W90VN6-17-R-0031.pdf
PDF 521 KB Posted
- Attached to
- Cleaning service of kitchen exhaust system
- Solicitation number
- W90VN617R0031
About this file
This is a Request for Proposal for Kitchen Exhaust System Cleaning Services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A21_W90VN6-17-R-0031-0001.pdf | ||
| Kitchin_Exhaust_System_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W90VN6-17-R-0031 26-Jun-2017
b. TELEPHONE NUMBER
(031) 661-5893
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 17 Jul 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W90VN69. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
SFC YANG, YE
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
F3J3CE7104A001
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO OSAN, UNIT #2039
APO AP 96278-2039
UNITED STATES OF AMERICA (THE)
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE F3J3CE 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
51 CES
CHONG CHONG HUI
UNIT #2129, BLDG#600
APO AP 96278-2129
UNITED STATES OF AMERICA (THE)
TEL: 784-6644 FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$7,500,000
NAICS:
562998
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF88
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W90VN6-17-R-0031
Section A - Solicitation/Contract Form
GENERAL INFORMATION
GENERAL INFORMATION
All sources may submit a proposal or quote as applicable. However, the Republic of Korea (ROK)-United States (U.S.) Status of Forces Agreement (SOFA) does not permit the U.S. Government to grant Invited Contractor or Technical Representative Status to any offeror for this requirement. All sources submitting a proposal or quote, as applicable, including U.S. source, must already have, or obtain the requisite business licenses directly from the ROK Government, and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any contractor not already doing business in Korea must submit adequate verification in its initial proposal or quote that it has the requisite business licenses directly from the ROK Government to perform the contract and the capacity to conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. If the initial proposal does not fully demonstrate this authorization and capacity, it will not be further considered for award.
Whether an offeror demonstrates this authorization and capacity shall be determined by the Contracting Officer.
Proposed price shall be provided by local currency (Korean Won).
Offerors are required to submit complete proposals through Federal Business Opportunities (https://www.fbo.gov) by 02:00 PM on 21 Jul 2017 (Local Korea Time) as indicated in Block #8 of the solicitation or 00:00 AM on 21 Jul 2017 (Eastern Day-Light Time/EDT) of the Request for Proposal (RFP). All questions should be emailed to the Contract Specialist at ye.yang.mil@mail.mil and pyongha.hwang.ln@mail.mil or Contracting Officer at christopher.l.crouch.civ@mail.mil within 5 calendar days after the solicitation is issued. Questions received after this date and time may not be answered.
PERFORMANCE OF PERIOD
Base Year: 13 September 2017 – 12 September 2018 Option Year 1: 13 September 2018 – 12 September 2019 Option Year 2: 13 September 2019 – 12 September 2020 Option Year 3: 13 September 2020 – 12 September 2021 Option Year 4: 13 September 2021 – 12 September 2022
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 267,968 Square
Foot
Dining Facility - Grease and Oil Removal
FFP
Cleaning Service of Kitchen Exhaust System at dining facilities based on schedule by monthly at Osan Air Base. Removal of Grease and Oily Sludge from hoods up to fans of Dining Facility IAW PWS.
Base Year: 13 September 2017 to 12 September 2018.
FOB: Destination
PURCHASE REQUEST NUMBER: F3J3CE7104A001
NET AMT
0002 1 Job
CONTRACTOR MANPOWER REPORTING (CMR)
FFP
CMR Requirement must be reported by 31 October of each calendar year during the life of the contract. See the paragraph 5.6 of PWS for CMR requirements.
Base Year: 13 September 2017 to 12 September 2018.
ESTIMATED COST FOR WAR HAZARD
FFP
Estimated cost for war hazard losses is zero (0).
Base Year: 13 September 2017 to 12 September 2018.
1001 267,968 Square
OPTION Dining Facility - Grease and Oil Removal
Cleaning Service of Kitchen Exhaust System at dining facilities based on schedule by monthly at Osan Air Base. Removal of Grease and Oily Sludge from hoods up to fans of Dining Facility IAW PWS.
Option Year 1: 13 September 2018 to 12 September 2019.
1002 1 Job
OPTION CONTRACTOR MANPOWER REPORTING (CMR)
FFP
CMR Requirement must be reported by 31 October of each calendar year during the life of the contract. See the paragraph 5.6 of PWS for CMR requirements.
Option Year 1: 13 September 2018 to 12 September 2019.
OPTION ESTIMATED COST FOR WAR HAZARD
FFP
Estimated cost for war hazard losses is zero (0).
Option Year 1: 13 September 2018 to 12 September 2019.
2001 267,968 Square
Cleaning Service of Kitchen Exhaust System at dining facilities based on schedule by monthly at Osan Air Base. Removal of Grease and Oily Sludge from hoods up to fans of Dining Facility IAW PWS.
Option Year 2: 13 September 2019 to 12 September 2020
2002 1 Job
OPTION CONTRACTOR MANPOWER REPORTING (CMR)
FFP
CMR Requirement must be reported by 31 October of each calendar year during the life of the contract. See the paragraph 5.6 of PWS for CMR requirements.
Option Year 2: 13 September 2019 to 12 September 2020
OPTION ESTIMATED COST FOR WAR HAZARD
FFP
Estimated cost for war hazard losses is zero (0).
Option Year 2: 13 September 2019 to 12 September 2020
3001 267,968 Square
OPTION Dinig Facility - Grease and Oil Removal
Cleaning Service of Kitchen Exhaust System at dining facilities based on schedule by monthly at Osan Air Base. Removal of Grease and Oily Sludge from hoods up to fans of Dining Facility IAW PWS.
Option Year 3: 13 September 2020 to 12 September 2021.
3002 1 Job
OPTION CONTRACTOR MANPOWER REPORTING (CMR)
FFP
CMR Requirement must be reported by 31 October of each calendar year during the life of the contract. See the paragraph 5.6 of PWS for CMR requirements.
Option Year 3: 13 September 2020 to 12 September 2021.
OPTION ESTIMATED COST FOR WAR HAZARD
FFP
Estimated cost for war hazard losses is zero (0).
Option Year 3: 13 September 2020 to 12 September 2021.
4001 267,968 Square
Cleaning Service of Kitchen Exhaust System at dining facilities based on schedule by monthly at Osan Air Base. Removal of Grease and Oily Sludge from hoods up to fans of Dining Facility IAW PWS.
Option Year 4: 13 September 2021 to 12 September 2022.
4002 1 Job
OPTION CONTRACTOR MANPOWER REPORTING (CMR)
FFP
CMR Requirement must be reported by 31 October of each calendar year during the life of the contract. See the paragraph 5.6 of PWS for CMR requirements.
Option Year 4: 13 September 2021 to 12 September 2022.
OPTION ESTIMATED COST FOR WAR HAZARD
FFP
Estimated cost for war hazard losses is zero (0).
Option Year 4: 13 September 2021 to 12 September 2022.
Section C - Descriptions and Specifications
PWS
PERFORMANCE WORK STATEMENT (PWS)
CLEANING SERVICE OF KITCHEN EXHAUST SYSTEM IN OSAN AB
1.0. GENERAL: This is a non-personal services contract to provide Cleaning Service of Kitchen Exhaust System at Osan Air Base. The Government reserves the right to add or delete number of buildings during the life of the contract. This will affect the overall square footage to perform this requirement. The Contract will be adjusted accordingly for any increase or decrease to square footage.
1.1. Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Cleaning Service of Kitchen exhaust system as defined in this Performance Work Statement (PWS) except for those items specified as Government Furnished Property and services. The Contractor shall perform to the standards in this contract.
1.2. Background: The cleaning service of kitchen exhaust system services is required to prevent from fire caused by oil grease IAW AR 420-1, Chapter 23, Para 23-60.
1.3. Objectives: The objective of this contract is to clean the internal component of kitchen exhaust system at Osan AB thoroughly as an action of fire prevention.
1.4. Scope: The Contractor shall provide all personnel, management, supervision, tools, equipment, materials, transportation, and other items and services necessary to clean kitchen exhaust system at Osan AB in accordance with this PWS, applicable local laws, regulations, codes, technical manuals, manufacturer's instructions and recommendations, and acceptable commercial practices in the delivery of required services. During the life of the contract, buildings may be added/deleted due to new buildings being built and old buildings being demolished. This will affect the overall square footage for performance. The contract will be adjusted accordingly for any increase or decrease to square footage.
