21R0009 Amendment 0005 sb 0004.pdf

PDF 134 KB Posted

Attached to
MWMWW Tool-load
Solicitation number
W9098S21R0009
Issued by

View the file

Other files

File Type Posted
21R0009-0007.pdf PDF
revised drawings - amendment 0005.pdf PDF
21R0009-0006.pdf PDF
21R0009 conformed 12.20.2021.pdf PDF
21R0009 Amendment 0003.pdf PDF
11B5190269 - ARBOR PRESS HANDLE.pdf PDF
11B5090015 - FIRST AID KIT_Z-.pdf PDF
11B5092003rev-.pdf PDF
11B5091719 - SPOOLMATIC CASE LID FOAM.pdf PDF
11B5190528 - T SLOT NUT.pdf PDF
11B5190484 - .750 END MILL HOLDER.pdf PDF
11B5190793 - PLASMA CUTTER CASE BOTTOM FOAM ASSEMBLY.pdf PDF
11B5190443 - CNC TOOLHOLDER TIGHTENING FIXTURE.PDF PDF
11B5091722 - REGULATOR CASE LID FOAM.PDF PDF
11B5090288 - BENCH GRINDER.pdf PDF
11B5091437 - REGULATOR CASE ASSEMBLY WITHOUT TOOLS.pdf PDF
11B5190529 - SERRATED END STEP CLAMP.pdf PDF
11B5190867 - LEVER SHEAR HANDLE MODIFIED.PDF PDF
11B5090771revA.PDF PDF
11B5090772 - MILL DRILL FACE MILL ARBOR.pdf PDF
11B5190005 - SNAP JAW.pdf PDF
11B5090770 - MILL DRILL ANGLE VISE.pdf PDF
11B5190514 - RETENTION KNOB.pdf PDF
11B5190527 - FLANGE NUT.pdf PDF
11B5190526 - COUPLING NUT.pdf PDF
11B5091544 - ALTERED REGULATOR CASE.pdf PDF
11B5091434 - SPOOL GUN CASE ASSEMBLY WITHOUT TOOLS.pdf PDF
11B5090773 - MILL DRILL DRILL CHUCK.pdf PDF
11B5190698 - PLASMA TABLE BOX MIDDLE FOAM ASSEMBLY.pdf PDF
11B5091303revA.PDF PDF
11B5091026revA.PDF PDF
11B5140004 - CABINET I-J ASSEMBLY WITH TOOLS.pdf PDF
11B5091027 - MILL DRILL DRILL CHUCK ARBOR.pdf PDF
11B5090987 - CUTTING BOARD.pdf PDF
11B5091542 - ALTERED SPOOLMATIC CASE.pdf PDF
11B5190483 - .625 END MILL HOLDER.pdf PDF
11B5190107 - LEVER SHEAR.PDF PDF
11B5040002 - CABINET A ASSEMBLY WITHOUT TOOLS.PDF PDF
11B5042103 - FOAM ADHESIVE.pdf PDF
11B5190482 - .500 END MILL HOLDER.pdf PDF
11B5190485 - CNC KEYLESS DRILL CHUCK.pdf PDF
11B5190481 - .375 END MILL HOLDER.pdf PDF
11B5090774 - MILL DRILL DRILL CHUCK KEY.pdf PDF
11B5190520 - CLAMPING STUD.pdf PDF
21R0009 Amendment 0002.pdf PDF
11B5091615 - CUTTING BOARD MODIFIED.pdf PDF
11B5090807 - MILL DRILL TABLE HANDLE.pdf PDF
21R0009 Amend 0001.pdf PDF
11B5190006 - ARBOR PRESS.zip ZIP file
11B5190773 - DRAWER I4 MIDDLE FOAM.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Please see Amendment Narrative 0004

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Jun-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9098S21R0009

X 9B. DATED (SEE ITEM 11)

20-Apr-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Jun-2021

CODE

ROCK ISLAND ARSENAL (ACC-RI)

3055 RODMAN AVENUE

ROCK ISLAND IL 61299-8000

W9098S 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9098S21R0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0004 NARRATIVE

The purpose of Amendment 0004 is:

1. To re-open this solicitation for initial and revised quotes. Quotes are now due by 1:00pm, Friday, July 02, 2021.

2. Publish additional questions and answers Q25. Will IUID tags be required?

A25. the various tool prints requires the drawer inserts to have just the printed label which states DRAWER B11 (as an example). No true IUIDs are required.

Q26. The PRs for Shelf E1 and E2 don’t mention to include to include the pipe and bench vise (11B5090001) and cutting fluid (11B5090808), though they are on drawing 11B5040013.

Are those Government furnished, or are we to quote them?

A26. No, do not quote either item.

Q27 There appears to be no PR for drawer D1, D3 and D5.

Apparently the following drawings are for those drawers. Are we to quote these?

11B5090770; 11B5091026; 11B5091027; 11B5090807; 11B5090453; 7025-01-538-2813 11B5091623; 11B5091615; 11B5090972

A27. Do not quote any of these parts for this solicitation.

Q28. For cabinet I and J how do I price these? The drawing has a couple on the top of the shelf and front of shelf A-A, B-B. Neither of those are on the pricing matrix. Not sure how we would pack these as Rock island already has the cabinets. Would Rock Island oversee assembling onto the cabinet?

A28. Answer for each in far right column below, in red.

11B5190443 CNC TOOLHOLDER

TIGHTENING FIXTURE 6

TOP?? Do Not Price this item

11B5091614 DUFFEL BAG 23 FRONT OF SHELF? B-B This item should be priced

11B5190118 PORTABLE BAND SAW TABLE

FRONT OF SHELF? B-B This item should be priced

11B5090808 CUTTING FLUID 25 FRONT OF SHELF? A-A Do Not Price this item

11B5190574 PORTABLE BAND SAW 26 FRONT OF SHELF? A-A This item should be priced

11B5190107 LEVER SHEAR 34 TOP?? Do Not Price this item

11B5190506 MANUAL MACHINE VISE 42 FRONT OF SHELF? B-B This item should be priced

11B5090441 HAND OILER 43 FRONT OF SHELF? A-A This item should be priced

11B5190575 BAND SAW BLADES 48 FRONT OF SHELF? A-A This item should be priced

W9098S21R0009

11B5190867 LEVER SHEAR HANDLE,

MODIFIED 62

TOP?? Do Not Price this item

Q29. Item 11B5090769 goes on top of the Cabinet D so how will that get priced? Same issue with drawing 11B5190006 for cabinet “F”.

A29. Neither of these items are part of this solicitation, and should not be quoted.

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 18-Jun-2021 03:00 PM to 02-Jul-2020 01:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .