AF_UH60_CDRLs.pdf

PDF 341 KB Posted

Attached to
Afghanistan Air Force UH-60A Flight Training Devices
Solicitation number
W900KK-18-R-0004
Issued by

About this file

AAF SMW UH60A Contract Data Item List (CDRL)

View the file

Other files

File Type Posted
SMW_UH-60A_Q_and_A_Reponses.docx DOCX document
UH-60_Solicitation_FINAL_121817.docx DOCX document
AF_UH-60A_SYS_SPEC.pdf PDF
UH60A_Comment_Clarification_Form.docx DOCX document
AF_UH-60A_SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SFAE-STRI-TRADE-FMS

6. REQUIRING OFFICE

SOW paragraph 3.6 Program Management

5. CONTRACT REFERENCE

DI-MGMT-80227

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

CPSMRSee Block 16

2. TITLE OF THE DATA ITEM

A001

1. DATA ITEM NO.

F. CONTRACTOR

2017-053

E. CONTRACT/PR NO.

Afghan Air Force UH-60A FTDs

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

11. AS OF DATE

12.DATE OF FIRST

SUBMISSION

MNTHLY

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

08-DEC-2017

J. DATE

Meister, Jeffery

I. APPROVED BY

07-DEC-2017

H. DATEG. PREPARED BY

Andrade, Richard

Block 2: Contractors Progress, Status and Management Report

Block 2: Contractors Progress, Status and Management Report

1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED

ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):

"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS

OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS

FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE

OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)

12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING

DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED

TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY

THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE

EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET

SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES.

DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.

DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD

5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD

INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY

ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE

DOCUMENT.

2. BLOCK 12: SHALL BE DUE 30 CALENDAR DAYS AFTER CONTRACT AWARD.

3. BLOCK 13: SHALL BE DUE MONTHLY THROUGH THE LIFE OF THE CONTRACT.

4. THE GOVERNMENT WILL HAVE 10 CALENDAR DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION.

5. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE

GOVERNMENT COMMENTS.

6. SUBMISSIONS SHALL CONCLUDE 60 CALENDAR DAYS AFTER RTF OF THE

FINAL TRAINING DEVICE.

7. BLOCK 14 : DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC MAIL

OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL

DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR

PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL

DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND

NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING

PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,

AUTOCAD, VECTORWORKS, OR OTHERS). ONE COPY EACH OF THE

REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT

LEADER AND THE FMS CONTRACT SPECIALIST. DELIVERY SHALL BE MADE

TO THE FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-TRADE-FMS,

ATTN: FMS PROJECT LEADER AND FMS CONTRACT SPECIALIST, 12211

SCIENCE DRIVE, ORLANDO, FL 32826-3224.

16. REMARKS 020SEE BLOCK 16

020 15. TOTALSee continuation sheet...

18.ESTIMATED

TOTAL PRICE

17. PRICE GROUP

Page 1 of 2 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001

16. REMARKS (Continued)

8. DELIVERED FILE TYPE SHALL BE SEARCHABLE PDFs.

9. CONTRACTOR TEMPLATE IS ACCEPTABLE.

10. CONTENT IS DEFINED BY DID; CONTENT TAILORED OUT AS NECESSARY AND IDENTIFIED BELOW:

a) 10.3 (f)

b) 10.3 (g)

c) 10.3 (h)

d) 10.3 (i)

F. CONTRACTOR

2017-053

E. CONTRACT/PR NO.

Afghan Air Force UH-60A FTDs

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Page 2 of 2 PagesDD FORM 1423-1, FEB 2001

See Block 16

5. CONTRACT REFERENCE

DI-MGMT-81861A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

IPMRIntegrated Program Management Report (IPMR)

2. TITLE OF THE DATA ITEM

A002

1. DATA ITEM NO.

F. CONTRACTOR

2017-053

E. CONTRACT/PR NO.

Afghan Air Force UH-60A FTDs

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

11. AS OF DATE

12.DATE OF FIRST

SUBMISSION

MNTHLY

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

08-DEC-2017

J. DATE

Meister, Jeffery

I. APPROVED BY

07-DEC-2017

H. DATEG. PREPARED BY

Andrade, Richard

Block 5: SOW paragraph 3.7.1 Integrated Master Schedule

1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED

ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):

"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS

OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS

FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE

OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)

12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING

DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED

TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY

THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE

EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET

SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES.

DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.

DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD

5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD

INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY

ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE

DOCUMENT.

2. BLOCK 12: SHALL BE DUE 30 CALENDAR DAYS AFTER CONTRACT AWARD.

3. BLOCK 13: SHALL BE DUE MONTHLY THROUGH THE LIFE OF THE CONTRACT.

4. THE GOVERNMENT WILL HAVE 10 CALENDAR DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION.

5. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE

GOVERNMENT COMMENTS.

6. BLOCK 14*: DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC MAIL

OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL

DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR

PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL

DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND

NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING

PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,

AUTOCAD, VECTORWORKS, OR OTHERS). ONE COPY EACH OF THE

REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT

LEADER AND THE FMS CONTRACT SPECIALIST. DELIVERY SHALL BE MADE

TO THE FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-TRADE-FMS,

ATTN: FMS PROJECT LEADER AND FMS CONTRACT SPECIALIST, 12211

SCIENCE DRIVE, ORLANDO, FL 32826-3224.

7. DELIVERED FILE TYPE SHALL BE SEARCHABLE PDFs and Microsoft Project compatible files.

8. CONTRACTOR TEMPLATE IS ACCEPTABLE

9. CONTENT IS DEFINED BY DID; CONTENT TAILORED OUT AS NECESSARY

16. REMARKS 020*SEE BLOCK 16

020 15. TOTALSee continuation sheet...

18.ESTIMATED

TOTAL PRICE

AND IDENTIFIED BELOW:

a) Use Format 6 only

F. CONTRACTOR

2017-053

E. CONTRACT/PR NO.

Afghan Air Force UH-60A FTDs

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

CONTRACT DATA REQUIREMENTS LIST

See Block 16

5. CONTRACT REFERENCE

DI-ADMN-81250B

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

CMConference Minutes

2. TITLE OF THE DATA ITEM

A003

1. DATA ITEM NO.

F. CONTRACTOR

2017-053

E. CONTRACT/PR NO.

Afghan Air Force UH-60A FTDs

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER ADMNA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

11. AS OF DATE

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

08-DEC-2017

J. DATE

Meister, Jeffery

I. APPROVED BY

07-DEC-2017

H. DATEG. PREPARED BY

Andrade, Richard

Block 5: SOW paragraph 3.7.2.1 Program and Technical Reviews

1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED

ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):

"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS

OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS

FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE

OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)

12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING

DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED

TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY

THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE

EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET

SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS

OF DOD DIRECTIVE 5230.25.

DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD

5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD

INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY

ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE

DOCUMENT.

2. BLOCK 12: SHALL BE DUE 10 DAYS AFTER EACH MEETING, CONFERENCE,

OR REVIEW (EXCEPT INTEGRATED PRODUCT TEAM (IPT) MEETINGS).

3. BLOCK 13: SHALL CONTINUE THROUGHOUT THE LIFE OF THE CONTRACT.

4. THE GOVERNMENT WILL HAVE 10 CALENDAR DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION.

5. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE

GOVERNMENT COMMENTS.

6. BLOCK 14*: DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC MAIL

OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL

DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR

PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL

DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND

NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING

PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,

AUTOCAD, VECTORWORKS, OR OTHERS). ONE COPY EACH OF THE

REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT

LEADER AND THE FMS CONSTRACT SPECIALIST. DELIVERY SHALL BE MADE

TO THE FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-TRADE-FMS,

ATTN: FMS PROJECT LEADER AND FMS CONTRACT SPECIALIST, 12211

SCIENCE DRIVE, ORLANDO, FL 32826-3224.

