This is a Questions and Answers document for RFP W900KK-24-R-0001, relating to the Live Training Ranges and Combat Training Centers (LTRaC) Multiple Award Contract (MAC) 1. The Q&A addresses 26 industry questions about technical requirements, testing procedures, and contract terms for target lifters and range equipment.

Key clarifications include: no pricing is required for CLINs listed in RFP Section B as pricing will be requested in individual Task/Delivery Orders; the Government will provide RF solutions through MAC 2 contractors for wireless ranges; vendors are responsible for ensuring production meets specifications but not design requirements; environmental testing facilities will be provided by the Government at no cost except shipping; and non-recurring costs will be addressed at the delivery order level. The document confirms questions were due by January 27, 2025, with no change to the proposal due date of February 12, 2025. The Q&A also clarifies that vendors can participate in both MAC 1 and the BATL Productline Management delivery order under MAC 2.

View the file

Other files

File Type Posted
W900KK-25-R-0001-Amend-0001_23JAN2025.pdf PDF
W900KK-25-R-0001-Conformed-to-Amend-0001_23JAN2025.pdf PDF
RFP_W900KK-25-R_0001_13Jan2025.pdf PDF
RFP_LTRaC-MAC1_SectionJ-Attach-2_CDRLs_Draft_RFP.pdf PDF
RFP_LTRaC-MAC1_SectionJ-Attach-1_SOW_6Jan2025_v1.1.pdf PDF
RFP_LTRaC-MAC1_SectionJ-Appendix C-Anticipated FY25-FY26 Delivery Orders.pdf PDF
RFP_LTRaC-MAC1_SectionJ-Appendix H-HW_RF_WiFi Ranges_Baseline_Test_Procedure_draft.docx DOCX document
RFP_LTRaC-MAC1_SectionJ-Appendix B-Example Iron Maiden Target.pdf PDF
RFP_LTRaC-MAC1_SectionJ-Appendix E-DO3_Rilea-ARF_JBLM-MRF_Yakima-MPTR.xlsx XLSX spreadsheet
RFP_LTRaC-MAC1_SectionJ-Appendix F-LT2 Distribution Agreement.pdf PDF
RFP_LTRaC-MAC1_SectionJ-Appendix D-DO2_Blanding-ARF_Liberty-MPMG.xlsx XLSX spreadsheet
RFP_LTRaC-MAC1_SectionJ-Appendix I-PRF-PT-00468 FASIT v 5_9f.pdf PDF
RFP_LTRaC-MAC1_SectionJ-Appendix A-Example of Target Silhouettes.pdf PDF
RFP_LTRaC-MAC1_SectionJ-Attach-3_ Annex-to-Exhibit-A_LPD_23Sep2024.docx DOCX document
RFP_LTRaC-MAC1_SectionJ-Attach-6_Preaward Survey of Prospective Contractor Accounting System Checklist.pdf PDF
RFP_LTRaC-MAC1_SectionJ-Attach-5_Past Performance Assessment Questionnaire.docx DOCX document
RFP_LTRaC-MAC1_SectionJ-Appendix G-Government Test Checklist.xlsx XLSX spreadsheet
RFP_LTRaC-MAC1_SectionJ-Appendix K-Performance Specifications_17 Dec 24_v1.1.pdf PDF
RFP_LTRaC-MAC1_SectionJ-Attach-4_RFP-Questions-Comments-Form.xlsx XLSX spreadsheet
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LTRaC MAC 1 RFP QandAs Live Training Ranges and Combat Training Centers (LTRaC) Multiple Award Contract (MAC) 1 Request For Proposal (RFP) W900KK-24-R-0001 Section J - Attachment 4: Questions/Comments Form

