Text version
411TH CSB, KOREA - RCO OSAN
POC: MR. YI, CHAE YONG
011-82-31-661-8977
CHAEYONG.YI5.LN@MAIL.MIL
APO AP 96278-2039
KOREA (THE REPUBLIC OF)
F3J6SG8008AW01 WNHQ18-1102
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to clarify the Scope of Work (Yellow highlighted part).
1. CONTRACT ID CODE PAGE OF PAGES
1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jan-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W90VN6-18-R-0002
X 9B. DATED (SEE ITEM 11)
11-Jan-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jan-2018
CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO OSAN, UNIT #2039
APO AP 96278-2039
UNITED STATES OF AMERICA (THE)
W90VN6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W90VN6
FACILITY CODECODE
EMAIL:TEL:
W90VN6-18-R-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0002
The FOB Destination has been deleted.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
SPECIFICATIONS
FOR
WNHQ 18-1102
CONSTRUCT AGE MX AWNING
AT
SUWON AB, ROK
7TH AIR FORCE PROJECT DEVELOPMENT TEAM
TABLE OF CONTENTS
WNHQ 18-1102
CONSTRUCT AGE MX AWNING
SECTION NO. TITLE PAGE NO.
Technical Provisions – I STATEMENT OF WORKS Page 3 - 4 Technical Provisions – II SPECIAL INSTRUCTIONS Page 5 - 6
APPENDIX “A” List of Drawings Page 7
TECHNICAL PROVISIONS - I
STATEMENT OF WORK
CONSTRUCT AGE AWNING
1. DESCRIPTION: The work to be performed for completion of this project shall be as described in general below.
1.1. The contractor shall provide all labor, tools, equipment, supplies, and any other resources necessary to accomplish the scope of work contained herein and as included in the drawings and specifications.
1.2. All work shall be completed IAW drawings and specifications.
2. PRINCIPLE FEATURES: This project is construction and also includes the following principle features:
2.1. CIVIL WORK:
2.1.1. Demolish and remove existing asphalt pavement (Approx. 61 Cubic Meters (CM)).
2.1.2. Demolish and remove existing metal encased revetment (Approx. 51 CM).
2.1.3. Install Portland Cement Concrete footers and floor with strength of 3500 PSI (Approx. 61 Cubic Meters)
2.1.4. Install entrenched electrical conduit 24 inches (0.6 LM) deep between existing Aircraft Generating Equipment (AGE) Maintenance (MX) building (B2506) and the new awning (approx. 30 feet (9.1 LM) distance) with access points at both ends.
2.1.5. No drainage work should be required. Maintain intact existing drainage system.
2.2. ARCHITECTURAL WORK:
2.2.1. Install 2,000 square feet (185.8 SM) awning. Dimensions shall be 40 feet (12.19 LM) by 50 feet (15.24 LM).
2.2.1.1. Install steel I-beam columns into footers as shown on the drawings (12 EA).
2.2.1.2. Install steel I-beam support beams as shown on the drawings (14 EA).
2.2.1.3. Install cross-brace tension steel cables with turn-buckles on back (northwest side) as shown on the drawings (4 EA).
2.2.1.4. Install 16 gauge corrugated metal roof at a 1:13 slope, with the slope down towards the back (northwest side). Height of the roof shall be 10.5 feet (3.2 LM) at the lowest and
13.5 feet (4.1 LM) at the highest. Top side of roof shall be brown colored to match installation paint scheme.
2.2.1.5. Install all fasteners so as to ensure that awning is resistant to typical local wind loads and seismic activity.
2.3. ELECTRICAL WORK:
2.3.1. Install LED lighting under roof sufficient to meet illumination requirements (35 foot-candles) in section 3.9 of UFC 3-530-01 (link provided below).
2.3.2. Install outdoor-rated duplex receptacles attached to vertical columns (6 EA).
2.3.3. Install all wiring for the lights and duplex receptacles to connect with the sub-panel available in B2506 via the underground conduit referenced in section 2.1.4.
