Attachment 4 - BSDC - Contract Data Requirements Lists
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CombinedSynSol-BSDC.pdf | ||
| Att1-BSDC-SOW.pdf | ||
| Att3-BSDC-Spec-YTC.pdf | ||
| Att2-BSDC-Spec-ATC.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SFAE-STRI-ITTS
6. REQUIRING OFFICE
SOW Paragraph 3.2.1
5. CONTRACT REFERENCE
DI-MGMT-81861
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Integrated Master Schedule (IMS)
Integrated Program Management Report (IPMR)
2. TITLE OF THE DATA ITEM
A001
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-C-17-Sand and Dust
E. CONTRACT/PR NO.
Sand and Dust
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
A
B. EXHIBIT
A. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved
OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
11. AS OF DATE
12. DATE OF FIRST
MNTHLY
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
05-JUN-2017
J. DATE
Vick, Derek
I. APPROVED BY
H. DATE
G. PREPARED BY
Primas, Mitchell
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND
U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY EFFECTIVE 1 JUNE 2015. OTHER REQUEST FOR THIS DOCUMENT
SHALL BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.
2. BLOCK 12: INITIAL SUBMISSION IS DUE NO LATER THAN 60 CALENDAR
DAYS AFTER CONTRACT AWARD.
3. BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE DUE THE 7TH CALENDAR
DAY OF EACH MONTH AND CONTINUE MONTHLY THROUGH CONTRACT PERIOD OF PERFORMANCE.
4. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF
ATTACHMENTS, VIA EMAIL TO
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-AEM-CDRLS@MAIL.MIL AND TO THE
CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE THE
CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD (E.G.,
W900KK-15-D-0001/004, CLIN 0002, CDRL A001, 1 MAY 2015). SUBMISSIONS
SHALL BE IN MICROSOFT OFFICE 2013 AND SEARCHABLE ADOBE ACROBAT
READER (*.PDF) FORMATS. GRAPHIC PACKAGES USED TO CREATE FIGURES,
TABLES, AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT OFFICE 2013.
FOR DATA SUBMISSION WITH AN ELECTRONIC FILE SIZE GREATER THAN 10 MB
OR IF THE COMBINED SIZE OF THE ATTACHMENTS TO THE EMAIL IS GREATER
THAN 10 MB, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS. EMAIL IN
THE FORM OF COMPRESSED OR ZIP FILES AND EXECUTABLE FILES ARE NOT
ACCEPTED BY THE PEO STRI FIREWALL. FOR SUBMISSION OF THESE FILE
TYPES, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS.
5. GOVERNMENT WILL HAVE 10 WORK DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
6. CONTRACTOR SHALL HAVE 5 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS
1 SFAE-STRI-ITTS-I
0 1 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Page 1 of 16 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SFAE-STRI-ITTS-I
SOW Paragraph 3.2.3
DI-MISC-80711A
Cybersecurity Artifacts
Scientific and Technical Reports
A002
TM OTHER MISC
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
N/A
SEE BLOCK 16
1TIME
27-JUN-2017
U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL TECHNOLOGY 1
JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO
U.S. ARMY PEO STRI/SFAE-STRI-ITTS.
2. BLOCK 12: SHALL BE DUE NO LATER THAN 90 CALENDAR DAYS PRIOR TO FAT TRR.
3. GOVERNMENT WILL HAVE 7 CALENDAR DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION.
4. CONTRACTOR SHALL HAVE 7 CALENDAR DAYS TO INCORPORATE GOVERNMENT COMMENTS.
3. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-AEM-CDRLS@MAIL.MIL. AND THE
CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE THE
CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD (E.G.,
W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 MAY 2013). SUBMISSIONS
REQUIREMENTS TO BE DETERMINED BASED ON ATC/YTC RMF REQUIREMENTS.
Page 2 of 16 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SFAE-STRI-ITTS-IMO
SOW Paragraph 3.4.1.1
DI-MISC-80711A
Site Survey Report
Scientific and Technical Reports
A003
TM OTHER MISC
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
2. BLOCK 12: SHALL BE DUE NO LATER THAN 5 CALENDAR DAYS AFTER SITE SURVEY.
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-AEM-CDRLS@MAIL.MIL AND TO THE
CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE THE
CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD (E.G.,
W900KK-15-D-0001/004, CLIN 0002, CDRL A001, 1 MAY 2015). SUBMISSIONS
SHALL BE IN MICROSOFT OFFICE 2013 AND SEARCHABLE ADOBE ACROBAT
READER (*.PDF) FORMATS. GRAPHIC PACKAGES USED TO CREATE FIGURES,
TABLES, AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT OFFICE 2013.
FOR DATA SUBMISSION WITH AN ELECTRONIC FILE SIZE GREATER THAN 10 MB
OR IF THE COMBINED SIZE OF THE ATTACHMENTS TO THE EMAIL IS GREATER
THAN 10 MB, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS. EMAIL IN
THE FORM OF COMPRESSED OR ZIP FILES AND EXECUTABLE FILES ARE NOT
6. GOVERNMENT WILL HAVE 7 CALENDAR DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION.
7. CONTRACTOR SHALL HAVE 7 CALENDAR DAYS TO INCORPORATE GOVERNMENT COMMENTS.
8. CONTRACTOR FORMAT IS ACCEPTABLE.
Page 3 of 16 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW Paragraph 3.5.1
DI-NDTI-80566A
Test Plan
A004
TM OTHER NDTI
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
2. BLOCK 12: SHALL BE DUE NO LATER THAN 45 CALENDAR DAYS PRIOR TO FAT TRR.
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-AEM-CDRLS@MAIL.MIL AND TO THE
CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE THE
CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD (E.G.,
W900KK-15-D-0001/004, CLIN 0002, CDRL A001, 1 MAY 2015). SUBMISSIONS
SHALL BE IN MICROSOFT OFFICE 2013 AND SEARCHABLE ADOBE ACROBAT
READER (*.PDF) FORMATS. GRAPHIC PACKAGES USED TO CREATE FIGURES,
TABLES, AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT OFFICE 2013.
FOR DATA SUBMISSION WITH AN ELECTRONIC FILE SIZE GREATER THAN 10 MB
OR IF THE COMBINED SIZE OF THE ATTACHMENTS TO THE EMAIL IS GREATER
THAN 10 MB, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS. EMAIL IN
THE FORM OF COMPRESSED OR ZIP FILES AND EXECUTABLE FILES ARE NOT
4. GOVERNMENT WILL HAVE 10 CALENDAR DAYS FOR REVIEW.
5. CONTRACTOR SHALL HAVE 10 CALENDAR DAYS TO INCORPORATE GOVERNMENT COMMENTS.
6. CONTRACTOR FORMAT IS ACCEPTABLE.
Page 4 of 16 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARAGRAPH 3.5.4 AND 3.5.5
DI-NDTI-80603A
Test Procedure
A005
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
2TIME
1. BLOCK 12: FIRST SUBMISSION DUE 21 CALENDAR DAYS PRIOR TO FAT TRR.
2. BLOCK 13: FINAL SUBMISSION DUE 21 CALENDAR DAYS PRIOR TO SAT TRR.
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-AEM-CDRLS@MAIL.MIL AND
CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE THE
CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD (E.G.,
W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 MAY 2013). SUBMISSIONS SHALL
BE IN MICROSOFT OFFICE 2013 OR SEARCHABLE ADOBE ACROBAT READER
(*.PDF) FORMATS. GRAPHIC PACKAGES USED TO CREATE FIGURES, TABLES,
AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT OFFICE 2013. FOR DATA
SUBMISSION WITH AN ELECTRONIC FILE SIZE GREATER THAN 10 MB OR IF
THE COMBINED SIZE OF THE ATTACHMENTS TO THE EMAIL IS GREATER THAN
10 MB, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS. EMAIL IN THE
FORM OF COMPRESSED OR ZIP FILES AND EXECUTABLE FILES ARE NOT
TYPES, CONTACT THE CONTRACTING SPECIALIST FOR SUBMISSION INSTRUCTIONS.
