ATTACHMENT_001_SOW_8_OCT_2015.docx
DOCX document 15 KB Posted
- Attached to
- INDUCTION HARDENING
- Solicitation number
- W9098S-15-T-0226
About this file
UPDATED ATTACHMENT 001 - SOW 8 OCT 2015
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 15-T-0226-0002.pdf | ||
| 15-T-0226-0001.pdf | ||
| ADDITIONAL_DRAWINGS_15-T-0226.pdf | ||
| ATTACHMENT_001_SOW.docx | DOCX document | |
| DRAWINGS_15_T_0226.pdf | ||
| W9098S-15-T-0226.pdf | ||
| ATTACHEMENT_002_QASP.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Induction Hardening of PN’s 7070851 and 7070704
DATED 8 OCTOBER 2015
The contractor is expected to perform heat treating on two (2) individual part numbers, IAW Drawings for PN 7070851 Revision J, Note 3 and 7070704 Revision G, Note 5. Hardening of surfaces marked only (1/16" +1/8") 0.0625" +0.125" deep to Rockwell C 55 minimum per SPEC MIL-S-12515 (except soft spot between start and stop not to exceed 1/2 inch). The contractor will need to achieve the in-process depth requirements of 0.122-0.247" with HRC 55 Min to include 0.060" stock for finish machining. The Government will provide two (2) of each part at no charge for process set up and destructive testing required for process verification.
The contractor will perform a magnetic particle inspection on all parts after hardening. The inspection shall be in accordance with SPEC.MIL-M-11472 or Dye Penetrate Inspect, MIL-1-6866. The Government’s target process dimension prior to heat treat is 0.010” Out of Round, with parts not exceeding 0.015” OOR. The Government will not accept hardened parts with cracks, or out of round conditions exceeding 0.040”. The Government will require a Certified Test Report (CTR) containing the Rockwell Hardness and Magnetic Particle Inspection results for each part processed.
The Government will provide the contractor quantities between 10-175 EA of both parts (20-350 total) per month. Shipments will be incremental with no more than three shipments per month, however, it is anticipated one shipment per month. RIA- JMTC’s production ramp-up is planned as follows:
| Month |
| Quantity of 7070851, Rev J |
| Quantity of 7070704 Rev G |
| October 2015 |
| 10 |
| 10 |
| December 2015 |
| 50 |
| 50 |
| January 2016 |
| 120 |
| 120 |
| February 2016 thru August 2016 |
| 150 |
| 150 |
Shipments will begin within 2 weeks after contract award. The Government expects that the contractor will harden, inspect and return the parts within 3 weeks of receipt, dependent on size of shipment. Parts do not all have to be returned in one shipment.
The Government will pay for shipping to contractor. The contractor will be responsible for all return shipping charges. The parts will be provided by the Government with reusable shipping containers. Items shall be returned in the same containers they were received, with packing to prevent damage. Any additional packing for safe return of the parts will be the responsibility of the contractor
File details come from the government source that posted it. Updated .