7. DELIVERED FILE TYPE SHALL BE SEARCHABLE PDFs.

8. CONTRACTOR TEMPLATE IS ACCEPTABLE

9. CONTENT IS DEFINED BY DID; CONTENT TAILORED OUT AS NECESSARY

16. REMARKS 020* SEE BLOCK 16

020 15. TOTALSee continuation sheet...

18.ESTIMATED

TOTAL PRICE

AND IDENTIFIED BELOW:

a) 10.2.A.3

F. CONTRACTOR

2017-053

E. CONTRACT/PR NO.

Afghan Air Force UH-60A FTDs

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER ADMNA

B. EXHIBITA. CONTRACT LINE ITEM NO.

CONTRACT DATA REQUIREMENTS LIST

See Block 16

5. CONTRACT REFERENCE

DI-SESS-81000E

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

PDALProduct Drawings/Models and Associated Lists

2. TITLE OF THE DATA ITEM

B001

1. DATA ITEM NO.

F. CONTRACTOR

2017-053

E. CONTRACT/PR NO.

Afghan Air Force UH-60A FTDs

D. SYSTEM/ITEM

TDP

C. CATEGORY

X TM OTHERB

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

11. AS OF DATE

12.DATE OF FIRST

SUBMISSION

ONE/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

08-DEC-2017

J. DATE

Meister, Jeffery

I. APPROVED BY

07-DEC-2017

H. DATEG. PREPARED BY

Andrade, Richard

Block 5: SOW paragraph 3.3.9 Product Definition Data

1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED

ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):

"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS

OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS

FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE

OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)

12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224

EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING

DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED

TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY

THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE

EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET

SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS

OF DOD DIRECTIVE 5230.25.

DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD

5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD

INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY

ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE

DOCUMENT.

2. BLOCK 12: ONE SET OF PRODUCT DRAWINGS SHALL BE PREPARED AND

SUBMITTED FOR EACH TRAINER. FIRST SUBMISSION SHALL BE DUE 60

CALENDAR DAYS AFTER CRITICAL DESIGN REVIEW (CDR).

3. BLOCK 13: SUBSEQUENT SUBMISSION SHALL BE DUE 30 CALENDAR DAYS

AFTER GOVERNMENT ACCEPTANCE TEST. REVISIONS AS REQUIRED

THROUGHOUT THE LIFE OF THE CONTRACT.

4. THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION.

5. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE

GOVERNMENT COMMENTS.

6. BLOCK 14*: DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC MAIL

OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL

DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR

PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL

DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND

NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING

PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,

AUTOCAD, VECTORWORKS, OR OTHERS). ONE COPY EACH OF THE

REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT

LEADER AND THE PROJECT SPECIALIST. ONE COPY EACH OF THE

REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT

LEADER AND THE PROJECT ENGINEER. DELIVERY SHALL BE MADE TO THE

FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-TRADE-FMS, ATTN:

FMS PROJECT LEADER AND FMS PROJECT ENGINEER, 12211 SCIENCE DRIVE,

ORLANDO, FL 32826-3224.

16. REMARKS 020*SEE BLOCK 16

020 15. TOTALSee continuation sheet...

18.ESTIMATED

TOTAL PRICE

7. DELIVERED FILE TYPE SHALL BE SEARCHABLE PDFs.

8. CONTRACTOR TEMPLATE IS ACCEPTABLE.

9. CONTENT IS DEFINED BY DID.

F. CONTRACTOR

2017-053

E. CONTRACT/PR NO.

Afghan Air Force UH-60A FTDs

D. SYSTEM/ITEM

TDP

C. CATEGORY

X TM OTHERB

B. EXHIBITA. CONTRACT LINE ITEM NO.

CONTRACT DATA REQUIREMENTS LIST

SOW paragraph 3.2 System Design

5. CONTRACT REFERENCE

DI-IPSC-81431A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

SSSSystem/Subsystem Specification (SSS)

2. TITLE OF THE DATA ITEM

B002

1. DATA ITEM NO.

F. CONTRACTOR

2017-053

E. CONTRACT/PR NO.

Afghan Air Force UH-60A FTDs

D. SYSTEM/ITEM

TDP

C. CATEGORY

X TM OTHERB

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

R/ASR

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

08-DEC-2017

J. DATE

Meister, Jeffery

I. APPROVED BY

07-DEC-2017

H. DATEG. PREPARED BY

Andrade, Richard

1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED

ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):

"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS

OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS

FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE

OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)

12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224

EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING

DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED

TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY

THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE

EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET

SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS

OF DOD DIRECTIVE 5230.25.

DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD

5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD

INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY

ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE

DOCUMENT.

2. BLOCK 12: SHALL BE DUE 15 CALENDAR DAYS PRIOR TO SRR.

3. BLOCK 13: REVISIONS AS REQUIRED THROUGH THE LIFE OF THE CONTRACT.

4. BLOCK 14: DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC MAIL

OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL

DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR

PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL

DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND

NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING

PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,

AUTOCAD, VECTORWORKS, OR OTHERS).ONE COPY EACH OF THE

REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT

LEADER AND THE PROJECT ENGINEER. DELIVERY SHALL BE MADE TO THE

FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-TRADE-FMS, ATTN:

FMS PROJECT LEADER AND FMS PROJECT ENGINEER, 12211 SCIENCE DRIVE,

ORLANDO, FL 32826-3224.

5. THE GOVERNMENT WILL HAVE 10 CALENDAR DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION.

6. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE

GOVERNMENT COMMENTS.

16. REMARKS 020SEE BLOCK 16

020 15. TOTAL

18.ESTIMATED

TOTAL PRICE

Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001

SOW paragraph 3.4 Safety Engineering

5. CONTRACT REFERENCE

DI-SAFT-80102C

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

SARSAFETY ASSESSMENT REPORT

2. TITLE OF THE DATA ITEM

B003

1. DATA ITEM NO.

F. CONTRACTOR

2017-053

E. CONTRACT/PR NO.

Afghan Air Force UH-60A FTDs

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SAFTB

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ONE/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

08-DEC-2017

J. DATE

Meister, Jeffery

I. APPROVED BY

07-DEC-2017

H. DATEG. PREPARED BY

Andrade, Richard

1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED

ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):

"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS

OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS

FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE

OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)

12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING

DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED

TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY

THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE

EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET

SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES.

DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.

DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD

5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD

INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY

ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE

DOCUMENT.

2. BLOCK 12: SUBMISSION SHALL BE DUE 30 CALENDAR DAYS AFTER

CRITICAL DESIGN REVIEW (CDR).

3. BLOCK 13: REVISIONS AS REQUIRED THROUGH THE LIFE OF THE

CONTRACT. FINAL SHALL BE SUBMITTED 60 DAYS PRIOR TO GOVERNMENT

SITE ACCEPTANCE TESTING FOR EACH DEVICE.

4. THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION.

5. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE

GOVERNMENT COMMENTS.

6. BLOCK 14: DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC MAIL

OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL

DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR

PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL

DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND

NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING

PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,

AUTOCAD, VECTORWORKS, OR OTHERS). ONE COPY EACH OF THE

REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT

LEADER, THE PROJECT ENGINEER, AND PEO STRI'S OFFICE OF THE

TECHNICAL DIRECTOR'S SYSTEM SAFETY ENGINEER. DELIVERY SHALL BE

MADE TO THE FOLLOWING ADDRESS: PEO STRI, ATTN:

SFAE-STRI-TRADE-FMS, ATTN: FMS PROJECT LEADER, FMS PROJECT

ENGINEER, PEO STRI'S OFFICE OF THE TECHNICAL DIRECTOR'S SYSTEM

SAFETY ENGINEER, 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

7. DELIVERED FILE TYPE SHALL BE SEARCHABLE PDFs.

16. REMARKS 030SEE BLOCK 16

030 15. TOTALSee continuation sheet...

