This pre-solicitation notice seeks industry feedback on draft statements of work for a multiple award indefinite delivery indefinite quantity contract to provide test instrumentation systems to the U.S. Army and Department of Defense test and evaluation community. The Modernizing Instrumentation Solutions for Test and Evaluation (MISTE) contract will have an estimated total value of $896 million over a ten-year period. The first delivery orders include providing atmospheric enhancement capabilities to the System-of-Systems Controlled Environment Test Infrastructure at Redstone Test Center, with a firm fixed price requirement and 24-month delivery schedule. A second delivery order involves modernizing the test network at Electronic Proving Ground in Fort Huachuca under a cost-plus-fixed-fee arrangement with a 36-month period of performance. Industry is requested to submit comments on the draft statements of work by December 3, 2018. A pre-solicitation conference will be held on December 10, 2018 in Orlando to discuss the opportunity. The Army Contracting Command Orlando plans to release a draft request for proposals in the second quarter of fiscal year 2019 and a final solicitation in the third quarter.
Final Slide Deck.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Modernizing Instrumentation Solutions for Test & Evaluation (MISTE) Pre-Solicitation Conference 10 December 2018
WELCOME
The US Army is testing a turret to protect military facilities (2 photos) by Sohail | October 2, 2015
Agenda
Monday, December 10, 2018
• 0830 – 0855 Sign In
• 0900 – 0910 Welcome COL Rich Haggerty
• 0910 – 0930 Administrative: Ron Miller, MISTE PM
• Team Introduction
• MISTE Acquisition Recap
• Market Research and Project Schedule
• 0940 – 1000 Base SOW, Contract Structure, Best Value Tradeoff
• 1000 – 1030 MISTE Program and Base Contract SOW Discussion
• 1030 – 1045 Break
• 1045 – 1130 Delivery Order 0001 SCETI Discussion
• 1130 -- 1215 Delivery Order 0002 TNM Discussion
• 1230 Closing Remarks: Ron Miller
Administrative
Restrooms in the hallway
Fire Exits
Please silence your cell phones
NO RECORDING ALLOWED
No “classified” information will be shared during this session
Today’s attendees’ list and briefing slides will be posted on FedBizOpps
**No information exchanged during this session will be considered “Bid and Proposal Information” or “Source Selection Sensitive Information” unless otherwise specified
• Classification: UNCLASSIFIED
• Today’s Communications are “Exchanges with industry before receipt of proposals” per FAR 15.201
– Pre-solicitation Conferences constitute an informal exchange of information
– Intended to provide insight into Government plans
– No guarantee as to Government’s final course of action
– Intended to improve the understanding of Government requirements and industry capabilities, thereby allowing potential offerors to judge whether or how they can satisfy the Government’s requirements
– Enhances the Government’s ability to obtain quality services at reasonable prices, and increases efficiency in proposal preparation, proposal evaluation, negotiation, and contract award.
• Informal Exchanges with Industry end with release of formal RFP
• Formal RFP is the only contract action to allow industry to formally respond with a proposal
Administrative
Introduction of the MISTE IPT:
Ron Miller, Assistant Program Manager MISTE Dan Veenstra, ACC-O Procuring Contracting Officer Joe Candelaria, ACC-O Contract Specialist Juan Orozco, Project Director System-of-Systems Controlled
Environment Test Infrastructure (SCETI) and Test Network Modernization (TNM)
Team Introduction
What is MISTE?
