AF_UH60_CDRLs.pdf
PDF 341 KB Posted
- Solicitation number
- W900KK-18-R-0004
About this file
AAF SMW UH60A Contract Data Item List (CDRL)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SMW_UH-60A_Q_and_A_Reponses.docx | DOCX document | |
| UH-60_Solicitation_FINAL_121817.docx | DOCX document | |
| AF_UH-60A_SYS_SPEC.pdf | ||
| UH60A_Comment_Clarification_Form.docx | DOCX document | |
| AF_UH-60A_SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SFAE-STRI-TRADE-FMS
6. REQUIRING OFFICE
SOW paragraph 3.6 Program Management
5. CONTRACT REFERENCE
DI-MGMT-80227
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
CPSMRSee Block 16
2. TITLE OF THE DATA ITEM
A001
1. DATA ITEM NO.
F. CONTRACTOR
2017-053
E. CONTRACT/PR NO.
Afghan Air Force UH-60A FTDs
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
08-DEC-2017
J. DATE
Meister, Jeffery
I. APPROVED BY
07-DEC-2017
H. DATEG. PREPARED BY
Andrade, Richard
Block 2: Contractors Progress, Status and Management Report
Block 2: Contractors Progress, Status and Management Report
1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED
ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):
"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE
DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS
OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS
FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE
OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)
12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.
EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING
DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED
TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE
EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET
SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD
5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD
INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY
ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE
DOCUMENT.
2. BLOCK 12: SHALL BE DUE 30 CALENDAR DAYS AFTER CONTRACT AWARD.
3. BLOCK 13: SHALL BE DUE MONTHLY THROUGH THE LIFE OF THE CONTRACT.
4. THE GOVERNMENT WILL HAVE 10 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION.
5. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
6. SUBMISSIONS SHALL CONCLUDE 60 CALENDAR DAYS AFTER RTF OF THE
FINAL TRAINING DEVICE.
7. BLOCK 14 : DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC MAIL
OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL
DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR
PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL
DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND
NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING
PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,
AUTOCAD, VECTORWORKS, OR OTHERS). ONE COPY EACH OF THE
REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT
LEADER AND THE FMS CONTRACT SPECIALIST. DELIVERY SHALL BE MADE
TO THE FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-TRADE-FMS,
ATTN: FMS PROJECT LEADER AND FMS CONTRACT SPECIALIST, 12211
SCIENCE DRIVE, ORLANDO, FL 32826-3224.
16. REMARKS 020SEE BLOCK 16
020 15. TOTALSee continuation sheet...
18.ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Page 1 of 2 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001
16. REMARKS (Continued)
8. DELIVERED FILE TYPE SHALL BE SEARCHABLE PDFs.
9. CONTRACTOR TEMPLATE IS ACCEPTABLE.
10. CONTENT IS DEFINED BY DID; CONTENT TAILORED OUT AS NECESSARY AND IDENTIFIED BELOW:
a) 10.3 (f)
b) 10.3 (g)
c) 10.3 (h)
d) 10.3 (i)
F. CONTRACTOR
2017-053
E. CONTRACT/PR NO.
Afghan Air Force UH-60A FTDs
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Page 2 of 2 PagesDD FORM 1423-1, FEB 2001
See Block 16
5. CONTRACT REFERENCE
DI-MGMT-81861A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
IPMRIntegrated Program Management Report (IPMR)
2. TITLE OF THE DATA ITEM
A002
1. DATA ITEM NO.
F. CONTRACTOR
2017-053
E. CONTRACT/PR NO.
Afghan Air Force UH-60A FTDs
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
08-DEC-2017
J. DATE
Meister, Jeffery
I. APPROVED BY
07-DEC-2017
H. DATEG. PREPARED BY
Andrade, Richard
Block 5: SOW paragraph 3.7.1 Integrated Master Schedule
1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED
ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):
"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE
DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS
OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS
FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE
OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)
12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.
EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING
DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED
TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE
EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET
SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD
5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD
INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY
ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE
DOCUMENT.