1.5. Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and four (4) 12 month option years. The Period of Performance reads as follows:
Base Year: 13 September 2017 – 12 September 2018 Option Year 1: 13 September 2018 – 12 September 2019 Option Year 2: 13 September 2019 – 12 September 2020 Option Year 3: 13 September 2020 – 12 September 2021 Option Year 4: 13 September 2021 – 12 September 2022
1.6. General Information:
1.6.1. ROK Legal Holidays: The Contractor is not required to perform cleaning service of kitchen exhaust system at Osan AB on ROK Legal Holiday and National Temporary Holiday except emergency service.
New Year’s Day (01 Jan) Lunar New Year's Day (31 Dec, 1&2 Jan on Lunar Calendar) Independence Movement Day (01 Mar) Labor Day (01 May) Children's Day (05 May) Buddha's Birthday (8 April on the Lunar Calendar) Memorial Day (06 June) Liberation Day (15 Aug)
Chu-Suk (14, l5 and 16 Aug on the Lunar Calendar) National Foundation Day (03 Oct) Hangul Day (09 Oct) Christmas Day (25 Dec)
1.6.2. Hours of Operation: The Contractor is responsible to provide cleaning service kitchen Exhaust systems at various locations base-wide of Osan AB during the hours when the facility is not in operation from 0000hrs and 2400hrs, Monday through Sunday except ROK legal holidays. However, working on Saturday and Sunday shall only be done upon written approval from the COR. The Contractor shall submit the request for approval of the KO or COR NLT ten (10) working days prior to the working date.
1.6.3. Place of Performance: The work to be performed under this contract will be performed at various facilities of Osan AB indicated in ATTACHMENTS #1. During the life of the contract, buildings may be added/deleted due to new buildings being built and old buildings being demolished.
1.6.4. Quality Control Program (QCP): The Contractor shall develop and maintain an effective QCP to ensure services are performed in accordance with (IAW) this PWS. The QCP shall be forwarded to and accepted by the COR. Upon accepted by the COR, the COR will forward a copy of QCP to KO for file. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of deficiencies. The Contractor’s QCP is the means by which the Contractor assures that the work complies with the requirement of the contract. An electronic copy of a comprehensive written QCP shall be submitted to the COR within 14 calendar days after contract award.
1.6.4.1. The QCP shall include but is not limited to the following:
1.6.4.1.1. Inspection System. The Contractor shall maintain an inspection system that covers all tasks in the contract.
The quality control plan shall specify areas to be inspected by the trained and qualified person(s) and shall address procedures to identify and prevent defective services from re-occurring.
1.6.4.1.2. Method of Identification of Deficiencies. A method of identifying deficiencies in the quality of services performed before the level of performance becomes unacceptable. The Contractor immediately shall correct all deficiencies, whether reported by the Government or discovered by the Contractor, and perform tasks to meet the standards of this contract.
1.6.4.1.3. Quality Control Inspection File. The Contractor shall maintain a centralized file of all inspections was conducted by the Contractor and the actions taken to correct deficiencies. This documentation shall be made available to the Government throughout the term of the contract. The Contractor shall collect data, perform self-evaluation, and document performance against standards associated with each specific requirement. The Contractor shall address all tasks in the PWS based on the example below:
Objective (contract requirement) Performance
Standard Acceptable Quality
Level (AQL) or Performance
Threshold
What/Data Source Calculation
This information comes from the
PWS
This information comes from the
PWS
This information comes from the
PWS
Contractor shall submit
Contractor shall submit
1.6.5. Quality Assurance: The Government shall evaluate the Contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.6. Type of Contract: The Government will award a Firm Fixed Price (FFP) Contract.
1.6.7. Safety Requirement: The general safety requirement of EM 385-1-1 with applicable attachments, figures, and tables shall be complied with in all Contractor activities pertaining to this contract.
2. 1.6.7.1. The Contractor is responsible for ensuring that all work performed under this contract is accomplished in a safe and proper manner as defined in the PWS.
3.
4. 1.6.7.2. All Contractor employees shall be instructed on accident prevention and safety. Special emphasis shall be placed on the safe operation of equipment. Training shall be conducted for all employees by the Contractor on appropriate safety measures and on the employee’s obligation to obey all existing installation safety regulations.
1.6.7.3. The safety plan shall explain procedures to ensure all employees familiarize themselves with the safety requirements of the contract before commencement of work. The Contractor shall insure that safety precautions are taken during the performance of this contract to protect the lives of Contractor personnel, the property of the U.S.
Government and the Republic of Korea, as well as the private individuals and firms who may be exposed to or be endangered by the Contractor’s actions. The Contractor shall provide a written safety plan with policies, procedures and safety checklist within 14 calendar days after contract award. The program shall comply with the Korean Occupational Safety and Health Act (KOSHA). The Contractor agrees to comply with its written program for the life of the contract. Any changes or modification to its safety program shall be submitted to the Contracting Officer or his/her duly authorized representative for coordination and review.
1.6.7.3.1. Risk Management Process: The safety plan shall include detailed job related hazards and controls measures and an Activity Hazard Analysis (AHA) for each work activity. The AHA shall include at a minimum the name of the activity/job, the job steps, the job hazards, the tools or equipment required to perform the job, control measures to eliminate or reduce the hazard(s), and a Risk Assessment Code (Risk Contractor shall assure that the safety control measures are implemented. The Contractor may use the sample AHA forms in http://www.usace.army.mil/SafetyandOccupationalHealth/ActivityHazard Analysis.aspx or develop their own.
1.6.7.3.2. Accident Investigations, Reports, and Logs: The safety plan shall include a copy of the Contractor’s accident investigation reporting format, and logs. Report all accidents as soon as possible but not more than four (4) hours of accident occurrence to the COR. The Contractor shall thoroughly investigate the accident and submit the findings of the investigation along with appropriate corrective actions to the COR in the accident investigation reporting format as soon as possible but no later than five (5) workings following the accident. The Contractor shall implement corrective actions as soon as reasonably possible. The accident investigation reporting format shall include at a minimum:
‐ Contract Number and Contract Name/Description ‐ Name of Contractor ‐ Date/Time of accident ‐ Date report was completed ‐ Detail description of events that lead to the accident ‐ Root cause of accident ‐ Contributing factors of accident ‐ Corrective action(s) to prevent recurrence ‐ Specific dates when the corrective actions will be implemented
1.6.7.3.3. The following require immediate accident notification and written accident report:
‐ A fatality;
‐ A permanent total or permanent partial disability;
‐ The hospitalization of three (3) or more people resulting from a single occurrence;
‐ Property damage of $200.00 or more.
1.6.8. Security Requirement: The Contractor’s personnel or any representative of the Contractor entering Osan AB shall abide by all security regulations imposed by the local installation commander at all times and shall be subject to security checks. The Contractor’s personnel and property shall be subject to search and seizure upon entering the confines of above installations, while on, and upon leaving the confines of above installations.
1.6.9. Environmental Concern: The Contractor shall be knowledgeable of and comply with all applicable USFK and local laws, regulations, and requirements regarding environmental protection. In the event environment laws or regulations change during the term of this contract, the Contractor is required to comply as such laws come into effect.
If there is an increase or decrease in cost as a result of the change, the Contractor shall inform the KO pursuant to notice requirements and negotiate a modification to the contract.
1.6.9.1. The Contractor shall transport and dispose of all trash, wastes, and rags which are contaminated with grease, oily lint, and sludge generated from cleaning the exhaust systems in accordance with ROK environment laws. Waste shall not be disposed of on the installation. Any waste shall not be disposed on the installation.
1.6.9.2. The Contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness, and materials handling. This includes hazardous materials.
1.6.10. Contractor Qualifications: The Contractor shall maintain all required ROK licenses and qualifications for kitchen exhaust system cleaning service within the PWS of this contact.