MISTE provides an enterprise approach to modernizing DT and
OT test instrumentation to deliver a common, reusable and interoperable set of test instrumentation, where applicable, that will continue to evolve as capabilities are fielded
This approach is referred to as the MISTE Test Instrumentation Systems Enterprise (TISE)
Enterprise management functions includes a system that optimizes the process of speed to award for successive delivery orders through effective collaboration with the Government that ensures expedited performance and full integration of program objectives
Fielding of capabilities will initiate the evolution of the TISE that assesses common requirements and creates a value-added function, based on lifecycle considerations
Acquisition Recap
Market Research and Project Schedule:
Market Research (per FAR Part 10 and DFARS 210) and Exchanges with Industry (per FAR 15.201) began in 2017. Since that time the Government has:
Published two separate Request for Information (RFI) on 20
December 2016 and 25 July 2017 respectively Conducted an Industry Day Event on 02 March 2018 Published a Sources Sought Notice on 05 April 2018 Performed multiple company capabilities site surveys and one-on-one sessions Determination has been made to publish the MISTE requirement as Full and Open Competition based on results of Market Research and posted under NAICS 334519 and PSC Group 6695
SCHEDULE: Program “Projects” Draft RFP Release 2nd QTR FY19 and Formal RFP Release 3rd QTR FY19
MISTE Acquisition:
Single Award Indefinite Delivery Indefinite Quantity (IDIQ) Contract with Firm Fixed Price and Cost Plus Fixed Fee Orders Ten Year Contract Term w/Total Estimated Value of $896M Per Army Regulation 73-1, PM ITTS IMO is the Army’s materiel developer for Army major test instrumentation systems MISTE will provide test instrumentation systems to the Army and
DOD T&E community including DoD Acquisition-defined Army and DoD Service Major Test instrumentation programs which are funded at the Major Range Test Facility Base (MRTFB)
Work to be performed under the MISTE contract includes test instrumentation system hardware and software design, integration, lifecycle support concepts, technology updates/upgrades, product performance verification, and manufacturing
MISTE
Mr. Dan Veenstra Procuring Contracting Officer Army Contracting Command-Orlando
MISTE has a broadly scoped Base Contract Statement of Work (SOW):
Broadly scoped SOW includes: Manufacturing, Engineering, HW/SW
Development and Integration, Test Instrumentation Systems Enterprise across the (TISE) pillars of Test Communication/Networks, Sensors and Data Collection, and Test Environments
Contract Structure:
Five Year Base Contract period with two, two-year Option periods and one, one-year Option period – Total Term is 10 Years if all Options are Exercised All contract years, including Options will be Priced
Source Selection:
Award will be made using FAR 15.101-1 Best Value Tradeoff Process Planned evaluation methodology consists of four (4) factors: Technical, Cost/Price, Past Performance, and Small Business Participation
Contracting
Mr. Ron Miller Assistant Program Manager, MISTE
PM ITTS IMO
Most recent MISTE SOW published with the Pre-Solicitation Notice Common themes for questions and requests for clarification were received in the following areas (to-date):
Q: Will there be a separate DO for establishing, implementing, and maintaining the TISE?
A: Yes, at some point after contract award Q: Where is the TISE to be hosted?
A: Government will not stipulate where TISE is to be hosted Q: Which community members will require access to the TISE?
A: MISTE Awardee and PM ITTS IMO Q: Is establishing the enterprise approach retroactive?
A: No, begins with MISTE award where applicable Q: How will the Government evaluate “excessive pass through cost?”
A: Evaluated under Cost Reimbursement DO’s IAW Section L, M & I clauses of the RFP & contract award ** SOW revisions are expected to be reflected with release of the DRAFT RFP **
Base Contract SOW Discussion
Mr. Juan Orozco Project Director, SCETI & TNM
PM ITTS IMO
PM ITTS IMO has a requirement from the U.S. Army Test and Evaluation Command (ATEC) to provide the Atmospheric Conditions Enhancement (ACE) for the System-of-Systems Controlled Environment Test Infrastructure (SCETI) at Redstone Test Center (RTC)
ACE will include the development of Snow Development Capability (SDC), Fog Development Capability (FDC), and enhancements to the existing Atmospheric Measurement (AM) capability to measure those new environmental conditions
SCETI is an outdoors instrumentation test system currently under development at Redstone Test Center (RTC) and used to verify the functionality of aircraft sensor assemblies within degraded visual environment (DVE) conditions
SCETI will be comprised of an Emulated Flight Capability (EFC) to replicate rotary winged flight scenarios with the sensor assemblies secured to a payload structure, a Rain Development Capability (RDC) to develop DVE rain conditions, and an AM capability to characterize rain
SCETI will be operated from a Government-provided Test Control Center (TCC) using the RTC/Aircraft Survivability Equipment (ASE) Architecture for Test and Evaluation of Hostile Fire (RATH), an architecture developed at RTC based on the Test/Training Enabling Architecture (TENA)
SCETI Delivery Order Overview
SCETI Operational Concept / OV-1
This system has a delivery and acceptance requirement of 24 months after Date of DO Award
The Statement of Work is accompanied by detailed Performance Specifications
The Offeror’s response to this Delivery Order as part of the Technical Proposal Submission to the RFP will be evaluated for award
The Offeror’s Firm Fixed Price (FFP) proposal for this delivery order will also undergo a price analysis that will include a technical analysis of the appropriateness of the proposed labor mix, hours, other direct costs, proposed travel, and subcontracting/purchasing
SCETI Delivery Order Overview (cont.)
