE
SCALE
TITLE
AS SHOWN
PARTS LIST
4 3 2
DRAWING NO
SHEET OF
A
B
C
D
DATE
8 7 6 5 4
NONE 1 9
TITLE SHEET AND GENERAL NOTE
CONSTRUCT ARTIFICIAL TURF FIELD NEXT TO B-2131
WO# 514-190011
C-0
S C H E D U L E O F D R A W I N G S
REVISION STATUSDESCRIPTION OF DRAWINGS
GENERAL NOTE
DESCRIPTION OF DRAWINGS REVISION STATUS
TITLE SHEET, GENERAL NOTEC - 001
SUWON AB
CONSTRUCT ARTIFICIAL TURF FIELD NEXT TO B-2131
DESIGN DRAWING
LOCATION PLANC - 1
SITE PLAN C - 2
SECTION DETAILSC - 3
REINFORCE DETAILSC - 4
1. ALL CONCRETE WORK SHALL CONFORM TO ACI 211.1 AS MODIFIED BY AIR FORCE ETL 97-05 (CHANGE1).
2. AGGREGATES SHALL CONFORM TO ASTM C33.
3. CEMENT SHALL CONFORM TO ASTM C150, TYPE I OR II.
4. PLACEMENT OF CONCRETE SHALL BE IN CONFORMANCE WITH UFGS 32 13 11.
5. CONCRETE SHALL BE CONTINUOUSLY MOIST-CURED FOR AT LEAST SEVEN DAYS FOLLOWING COMPLETION OF CONCRETE
MAY BE USED INSTEAD OF MOIST-CURING.
6. SUBMIT A JOINT PLAN FOR APPROVAL PRIOR TO PLACING CONCRETE.
7. ALL CONSTRUCTION JOINTS SHALL BE THOROUGHLY CLEANED,
ALL LAITANCE REMOVED, THOROUGHLY WETTED, AND SLUSHED
8. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICE'S 48 HOURS PRIOR TO THE POURING OF ANY CONCRETE, NO POUR SHALL PROCEED WITHOUT THE CONSENT OF CONTRACTING OFFICE'S REPRESENTATION.
CONCRETE NOTES
NEW CONCRETE.
1. SPECIFIED FLEXURAL STRENGTH FOR CONCRETE PAD IS 4.5 MPA (650 PSI) AT 90 DAYS,
AS DETERMINED BY TEST MADE IN ACCORDANCE WITH ASTM C 78 OR KS F 2325.
DESIGN CRITERIA;
2. THE MAXIMUM ALLOWABLE SLUMP OF THE CONCRETE AT THE POINT OF PLACEMENT IS 75mm (3in.).
FINISHING OPERATION. ALTERNATIVELY, A WHITE PIGMENTED MEMBRANCE FORMING CURING COMPOUND MEETING COE CRD-C 300
9. SUBMIT RESULTS OF FREEZING-THAWING TEST, SIEVE ANALYSIS, ALKALI SILICA REACTIVITY, AND L.A. ABRASION TEST.
10. SUBMIT A RESULT OF DENSITY TEST FOR APPROVAL PRIOR TO PLACING CONCRETE.
11. THE CONTRACTOR SHALL MAKE 18 SPECIMENS FOR THE STRENGTH TEST FOR EACH TIME WHEN CONCRETE IS POURED.
9 SPECIMENS SHALL BE CURED AT THE JOB SITE WHILE THE OTHER 9 SPECIMENS SHALL BE CURED IN THE LAB.
3. THE COMPRESSIVE CONCRETE STRENGTH AT 28 DAYS FOR MANHOLE IS MINIMUM 27MPA
COLOR SCHEDULEC - 5
SITE PLAN E - 1
SECTION DETAILSE - 2
PANEL SCHEDULEE - 3
CIVIL WORK
ELECTRICAL WORK
NA
04 22
W
AF 1655
A
FORM
FEB 74
B
C
D
8 7 6 5
CODE IDENT NO.
ENGINEERING DRAWING LAYOUT D
AIR FORCE AUTHENTICATION
AIR FORCE RELEASE
ENG
CHK
DR
SIZE
SCALE
TITLE
AS SHOWN
PARTS LIST
4 3 2
DRAWING NO
SHEET OF
A
B
C
D
DATE
8 7 6 5 4
NONE 2 9
LOCATION PLANLOCATION PLAN
WO# 514-190011
THIS PROJECT
CONSTRUCT ARTIFICIAL TURF FIELD NEXT TO B-2131
WO# 514-190011
C-1
20.0
8.
17.7
9.
AF 1655
A
FORM
FEB 74
B
C
D
8 7 6 5
CODE IDENT NO.
ENGINEERING DRAWING LAYOUT D
AIR FORCE AUTHENTICATION
AIR FORCE RELEASE
ENG
CHK
DR
SIZE
SCALE
TITLE
AS SHOWN
PARTS LIST
4 3 2
DRAWING NO
SHEET OF
A
B
C
D
DATE
8 7 6 5 4
NONE 3 9
SITE PLAN
CONSTRUCT ARTIFICIAL TURF FIELD NEXT TO B-2131
WO# 514-190011
C-2
B-2131
INSTALL 45MM THICK ARTIFICIAL TURF INCLUDING SILICA SAND AND INFILL
OVER NEW 150MM THK. CON'C PAVEMENT, SEE C-3, 1 & C-4, 1
INSTALL TOPSOIL & SODDING (APPROX. 205 SM)
CONCRETE PAD FOR CONNEX
3.1MX2.6M, SEE C-3, 2
S
LO
P E
SLOPE
THE CONTRACTOR SHOULD SUBMIT THE SHOP DRAWING FOR SLOPE PLAN BEFORE CONSTRUCTION.
NOTE
EXIST. SIDEWALK
E X
IS
T
. S
ID
E W
A
LK
EXIST. SIDEWALK
(APPROX. 360 SM)
8.
4.5
.5
20.0 2.0
AF 1655
A
FORM
FEB 74
B
C
D
8 7 6 5
CODE IDENT NO.
ENGINEERING DRAWING LAYOUT D
AIR FORCE AUTHENTICATION
AIR FORCE RELEASE
ENG
CHK
DR
SIZE
SCALE
TITLE
AS SHOWN
PARTS LIST
4 3 2
DRAWING NO
SHEET OF
A
B
C
D
DATE
8 7 6 5 4
NONE 4 9
SECTION DETAILS
CONSTRUCT ARTIFICIAL TURF FIELD NEXT TO B-2131
WO# 514-190011
C-3
POURED
JOINT SEALANT
SEPARATING
TAPE BACKER
MATERIAL
POURED
JOINT SEALANT
W = WIDTH OF SEALANT
RESERVOIR (SEE TABLE)
D = DEPTH OF SEALANT;
1.0 TO 1.5 TIMES W
T = DEPTH OF INITIAL SAW CUT,
1/4 OF THE SLAB THICKNESS FOR
PAVEMENT LESS THAN 12 IN.;
3 IN. FOR PAVEMENTS 12-18 IN.;
OR 1/6 OF THE SLAB THICKNESS
FOR PAVEMENTS OVER 18 IN.
TABLE
JOINT SPACING
FT
W, IN.
< 25
MIN MAX
1/2 5/8
25 TO 50 3/4 7/8
> 50 1 1-1/8
NOTES : 1. SEPARATING TAPE OR BACKER
MATERIAL REQUIRED TO PRE-
VENT JOINT SEALANT FROM
FLOWING INTO SAWCUT, TO SEPA-
RATE NONCOMPATIBLE MATERIALS,
AND TO PREVENT SEALANT FROM
BONDING TO BOTTOM OF RESERVOIR.
2. TOP OF SEALANT WILL BE 1/8 IN. TO
1/4 IN. BELOW TOP OF PAVEMENT.
EXST PAVEMENT
NEW PAVEMENT
PREPARED 300 MM BASE COURSE.
CONSTRUCTION JOINT
n
D28 drilled hole.
Use epoxy resin ASTM C881, Type IV, Grade 3 or equivalent
HALF
HALF
AF 1655
A
FORM
FEB 74
B
C
D
8 7 6 5
CODE IDENT NO.
ENGINEERING DRAWING LAYOUT D
AIR FORCE AUTHENTICATION
AIR FORCE RELEASE
ENG
CHK
DR
SIZE
SCALE
TITLE
AS SHOWN
PARTS LIST
4 3 2
DRAWING NO
SHEET OF
A
B
C
D
DATE
8 7 6 5 4
NONE 5 9
REINFORCE DETAILS
CONSTRUCT ARTIFICIAL TURF FIELD NEXT TO B-2131
WO# 514-190011
C-4
* "R" INDICATES SLAB IS TO BE REINFORCED
1. ALL CONCRETE WORK SHALL CONFORM TO ACI 211.1 AS MODIFIED BY AIR FORCE ETL 97-05 (CHANGE1).
2. AGGREGATES SHALL CONFORM TO ASTM C33.
3. CEMENT SHALL CONFORM TO ASTM C150, TYPE I OR II.
4. PLACEMENT OF CONCRETE SHALL BE IN CONFORMANCE WITH UFGS 32 13 11.
5. CONCRETE SHALL BE CONTINUOUSLY MOIST-CURED FOR AT LEAST SEVEN DAYS FOLLOWING COMPLETION OF CONCRETE
CRD-C 300 MAY BE USED INSTEAD OF MOIST-CURING.
6. SUBMIT A JOINT PLAN FOR APPROVAL PRIOR TO PLACING CONCRETE.
7. ALL CONSTRUCTION JOINTS SHALL BE THOROUGHLY CLEANED,
ALL LAITANCE REMOVED, THOROUGHLY WETTED, AND SLUSHED
8. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICE'S 48 HOURS PRIOR TO THE POURING OF ANY CONCRETE, NO POUR SHALL PROCEED WITHOUT THE CONSENT OF CONTRACTING OFFICE'S REPRESENTATION.
CONCRETE NOTES
NEW CONCRETE.
CONCRETE;
1. SPECIFIED FLEXURAL STRENGTH FOR CONCRETE IS 4.5 MPA (650 PSI) AT 90 DAYS,
AS DETERMINED BY TEST MADE IN ACCORDANCE WITH ASTM C 78 OR KS F 2325.
DESIGN CRITERIA;
2. THE MAXIMUM ALLOWABLE SLUMP OF THE CONCRETE AT THE POINT OF PLACEMENT IS 75mm (3in.).
FINISHING OPERATION. ALTERNATIVELY, A WHITE PIGMENTED MEMBRANCE FORMING CURING COMPOUND MEETING COE
9. SUBMIT RESULTS OF FREEZING-THAWING TEST, SIEVE ANALYSIS, ALKALI SILICA REACTIVITY, AND L.A. ABRASION TEST.
10. SUBMIT A RESULT OF DENSITY TEST FOR APPROVAL PRIOR TO PLACING CONCRETE.
11. THE CONTRACTOR SHALL MAKE 18 SPECIMENS FOR THE STRENGTH TEST FOR EACH TIME WHEN CONCRETE IS POURED.
9 SPECIMENS SHALL BE CURED AT THE JOB SITE WHILE THE OTHER 9 SPECIMENS SHALL BE CURED IN THE LAB.
TRANSVERSE CONTRACTION
OR DOWELED CONSTRUCTION
@ 380 OC EW
D13 BARS
75 EDGE OF
PCC PAVEMENT
ST
EE
L
BA
R
LE
N
G
TH
8.
20.0
1.0
.0
.0
1.0
AF 1655
A
FORM
FEB 74
B
C
D
8 7 6 5
CODE IDENT NO.
ENGINEERING DRAWING LAYOUT D
AIR FORCE AUTHENTICATION
AIR FORCE RELEASE
ENG
CHK
DR
SIZE
SCALE
TITLE
AS SHOWN
PARTS LIST
4 3 2
DRAWING NO
SHEET OF
A
B
C
D
DATE
8 7 6 5 4
NONE 6 9
COLOR SCHEDULE OF ARTIFICIAL TURF
CONSTRUCT ARTIFICIAL TURF FIELD NEXT TO B-2131
WO# 514-190011
C-5
BLUE COLOR
GREEN COLOR
20.0
.0
17.7
5.
.5
AF 1655
A
FORM
FEB 74
B
C
D
8 7 6 5
CODE IDENT NO.
ENGINEERING DRAWING LAYOUT D
AIR FORCE AUTHENTICATION
AIR FORCE RELEASE
ENG
CHK
DR
SIZE
SCALE
TITLE
AS SHOWN
PARTS LIST
4 3 2
DRAWING NO
SHEET OF
A
B
C
D
DATE
8 7 6 5 4
NONE 7 9
SITE PLAN
CONSTRUCT ARTIFICIAL TURF FIELD NEXT TO B-2131
WO# 514-190011
E-1
B-2131
INSTALL 2EA WALL MOUNTED 400W LED LIGHT W/ BRACKET
SEE E-2, 1,
REMOVE/RELOCATE EXIST. CT BOX AND WATTHOUR METER BOX
REPLACE EXIST. 16MM CONDUIT WITH NEW 25MM CONDUIT
SEE E-2, 2
REPLACE EXIST. 2EA LIGHTING FIXTURES WITH
NEW WALL MOUNTED 100W LED LIGHT W/ ACCESSORIES, SEE E-2,2
C/B-16, 20A, 120V 1P, 2-#10, G#12
C/B-6, 20A, 120V 1P, 2-#10, G#12
INSTALL ON/OFF SWITCH FOR 2EA, 400W LED LIGHT
WALL MTG. TYPE, NEMA 3R
APPROX. INSTALLATION HEIGHT=1.3M
REPLACE EXISTING PHOTO ELECTRIC CELL
SEE E-2, 5
INSTALL LIGHTING CONTACTOR, MECH ROOM, B-2131
SEE E-2, 4
CODE IDENT NO.
ENGINEERING DRAWING LAYOUT D
AIR FORCE AUTHENTICATION
AIR FORCE RELEASE
ENG
CHK
DR
SIZE
SCALE
TITLE
AS SHOWN
PARTS LIST
DRAWING NO
SHEET OF
DATE
SECTION DETAILS
8 9
E-2
CONSTRUCT ARTIFICIAL TURF FIELD NEXT TO B-2131
WO# 514-190011
ENGINEERING DRAWING LAYOUT D
AS SHOWN
ENGINEERING DRAWING LAYOUT DENGINEERING DRAWING LAYOUT DAF 1655
A
FEB 74
B
C
D
8 7 6 5
ENGINEERING DRAWING LAYOUT D
4 3 2 1
8 7 6 5 4
CODE IDENT NO.
ENGINEERING DRAWING LAYOUT D
AIR FORCE AUTHENTICATION
AIR FORCE RELEASE
ENG
CHK
DR
SIZE
SCALE
TITLE
AS SHOWN
PARTS LIST
DRAWING NO
SHEET OF
DATE
PANEL SCHEDULE
9 9
E-3
CONSTRUCT ARTIFICIAL TURF FIELD NEXT TO B-2131
WO# 514-190011
ENGINEERING DRAWING LAYOUT DENGINEERING DRAWING LAYOUT DAF 1655
A
FEB 74
B
C
D
8 7 6 5
ENGINEERING DRAWING LAYOUT D
4 3 2 1
8 7 6 5 4
| c-0 |
| c-1 |
| c-2 |
| c-3 |
| c-4 |
| c-5 |
| e-1 |
| e-2 |
| e-3 |
File details come from the government source that posted it.