1.6.10.1. Licensing and Certification: The Prime Contractor shall possess (i) the required business registration
(사업자 등록증), (ii) a valid Hygiene management permission license under Management of Public Health Act
(공중위생영업 중 위생관리 용역업 신고증) issued by the Republic of Korea (ROK) Government, and (iii) a valid
Annual Hygiene Training Certificate (정기 위생교육필증) issued by Korean Facility Hygiene Management
Association (한국건물위생관리협회) in CY16 to provide cleaning service for kitchen exhaust system at dining facilities. These licensing and certification shall maintain throughout the life of contract, and a copy of it shall be submitted to the Contracting Officer as a part of technical proposal. This certificate shall be renewed every year and a copy of certification shall be provided to the COR.
1.6.10.2. Experience: The Prime Contractor shall have a minimum two (2) years of experience within the last five
(5) years in kitchen exhaust system cleaning service. The experience of a subcontractor cannot be substituted for the prime contractor’s experience. The offerors(s) shall provide evidence of relevant past experience as required below:
- Title of the contract/Project
- A brief description of work completed
- Amount of Contract
- Length of contract/Project (year/month/date – year/month/date)
- Complete name of point of contact at Client Organization
1.6.10.3. Personnel Requirement:
1.6.10.3.1. The Contractor shall be responsible for determining the composition and size of work force required to perform the specific requirements as specified in paragraph 5, Specific Tasks. It is the Contractor’s responsibility to assure, for itself, that employee qualifications are accurate and that the person(s) can perform adequately under this contract.
1.6.10.3.2. Contract Manager (CM). The Contractor shall provide a qualified CM who shall be responsible for the overall performance of the work and has the authority to make on-site decisions on behalf of the Contractor on contract matters. When the CM is not available, the Contractor shall ensure a substitute who is fully qualified. The Contractor shall provide CM’s resume to the Contracting Officer as a part of technical proposal.
1.6.10.3.2.1. The CM shall have at least two (2) years of satisfactory experience as a CM within the last five (5) years in kitchen exhaust system cleaning Service.
1.6.10.3.2.2. The CM shall instruct and train Contractor’s personnel in proper and specific work methods in performing services required in the PWS. CM shall direct schedule and coordinate all services and functions to completely accomplish the work as required by this contract.
1.6.10.3.2.3. The CM's Language Requirements: Personnel working on this contract shall have the ability at an intermediate level of daily conversing in, being understood and understand English as exemplified in their written and verbal skills in their functional duties in the performance of services as required by this contract. If the Government, at its sole discretion, determines that the language skills of a Contractor employee does not meet the language proficiency skills required of the position, the Government reserves the right to require the Contractor to provide a new Contract employee that does possess the required language proficiency skills required of the position, at no additional cost to the Government.
1.6.10.4. Base Passes and Escorts:
1.6.10.4.1. Base Pass: A list of personnel and equipment shall be submitted to the COR for Base Pass and Vehicle Permit processing within three (3) days after contract award. The Contractor shall obtain all passes and necessary vehicle permits required for entry by authorized Contractor personnel within 30 days of contract award. All Contractor’s employees and representatives shall have in their possession a Korean Citizen Identification Card during performance under this contract.
1.6.10.4.2. The Contractor shall ensure that employees have a current and valid driver’s license before allowing the employee to operate a Contractor‐owned vehicle on the base. The Contractor and its employees shall comply with all security requirements imposed by the local installation commander at all times while on the military installation. Any Contractor traffic violations may result in the denial of driving privileges on the installations. A copy of all licenses shall be provided to the COR within three (3) days after contract award.
1.6.10.4.3. All Contractor employees shall abide by all Government installation regulations during performance under this contract.
1.6.10.4.4. The COR will be responsible for providing escorts for the Contractor until base passes are complete.
1.6.10.4.5. The Contractor will be authorized escort privileges only for people working under this contract and only during hours stated under this contract.
1.6.11. Contracting Officer’s Representative (COR): Use of the COR Management System Tool (CORT Tool which is located inside Wide Area Work Flow (WAWF) https://wawf.eb.mil) for nomination, tracking, documentation, and management of CORs. The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: Assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.12. Identification of Contractor Employees:
1.6.12.1. The Contractor personnel shall be easily recognized. This may be accomplished by wearing appropriate uniforms or displaying identification badges that contain the company name and employee’s name. Such uniforms or badges shall be furnished and controlled by the contractor. All of the contractor’s employees shall be required to wear uniforms or display identification badges at all times during the performance of work under this contract.
1.6.12.2. The Government has the right to restrict the employment of any contractor employee, or prospective contractor employee, who is identified as a potential threat to the health, safety, or security to the installation and its population under this contract.
1.6.13. Antiterrorism (AT) and Operations Security (OPSEC):
1.6.13.1. AT Level I Training: This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility, or area. All contractor employees to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within 14 calendar days after contract award and within 14 calendar days of new employees commencing performance with the results reported to the COR NLT 15 calendar days after completing the training.
The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the KO.
1.6.13.2. Access and General Protection/Security Policy and Procedures: This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility, or area.
Contractor and all associated sub-contractors’ employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshall Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.6.13.3. AT Awareness Training for Contractor Personnel Traveling Overseas: This standard language text required US based contractor employees and associated sub-contractor employees to make available and to receive government provided area of responsibility (AOR) specific AT awareness training as directed by AR 525-13.
Specific AOR training content is directed by the combatant commander with the unit Anti-Terrorism Officer (ATO) being the local point of contact.
1.6.13.4. iWATCH Training: This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 14 calendar days of contract award and within 14 calendar days of new employees commencing performance with the results reported to the COR NLT 15 calendar days after completing the training.
1.6.13.5. For Contracts that Require an OPSEC Standing Operating Procedure (SOP)/Plan: The contractor shall develop an OPSEC SOP/Plan within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer, per AR 530-1, Operations Security. This SOP/Plan will include the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. In addition, the contractor shall identify an individual who will be an OPSEC Coordinator. The contractor shall ensure this individual becomes OPSEC Level II certified per AR 530-1.
1.6.13.6 For Contracts that Require OPSEC Training: Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of their reporting for duty. All contractor employees must complete annual OPSEC awareness training.
1.6.13.7 For Contractors Requiring Performance or Delivery in a Foreign Country, DFARS Clause 252.225-7043, Antiterrorism/Force Protection for Defense Contractors Outside the US: The clause shall be used in solicitations and contracts that require performance or delivery in a foreign country. This clause applies to both contingencies and non-contingency support. The key AT requirement is for non-local national contractor personnel to comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor’s compliance with combatant commander and subordinate task force commander policies and directives
1.6.14. Emergency Services:
1.6.14.1. The Contractor shall have competent personnel trained and capable of dealing with minor personnel injuries. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall, in turn, notify the KO or COR within 30 minutes of the incident.
1.6.14.2. Emergency medical treatment and services for Contractor personnel is the responsibility of the Contractor.
1.6.15. Base Passes. It shall be the contractor’s responsibility to arrange for base passes and necessary vehicle permits required for entry onto this installation prior to performing any work under this contract. The COR will not be responsible for providing escorts for the contractor.
1.6.16. Conduct and Appearance.
1.6.16.1. The contractor shall ensure that the conduct of his employees shall not in any way be discourteous and shall present themselves in a professional appearance at all times. The conduct and appearance of contractor employees shall not reflect discred it upon this installation or upon the Department of the Army (DA).
1.6.16.2. All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the Government reservation, shall abide by all the regulations of the installation which may be in effect during the contract period and as may be deemed necessary to ensure that no violations that no violations occur.
1.6.17. Phase-In/Phase-Out: If there is a change in Contractor, the outgoing Contractor shall provide familiarization to the follow-on Contractor for a period of up to 30 days. During this period, the outgoing Contractor remains responsible for the successful performance of this contract. In the event, the following contract is awarded to other than the incumbent, the incumbent will cooperate to the extent required to permit an orderly change over to the successive Contractor. The incoming Contractor shall complete and submit base pass applications to the COR no later than three (3) days after receipt of order (14 days total from phase-in period start).
2.0. DEFINITIONS AND ACRONYMS:
2.1.1. Acceptable Quality Level (AQL): The AQL is the maximum percent defective (or the number of defects per hundred units) that, for purposes of sampling inspection can be considered satisfactory.
2.1.2. Cleaning: Removing grease, stains, soil, and dirt. May be accomplished by chemical or mechanical means.
2.1.3. Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government.
The term used in this contract refers to the prime.
