A13 Presolicitation RFP - RESPONSE - Industry Questions.pdf

PDF 397 KB Posted

Attached to
Army Ground Aerial Target Control System (AGATCS) Support, Development, and Production (SDP)
Solicitation number
W900KK20R0020
Issued by

About this file

This document contains questions and answers from industry regarding a forthcoming Army solicitation for aerial and ground target systems support. The solicitation will be a multiple award ID/IQ contract providing production, development, and operational services for target systems and threats to support various training programs. The Government intends to issue orders on both a firm-fixed price and cost-plus-fixed-fee basis depending on risk. While initial documentation provided limited technical details, the Government plans additional information in the draft RFP including network diagrams and data packets. Historical cost and labor data may also be made available where non-proprietary. The Government will furnish all designs, source code, equipment and property at time of award and does not anticipate delays to the planned schedule.

View the file

Other files

File Type Posted
AGATCS SDP IDIQ DRAFT SOW Version 1.docx DOCX document
AGATCS SDP Draft Sample Orders Version 1.docx DOCX document
AGATCS SDP Draft Order SOW Version 1.docx DOCX document
Draft IDIQ Section B Version 1.docx DOCX document
W900KK-20-R-0020_Amend 01-ATFS_.docx DOCX document
W900KK-20-R-0020_RFI_AGATCS_2021.docx DOCX document
W900KK-20-R-0020_SOW-FD_RevC111419.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q1. The Government thus far has provided very little system and technical information in the draft SOW especially for a firm-fixed price contract (FFP). The lack of sufficient information in an FFP environment poses high risk to both the government and industry. Subsequently, it would seem that only the current incumbent would have sufficient knowledge to bid acceptably. Does the Government intend to provide more detail in the draft RFP (DRFP) with other documents that have yet to be provided to ensure good competition for this procurement? More detail would be needed, for example, from requirement documents, system specifications, and HW/SW architectural descriptions, such that sound business and bid decisions could be made by industry to meet the Government's requirements.

Government Response 1: Yes, the Government intends to provide more detail in the draft RFP (DRFP) with other supporting documents and details (i.e., Technical Data Packet and Network Diagram). The Government does not anticipate issuing a Firm Fixed Price Contract. As posted, the Government intends to issue a single award ID/IQ that will have the ability to issue CPFF or FFP orders/CLINS. The order type will be determined on the level of risk and uncertainties with input from Government and industry.

Q2. Given the high risk associated with a proposing a FFP contract while being provided very little technical information in the current draft SOW and other furnished documentation, is the Government open to changing the contract to cost-plus fixed fee (CPFF) to assist industry (and the Government) in managing the risk? Further, if CPFF would be contemplated, would the Government also provide the recent past history of work hours with associated labor categories?

Government Response 2: The Government intends to use a hybrid CLIN structure that allows for the use of Firm-Fixed-Price (FFP) and/or CPFF as suitable as outlined in FAR 16.202 Firm-Fixed-Price contracts and FAR 16.306, Cost-Plus-Fixed-Fee contracts. Further, Government-owned historical data may be made available. The preponderance of the work for development of products does not contain specific labor hours only the end product. The Government can only release non-sensitive information and all proprietary cost and work information is restricted.

Q3. Does the Government intend to provide existing designs and source code should a non-incumbent be awarded the contract? Is there a list of the Government-furnished equipment (GFE) or Government-furnished property (GFP) that will be provided in the DRFP and RFP?

Government Response 3: Yes, the Government will provide all associated designs and source code at the time of award. Yes, there is a list of the Government-furnished equipment (GFE) or Government-furnished property (GFP) that will be provided in the DRFP and RFP.

Q4. If the Government re-assesses the current acquisition strategy related to questions submitted by Industry, should Industry expect a delay in this procurement to accommodate the necessary staffing of the changes within the Government, as well as for industry to make further assessments and decisions to arrive at competitive bid postures?

Government Response 4: No, Industry should not expect a delay.