18.ESTIMATED

TOTAL PRICE

8. CONTRACTOR TEMPLATE IS ACCEPTABLE.

9. CONTENT IS DEFINED BY DID.

F. CONTRACTOR

2017-053

E. CONTRACT/PR NO.

Afghan Air Force UH-60A FTDs

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SAFTB

B. EXHIBITA. CONTRACT LINE ITEM NO.

CONTRACT DATA REQUIREMENTS LIST

See Block 16

5. CONTRACT REFERENCE

DI-NDTI-80603A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

TPTest Procedure

2. TITLE OF THE DATA ITEM

B004

1. DATA ITEM NO.

F. CONTRACTOR

2017-053

E. CONTRACT/PR NO.

Afghan Air Force UH-60A FTDs

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER NDTIB

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ONE/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

08-DEC-2017

J. DATE

Meister, Jeffery

I. APPROVED BY

07-DEC-2017

H. DATEG. PREPARED BY

Andrade, Richard

Block 5: SOW paragraph 3.12 Integrated Testing and Inspections

1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED

ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):

"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS

OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS

FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE

OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)

12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224

EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING

DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED

TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY

THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE

EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET

SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS

OF DOD DIRECTIVE 5230.25.

DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD

5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD

INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY

ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE

DOCUMENT.

2. BLOCK 12. THE CONTRACTOR SHALL DELIVER ONE SET OF TEST

PROCEDURES EACH FOR THE FTD, CPT, SCHEMATIC, BMC AND

ILLUSTRATION. DELIVERY IS REQUIRED 45 CALENDAR DAYS PRIOR TO EACH TEST.

3. BLOCK 13. REVISIONS DUE AS REQUIRED.

4. THE GOVERNMENT WILL HAVE 10 CALENDAR DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION.

5. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE

GOVERNMENT COMMENTS.

6. BLOCK 14: DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC MAIL

OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL

DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR

PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL

DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND

NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING

PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,

AUTOCAD, VECTORWORKS, OR OTHERS). ONE COPY EACH OF THE

REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT

LEADER AND THE PROJECT ENGINEER. DELIVERY SHALL BE MADE TO THE

FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-TRADE-FMS, ATTN:

FMS PROJECT LEADER AND FMS PROJECT ENGINEER, 12211 SCIENCE DRIVE,

ORLANDO, FL 32826-3224.

7. DELIVERED FILE TYPE SHALL BE SEARCHABLE PDFs. FOR TESTING

PURPOSES; PAPER COPIES WILL BE PROVIDED.

8. CONTRACTOR TEMPLATE IS ACCEPTABLE

16. REMARKS 020SEE BLOCK 16

020 15. TOTALSee continuation sheet...

18.ESTIMATED

TOTAL PRICE

9. CONTENT IS DEFINED BY DID.

F. CONTRACTOR

2017-053

E. CONTRACT/PR NO.

Afghan Air Force UH-60A FTDs

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER NDTIB

B. EXHIBITA. CONTRACT LINE ITEM NO.

CONTRACT DATA REQUIREMENTS LIST

See Block 16

5. CONTRACT REFERENCE

DI-NDTI-80809B

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

TIRTest/Inspection Report

2. TITLE OF THE DATA ITEM

B005

1. DATA ITEM NO.

F. CONTRACTOR

2017-053

E. CONTRACT/PR NO.

Afghan Air Force UH-60A FTDs

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER NDTIB

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ONE/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

08-DEC-2017

J. DATE

Meister, Jeffery

I. APPROVED BY

07-DEC-2017

H. DATEG. PREPARED BY

Andrade, Richard

Block 5: SOW paragraphs 3.12.3 Factory Acceptance Test and 3.12.4 Site Acceptance Test

1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED

ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):

"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS

OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS

FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE

OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)

12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224

EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING

DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED

TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY

THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE

EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET

SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES.

DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.

DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD

5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD

INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY

ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE

DOCUMENT.

2. BLOCKS 12 AND 13: A TEST/INSPECTION REPORT SHALL BE SUBMITTED

FOR EACH USG TEST EVENT. EACH SUBMISSION SHALL BE DUE 30

CALENDAR DAYS AFTER COMPLETION OF EACH USG TEST. 3. BLOCK 13:

REVISIONS AS REQUIRED.

4. THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION.

5. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE

GOVERNMENT COMMENTS.

6. BLOCK 14: DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC MAIL

OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL

DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR

PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL

DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND

NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING

PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,

AUTOCAD, VECTORWORKS, OR OTHERS). ONE COPY EACH OF THE

REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT

LEADER AND THE PROJECT ENGINEER. DELIVERY SHALL BE MADE TO THE

FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-TRADE-FMS, ATTN:

FMS PROJECT LEADER AND FMS PROJECT ENGINEER, 12211 SCIENCE DRIVE,

ORLANDO, FL 32826-3224.

7. DELIVERED FILE TYPE SHALL BE SEARCHABLE PDFs.

8. CONTRACTOR TEMPLATE IS ACCEPTABLE.

16. REMARKS 020SEE BLOCK 16

020 15. TOTALSee continuation sheet...

18.ESTIMATED

TOTAL PRICE

9. CONTENT IS DEFINED BY DID.

F. CONTRACTOR

2017-053

E. CONTRACT/PR NO.

Afghan Air Force UH-60A FTDs

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER NDTIB

B. EXHIBITA. CONTRACT LINE ITEM NO.

CONTRACT DATA REQUIREMENTS LIST

SOW paragraph 3.14 Site Requirements

5. CONTRACT REFERENCE

DI-FACR-80966

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

TFRTrainer Facilities Report (TFR)

2. TITLE OF THE DATA ITEM

B006

1. DATA ITEM NO.

F. CONTRACTOR

2017-053

E. CONTRACT/PR NO.

Afghan Air Force UH-60A FTDs

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER FACRB

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ONE/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

08-DEC-2017

J. DATE

Meister, Jeffery

I. APPROVED BY

07-DEC-2017

H. DATEG. PREPARED BY

Andrade, Richard

1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED

ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):

"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS

OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS

FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE

OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)

12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING

DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED

TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY

THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE

EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET

SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES.

DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.

DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD

5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD

INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY

ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE

DOCUMENT.

2. BLOCKS 12 AND 13: A TFR SHALL BE SUBMITTED FOR EACH DEVICE AND

ITS LOCATION. THE TFR SHALL BE DUE 30 CALENDAR DAYS AFTER

COMPLETION OF EACH SITE VISIT.

3. BLOCK 13: REVISIONS AS REQUIRED THROUGH THE LIFE OF THE CONTRACT.

4. THE GOVERNMENT WILL HAVE 20 CALENDAR DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION.

5. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE

GOVERNMENT COMMENTS.

6. BLOCK 14: DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC MAIL

OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL

DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR

PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL

DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND

NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING

PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,

AUTOCAD, VECTORWORKS, OR OTHERS). ONE COPY EACH OF THE

REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT

LEADER AND THE PROJECT ENGINEER. DELIVERY SHALL BE MADE TO THE

FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-TRADE-FMS, ATTN:

FMS PROJECT LEADER AND FMS PROJECT ENGINEER, 12211 SCIENCE DRIVE,

ORLANDO, FL 32826-3224.

7. DELIVERED FILE TYPE SHALL BE SEARCHABLE PDFs.

8. CONTRACTOR TEMPLATE IS ACCEPTABLE

9. CONTENT IS DEFINED BY DID.

16. REMARKS 020SEE BLOCK 16

020 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW paragraph 3.2.2. Software Design

5. CONTRACT REFERENCE

DI-IPSC-81442A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

SVDSoftware Version Description (SVD)

2. TITLE OF THE DATA ITEM

B007

1. DATA ITEM NO.

F. CONTRACTOR

2017-053

E. CONTRACT/PR NO.

Afghan Air Force UH-60A FTDs

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER IPSCB

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ONE/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

08-DEC-2017

J. DATE

Meister, Jeffery

I. APPROVED BY

07-DEC-2017

H. DATEG. PREPARED BY

Andrade, Richard

1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED

ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):

"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS

OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS

FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE

OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)

12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING

DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED

TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY

THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE

EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET

SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES.

DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.

DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD

5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD

INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY

ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE

DOCUMENT.

2. BLOCK 12: FIRST SUBMISSION 5 CALENDAR DAYS PRIOR TO FACTORY

ACCEPTANCE TEST (FAT) AND SITE ACCEPTANCE TEST (SAT).

3. BLOCK 13: REVISIONS AS REQUIRED THROUGHOUT THE LIFE OF THE CONTRACT.

4. THE GOVERNMENT WILL HAVE 15 CALENDAR DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION.

5. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE CHANGES.

6. BLOCK 14*: DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC MAIL

OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL

DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR

PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL

DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND

NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING

PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,

AUTOCAD, VECTORWORKS, OR OTHERS).ONE COPY EACH OF THE

REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT

LEADER AND THE PROJECT ENGINEER. DELIVERY SHALL BE MADE TO THE

FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-TRADE-FMS, ATTN:

FMS PROJECT LEADER AND FMS PROJECT ENGINEER, 12211 SCIENCE DRIVE,

ORLANDO, FL 32826-3224.

7. DELIVERED FILE TYPE SHALL BE SEARCHABLE PDFs.

8. CONTRACTOR TEMPLATE IS ACCEPTABLE.

16. REMARKS 020SEE BLOCK 16

020 15. TOTAL

18.ESTIMATED

TOTAL PRICE

See Block 16

5. CONTRACT REFERENCE

DI-SESS-81003E

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

CD/MALCOMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LISTS

2. TITLE OF THE DATA ITEM

B008

1. DATA ITEM NO.

F. CONTRACTOR

2017-053

E. CONTRACT/PR NO.

Afghan Air Force UH-60A FTDs

D. SYSTEM/ITEM

TDP

C. CATEGORY

X TM OTHERB

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ONE/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

08-DEC-2017

J. DATE

Meister, Jeffery

I. APPROVED BY

07-DEC-2017

H. DATEG. PREPARED BY

Andrade, Richard

Block 5: SOW paragraph 3.3.9 Product Definition Data

1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED

ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):

"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS

OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS

FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE

OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)

12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING

DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED

TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY

THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE

EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET

SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS

OF DOD DIRECTIVE 5230.25.

DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD

5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD

INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY

ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE

DOCUMENT.

2. Block 12: FIRST DELIVERY SHALL BE DUE 60 CALENDAR DAYS AFTER

CRITICAL DESIGN REVIEW (CDR).

3. Block 13: SUBSEQUENT SUBMISSION SHALL BE DUE 30 CALENDAR DAYS

AFTER GOVERNMENT ACCEPTANCE TEST. REVISIONS AS REQUIRED

THROUGHT THE LIFE OF THE CONTRACT.

4. BLOCK 14*: DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC

MAIL OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL

DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR

PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL

DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND

NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING

PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,

AUTOCAD, VECTORWORKS, OR OTHERS). ONE COPY EACH OF THE

REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT

LEADER AND THE PROJECT ENGINEER. DELIVERY SHALL BE MADE TO THE

FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-TRADE-FMS, ATTN:

FMS PROJECT LEADER AND FMS PROJECT ENGINEER, 12211 SCIENCE DRIVE,

ORLANDO, FL 32826-3224.

5. THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION.

6. THE CONTRACTOR SHALLHAVE 10 CALENDAR DAYS TO INCORPORATE

GOVERNMENT COMMENTS.

16. REMARKS 020SEE BLOCK 16

020 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SFAE-STRI-PMTRADE

See Block 16

5. CONTRACT REFERENCE

DI-SESS-81758A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Logistics Product DataLOGISTICS PRODUCT DATA

2. TITLE OF THE DATA ITEM

C001

1. DATA ITEM NO.

F.…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.