2.1.4. Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.5. Contracting Officer’s Representative (COR): An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.6. Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.7. Deliverable: Anything that can be physically or electronically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.8. Equipment: A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale, and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, special test equipment or special tooling.
2.1.9. Government Furnished Property: Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
2.1.10. Government Property: All property owned or leased by the Government. Government property includes both Government-furnished property and contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
2.1.11. Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal. The prime contractor is responsible for performance of all subcontractors.
2.1.12. Loss of Government Property: Unintended, unforeseen or accidental loss, damage, or destruction of Government property that reduces the Government’s expected economic benefits of the property. Loss of Government property does not include occurrences such as purposeful destructive testing, obsolescence, normal wear and tear, or manufacturing defects. Loss of Government property includes, but is not limited to:
(1) Items that cannot be found after a reasonable search;
(2) Theft:
(3) Damage resulting in unexpected harm to property requiring repair to restore the item to usable condition;
or
(4) Destruction resulting from incidents that render the item useless for its intended purpose or beyond economical repair.
2.1.13. Performance Requirements Summary: Identifies the key service outputs of the contract that will be evaluated by the Government to assure contract performance standards are met by the Contractor.
2.1.14. Physical Security: Actions that prevent the loss or damage of Government property.
2.1.15. Property: All tangible property, both real and personal.
2.1.16. Provide: To furnish, as in Government-furnished property, or to acquire, as in contractor-acquired property
2.1.17. Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.18. Quality Assurance Surveillance Plan: An organized document written by the government specifying the surveillance methodology used for surveillance of contractor performance.
2.1.19. Quality Control: All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.20. Real Property: See Federal Management Regulation 102-71.20 (41 CFR 102-71.20).
2.1.21. Sensitive Property: Property potentially dangerous to the public safety or security if stolen, lost, or misplaced, or that shall be subject to exceptional physical security, protection, control, and accountability. Examples include weapons, ammunition, explosives, controlled substances, radioactive materials, hazardous materials or wastes, or precious metals.
2.1.22. Wide Area Work Flow (WAWF): A secure web based system for electronic invoicing, receipt, and acceptance. WAWF allows government vendors to submit and track invoices and receipt/acceptance documents over the web and allows government personnel to process those invoices in a real-time, paperless environment.
2.1.23. Work Day: The number of hours per day the Contractor provides services in accordance with the contract.
2.2. Acronyms:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CAP Contractor Acquired Property CDC Child Development Center CFR Code of Federal Regulations CM Contract Manager COR Contracting Officer Representative DA Department of the Army DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense DPW Directorate of Public Works FAR Federal Acquisition Regulation GFP Government-Furnished Property KO Contracting Officer PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program WAWF Wide Area Work Flow
6. 3.0. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Facilities: The Government will not provide any facilities for Cleaning of Food Service Exhaust Fans and Duct.
3.2. Utilities: The Government will provide all utilities in the facility will be available for the contractor’s use in performance of tasks outlined in this PWS. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
7. 4.0. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1. General: The Contractor shall furnish all supplies, equipment, and services required to perform work under this contract that are not listed under Paragraph 3 of this PWS.
4.2. The Contractor shall submit Material Safety Data Sheet (MSDS) of cleaning chemicals to a COR for approval after 14 calendar days of the contract awarded.
8. 5.0. SPECIFIC TASKS:
5.1. Requirements: The Contractor shall clean the kitchen exhaust system in accordance with Paragraph 11.4 of National Fire Protection Association 96 (NFPA 96 Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations), 51st Fighter Wing Instruction, 32-2001(2013) and Air Force Instruction 91- 203(2012). These instructions and regulations are attached as ATTATCHMENT #2, 3, 4. The Contractor shall clean from the hood up to the exhaust fan on the roof.
5.1.1. Prior to starting any cleaning operations, the Contractor shall be responsible to cover all surfaces below any hood or duct with a suitable material to protect these surfaces from the cleaning operations. These surfaces may include grills, deep fat fryers, ovens, counter surfaces, and etc. All appliances, furniture, etc. shall be covered by vinyl covering for protection during cleaning operations.