2. BLOCK 12: SHALL BE DUE 30 CALENDAR DAYS AFTER CONTRACT AWARD.
3. BLOCK 13: SHALL BE DUE MONTHLY THROUGH THE LIFE OF THE CONTRACT.
4. THE GOVERNMENT WILL HAVE 10 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION.
5. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
6. BLOCK 14*: DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC MAIL
OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL
DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR
PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL
DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND
NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING
PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,
AUTOCAD, VECTORWORKS, OR OTHERS). ONE COPY EACH OF THE
REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT
LEADER AND THE FMS CONTRACT SPECIALIST. DELIVERY SHALL BE MADE
TO THE FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-TRADE-FMS,
ATTN: FMS PROJECT LEADER AND FMS CONTRACT SPECIALIST, 12211
SCIENCE DRIVE, ORLANDO, FL 32826-3224.
7. DELIVERED FILE TYPE SHALL BE SEARCHABLE PDFs and Microsoft Project compatible files.
8. CONTRACTOR TEMPLATE IS ACCEPTABLE
9. CONTENT IS DEFINED BY DID; CONTENT TAILORED OUT AS NECESSARY
16. REMARKS 020*SEE BLOCK 16
020 15. TOTALSee continuation sheet...
18.ESTIMATED
TOTAL PRICE
AND IDENTIFIED BELOW:
a) Use Format 6 only
F. CONTRACTOR
2017-053
E. CONTRACT/PR NO.
Afghan Air Force UH-60A FTDs
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
CONTRACT DATA REQUIREMENTS LIST
See Block 16
5. CONTRACT REFERENCE
DI-ADMN-81250B
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
CMConference Minutes
2. TITLE OF THE DATA ITEM
A003
1. DATA ITEM NO.
F. CONTRACTOR
2017-053
E. CONTRACT/PR NO.
Afghan Air Force UH-60A FTDs
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER ADMNA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
08-DEC-2017
J. DATE
Meister, Jeffery
I. APPROVED BY
07-DEC-2017
H. DATEG. PREPARED BY
Andrade, Richard
Block 5: SOW paragraph 3.7.2.1 Program and Technical Reviews
1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED
ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):
"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE
DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS
OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS
FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE
OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)
12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.
EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING
DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED
TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE
EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET
SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS
OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD
5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD
INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY
ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE
DOCUMENT.
2. BLOCK 12: SHALL BE DUE 10 DAYS AFTER EACH MEETING, CONFERENCE,
OR REVIEW (EXCEPT INTEGRATED PRODUCT TEAM (IPT) MEETINGS).
3. BLOCK 13: SHALL CONTINUE THROUGHOUT THE LIFE OF THE CONTRACT.
4. THE GOVERNMENT WILL HAVE 10 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION.
5. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
6. BLOCK 14*: DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC MAIL
OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL
DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR
PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL
DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND
NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING
PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,
AUTOCAD, VECTORWORKS, OR OTHERS). ONE COPY EACH OF THE
REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT
LEADER AND THE FMS CONSTRACT SPECIALIST. DELIVERY SHALL BE MADE
TO THE FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-TRADE-FMS,
ATTN: FMS PROJECT LEADER AND FMS CONTRACT SPECIALIST, 12211
SCIENCE DRIVE, ORLANDO, FL 32826-3224.
7. DELIVERED FILE TYPE SHALL BE SEARCHABLE PDFs.
8. CONTRACTOR TEMPLATE IS ACCEPTABLE
9. CONTENT IS DEFINED BY DID; CONTENT TAILORED OUT AS NECESSARY
16. REMARKS 020* SEE BLOCK 16
020 15. TOTALSee continuation sheet...
18.ESTIMATED
TOTAL PRICE
AND IDENTIFIED BELOW:
a) 10.2.A.3
F. CONTRACTOR
2017-053
E. CONTRACT/PR NO.
Afghan Air Force UH-60A FTDs
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER ADMNA
B. EXHIBITA. CONTRACT LINE ITEM NO.
CONTRACT DATA REQUIREMENTS LIST
See Block 16
5. CONTRACT REFERENCE
DI-SESS-81000E
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
PDALProduct Drawings/Models and Associated Lists
2. TITLE OF THE DATA ITEM
B001
1. DATA ITEM NO.
F. CONTRACTOR
2017-053
E. CONTRACT/PR NO.
Afghan Air Force UH-60A FTDs
D. SYSTEM/ITEM
TDP
C. CATEGORY
X TM OTHERB
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
ONE/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
08-DEC-2017
J. DATE
Meister, Jeffery
I. APPROVED BY
07-DEC-2017
H. DATEG. PREPARED BY
Andrade, Richard
Block 5: SOW paragraph 3.3.9 Product Definition Data
1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED
ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):
"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE
DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS
OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS
FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE
OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)
12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224
EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING
DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED
TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE
EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET
SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS
OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD
5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD
INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY
ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE
DOCUMENT.
2. BLOCK 12: ONE SET OF PRODUCT DRAWINGS SHALL BE PREPARED AND
SUBMITTED FOR EACH TRAINER. FIRST SUBMISSION SHALL BE DUE 60
CALENDAR DAYS AFTER CRITICAL DESIGN REVIEW (CDR).
3. BLOCK 13: SUBSEQUENT SUBMISSION SHALL BE DUE 30 CALENDAR DAYS
AFTER GOVERNMENT ACCEPTANCE TEST. REVISIONS AS REQUIRED
THROUGHOUT THE LIFE OF THE CONTRACT.
4. THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION.
5. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
6. BLOCK 14*: DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC MAIL
OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL
DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR
PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL
DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND
NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING
PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,
AUTOCAD, VECTORWORKS, OR OTHERS). ONE COPY EACH OF THE
REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT
LEADER AND THE PROJECT SPECIALIST. ONE COPY EACH OF THE
REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT
LEADER AND THE PROJECT ENGINEER. DELIVERY SHALL BE MADE TO THE
FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-TRADE-FMS, ATTN:
FMS PROJECT LEADER AND FMS PROJECT ENGINEER, 12211 SCIENCE DRIVE,
ORLANDO, FL 32826-3224.
16. REMARKS 020*SEE BLOCK 16
020 15. TOTALSee continuation sheet...
18.ESTIMATED
TOTAL PRICE
7. DELIVERED FILE TYPE SHALL BE SEARCHABLE PDFs.
8. CONTRACTOR TEMPLATE IS ACCEPTABLE.
9. CONTENT IS DEFINED BY DID.
F. CONTRACTOR
2017-053
E. CONTRACT/PR NO.
Afghan Air Force UH-60A FTDs
D. SYSTEM/ITEM
TDP
C. CATEGORY
X TM OTHERB
B. EXHIBITA. CONTRACT LINE ITEM NO.
CONTRACT DATA REQUIREMENTS LIST
SOW paragraph 3.2 System Design
5. CONTRACT REFERENCE
DI-IPSC-81431A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
SSSSystem/Subsystem Specification (SSS)
2. TITLE OF THE DATA ITEM
B002
1. DATA ITEM NO.
F. CONTRACTOR
2017-053
E. CONTRACT/PR NO.
Afghan Air Force UH-60A FTDs
D. SYSTEM/ITEM
TDP
C. CATEGORY
X TM OTHERB
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
R/ASR
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
08-DEC-2017
J. DATE
Meister, Jeffery
I. APPROVED BY
07-DEC-2017
H. DATEG. PREPARED BY
Andrade, Richard
1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED
ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):
"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE
DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS
OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS
FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE
OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)
12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224
EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING
DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED
TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE
EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET
SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS
OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD
5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD
INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY
ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE
DOCUMENT.
2. BLOCK 12: SHALL BE DUE 15 CALENDAR DAYS PRIOR TO SRR.
3. BLOCK 13: REVISIONS AS REQUIRED THROUGH THE LIFE OF THE CONTRACT.
4. BLOCK 14: DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC MAIL
OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL
DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR
PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL
DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND
NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING
PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,
AUTOCAD, VECTORWORKS, OR OTHERS).ONE COPY EACH OF THE
REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT
LEADER AND THE PROJECT ENGINEER. DELIVERY SHALL BE MADE TO THE
FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-TRADE-FMS, ATTN:
FMS PROJECT LEADER AND FMS PROJECT ENGINEER, 12211 SCIENCE DRIVE,
ORLANDO, FL 32826-3224.
5. THE GOVERNMENT WILL HAVE 10 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION.
6. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
16. REMARKS 020SEE BLOCK 16
020 15. TOTAL
18.ESTIMATED
TOTAL PRICE
Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001
SOW paragraph 3.4 Safety Engineering
5. CONTRACT REFERENCE
DI-SAFT-80102C
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
SARSAFETY ASSESSMENT REPORT
2. TITLE OF THE DATA ITEM
B003
1. DATA ITEM NO.
F. CONTRACTOR
2017-053
E. CONTRACT/PR NO.
Afghan Air Force UH-60A FTDs
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SAFTB
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ONE/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
08-DEC-2017
J. DATE
Meister, Jeffery
I. APPROVED BY
07-DEC-2017
H. DATEG. PREPARED BY
Andrade, Richard
1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED
ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):
"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE
DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS
OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS
FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE
OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)
12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.
EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING
DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED
TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE
EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET
SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD
5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD
INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY
ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE
DOCUMENT.
2. BLOCK 12: SUBMISSION SHALL BE DUE 30 CALENDAR DAYS AFTER
CRITICAL DESIGN REVIEW (CDR).
3. BLOCK 13: REVISIONS AS REQUIRED THROUGH THE LIFE OF THE
CONTRACT. FINAL SHALL BE SUBMITTED 60 DAYS PRIOR TO GOVERNMENT
SITE ACCEPTANCE TESTING FOR EACH DEVICE.
4. THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION.
5. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
6. BLOCK 14: DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC MAIL
OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL
DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR
PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL
DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND
NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING
PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,
AUTOCAD, VECTORWORKS, OR OTHERS). ONE COPY EACH OF THE
REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT
LEADER, THE PROJECT ENGINEER, AND PEO STRI'S OFFICE OF THE
TECHNICAL DIRECTOR'S SYSTEM SAFETY ENGINEER. DELIVERY SHALL BE
MADE TO THE FOLLOWING ADDRESS: PEO STRI, ATTN:
SFAE-STRI-TRADE-FMS, ATTN: FMS PROJECT LEADER, FMS PROJECT
ENGINEER, PEO STRI'S OFFICE OF THE TECHNICAL DIRECTOR'S SYSTEM
SAFETY ENGINEER, 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.
7. DELIVERED FILE TYPE SHALL BE SEARCHABLE PDFs.
16. REMARKS 030SEE BLOCK 16
030 15. TOTALSee continuation sheet...
18.ESTIMATED
TOTAL PRICE
8. CONTRACTOR TEMPLATE IS ACCEPTABLE.
9. CONTENT IS DEFINED BY DID.
F. CONTRACTOR
2017-053
E. CONTRACT/PR NO.
Afghan Air Force UH-60A FTDs
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SAFTB
B. EXHIBITA. CONTRACT LINE ITEM NO.
CONTRACT DATA REQUIREMENTS LIST
See Block 16
5. CONTRACT REFERENCE
DI-NDTI-80603A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
TPTest Procedure
2. TITLE OF THE DATA ITEM
B004
1. DATA ITEM NO.
F. CONTRACTOR
2017-053
E. CONTRACT/PR NO.
Afghan Air Force UH-60A FTDs
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER NDTIB
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ONE/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
08-DEC-2017
J. DATE
Meister, Jeffery
I. APPROVED BY
07-DEC-2017
H. DATEG. PREPARED BY
Andrade, Richard
Block 5: SOW paragraph 3.12 Integrated Testing and Inspections
1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED
ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):
"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE
DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS
OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS
FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE
OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)
12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224
EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING
DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED
TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE
EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET
SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS
OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD
5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD
INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY
ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE
DOCUMENT.