Current SCETI SOW published with the Pre-Solicitation Notice Common themes for questions and requests for clarification were received in the following areas (to-date):
Q: Will the Government consider changing DO type to CPFF?
A: Under consideration. Final determination reflected in RFP.
Q: DO does not make correlation to the Base SOW for the TISE?
A: To be corrected before DRAFT RFP is issued Q: Will the Gov’t develop a list of assumptions relevant to this acquisition?
A: Yes, it’s in the works
SOW revisions are expected to be reflected with release of the DRAFT
RFP
SCETI Discussion
PM ITTS has a requirement from ATEC to modernize the Test Network at Electronic Proving Ground (EPG), in Ft. Huachuca, AZ as part of the Test Network Modernization Program (TNM)
The goal of the overarching TNM Program is to establish an enterprise environment for commonality, interchangeability, and interoperability – this process will standardize architecture, configuration, hardware and network management tools across ATEC test centers
EPG Test Instrumentation Systems Network (TISN-EN) solution shall address reliable, secure, data distribution requirements such as network redundancy, bandwidth and network availability, and standard network architecture
Future requirements include enterprise-level connectivity across all Army Test Evaluation Command (ATEC) Test Centers relying on standardized core Internet Protocol (IP) transport service network (Multi-Protocol Label Switching (MPLS) Service Network with security stack services
TNM Delivery Order Overview
• Replacement of “end of life” (EOL) network equipment
• Increase Bandwidth (100G/40G)
• Add redundant capability to enhance reliability and availability
• Add Network monitoring and management capability
Note: No infrastructure work being performed (i.e.
fiber, HVAC, building, etc.)
Operational Concept / OV-1
This system has a delivery and acceptance requirement of 36 months after Date of DO Award
The Statement of Work is accompanied by detailed Performance Specifications
The Offeror’s response to this Delivery Order as part of the Technical Proposal Submission to the RFP will be evaluated for award
The Offeror’s Cost Plus Fixed Fee (CPFF) proposal for this delivery order will also undergo a Cost Realism Analysis that will include a technical analysis of the appropriateness of the proposed labor mix, hours, other direct costs, proposed travel, and subcontracting/purchasing
TNM Delivery Order Overview
Current TNM SOW published with the Pre-Solicitation Notice
Common themes for questions and requests for clarification were received in the following areas (to-date):
Q: Will the Government consider changing DO type to FFP?
A: Under consideration. Final determination reflected in RFP.
Q: DO does not make correlation to the Base SOW for the TISE?
A: To be corrected before DRAFT RFP is issued
TNM Discussion
Q: Will the Government provide an updated site network map for
EPG?
A: Yes, if required Q: Are there any requirements to upgrade fiber at EPG in association with TNM?
A: No Q: Will the Government develop a list of assumptions relevant to this acquisition?
A: Yes, it’s in the works
SOW revisions are expected to be reflected with release of the DRAFT
RFP
TNM Discussion (cont.)
Closing Remarks
*** Slides will be posted on FedBizOpps *** DRAFT MISTE RFP early 2nd QTR
FY 19
*** RFP NET late 2nd QTR FY 19
| Slide Number 1 |
| Agenda |
| Administrative |
| Slide Number 4 |
| Team Introduction |
| Acquisition Recap |
| Acquisition Recap |
| Acquisition Recap |
| MISTE |
| �Contracting |
| MISTE |
| �Base Contract SOW Discussion |
| MISTE |
| �SCETI Delivery Order Overview |
| �SCETI Operational Concept / OV-1� |
| �SCETI Delivery Order Overview (cont.) |
| �SCETI Discussion |
| �TNM Delivery Order Overview |
| Slide Number 19 |
| �TNM Delivery Order Overview |
| �TNM Discussion |
| �TNM Discussion (cont.) |
| Closing Remarks |