Question
NumberTopicSubjectQuestion / CommentQuestion / Comment Reference (SOW, L&M, Page #s, etc.)Government Answer
1response to solicitationCLIN pricingPlease confirm that per the instructions to bidders no pricing should be entered in the 8 CLIN list items and there is no need to submit pricing for the CLINs list along with the completed SF33RFP paragraph B 2 CLIN's 001-004 and 1000-1004, and responses to Draft RFP RFI's quest#78No pricing is required for the CLINs listed in the RFP Section B. The data provided in the RFP Section B is for informational purposes. Pricing will be requested for the individual Task/Delivery Orders RFPs.
2SOWSurge ProtectionAre MAC1 contractors to provide surge protection for the range tower if a MAC2 contractor is installing the range control systemSOW 3.3.4.1 4.5.1 and 3.4.5.2All requirements for the MAC 1 DOs will be specified in the RFP.
3responses to draft RFP RFIsHit detection - false hitsAssuming false hits are not found to be the result of poor installation, but rather a design issue or component failure (in a unit that passed PQT) , how will contractors recoup their costs to assist the Government with diagnosing the issue? Historically contractors often had to eat the costs of diagnosing network and other issues beyond their control in order to prove that the actuators and/or installation were not the issue.SOW 3.4.5.1The Gov't will consider this on a case-by-case basis. Vendors should notify the Gov't immediately if issues are seen during installation/vendor testing.
4responses to draft RFP RFIsHit detection - false hitsAssuming "reported out-of-comms/target failure conditions and/or false hits" are not found to be the result of poor installation, but rather a design issue or component failure (in a unit that passed PQT) , how will contractors recoup their costs to assist the Government with diagnosing the issue? Historically contractors often had no recourse to recover their costs of diagnosing what turned out to be network and other issues beyond their control in order to prove that the actuators and/or installation were not the issue.SOW 3.4.5.2The Gov't will consider this on a case-by-case basis. Vendors should notify the Gov't immediately if issues are seen during installation/vendor testing.
5responses draft RFP RFIsnon-recurring costsThe Government response to RFI #86 was 'at Delivery Order' please confirm if this means that individual delivery orders will include CLINs for Non-Recurring CostsRFI #86 question and responseThe Government cannot determine at this time how Non-Recurring Costs will be addressed at the ordering level. Questions pertaining cost/pricing are considered not relevant to this solicitation.
6responses draft RFP RFIsSCUs., question 44Please confirm if the Government's intent for the SCU includes ballistic protection(aka ILS/ALS) integral to the frame to shelter SIT/SAT or not.RFP Appendix K, Performance Work Statement, Para 3.2.4 (and Draft RFP Appendix K, Performance Work Statement, Para 3.1.6, 3.2.5, 3.3.1 )No, that is not the intent.
7responses draft RFP RFIsRange EffectsIf "...However, installation provided range effect device(s) may be a Contractor requirement to have tested with the BATL devices during acceptance tests…" is contractor responsible for diagnosis and repair of these range effects if they do not operate? If so how will contractors be paid for these efforts?Draft RFPs RFI # 56 Appendix I, PRF-PT 00468, para 3.5, 3.5.2, 3.5.3MAC 1 vendors are not responsible for diagnosing or repairing range effect devices.
8MAT TrackCrosstiesPlease confirm if MIT and MAT track (if/as required) will be installed in COE standard emplacements, which have concrete slab floor (in lieu of railroad track ballast bed)RFP Appendix K, Performance Work Statement, Para 3.2.6MIT/MAT track beds may vary based on location and age of the range. All requirements for the MAC 1 DOs will be specified in the RFP.
9RFIExtensionWould you consider extending the RFI window due to all manufacturers currently attending SHOT Show?RFP Amendment No. 0001 extended the Industry questions submission date to 27 Jan 2025. The Proposals due date has not changed.
10RFPExtensionWould you consider extending the RFP window due to all manufacturers currently attending SHOT Show?RFP Amendment No. 0001 extended the Industry questions submission date to 27 Jan 2025. The Proposals due date has not changed.
11BATL
TDPAccessCan Range Systems get a copy of or access to a finalized copy of the BATL (Basic Army Target Lifters) TDP?The current TDP may be accessed through the LT2 Portal_Collaboration Areas_BATL (Basic Army Target Lifters)(Community Collaboration Area). The BATL TDP/Drawings on LT2 are not finalized. The Government will place finalized data onto the LT2 Portal as they become available.
12GeneralNon-Recurring CostsHow will the Government ensure that LRIP vendors do not have a competitive advantage over other vendors awarded MAC 1 contracts, was indicated per Delivery order? Please elaborate, will a separate line item or RFP be issued to vendors who have not received an award yet? If pricing is the only determining factor, how will the government weigh non-recurring cost?REF Draft RFP Q&A # 86Questions pertaining cost/pricing are considered not relevant to this solicitation. The Government will assess the factors (ie. non-recurring cos) that affect Offerors' pricing when setting the evaluation criteria for solicitations at the ordering level. As result, the Government has no answer at this time on how non-recurring costs will be addressed when soliciting at the Task/Delivery ordering level.
13GeneralTDP itemsPlease elaborate on why the Government will not release approved suppliers for castings and circuit boards. This will ultimately lead to cost savings and shorter lead times and ensure consistent products.REF Draft RFP Q&A # 87No, the suppliers for these custom items will not be provided.
14Baseline TestData and Power Tests at emplacement5.1.1.1 states that the contractor is to perform data and power tests at the emplacement. Please define the tests that are to be performed in an emplacement.5.1.1.1 of APPENDIX H
Baseline Test (BT) Procedures for Hardwired & RF/Wi-Fi Data RangesTests to ensure the emplacements have HW power, and that data lines are functioning.
15Baseline TestRF/Wi-Fi devices used in BT5.1.1.2 states that the contractor is to use their proposed RF/Wi-Fi devices to determine if line of sight or distance between emplacements will interfere with t RF/Wi-Fi communications. Per the Q&A from the draft RFP, the Government intends to provide the RF solution on wireless ranges. There are no contractor proposed RF/Wi-Fi devices. Please clarify what the proper test method would be to determine if line of sight or distance between emplacements will interfere with RF/Wi-Fi communications.5.1.1.2 of APPENDIX H
Baseline Test (BT) Procedures for Hardwired & RF/Wi-Fi Data RangesVendors should be able to use any Wi-Fi network to make a determination
16Baseline TestAncillary Range Devices5.1.3 states that the ". . .contractor shall test ensure that the range has adequate infrastructure for the use of any. . . . "
Please define "adequate infrastructure"5.1.3 of APPENDIX H
Baseline Test (BT) Procedures for Hardwired & RF/Wi-Fi Data RangesAdequate infrastructure in this case can mean, but is not limited to (1) that there are emplacements present and they are of adequate size for all the equipment, (2) that the emplacements have power, unless specifically called out as a battery powered range in the DO, and (3) the vendor does not have to provide any SCUs, unless all ready called for in the DO.
17Baseline TestRange Infrastructure5.1.4 states that " . . the contractor shall visually inspect….Range access points for proper maneuvering around the range." Please clarify if this is meant to ensure that the contractor has adequate access to install and test the range.5.1.4 of APPENDIX H
Baseline Test (BT) Procedures for Hardwired & RF/Wi-Fi Data RangesYes, this is meant to ensure the contractor has adequate access to install and test the range.
18Sample Delivery Ordersremoval of legacy equipmentDraft RFP Q&A #61, question was asked... "will removal, survey, catalogue, and removal to storage of existing equipment be paid as a separate CLIN on specific delivery orders, or just be considered part of installation services". Answer was "If required, a separate line item under CLIN 0001 will be available. The Delivery Order will call out any need for removal of equipment and/or accessories". However, in document RFP_LTRaC-MAC1_SectionJ-Appendix D-DO2_Blanding-ARF_Liberty-MPMG, there is a requirement for removal of various equipment, but no CLIN 0001 associated. Please clarify.RFP_LTRaC-MAC1_SectionJ-Appendix D-DO2_Blanding-ARF_Liberty-MPMGAppendix D-DO2_Blanding-ARF_Liberty-MPMG is a sample of what a vendor may see during the RFP process, not the finalized DO2 RFP. This document was not updated from the Draft RFP to now. Specific requirements pertaining to DO RFPs will be carefully constructed to ensure detailed information is accurately provided to the vendors at time of DO solicitations.
19Statement of WorkFirst Article Testing (FAT)Section 3.4.1 states ". . . Environmental testing will be conducted at facilities to be provided by the Government." Will the Government please clarify if every vendor will be subject to addional FAT(s) when product baseline changes? Also, will the Government clarify if the environmental testing at FAT and any subesequent FAT(s) will be at no charge to the vendors?3.4.1. of RFP_LTRaC-MAC1_SectionJ-Attach-1_SOW_6Jan2025_v1.1Every vendor will be subject to the same testing requirements if there is a baseline change.

The only cost to the DO vendors for the FAT is the shipment of the devices to and from the Government's designated location.

20Draft RFP Q&ARF SolutionDraft RFP Q&A #3, question was asked about the RF solution, answer was ". . .the LTRaC MAC 1 Contractor will work with the RF vendor to ensure adequate communication devices are installed on/throughout the range for functionality of all target devices."
WIll the Government please clarify if the RF solution will be GFE or if the vendors are to purchase the RF solution on their own? If GFE, who will coordinate with the RF vendor to ensure adequate communication devices are provided? How/when will the RF devices be provided to vendors?Draft RFP Q&AOn ranges that require RF implementation, the Government will contract, through LTRaC MAC 2, with a vendor to provide the RF solution onto the range. The equipment will NOT be GFE. The Government will coordinate with the BATL MAC 1 and RF MAC 2 vendor to syncronize installation and testing.

The Government will ensure that adequate quantities of RF devices are provided to the range.

The Government may provide a few RF devices to a vendor what is awarded a DO under MAC 1 to allow them to test their devices before shipping to the site.

21Draft RFP Q&ANon-Recurring CostDraft RFP Q&A #86, vendor asked "Will the Government allow for Non-recurring costs for vendors that were not part of LRIP to cover initial tooling, testing, fixtures and other ramp-up related costs? How will the government ensure that LRIP vendors do not have a competitive advantage over other vendors awarded MAC 1 contracts?" Answer was "This will be addressed on each individual Delivery Order."
Given the Government’s response to #86 on Non-Recurring Costs, "This will be addressed by each individual Delivery Order", vendors from the LRIP effort may have a pricing advantage due to prior investments in tooling, testing, and ramp-up costs. Under FAR Part 15, how does the Government plan to ensure fair competition and mitigate any undue competitive advantage in each Delivery Order?Draft RFP Q&AThe Government cannot determine at this time how Non-Recurring Costs will be addressed at the ordering level. Questions pertaining cost/pricing are considered not relevant to this solicitation.
22SOW3.5.5 Sustainment Partnership and Draft RFP Q&ADraft RFP Q&A #92, vendor asked "Will the separate contract awarded outside MAC1 be awarded to a contractor on MAC1? Will it be competitively bid? Will this contractor be responsible for warranty issues? It also states this contractor will be providing test chambers for FAT systems? Is this a conflict of interest or a competitive advantage to a particular vendor?" Answer was "Undetermined at this time if an awardee in LTRaC MAC 1 can also be the Contractor described in this section."
Will the Government please clarify if LTRaC MAC 1 vendor will be able to participate in both efforts?Draft RFP Q&AYes, vendors will be able to participate in both. At this time there is NO issue with a vendor being awarded the BATL Productline Management DO under MAC 2 and participating in MAC 1. Since the products are build to the Governement's drawing package, there is nothing that would provide a competitive advantage. Every BATL device should be the same from every vendor.
23Draft RFP Q&ADraft RFP Q&A #131, vendor asked question "If the testing and specification requirements are found to not meet the BATL TDP, how would the Government address potential non-compliance during testing?" Answer was "The BATL TDP is build to print and the Government has already validated that the design passes testing and meets the needed performance requirements. Since the BATL TDP systems are build to print, the Government will be verifying the workmanship in the manufacturing and assembly processes. If the Contractor's BATL systems do not meet the testing requirements detailed in the SOW, then Contractor will need to take corrective action."
Will the Government please provide environmental test reports for all BATL devices?Draft RFP Q&ANo. The Government has conducted the environmental tests it needed to ensure the BATL design meets its requirements. The risk is on the Government if the DESIGN does not meet requirements. The onus is on the MAC 1 vendors to ensure their production of the design meets those specifications.
24Government Test ChecklistPS 3.2.10.2.4Requirement of "The battery charger is UL tested and approved" should be removed. UL rated multi-bank chargers do not exist in the COTS marketplace.RFP_LTRaC-MAC1_SectionJ-Appendix G-Government Test ChecklistUnderwriters Laboratories (UL) does not use the phrase "UL approved" in their marketing guidelines. Instead, they provide certifications that indicate a product meets safety, quality, and compliance standards”. If a vendor cannot verify battery chargers as UL tested and approved, they should ensure it is a COTS battery charger that can be easily replaced if it fails. Data sheets for the product should be provided to the Gov't for review
25Government Test ChecklistPS 3.2.11.2
PS 3.2.11.3Requirement of "All NEMA rated enclosures maintain the NEMA rating at the conclusion of installation" should read "All fittings used on NEMA rated enclosures should match the NEMA rating of the enclosures"RFP_LTRaC-MAC1_SectionJ-Appendix G-Government Test ChecklistRequirement verbiage will remain as is.
26The ARMY Ivan target backer calls out a material spec. 9363146. Do you know where I can track down a copy of that? I don’t see it in the LT2 portal.RFP_LTRaC-MAC1_SectionJ-Appendix A-Example of Target Silhouettes9363146 is a specification control drawing for material on the Ivan (11829332).

The Spec is not on the LT2 Portal.

The Ivan can be purchased through an NSN that Offerors can find by googling 3D Target 11829332. There is no reason a an Offeror would need to manufacture it; if that is the company’s intent.