TECHNICAL PROVISIONS - II
SPECIAL INSTRUCTIONS
CONSTRUCT AGE MX AWNING
1. GENERAL: This project shall comply with the “Standard Technical Specifications and Standard Detail Drawings for OMA Projects, Korea” dated 30 November 2015 issued by the Department of the Army, Installation Management Agency, Korea Region Office. The most current specifications (OMA Specification 2014, Revision-1) and standard drawings are available at the CENM, Engineering
Flight, 51st Civil Engineer Squadron, Osan AB, Unit 2129, APO AP 96278-2129 and also are located on the Web Page http://www.usfk.mil/Resources/ContractingwithUSFK.aspx
2. OTHER APPLICABLE PARTICULAR SPECIFICATIONS OR GUIDES: The project shall comply with the UFC (Unified Facilities Criteria) 3-301-01 “Structural Engineering” latest version (http://www.wbdg.org/FFC/DOD/UFC/ufc_3_301_01_2013_c3.pdf ), and UFC 3-530-01 “Interior and Exterior Lighting Systems and Controls” latest version (http://www.wbdg.org/FFC/DOD/UFC/ufc_3_530_01_2015_c3.pdf ).
3. SPECIAL REQUIREMENTS:
3.1. Government provides 30% of concept design for the contract and contractor shall accomplish and submit “Design Data” with the rest of 70% design (MATOC WORK PLAN). Following conceptual design documents shall be submitted for technical evaluation with the proposal.
3.1.1. Design Data to be submitted
3.1.1.1. Required Drawings
i. Civil:
- Pavement and trenching details
ii. Architecture:
- Building Elevation
- Details of structural members
- All dimension matching with the actual site condition shall be clearly shown on the required drawing submitted by offerors.
Accordingly, taking part in the site visit orientation is strongly recommended.
iii. Electrical:
- The location of LED lights and receptacles.
- Indicate the removal and reinstall plan for wiring devices/lightings.
- Provided the product data for LED lights.
3.1.1.2. Offer Breakdown
3.1.1.3. Drawing submission milestone after contract award
- Pre-design meeting: within 5 days after award
- 30% design drawing package submittal: within 10 days after award
- 60% design drawing package submittal: within 15 days after award
- 90% design drawing package submittal: within 20 days after award
- 100% design drawing package submittal: within 25 days after award
- Final drawing package submittal: within 30 days after completion
(Note) Ownership of Construction Drawings: The Government shall take full ownership of the drawings submitted with the proposal and after contract award.
3.2. The contractor shall restore all improvements, damaged or removed as a result of construction to its original or better condition, unless otherwise noted.
3.3. The contractor shall be responsible for verifying the location, size and inverts of all existing utilities and shall protect all such utilities at all times, unless otherwise indicated. Existing utilities whether shown on the drawings or not which have been damaged as a result of the construction work, shall be restored immediately to their original or better condition and shall be paid for by the contractor.
3.4. Performance of Period (PoP) for this project is 90 days after the Notice to Proceed (NTP). This PoP includes base pass, contractor’s mobilization, off-shore/local material procurement lead time, and submittals for government approval.
3.5. Site Orientation will be strongly recommended. The contractor acknowledges that it has taken steps necessary to ascertain the nature and location of the works, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost IAW FAR 52.236-3.
3. SECURITY REQUIRMENTS:
3.1 Contractor’s personnel or any representative of the contractor entering installation/base shall abide by all security regulations imposed by Installation Commander or Base Commander at all times and shall be subject to security checks.
Contractor’s personnel and property shall be subject to search and seizure upon entering the confines of the installation/base, while on, and upon leaving confines of the installation/base.
3.2 Escort Privileges: The contractor shall be responsible for adhering to the escorting privileges on base passes for the Program Manager, Contract Manager (CM), CQC System Manager, SSHO with a limitation of three (3) persons and one (1) vehicle access per base pass. It is the contractor’s responsibility to ensure that the escorting official has full control over all escorted individuals at all times. Any individual found on the installations unescorted will be removed from the installation or base and the escort officials escorting privileges will be immediately withdrawn. Any individual removed from these installations/bases will not be authorized further access to these installations/bases and may further be subject to other Government actions.
3.3 Return Post/Base Passes: On the contract completion date, the contractor shall turnin all passes to the sponsor that were issued for the contract and final payment will not be made until such items are returned.
APPENDIX “A”
LIST OF DRAWINGS
WNHQ 18-1102
CONSTRUCT AGE MX AWNING
SUWON AB, ROK
1. GENERAL: The work shall refer to the following as-built drawings, all of which form a part of the specifications. Additional sets will be furnished to the contractor per request. Drawings are available at the 7 Air Force Staff, Osan AB.
DWG NO. SHT NO. REF NO. DESCRIPTION
SITE PLAN
2 OF 3 ARCHITECTURAL PLAN (Side View)
3 OF 3 ARCHITECTURAL PLAN (Front View)
SECTION E - INSPECTION AND ACCEPTANCE
The Acceptance/Inspection Schedule for CLIN 0002 has been changed from:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government