5.1.2. The Contractor shall clean the kitchen exhaust system by removing all foreign materials such as dirt and grease. Grease removal devices, fans, ducts and other appurtenances shall be cleaned to bare metal at frequent intervals (See Attachment #1-Building List with drawing).
5.1.3. The Contractor shall clean the complete exhaust fan assembly parts including the structural frame assemblies, housing, fan blades, shafts, braces, louvers and all other apparatus thereto, except motor interiors.
5.1.4. At the start of the cleaning process, the Contractor shall lock-out and tag-out the electrical switches that could be activated accidentally shall be locked out. Appropriate safety measures shall be taken to ensure that fans will not accidentally start while ventilation and exhaust systems are being cleaned.
5.1.5. The Contractor shall not render inoperable components of the fire suppression system during the cleaning process.
5.1.6. Fire-extinguishing systems shall be permitted to be rendered inoperable during the cleaning process where serviced by properly trained and qualified persons.
5.1.7. The Contractor shall not use flammable solvents or other flammable cleaning aids.
5.1.8. The Contractor shall not apply cleaning chemicals on fusible links or other detection devices or the automatic extinguishing system.
5.1.9. After the exhaust system is cleaned, the Contractor shall not coat it with powder or other substance.
5.1.10. The Contractor may use steam cleaning process or commercially acceptable method to clean the kitchen hoods, ducts and fans.
5.1.11. The Contractor shall submit pictures which show cleaning status before and after cleaning prior to payment request.
5.1.12. Fire Prevention Inspection. The contractor shall make contact with 51 CES/CEF (Fire Department Alarm Room), at 784-4710, immediately upon arrival and/or before performing kitchen exhaust systems cleaning.
Remained on scene for a maximum of 60 minutes until 51 CES/CEF personnel arrive on scene to inspect kitchen exhaust systems after performing cleaning services. After the cleaning is completed and the Fire Department has performed a fire prevention inspection, the contractor shall re-install all materials, equipment and furnishings to their original locations. The contractor shall provide assistance to 51 CES/CEF by any means necessary, to include laddering the facility, removing filters, and spot cleaning.
5.1.13. Temporary Access Holes. Any access holes temporarily cut for the cleaning process shall be repaired so as not to significantly alter the airflow. All openings, after completion of cleaning, shall be sealed. For insulated duct, care shall be exercised to neatly cut off the insulation for openings. After the completion of work, the removed pieces shall be reinstalled. The reinstalled patch shall be marked with fluorescent color (paint or tape) in order to be easily identified. No additional cost shall be claimed to the government in regarding with installing temporary access holes.
5.2. Unit Defects: The Contractor shall document and report to the COR within 24 hours when the Contractor finds defects in the units (e.g. Broken fan blades, nonfunctioning blowers, frayed fan belts, broken conduit, excessive grease, missing filters, inaccessible areas, and etc.) that require repair and if not corrected, could impact the Contractor’s ability to perform his/her service or would impair the unit’s ability to function properly.
5.3. Scheduling: The contractor shall render cleaning service of kitchen exhaust system at various locations base-wide during the hours when the facility is not in operation and the kitchen exhaust system assemblies are cool enough to clean. Every facility to undergo a hood/duct cleaning must be coordinated in advance with the facility point of contact to determine when services shall be rendered. The Contractor shall submit monthly cleaning schedule to the COR at least two (2) weeks in advance of his or her schedule for working on the kitchen exhaust system in each building for coordination of work with the using activities. The contractor shall schedule all services with the facility manager of each building in order to ensure complete cooperation between the customer and the contractor.
The Contractor shall coordinate his or her cleaning work plan with the using activities so that the using activities were not damaged by cleaning work in regarding with their business operation. The schedule shall include the start date/time and the estimated completion date/time.
5.3.1. When there is need to change the COR approved schedule the contractor shall immediately contact the COR and Fire Prevention at 784-4835 during the daytime or Fire Alarm Control Center at 784-4810 during the night time.
5.4. Cleaning Service: The Contractor shall keep the service area free from accumulations of waste material or rubbish.
Upon completion of the service, the Contractor shall leave the work area and premises in a clean and neat condition.
5.5. Environmental Management System (EMS) Requirement:
5.5.1. The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection.
The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals.
In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract.
5.5.2. In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .