Install Networked CCTV in Osan AB
Solicitation number
W90VN619Q0003
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W90VN619Q0003 14-Nov-2018

b. TELEPHONE NUMBER

031-661-5499

8. OFFER DUE DATE/LOCAL TIME

01:00 PM 28 Nov 2018

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W90VN69. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MS. NAM, YUCHIN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

F3J3RS8072AG01

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCO OSAN, UNIT #2039

APO AP 96278-2039

UNITED STATES

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

NAICS:

334290

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF41

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W90VN619Q0003

Section SF 1449 - CONTINUATION SHEET

BASIS OF AWARD

Award will be made to the responsible offeror(s) submitting the lowest priced, technically acceptable (LPTA) offer(s) that satisfies all terms and conditions of this solicitation. The Government intends to evaluate proposals and award a contract without discussions with offerors, if it is determined to be most advantageous to the Government.

However, the Government reserves the right to conduct discussions if the Contracting Officer determines them to be necessary. The following evaluation factors will be used to evaluate each offer: Each non-price factor will be rated as either acceptable or unacceptable. If any of factor is rated as unacceptable, the overall factor rating is unacceptable and the entire proposal is unacceptable.

Factor A: Technical

The Government will evaluate the offeror’s proposal against Government’s minimum requirements as specified on the solicitation to determine whether the proposal is acceptable or unacceptable using the ratings and descriptions outlined in table below.

Technical Acceptable/Unacceptable Ratings Rating Description Acceptable Proposal meets the minimum requirements of the solicitation Unacceptable Proposal does not meet the minimum requirements of the solicitation

Sub-factor 1: Specifications: Offerors shall submit the detailed specifications for the proposed items along with their offer which clearly demonstrates that the proposed items meet the minimum specifications in the solicitation in order to enable the Government to determine if the offered items meet the requirements of this solicitation. Offerors who fail to submit detailed specifications with required document will not be considered for award.

Sub-factor 2: Relevant Experience: The offeror must possess and shall submit the evidence (copies of contract) of at least two (2) years prior experience during the last five (5) years in similar or same in scope and size of the installation of CCTV into multi and multi-story building associated with network video recording system. The experience of a sub-contractor cannot substitute for the prime contractor’s experience. The offeror shall provide the evidence of prior experience as required below.

Past Contracts:

(i) Contract number

(ii) Total contract value

(iii) Contract award date

(iv) Description of Work: Detailed description of work, how many and type of building, number of floor, number of installed camera per a contract, description of NVR system installation into CCTV

(v) Period of performance (year/month/date-year/month/date)

(vi) Name, Phone Number, Email of Client

Sub-factor 3: Performance of work by the Contractor or a subcontractor. The contractor shall perform not less than 51 percent of the total amount of installation work to be performed.

Factor B: Past Performance

The Government will evaluate the offeror’s record of past and current performance to ascertain the probability of successfully performing the required efforts of the solicitation requirements. This factor will be evaluated on an “acceptable” or “unacceptable” basis using the ratings in below table. Past Performance will be evaluated based upon offeror’s client’s satisfaction on similar projects within the last 3 years. In determining the acceptability, each offeror shall be required to submit Past Performance Information within the last three (3) years in accordance with responses received to the Proposal Instruction (Addendum to FAR 52.212-1, Instructions to the offeror(s)). The Government reserves the right to obtain past performance from any reasonable source available, including Government databases in order to evaluate past performance.

Past Performance Evaluation Ratings Rating Description Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See note below.)

Unacceptable Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.

* Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. “Unknown” will be considered “acceptable.”

Factor C: Price

SALIENT CHARACTERISTICS

CCTV EQUIPMENT SPECIFICATIONS:

Item 0001: 2.0M Pixel Full‐HD Outdoor Network PTZ Camera w/Bracket and Mount.

MINIMUM SALIENT CHARACTERISTICS INCLUDE:

MFR: DIVISYS

MFR PART NR: DV-IHS UCIR30X (Network PTZ Dome Camera) or Equal 1/2.8” Sony progressive CMOS Image Sensor 30X Optical Zoom 1-10X variable Digital Zoom

0.05 (color), 0.01 lux (B/W) @ F1.6 minimum illumination

4.7 ~ 94mm Focal Length Frame Rate 1080P (30fps) + D1 (30fps) 720P (60fps) + cif (60fps) User Account / Password protected Security Power over Ethernet (PoE)

Outdoor weather environment

Operating Temperature -40˚C ~ 50˚C (-40˚F ~ 122˚F)

Weight 2.3 kg (5.11 lbs)

Item 0002 (Appendix-A): 16CH Network Video Recorder (NVR) – for Bulk Storage Area

MINIMUM SALIENT CHARACTERISTICS INCLUDE:

MFR: DIVISYS

MFR PART NR: DV-N16 or Equal 16 channel NVR with Bidirectional audio support Real-time NVR capability H.264 (Video) / Audio (ADPCM) Minimum 1470fps (Full-HD 1920*1080) frame rate Display Minimum 1470fps (Full-HD 1920*1080) frame rate Recording of Full HD size: 1920*1080 DVD/Video recording must be compatible with the 2.0M Pixel Full-HD camera to include all hardware and software Smart Phone Application/ minimum 20 users Recording Method, continue, motion detect, sensor, and schedule event DVD & HDD SATA interface

DOM SSD for Linux 64bit Embedded OS DVD-RW - capable Minimum 1 HDMI port Internal HDD 18TB 100V/60Hz ~ 240V/60Hz Free Volt option Certification KCC listed

Item 0002(Appendix-B): 32CH Network Video Recorder (NVR) – for POL Area through Osan AB

MINIMUM SALIENT CHARACTERISTICS INCLUDE:

MFR: DIVISYS

MFR PART NR: DV-N32 or Equal 32 channel NVR with Bidirectional audio support Real-time NVR capability H.264 (Video) / Audio (ADPCM) Minimum 1470fps (Full-HD 1920*1080) frame rate Display Minimum 1470fps (Full-HD 1920*1080) frame rate Recording of Full HD size: 1920*1080 DVD/Video recording must be compatible with the 2.0M Pixel Full-HD camera to include all hardware and software Smart Phone Application/ minimum 20 users Recording Method, continue, motion detect, sensor, and schedule event DVD & HDD SATA interface DVD-RW - capable Minimum 1 HDMI port Internal HDD 36TB 100V/60Hz ~ 240V/60Hz Free Volt option

Item 0003: Central Management System (CMS) Server

MFR: DIVISYS

MFR PART NR: DIVISYS NVR-CMS or Equal CPU minimum intel i7 dual core processor 3 RAM minimum DDR2 4G HDD Minimum HDD 100G recommended SSD 128G Network over 100Mbps bandwidth required Intelligent programming option by event function System status monitoring (Real-Time-Health-Check) Multi-site auto/manual audio broadcasting option Indicate camera location / checking the video on E-Map option Pan Tilt Zoom control capable

Item 0004: Switching Hub 24 Ports SFP 100/1000mbps

MFR: SOLTECH

MFR PART NR: SFC4000D or Equal 24-Ports 100/1000Mbps + 8=Ports TP (Combo) UTP Auto Negotiation, Auto MDI-X Web Based Management, SNMP IEEE 802.1p Qos Voip Qos 1Q-in-Q Port Mirroring 802.3ad Link Aggregation Control Protocol IEE 802.1x user certification IEEE 802.1d & IEEE 802.1 Rapid Spanning Tree

8 Ports 10/100/1000 Base-T / Combo (1~8) Auto negotiation Auto MDI-X RJ45 Ports 24-SFP Slots, 1000 Base SX/LX SFP 100 Base-FX SFP Speed Auto Detection Fiber Ports Switch Fabric 68Gbps, MAC Address 8K Jumbo Frame 10Kbytes

Item 0005: Media Converter, Gigabit Ethernet SFP

MFR: SOLTECH

MFR PART NR: SFC-2000-SFP or Equal SFP Slot Support Provides Diagnostic LED indications 1000Mbps Data Transfer DC12V SMPS Adapter Input Voltage Internal Auto negotiation 10/100/1000Mbps Full/Half duplex FLCF on/off Dip Switch 1-Port 1000 Base-SX/LX/ZX w/SFP slot, Multi Mode 62.5/125 (220m), Single Mode 9/125 (~80km Fiber Ports) 1-Port 10/100/1000 Base-T (X) Auto negotiation & MDI/MDFX UTP/SIP Cat 3,4,5,6 Cable EIA/TIA-586 100-ohm (100m) RJ-45 Ports

IEEE 802.3 10 Base-T, 802.3u 1000 Base-TX/100 Base-FX, 802.3ab 1000 Base-T, 802.3z Gigabit Fiber

Item 0006: Pluggable Transceiver/Receiver

MFR: SOLTECH

MFR PART NR: SPF-LX or Equal

1.25 Gb/s Data Rate (Maximum Distance 20KMs)

1310nm Wave Length 0-70o Operating Environment Single Mode Media Type

Item 0007: 55” LED Monitor W/Wall mount bracket

MFR: LG

MFR PART NR: 55LB-8600 or Equal 138cm (55”) Full HD LED Monitor with wall mount bracket

Brightness ratio: 1,000,000:1 Response Time: 1ms Input: HDMI, USB, D-SUB, Ethernet

Item 0008: 19” Monitor

MINIMUM SALIENT CHARACTERISTICS INCLUDE:

MFR: Samsung MFR PART NR: LS19E45K or Equal Screen Size: 47cm, Min 19.5 Panel Type: LED TN Panel Resolution: 1,280 x 1,024 Aspect Ratio: 16:9 Pixel Pitch (mm): 0.271 x 0.262 Contrast Ratio: 5000000:1 Brightness: 250cd Response Time: 5ms Speaker: 2.5watts x 2ea, VESA: 100 x 100mm Input Power: 100-240V Power Consumption: 16watt, 0.3watt (Stanby) Stand: Pivot (90 Degree), Tilting (Up/Down), Sweable & Elevation

Dimensions: 407W x 469H x 210D mm Weight: 4.4kg

Item 0009: UPS 1500W 120VAC Tower Type

MFR: APC

MFR PART NR: SMX1500

Output Power Capacity: 1200 Watts / 1440VA Max Configurable Power: 1200 Watts / 1440VA Nominal Ouput Voltage: 120V Output Voltage Distortion: Less than 5% at full load Outpout Frequency (sync to mains): 50/60Hz +/- 3Hz (auto sensing) Topology: Line interactive Waveform Type: Sine Wave Output Connections: (8) NEMA 5-15R

Approvals: UL

Item 0010: UPS 2000W 120VAC Rack Type

MINIMUM SALIENT CHARACTERISTICS INCLUDE:

MFR: APC

MFR PART NR: SMX2000

Output Power Capacity: 1800 Watts / 1920VA Max Configurable Power: 1800 Watts / 1920VA Nominal Ouput Voltage: 120V Output Voltage Distortion: Less than 5% at full load Outpout Frequency (sync to mains): 50/60Hz +/- 3Hz (auto sensing) Topology: Line interactive Waveform Type: Sine Wave Output Connections: (3) NEMA 5-15R, (3) NEMA 5-20R, (1) NEMA L5-

20R Approvals: UL

Item 0011: PDU, Rack MTD 120VAC 8 Outlet

MFR: OCC

MFR PART NR: PS115 or Equal Voltage: 120VAC 15A, 50/60Hz Over Current Protection: 15A Thermal Breaker Plug Type/ Receptacle (Socket): NEMA5-15P/ NEMA5-15R

Item 0012: Surge Protector, UL Listed

MFR: DITEK

MFR PART NR: DTK-PVPIP or Equal Service Voltage: 48V Data 12/24V Power, MCOV: 64V/38V, Clamping Voltage: 72V/47V Protection Modes: Line-Ground (All) All 8 pins are protected Surge Current Rating: 30A/pair Max. Continuous Current: 1.5 Amps, Power Handling: 72 Watts/pair, 144 Watts/port

Data Rate: Gigabit Ethernet using all four pairs Connection Method: RJ45 In/Out Maximum Humidity: 95% non-condensing Agency Approvals: UL497B

Standards Compliance: CAT5e, EIA/TIA568A, EIA/TIA568B

Item 0013: FDF 8P Wall MTD, UL listed

MFR: OCC

MFR PART NR: ZDMB6B or Equal Port Capacity: 6 to 8 Adaptor plates: 1 Constructed of 16-gauge steel with durable powder coated finish Box Dimensions: 7 x 6 x 192 Agency Approvals: UL

Item 0014: FDF 36P Rack MTD

MFR: OCC

MFR PART NR: Prortc2u-3ISM or Equal Port Capacity: 36 Adaptor plates: 1 Constructed of 16-gauge steel with durable powder coated finish Mount Type: Rack MTD

Item 0015: Fiber Optic Cable(FOC) SM4C Conduit Use

MFR: Samsung Corning MFR PART NR: SM4C-C or Equal

Item 0016: CAT6 STP

MFR: Samsung Corning MFR PART NR: CAT6 STP 4P or Equal

Item 0017: Optical Jump Cord (OJC), SM

MFR: Ortronics MFR PART NR: SC-SC1M or Equal

Color: Yellow, Length: 3ft (1m)

Item 0018: CAT6 Patch Cable, Blue Color 7 ft

MFR: Ortronics MFR PART NR: OR SPC-607 or Equal

Color: Blue, Length: 7 ft

Item 0019: Enclosure NEMA4X UL Listed

MFR: NEMA ENCL.

MFR PART NR: 8060120 or Equal

NEMA4X, Weight (lbs.) 35.0000, Enclosure Material: 304 Stainless Steel Enclosure Feature: Concealed Hinge 1/4 Turn Latch, Door: Single Door, Weather-proof, Locking Device

Dimensions: 800W x 600D x 1,200H mm

Item 0020: System Rack 22U

MFR: Damac Korea MFR PART NR: 22U or Equal 22U Steel system rack

Item 0021: Steel Conduit 3/4”

MFR: Seah steel MFR PART NR: 16mm/ 27mm or Equal Material: Rigid steel conduit. GALV

Item 0022: Inner-duct Conduit System

MFR: Endocor Korea MFR PART NR: 4-3-32 or Equal Material: PVC, Color: Orange, Dimensions: 4”/3-32mm

Item 0023: Gate Operator(Sliding) and Associated items

MFR: Faac Korea MFR PART NR: FAAC844ERZ16 or Equal Items: Rack gear, Connector, Safety Beam, Push button switch (XB300), Keyboard(T-SA, Weather-proof type), ER push button, Lamp, Buzzer, Steel plate(Basement) for Operator & related items

INSTRUCTION OF OFFER

ADDENDUM TO FAR 52.212-1, INSTRUCTIONS TO THE OFFEROR(S)

ELIGIBILITY FOR AWARD OF ROK MND CONTRACTS

(a) This solicitation is conducted under the LCS program and will result in a contract between the Government of the Republic of Korea (ROK) and the contractor. ROK will directly pay the contractor. No appropriated funds of the United States (US) shall be obligated for payment due under this contract.

(b) In accordance with the International Agreement between the US and ROK, titled “Amendment to the Implementing Agreement between the United States Forces Korea and the Republic of Korea Ministry of National Defense Concerning Logistics Cost Sharing” (hereinafter “International Agreement”), signed by the parties on 14 October 2015:

The parties hereby agree that all LCS work must be accomplished in the ROK or its territorial waters and that all equipment and supplies that are to be acquired with ROK Government funds shall be manufactured in the ROK, and all LCS service work shall be carried out by Korean contractor(s), the Korea Railroad Corporation, or the ROK military. The term ‘Korean contractor(s)’ is defined as an entity, that, including its parent, is a domestic corporation under the Korean Tax Act and whose domestic status is recorded in the Certified Copy of Register or its successor document. A parent is defined as an entity that holds more than 50/100 of the total issued and outstanding shares in another company, as reflected in the Stock Change Certificate.

(c) In order to establish eligibility for award under this LCS contract, the offeror shall submit the documents listed below with their proposal prior to the closing date/time established in the solicitation. The contracting officer will determine the offeror’s eligibility status as a Korean contractor solely on the basis of these documents.

(1) Prime Contractor Registration: The offeror shall submit its Certified Copy of Register (등기부 등본

(유효사항)), as certified and submitted to the ROK Supreme Court (대법원). In order to qualify as a Korean

Contractor, the fourth block of the offeror's Certified Copy of Register [등기부 등본 (유효사항)] must state an address that is physically located in the Republic of Korea.

(2) Prime Contractor Stock Change Certification: The offeror shall submit its most recent Stock Change

Certificate (주식 변동 상황 명세서), as certified and submitted to the ROK Local Tax Office (국세청). The prime contractor’s Stock Change Certificate (주식 변동 상황 명세서) will be evaluated to determine if the prime contractor has a Parent (as defined in the International Agreement extract above).

(3) If the Prime Contractor has a Parent, the offeror shall submit the Parent’s Certified Copy of Register

(등기부등본 (유효사항)) as certified and submitted to the ROK Supreme Court (대법원). In order for the Prime Contractor to qualify as a Korean Contractor, the fourth block of the offeror’s Parent’s Certified Copy of Register

(등기부 등본 (유효사항)) must state an address that is physically located in the Republic of Korea.

(d) To summarize the requirements stated above:

(1) An offeror that does not have a “Parent” will submit 2 documents to establish that the offeror is a Korean Contractor: 1) Offeror's Certified Copy of Register, and 2) Offeror's Stock Change Certificate.

(2) An offeror that does have a “Parent” will submit 3 documents to establish that the offeror is a Korean

Contractor: 1) Offeror's Certified Copy of Register, 2) Offeror's Stock Change Certificate, and 3) Parent's Certified Copy of Register.”

1. Proposal shall be submitted to the Federal Business Opportunities (FBO) website (https://www.fbo.gov/). The Government requests all questions be emailed to Ms. Nam, Yuchin, Contract Specialist, email:

yuchin.nam1.ln@mail.mil within 10 calendar days after the solicitation is issued. The electronic bid shall be submitted by the closing date and time of the solicitation. Partial offer will not be accepted.

2. The offeror(s) shall submit the following requirements IAW paragraph 1 above. A failure to submit the following requirements will be grounds for determining the offer to be incomplete and ineligible for contract award.

2.1. Technical Proposal:

2.1.1. Specifications. The offeror shall provide description/specification of each listed item including manufacturer name and model/part number as applicable. The proposed “equal product” must meet, or exceed, the salient physical, functional, or performance characteristics specified in the solicitation including manufacturer name and model/part number as applicable. For equal product, without supporting information, only copy and paste of salient characteristics as listed in the solicitation with each item in the proposal is not acceptable, and will not be considered for an award. Even if the exact "brand name" is submitted, the offeror shall submit the respective specifications with their proposal. The offeror shall provide evidence of proposed item being certified by Korea Certification (KC) with the proposal.

2.1.2. Relevant Experience as a Prime Contractor: The offeror must possess and shall submit the evidence (copies of contract) of at least two (2) years prior experience during the last five (5) years in similar or same in scope and size of the installation of CCTV into multi and multi-story building associated with network video recording system. The experience of a sub-contractor cannot substitute for the prime contractor’s experience. The offeror shall provide the evidence of prior experience as required below.

Past Contracts:

i. Contract number

ii. Total contract value

iii. Contract award date

iv. Description of Work: Detailed description of work, how many and type of building, number of floor, number of installed camera per a contract

v. Period of performance (year/month/date-year/month/date)

vi. Name, Phone Number, Email address of Client

vii. Copies of contract

2.1.3. Performance of work by the contractor or a subcontractor. If the offeror contemplates subcontracting, the offeror shall identify in its proposal the total cost of the work to be performed by the offeror, and the total cost of the work to be performed by each subcontractor, under the CLIN 003 Installation, in this contract. In accordance with the Statement of Work, paragraph 1.3, the prime contractor shall perform no less than 51% of installation work.

2.2. Past Performance: The offeror shall describe its past performance on contracts it has held in the last three (3) years which are of same or similar scope, magnitude, complexity to that which is detailed in the solicitation. The offerors shall provide a list of Government or non-Government contract references including contract number, type, value, place of performance, date of award, whether performance is ongoing or complete, and the names, phone numbers, and e-mails of at least two points of contact for each contract.

i. Contract Number

ii. Contract Date

iii. Contract Amount

iv. Contracting Agency

v. Project Officer & Phone Number

vi. Project Description

Satisfactory or higher past performance rating on the government and commercial projects similar in nature, scope to the subject solicitation during the past three (3) years will be considered as “Acceptable Past Performance”.

If the offeror is a new entrant to the business and/or no past performance data is available, the offeror shall indicate “New Entrant” on the past performance proposal and the offeror will be considered to have “Neutral Rating.”. It will be considered to be “Acceptable”.

Each offeror shall submit any known adverse past performance information including all relevant supporting details with their proposal. Each offeror shall provide a copy of any cure notices or show cause letters received on each contract listed and a description of any corrective action by the offeror. The offeror shall also provide the information listed above on any contract that has been terminated, in whole or in part, for default during the past three (3) years, or any contracts which are currently in the process of such termination. This information is required for any contract, whether similar or not to the proposed effort. If the contract is awarded based on false information, the contract will be terminated for cause.

The Government reserves right to conduct investigation of the offeror’s past performances, not limited to the listed past performances on the Past Performance proposal.

2.3. Price Proposal. Offeror shall submit complete price proposal.

2.4. The offeror(s) shall submit a complete following package via FBO.

(1) Offeror’s status as a Korean Contractor:

(a) The offeror's most recent Stock Change Certificate (주식등변동 상황명세서), as certified and submitted to the ROK Local Tax Office (국세청)

(b) The offeror's Certified Copy of Register [등기부 등본 (유효사항)], as certified and submitted to the

ROK Supreme Court (대법원)

(c) If the offeror has a Parent (as Parent is defined in the International Agreement), the Parent's Certified

Copy of Register [등기부등본 (유효사항)], as certified and submitted to the ROK Supreme Court (대법원).

(2) 52.203-2, Certificate of Independent Price Determination.

(3) 52.209-5, Certification Regarding Responsibility Matters

(4) 5152.204-4032, Representations and Certifications.

3. In accordance with FAR 25.1002, solicitations for contracts to be entered into and performed in Korea, to ensure a fair evaluation of offers, the Government will use the Korea Exchange Bank conversion rate on the date specified for receipt of proposal.

4. Site Visit:

One site visit is scheduled as listed below for POL and bulk storage area in Osan AB. Interested vendors are highly encouraged to attend the site visit.

Note: In compliance with Air Force security and base access, you are requested to provide us with the following information:

a. Requirement for Interested Offerors to provide its name and company name including cell phone #, email address. - the requested info shall be submitted on or before 19 November 2018 via email, to yuchin.nam1.ln@mail.mil (Failure to do so will be at the offeror's risk.)

b. All persons under escort in the site visit area must bring valid Korean identification card or driver's license, or passport . (personnel that do not have their identification card shall not be given access to Osan Air Base.)

Participants will meet at--

Date: 20 November 2018 Time: 10:00AM Location to meet: Doolittle Gate, Osan Air Base POC: Ms. Nam, YUCHIN 031-661-5499 /yuchin.nam1.ln@mail.mil

STATEMENT OF WORK

1. Scope of Work:

1.1. Closed Circuit Television (CCTV) equipment will be installed/configured in accordance with Manufacturer’s recommended procedures, the Unified Facilities Criteria's (UFC 3-520-01), UFC 4-021-02 and National Electronic Code requirements (NEC).

1.2. The contractor shall furnish all management, supervision, labor, equipment, material, transportation, and supplies required to supply and install of IP CCTV system at POL storage area in Osan AB. The contractor shall configure the system as described and shown in this Statement of work (SOW). The system shall include all connectors, adapters, and terminators necessary to interconnect all equipment. The contractor shall also supply all fiber optic cabling and conduit (rigid and flexible) necessary to interconnect the CCTV equipment installed at the control/monitoring stations.

1.3. The contractor shall perform no less than 51 percent of installation work to be performed under this contract.

2. CCTV Project Description/Systems Overview:

2.1. The contractor shall provide all necessary equipment, labor, and tools required to provide and install a new CCTV system. The contractor shall be responsible for providing and installing all miscellaneous ancillary hardware not explicitly specified in this SOW as required for a complete and fully operational system as specified within this

SOW.

2.2. The system shall be non-proprietary and shall be available through multiple distribution channels.

Systems/components that are commercially available equipment shall be accepted.

2.3. The contractor shall be responsible for coordinating all electrical work in conjunction with this SOW’s specifications including, but not limited to connection of servers, cameras, conduit, and power supplies. Any additional requirements for power supplies and additional pathway conduits/sleeves shall be installed.

2.4. CCTV: At a minimum, the following equipment shall be provided and installed in each locations identified including but not limited to:

2.4.1. Bulk Storage Area (See “Appendix A”)

- Nine (9) PTZ Network IR Camera (Dome, Outdoor Weather-proof) with 30x zoom lens.

- One (1) 19” color flat panel LCD monitors and One(1) 16ch NVR (Bldg #336)

- One (1) wall mounted 55” color flat panel monitor and One(1) CMS (Bldg #623)

- One (1) Wireless Data T/R for Remote Monitoring Station (Bldg #336 to Bldg #623)

- One (1) CMS and One(1) 16ch NVR, 18TB HDD (minimum, to be based on ‘site specific’ calculated storage requirement) network video recorder with built-in USB & DVD drive), rack mountable video surge protector; heavy duty surge protector/ Uninterruptable Power Supply (UPS) with 7-15 minutes minimum battery backup.

2.4.2. POL Area Throughout the Osan AB (See “Appendix B”)

- Seven (7) PTZ Network IR Camera (Dome, Outdoor Weather-proof) with 30x zoom lens.

- One (1) 55” color flat panel LCD monitors (Bldg #1223)

- One (1) workstation: One (1) 32ch NVR, 36TB HDD (minimum, to be based on ‘site specific’ calculated storage requirement) network video recorder with built-in USB & DVD drive), rack mountable video surge protector; heavy duty surge protector/ Uninterruptable Power Supply (UPS) with 7-15 minutes minimum battery backup.

ANNEX-A Material List (Bulk Storage Area)

ITEM DESCRIPTION MFR UNIT QUANTITY

2MP FHD 30X IR PTZ Dome Camera w/Bracket DV-HIS(IR30X) Divisys EA 9

16CH Network Video Recorder (NVR) DV-N16 Divisys EA 1

CMS Server CMS(S) Divisys EA 1

Switch Hub 24P SFP 100/1000 SFC4000A Soltek EA 1

Media Converter 100/1000mbps SFC2000SFP Soltek EA 9

Plugable T/R SPF-LXWAB Soltek EA 9

55" Monitor w/Wall MTD Bracket 55UJ7220 LG EA 1

19" Monitor, 4:3 Ratio LS19E45K Samsung EA 1

UPS 1500W 120VAC Tower type, UL listed SMX1500 APC Korea EA 9

UPS 2000W 120VAC Rack type, UL listed SMX2000RM2U APC Korea EA 1

PDU, Rack MTD 120VAC 8 Outlet PS115 OCC EA 1

Surge Protector, UL listed DTK-PVPIP DITEK EA 9

FDF 8P Wall MTD, UL listed ZDMB6B OCC EA 9

FDF 36P Rack MTD PRORTC2U-3ISM OCC EA 1

FOC, SM4C Conduit use SM4C-C Samsung Corning FT 9,650

CAT6 STP CAT6 STP4P Samsung Corning FT 9,100

OJC, SM SC-SC1M Ortronics EA 20

CAT6 Patch Cable 7', UL listed, Blue OR-SPC607 Ortronics EA 20

Enclosure, NEMA4X UL listed 800Wx600Dx1,000Hmm NEMA ENCL. EA 9

System Rack 22U 1200mm 22U Damac Korea EA 1

Steel Conduit, 3/4" 3/4" Rigid STL Seah FT 1,235

Inner Duct 4"/ 3-32mm Endocor FT 2,580

Operator for Sliding Gate, K/B, Rack Gear & Connector, Safety Beam, Button, Motor Base (STL) and ER Switch

1800KG

Locally Made:

Customized

Lot 1

Misc. Hardwares (Video Transmitter/Receiver, KVM Extension, RJ45 Jack, Circuit Breaker, Terminal, 110V Outlet GFCI, Grounding Bus Bar, Fittings, Service Cap, Warning Tape, Junction Box)

Lot 1

Note: See the attached block diagram for specific camera placement. The exact areas where the security cameras are to be installed shall be coordinated with Contracting Officer's Representative (COR) to ensure that blind spots are covered.

2.5. Removal and Disposition of Existing System(s): The contractor shall be responsible for the removal of roughly 16 each CCTV and components, inventory in writing and return to the COR.

2.6. Power Requirement. Prior to installation, the contractor shall coordinate with COR if it is necessary to verify the location of utilities at each building. All installed equipment shall operate on 110V.

2.6.1. Electrical Support. All conduit and materials furnished by the contractor shall be new, be UL listed, and meet National Electrical Manufacturers Association (NEMA) and National Electric Code (NEC) requirements.

Information for obtaining NEMA and NEC requirements can be found at http://www.nfpa.org respectively. Junction boxes, expansion joints, and conduit fittings shall be fabricated from a material similar to the connecting conduit.

These materials shall be supplied and installed by the contractor. Conduits shall be electrical metallic tubing (EMT) except for the following conditions:

2.6.1.1. Wiring— All wiring and cables shall be individually marked and identified. Wiring and cabling shall be routed through conduit to a pull box.

2.6.1.2. Materials – All conduit and materials furnished by the contractor shall be new, be UL listed, and meet NEMA and NEC requirements. Unless otherwise shown on the plans, junction boxes, expansion joints and conduit fittings shall be fabricated from a material similar to the connecting conduit. Rigid metal conduit (RMC) shall be

ANNEX-B Material List (POL Area Throughout the Osan AB)

ITEM DESCRIPTION MFR UNIT QUANTITY

2MP FHD 30X IR PTZ Dome Camera w/Bracket DV-HIS(IR30X) Divisys EA 7

32CH Network Video Recorder (NVR) DV-N32 Divisys EA 1

CMS Server CMS(S) Divisys EA 1

Switch Hub 24P SFP 100/1000 SFC4000A Soltek EA 1

Media Converter 100/1000mbps SFC2000SFP Soltek EA 7

Plugable T/R SPF-LXWAB Soltek EA 7

55" Monitor w/Wall MTD Bracket 55UJ7220 LG EA 1

UPS 1500W 120VAC Tower type, UL listed SMX1500 APC Korea EA 7

UPS 2000W 120VAC Rack type, UL listed SMX2000RM2U APC Korea EA 1

PDU, Rack MTD 120VAC 8 Outlet PS115 OCC EA 1

Surge Protector, UL listed DTK-PVPIP DITEK EA 7

FDF 8P Wall MTD, UL listed ZDMB6B OCC EA 7

FDF 36P Rack MTD PRORTC2U-3ISM OCC EA 1

FOC, SM4C Conduit use SM4C-C Samsung Corning FT 950

CAT6 STP CAT6 STP4P Samsung Corning FT 3,600

OJC, SM SC-SC1M Ortronics EA 24

CAT6 Patch Cable 7', UL listed, Blue OR-SPC607 Ortronics EA 24

Enclosure, NEMA4X UL listed 800Wx600Dx1,000Hmm NEMA ENCL. EA 12

System Rack 45U UL listed 2200mm 45U Damac Korea EA 1

Steel Conduit, 3/4" 3/4" Rigid STL Seah FT 600

OJC, SM (2m x1, 5m x6, 15m x 4, 20m x 1) Locally Bioptic EA 12

Operator for Sliding Gate 1800KG Locally Made:

Customized

Lot 2

Misc. Hardwares (KVM Extension, RJ45 Jack, Circuit Breaker, Terminal, 110V Outlet GFCI, Grounding Bus Bar, Fittings, Service Cap, Warning Tape, Junction Box)

Lot 1 steel, hot-dipped galvanized inside and outside. When tested in accordance with ASTM A90, zinc coating of rigid metal conduit shall be a minimum of 1.5 ounces per square foot inside and out. Electrical metallic tubing (EMT) and intermediate metal conduit (IMC) shall be steel, galvanized on the outside and protected on the inside with a suitable corrosion-resistant material. Fittings shall be rain-tight. Set screw and pressure cast fittings will not be permitted.

Steel compression fittings will be allowed.

2.6.1.3. Wire Installation/ The use of Cable Locating Devices - The contractor shall use existing conduit and cable infrastructures for wire/cables installation. If there are not adequate existing conduit sweeps which can be used to install the new conductor, contractor will be notified by COR to emplace the electronical conduit. Approval is required prior to initiation on of work, contractor shall use cable locating devices such as wall scanner to trace the line of electric cables. Contractor shall take extra care to ensure that the conduit is not crushed from the use of heavy equipment over the conduit. If the conduit is found to be damaged, the contractor shall replace the conduit at their own expense.

2.6.1.4. Flexible conduit shall be liquid-tight. Installation of conduit shall be in accordance with the requirements of the NEC. All conduit ends shall be reamed to remove burrs and sharp edges. Where conduit is threaded in the field, a standard conduit-cutting die with a 3/4 inch taper per foot shall be used. All conduit placed on structures shall be fastened with conduit straps or hangers. Conduit shall be fastened within three (3) feet of each box or fitting and all metal conduit clamps shall be of the galvanized malleable type. Clamps for two (2) inch diameter or larger conduit shall be of the two (2) hole type. All PVC conduit terminations shall be fitted with bushings or bell ends. All metal conduit terminations shall be fitted with a grounding type bushing except for conduit used for duct cable casing that does not terminate in a ground box. All conduit locations and pull boxes shall be marked on the Wiring Diagram.

2.6.1.5. Pull Boxes—Pull boxes shall be precast and the lid shall be flush with the adjacent surfaces. All pull box installations must include proper drainage.

2.6.2. Video and Sync Signal Transmission Line Surge Protection. All cable used for video signal transmission shall include protective devices to safeguard the CCTV equipment against surges. The surge suppression device shall not attenuate or reduce the video signal under normal conditions.

2.7. Transportation/Site Access & Security. The contractor shall be responsible for the transportation of personnel and the materials to the work site. Access to the site and material storage shall be coordinated with COR.

The contractor shall be responsible for the security and condition of any materials or equipment stored on site prior to government acceptance.

2.7.1. The contractor shall coordinate all activities, including but not limited to site preparation, system installations, and systems inspection and acceptance with the COR. The contractor may request access to the sites prior to scheduled installation to conduct site investigations or preparations by coordinating in advance with the COR. Any pre-installation site investigations requested by the contractor shall be conducted at no additional cost to the government and shall not delay the schedule of installations.

2.8. The contractor shall provide all necessary equipment, labor, and tools required to provide and repair/install of a sliding gate operating system. The contractor shall be responsible for providing and installing all miscellaneous ancillary hardware not explicitly specified in this SOW as required for a complete and fully operational system as specified within this SOW.

3. CCTV Installation Schedule. Installation shall begin no later than 20 calendar days after receipt of award in order to allow for material acquisition lead time and the receipt of installation passes by contractor personnel. The work shall be completed within twenty one (21) calendar days. Installation work shall occur from 09:00 to 17:00 hours daily, Monday thru Friday excluding U.S. and Korean holidays. Any work requests outside of these days and times must be approved in advance by the Contracting Officer through COR.

3.1. The contractor shall dispose of all scrap material and equipment and other construction debris in accordance with Federal, Host Nation, and Local laws and regulations.

3.2. Work shall be performed in accordance with the Corps of Engineers Safety Manual EM 385-1-1. Contractor shall comply with local life safety and fire codes. The corps of Engineers Safety Manual EM 385-1-1 web site:

http://140.194.76.129/publications/eng-manuals/ .

3.3. The contractor shall be fully responsible and liable for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on its part or that of its employees or subcontractors, which results in illness or death.

3.4. The contractor will provide all necessary safety equipment and ensure that such equipment and all relevant safety procedures are adequate for the job being performed and are utilized properly.

3.5. The contractor shall develop a site-specific safety plan. The plan will identify specific steps for the intended operations, list of hazards, and procedures to minimize or eliminate those hazards.

3.6. Work shall be performed in accordance with the Corps of Engineers Safety Manual EM 385-1-1. The contractor shall comply with local life safety and fire codes. The corps of Engineers Safety Manual EM 385-1-1 web site: http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManua ls/EM_385-1-1.pdf.

4. Warranty. The contractor shall provide for the repair or replacement of defective items discovered for a minimum of one (1) year after acceptance. The contractor shall warrant all workmanship and replacement parts and repairs (to include labor) for 2 years from the date of acceptance. Repairs made necessary by reason of misuse, alteration, normal wear, or excessive voltage are not covered under this warranty. The contractor shall furnish a point of contact (POC) to receive warranty repair work. POC shall be available and able to be contacted on a 24 hours basis 7 days week. The contractor shall provide a local telephone number where the contractor can be notified or contacted. Answering services and recordings are not sufficient for this purpose. The contractor shall provide repair service within 48 hours or less after receiving telephone or email notification. The contractor shall provide working equipment to replace defective items removed for warranty repair. Timely services must be provided. Standard service hours are from 08:00 AM to 5:00 PM, Monday through Friday, legal holidays excluded. In the event that an item is repaired or replaced under warranty, the contractor shall provide the item serial number and type of equipment repaired or replaced to the COR upon completion of work.

5. Inspection and Acceptance. Upon completion of installation for each building, the contractor shall conduct a Performance Verification Test (PVT) for each installed system with the COR, who will determine if each system is operational and complete IAW this SOW. The COR will accept each building upon completion of the PVT, delivery of the Technical Data Package, and Training.

5.1. Performance Verification Test: The Performance Verification Test will be conducted during final inspection and acceptance of each building. The COR will witness all performance verification testing. The contractor shall calibrate and test all equipment and verify operation. In addition, the contractor shall make a master video recording showing typical day and night views of each camera in the system and shall deliver the recording to the COR. The recording shall be made for each building’s system and shall be recorded using the video recorder installed as part of the CCTV system. Disks for recording will be supplied by the COR. The testing shall as a minimum include:

5.1.1. Verification that the video transmission system and any signal or control cabling have been installed, tested, and is functioning properly.

5.1.2. When the system includes remote control/monitoring stations or remote switch panels, verification that the remote devices are functional.

5.1.3. Verification that the switcher is fully functional and that the switcher software has been programmed as needed for the site configuration.

5.1.4. Verification that switcher software is functioning correctly. All software functions shall be exercised.

5.1.5. Verification that the video system is functioning correctly.

5.1.6. Operation of all electrical and mechanical switcher controls and verification that the control performs the designed function.

5.1.7. Verification that all video signals are terminated properly.

5.1.8. Verification that all cameras are aimed and focused properly. The contractor shall conduct a walk test of the area covered by each camera to verify the field of view.

5.1.9. Verification that cameras facing the direction of rising or setting sun are aimed sufficiently below the horizon so that the camera does not view the sun directly.

5.1.10. If vehicles are used in proximity of the assessment areas, verification of night assessment capabilities and determination if headlights cause blooming or picture degradation.

5.1.11. Verification that all cameras are synchronized and that the picture does not roll when cameras are switched.

5.1.12. When pan/tilt mounts are used in the system, verification that the limit stops have been set correctly.

5.1.13. Verification of all controls for pan/tilt or zoom mechanisms are operative and that the controls perform the desired function. If preposition controls are used, verification that all home positions have been set correctly, and have been tested for auto home function and correct home position.

5.1.14. When dome camera mounts are used in the system, verify that all preset positions are correct and that the dome also operates correctly in a manual control mode.

5.2. Material Submittals. Within three (3) calendar days of the receipt of contract, and prior to ordering or purchasing, the contractor shall provide a list of all cable and conduit types with material data to the COR for review and approval.

5.2.1. Technical Data Package. The contractor shall submit technical data package within seven (7) calendar days after the completion of each building work. A technical data package shall be given to the COR for each building upon completion of installation and final acceptance by the government. Each technical data package shall consist of the following:

5.2.1.1. System block diagram.

5.2.1.1.1 CCTV system console installation, block diagrams, and wiring diagrams.

5.2.1.1.2. Security center CCTV equipment installation, interconnection with console equipment, block diagrams and wiring diagrams.

5.2.1.1.3. Remote control/monitoring station installation, interconnection to security center including block diagrams and wiring diagrams.

5.2.1.1.4. Camera wiring and installation drawings.

5.2.1.1.5. Pan/tilt mount wiring and installation drawings.

5.2.1.1.6. Interconnection with video signal transmission system, block diagrams and wiring diagrams.

5.2.2. Manufacturers' Data: The data package shall include manufacturers' data for all materials and equipment and security center equipment provided under this contract. The data package shall consist of serial numbers of all equipment installed by building number and location.

6. Training:

6.1. The contractor shall provide two (2) training sessions consisting of a two (2) hour user and administrator training class to a maximum of five (5) students per training session. The training plan must be approved by the COR prior to execution of training. Training shall be conducted within ten (10) days of the final inspection.

6.2. Training sessions shall be provided to train personnel in all aspects of the operation and shall include corrective and preventive maintenance of the equipment. Instruction manual/material shall be provided by the contractor to allow operating personnel to train additional personnel at a later date. Each session shall include instructions utilizing “hands on”. At a minimum, training shall cover the following topics:

6.2.1. Reviewing, saving, and archiving video files.

6.2.2. Changing and selecting camera and multi-screen views.

6.2.3. General user and administrator functions on the CCTV system.

6.2.4. Remote network operations

6.2.5. Simulate a power outage and bring system back to full operation.

6.2.6. Operator level training that covers system configuration and general operating procedures.

6.2.7. System backup and recovery procedures.

6.2.8. Burning of CD’s, and backing up to USB flash drive for evidentiary purposes.

6.2.9. Technical support information and procedures.

6.2.10. Maintenance training for day to day maintenance of the system and basic repairs.

7. Payment. Partial delivery and payments are NOT authorized. The payment shall be made based upon the COR’s inspection and approval after the contractor’s completion of work by project site, to include the submission of required reports, performance verification test, training and the submission of technical data package.

8. Contractor Requirements

8.1. The contractor shall ensure that its personnel do not follow any contract performance instructions for addition/deletion of work from any Government employee other than the direction of the Contracting Officer. The Contracting Officer is the only person authorized to modify the contract terms or take any action to enter into a change or contractual commitment on behalf of the Government. The Government will not be responsible for any cost incurred for any additional work, which is not identified in the contract, contract specifications or on the contract drawings.

8.2. Personnel.

8.2.1. All contractor employees with an area of performance within an Army-controlled installation, facility, or area shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures, which will be provided by the COR. The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy.

8.2.2. The contractor shall ensure that its employees entering Army-controlled installations or facilities have obtained access badges and passes in accordance with facility regulations and that these badges and passes are obtained in advance so as not to delay the accomplishment of contracted services. The contractor shall submit applications for installations passes and vehicle decals to the COR three (3) working days after receipt of award for contract personnel requiring reoccurring access. The contractor shall return all issued U.S.