2. BLOCK 12. THE CONTRACTOR SHALL DELIVER ONE SET OF TEST
PROCEDURES EACH FOR THE FTD, CPT, SCHEMATIC, BMC AND
ILLUSTRATION. DELIVERY IS REQUIRED 45 CALENDAR DAYS PRIOR TO EACH TEST.
3. BLOCK 13. REVISIONS DUE AS REQUIRED.
4. THE GOVERNMENT WILL HAVE 10 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
5. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
6. BLOCK 14: DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC MAIL
OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL
DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR
PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL
DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND
NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING
PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,
AUTOCAD, VECTORWORKS, OR OTHERS). ONE COPY EACH OF THE
REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT
LEADER AND THE PROJECT ENGINEER. DELIVERY SHALL BE MADE TO THE
FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-TRADE-FMS, ATTN:
FMS PROJECT LEADER AND FMS PROJECT ENGINEER, 12211 SCIENCE DRIVE,
ORLANDO, FL 32826-3224.
7. DELIVERED FILE TYPE SHALL BE SEARCHABLE PDFs. FOR TESTING
PURPOSES; PAPER COPIES WILL BE PROVIDED.
8. CONTRACTOR TEMPLATE IS ACCEPTABLE
16. REMARKS 020SEE BLOCK 16
020 15. TOTALSee continuation sheet...
18.ESTIMATED
TOTAL PRICE
9. CONTENT IS DEFINED BY DID.
F. CONTRACTOR
2017-053
E. CONTRACT/PR NO.
Afghan Air Force UH-60A FTDs
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER NDTIB
B. EXHIBITA. CONTRACT LINE ITEM NO.
CONTRACT DATA REQUIREMENTS LIST
See Block 16
5. CONTRACT REFERENCE
DI-NDTI-80809B
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
TIRTest/Inspection Report
2. TITLE OF THE DATA ITEM
B005
1. DATA ITEM NO.
F. CONTRACTOR
2017-053
E. CONTRACT/PR NO.
Afghan Air Force UH-60A FTDs
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER NDTIB
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ONE/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
08-DEC-2017
J. DATE
Meister, Jeffery
I. APPROVED BY
07-DEC-2017
H. DATEG. PREPARED BY
Andrade, Richard
Block 5: SOW paragraphs 3.12.3 Factory Acceptance Test and 3.12.4 Site Acceptance Test
1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED
ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):
"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE
DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS
OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS
FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE
OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)
12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224
EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING
DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED
TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE
EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET
SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD
5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD
INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY
ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE
DOCUMENT.
2. BLOCKS 12 AND 13: A TEST/INSPECTION REPORT SHALL BE SUBMITTED
FOR EACH USG TEST EVENT. EACH SUBMISSION SHALL BE DUE 30
CALENDAR DAYS AFTER COMPLETION OF EACH USG TEST. 3. BLOCK 13:
REVISIONS AS REQUIRED.
4. THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION.
5. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
6. BLOCK 14: DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC MAIL
OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL
DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR
PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL
DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND
NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING
PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,
AUTOCAD, VECTORWORKS, OR OTHERS). ONE COPY EACH OF THE
REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT
LEADER AND THE PROJECT ENGINEER. DELIVERY SHALL BE MADE TO THE
FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-TRADE-FMS, ATTN:
FMS PROJECT LEADER AND FMS PROJECT ENGINEER, 12211 SCIENCE DRIVE,
ORLANDO, FL 32826-3224.
7. DELIVERED FILE TYPE SHALL BE SEARCHABLE PDFs.
8. CONTRACTOR TEMPLATE IS ACCEPTABLE.
16. REMARKS 020SEE BLOCK 16
020 15. TOTALSee continuation sheet...
18.ESTIMATED
TOTAL PRICE
9. CONTENT IS DEFINED BY DID.
F. CONTRACTOR
2017-053
E. CONTRACT/PR NO.
Afghan Air Force UH-60A FTDs
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER NDTIB
B. EXHIBITA. CONTRACT LINE ITEM NO.
CONTRACT DATA REQUIREMENTS LIST
SOW paragraph 3.14 Site Requirements
5. CONTRACT REFERENCE
DI-FACR-80966
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
TFRTrainer Facilities Report (TFR)
2. TITLE OF THE DATA ITEM
B006
1. DATA ITEM NO.
F. CONTRACTOR
2017-053
E. CONTRACT/PR NO.
Afghan Air Force UH-60A FTDs
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER FACRB
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ONE/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
08-DEC-2017
J. DATE
Meister, Jeffery
I. APPROVED BY
07-DEC-2017
H. DATEG. PREPARED BY
Andrade, Richard
1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED
ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):
"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE
DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS
OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS
FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE
OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)
12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.
EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING
DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED
TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE
EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET
SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD
5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD
INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY
ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE
DOCUMENT.
2. BLOCKS 12 AND 13: A TFR SHALL BE SUBMITTED FOR EACH DEVICE AND
ITS LOCATION. THE TFR SHALL BE DUE 30 CALENDAR DAYS AFTER
COMPLETION OF EACH SITE VISIT.
3. BLOCK 13: REVISIONS AS REQUIRED THROUGH THE LIFE OF THE CONTRACT.
4. THE GOVERNMENT WILL HAVE 20 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
5. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
6. BLOCK 14: DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC MAIL
OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL
DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR
PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL
DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND
NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING
PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,
AUTOCAD, VECTORWORKS, OR OTHERS). ONE COPY EACH OF THE
REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT
LEADER AND THE PROJECT ENGINEER. DELIVERY SHALL BE MADE TO THE
FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-TRADE-FMS, ATTN:
FMS PROJECT LEADER AND FMS PROJECT ENGINEER, 12211 SCIENCE DRIVE,
ORLANDO, FL 32826-3224.
7. DELIVERED FILE TYPE SHALL BE SEARCHABLE PDFs.
8. CONTRACTOR TEMPLATE IS ACCEPTABLE
9. CONTENT IS DEFINED BY DID.
16. REMARKS 020SEE BLOCK 16
020 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW paragraph 3.2.2. Software Design
5. CONTRACT REFERENCE
DI-IPSC-81442A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
SVDSoftware Version Description (SVD)
2. TITLE OF THE DATA ITEM
B007
1. DATA ITEM NO.
F. CONTRACTOR
2017-053
E. CONTRACT/PR NO.
Afghan Air Force UH-60A FTDs
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER IPSCB
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ONE/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
08-DEC-2017
J. DATE
Meister, Jeffery
I. APPROVED BY
07-DEC-2017
H. DATEG. PREPARED BY
Andrade, Richard
1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED
ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):
"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE
DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS
OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS
FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE
OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)
12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.
EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING
DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED
TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE
EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET
SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD
5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD
INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY
ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE
DOCUMENT.
2. BLOCK 12: FIRST SUBMISSION 5 CALENDAR DAYS PRIOR TO FACTORY
ACCEPTANCE TEST (FAT) AND SITE ACCEPTANCE TEST (SAT).
3. BLOCK 13: REVISIONS AS REQUIRED THROUGHOUT THE LIFE OF THE CONTRACT.
4. THE GOVERNMENT WILL HAVE 15 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
5. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE CHANGES.
6. BLOCK 14*: DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC MAIL
OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL
DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR
PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL
DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND
NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING
PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,
AUTOCAD, VECTORWORKS, OR OTHERS).ONE COPY EACH OF THE
REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT
LEADER AND THE PROJECT ENGINEER. DELIVERY SHALL BE MADE TO THE
FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-TRADE-FMS, ATTN:
FMS PROJECT LEADER AND FMS PROJECT ENGINEER, 12211 SCIENCE DRIVE,
ORLANDO, FL 32826-3224.
7. DELIVERED FILE TYPE SHALL BE SEARCHABLE PDFs.
8. CONTRACTOR TEMPLATE IS ACCEPTABLE.
16. REMARKS 020SEE BLOCK 16
020 15. TOTAL
18.ESTIMATED
TOTAL PRICE
See Block 16
5. CONTRACT REFERENCE
DI-SESS-81003E
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
CD/MALCOMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LISTS
2. TITLE OF THE DATA ITEM
B008
1. DATA ITEM NO.
F. CONTRACTOR
2017-053
E. CONTRACT/PR NO.
Afghan Air Force UH-60A FTDs
D. SYSTEM/ITEM
TDP
C. CATEGORY
X TM OTHERB
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ONE/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
08-DEC-2017
J. DATE
Meister, Jeffery
I. APPROVED BY
07-DEC-2017
H. DATEG. PREPARED BY
Andrade, Richard
Block 5: SOW paragraph 3.3.9 Product Definition Data
1. BLOCK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE PLACED
ON DOCUMENT TITLE PAGE AND DISC LABEL (WHERE APPLICABLE):
"DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE
DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR REASONS
OF CRITICAL TECHNOLOGY, DETERMINED 21 JUNE 2017. OTHER REQUESTS
FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM EXECUTIVE
OFFICE FOR SIMULATION, TRAINING AND INSTRUMENTATION (PEO STRI)
12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.
EXPORT CONTROL WARNING. ALL PRINTED AND ELECTRONIC TECHNICAL DATA, INCLUDING
DIGITAL TECHNICAL DOCUMENTS THAT ARE DETERMINED TO CONTAIN EXPORT-CONTROLLED
TECHNICAL DATA SHALL BE MARKED AS SHOWN BELOW.
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE
EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET
SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS
OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD
5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11 -19 OR DOD 5200.01, DOD
INFORMATION SECURITY PROGRAM. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY
ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE
DOCUMENT.
2. Block 12: FIRST DELIVERY SHALL BE DUE 60 CALENDAR DAYS AFTER
CRITICAL DESIGN REVIEW (CDR).
3. Block 13: SUBSEQUENT SUBMISSION SHALL BE DUE 30 CALENDAR DAYS
AFTER GOVERNMENT ACCEPTANCE TEST. REVISIONS AS REQUIRED
THROUGHT THE LIFE OF THE CONTRACT.
4. BLOCK 14*: DELIVERABLES SHALL BE DELIVERED VIA ELECTRONIC
MAIL OR OPTIC DISK (CD OR DVD) BASED ON DOCUMENTATION SIZE. ALL
DOCUMENTS FOR GOVERNMENT REVIEW SHALL BE DELIVERED IN XML OR
PLJ, AND NATIVE FORMAT. AFTER GOVERNMENT ACCEPTANCE, ALL
DOCUMENTATION SHALL BE DELIVERED IN BOTH SEARCHABLE PDF AND
NATIVE EDITABLE FORMAT. NATIVE FORMAT IS DEFINED AS BEING
PRODUCED BY COTS SOFTWARE (I.E.MICROSOFT OFFICE, OPENOFFICE,
AUTOCAD, VECTORWORKS, OR OTHERS). ONE COPY EACH OF THE
REPRODUCIBLE SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT
LEADER AND THE PROJECT ENGINEER. DELIVERY SHALL BE MADE TO THE
FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-TRADE-FMS, ATTN:
FMS PROJECT LEADER AND FMS PROJECT ENGINEER, 12211 SCIENCE DRIVE,
ORLANDO, FL 32826-3224.
5. THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
6. THE CONTRACTOR SHALLHAVE 10 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
16. REMARKS 020SEE BLOCK 16
020 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SFAE-STRI-PMTRADE
See Block 16
5. CONTRACT REFERENCE
DI-SESS-81758A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Logistics Product DataLOGISTICS PRODUCT DATA
2. TITLE OF THE DATA ITEM
C001
1. DATA ITEM NO.
F.…
This is the start of the file's text. The full file is on GovTribe.