4. GOVERNMENT WILL HAVE 7 CALENDAR DAYS FOR REVIEW AND ACCEPTANCE
OR REJECTION OF EACH SUBMISSION.
5. CONTRACTOR SHALL HAVE 7 CALENDAR DAYS TO INCORPORATE GOVERNMENT COMMENTS.
6. REVISIONS TO THE DOCUMENT SHALL CLEARLY INDICATE CHANGES FROM
PREVIOUS VERSIONS THROUGH VERSION/REVISION NUMBER/LETTER,
HIGHLIGHTS, CHANGE BARS, ETC.
7. GOVERNMENT RESERVES THE RIGHT TO WITNESS ANY CONTRACTOR/SUBCONTRACTOR TEST.
8. CONTRACTOR FORMAT IS ACCEPTABLE.
Page 5 of 16 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARAGRAPHS 3.5.4 and 3.5.5
DI-NDTI-80809B
Test/Inspection Report
A006
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
2TIME
2. BLOCK 12: FIRST SUBMISSION SHALL BE DUE NO LATER THAN 7 CALENDAR
DAYS AFTER FAT.
3. BLOCK 13: FINAL SUBMISSION SHALL BE DUE NO LATER THAN 7 CALENDAR
DAYS AFTER SAT.
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-AEM-CDRLS@MAIL.MIL AND TO THE
CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE THE
CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD (E.G.,
W900KK-15-D-0001/004, CLIN 0002, CDRL A001, 1 MAY 2015). SUBMISSIONS
SHALL BE IN MICROSOFT OFFICE 2013 AND SEARCHABLE ADOBE ACROBAT
READER (*.PDF) FORMATS. GRAPHIC PACKAGES USED TO CREATE FIGURES,
TABLES, AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT OFFICE 2013.
FOR DATA SUBMISSION WITH AN ELECTRONIC FILE SIZE GREATER THAN 10 MB
OR IF THE COMBINED SIZE OF THE ATTACHMENTS TO THE EMAIL IS GREATER
THAN 10 MB, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS. EMAIL IN
THE FORM OF COMPRESSED OR ZIP FILES AND EXECUTABLE FILES ARE NOT
5. GOVERNMENT WILL HAVE 7 CALENDAR DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION.
6. CONTRACTOR SHALL HAVE 7 CALENDAR DAYS TO INCORPORATE GOVERNMENT COMMENTS.
7. CONTRACTOR FORMAT IS ACCEPTABLE.
Page 6 of 16 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARAGRAPH 3.6.1
DI-SAFT-80102C
SAFETY ASSESSMENT REPORT
A007
TM OTHER SAFT
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
DATE 16
BLOCK 16
1TIME/R
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL
TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE
REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.
2. BLOCK 12: FIRST SUBMISSION SHALL BE DUE NO LATER THAN 45 CALENDAR
DAYS PRIOR TO FAT TRR.
3. BLOCK 13: REVISIONS AS REQUIRED.
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-AEM-CDRLS@MAIL.MIL AND THE
CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE THE
CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD (E.G.,
W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 MAY 2013). SUBMISSIONS SHALL
BE IN MICROSOFT OFFICE 2013 OR SEARCHABLE ADOBE ACROBAT READER
(*.PDF) FORMATS. GRAPHIC PACKAGES USED TO CREATE FIGURES, TABLES,
AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT OFFICE 2013. FOR
DATA SUBMISSION WITH AN ELECTRONIC FILE SIZE GREATER THAN 10 MB OR
IF THE COMBINED SIZE OF THE ATTACHMENTS TO THE EMAIL IS GREATER
THAN 10 MB, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS. EMAIL IN
THE FORM OF COMPRESSED OR ZIP FILES AND EXECUTABLE FILES ARE NOT
5. GOVERNMENT WILL HAVE 7 CALENDAR DAYS FOR REVIEW AND ACCEPTANCE
6. CONTRACTOR SHALL HAVE 7 CALENDAR WORK DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
Page 7 of 16 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARAGRAPH 3..6.2
DI-SAFT-80106C
HEALTH HAZARD ASSESSMENT REPORT (HHAR)
A008
TM OTHER SAFT
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
2. BLOCK 12: SUBMISSION SHALL BE DUE NO LATER THAN 45 CALENDAR DAYS
PRIOR TO FAT TRR.
3. BLOCK 13: REVISIONS AS REQUIRED
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-AEM-CDRLS@MAIL.MIL AND THE
CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE THE
CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD (E.G.,
W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 MAY 2013). SUBMISSIONS SHALL
BE IN MICROSOFT OFFICE 2013 OR SEARCHABLE ADOBE ACROBAT READER
(*.PDF) FORMATS. GRAPHIC PACKAGES USED TO CREATE FIGURES, TABLES,
AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT OFFICE 2013. FOR
DATA SUBMISSION WITH AN ELECTRONIC FILE SIZE GREATER THAN 10 MB OR
IF THE COMBINED SIZE OF THE ATTACHMENTS TO THE EMAIL IS GREATER
THAN 10 MB, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS. EMAIL IN
THE FORM OF COMPRESSED OR ZIP FILES AND EXECUTABLE FILES ARE NOT
5. GOVERNMENT WILL HAVE 7 CALENDAR DAYS FOR REVIEW AND ACCEPTANCE
6. CONTRACTOR SHALL HAVE 7 CALENDAR DAYS TO INCORPORATE GOVERNMENT COMMENTS.
1 SFAE=STRI-ITTS-I
LEN
Page 8 of 16 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARAGRAPH 3.6.3
DI-ILSS-80872
Operator & Maintainer Training Course
Training Materials
A009
TM OTHER ILSS
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
DD
08-JUN-2017
Kinsman, David
06-JUN-2017
Daens, Glenn
OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO
STRI/SFAE-STRI-ITTS.
1. BLOCK 8: Government approval is required prior to system acceptance.
2. BLOCK 12: SHALL BE DUE NO LATER THAN 5 CALENDAR DAYS AFTER SAT.
3. BLOCK 13: REVISIONS AS REQUIRED
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-AEM-CDRLS@MAIL.MIL AND TO THE
CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE THE
CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD (E.G.,
W900KK-15-D-0001/004, CLIN 0002, CDRL A001, 1 MAY 2015). SUBMISSIONS
SHALL BE IN MICROSOFT OFFICE 2013 AND SEARCHABLE ADOBE ACROBAT
READER (*.PDF) FORMATS. GRAPHIC PACKAGES USED TO CREATE FIGURES,
TABLES, AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT OFFICE 2013.
FOR DATA SUBMISSION WITH AN ELECTRONIC FILE SIZE GREATER THAN 10 MB
OR IF THE COMBINED SIZE OF THE ATTACHMENTS TO THE EMAIL IS GREATER
THAN 10 MB, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS. EMAIL IN
THE FORM OF COMPRESSED OR ZIP FILES AND EXECUTABLE FILES ARE NOT
5. GOVERNMENT WILL HAVE 5 CALENDAR DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION.
6. CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE GOVERNMENT COMMENTS.
9. APPROPRIATE TECHNICAL MANUALS SHALL BE DELIVERED AT TIME OF TRAINING.
Page 9 of 16 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARAGRAPH 3.6.4
DI-SESS-81758A
LOGISTICS PRODUCT DATA
A010
TM OTHER SESS
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
SEE BLOCK
ONE/R
1. BLOCK 3: SPECIFIC DELIVERABLES UNDER THIS CONTRACT ARE:
A. MATERIEL COMPONENT LIST (MCL)
B. RECOMMENDED INITIAL SPARE/REPAIR PARTS LIST
C. TOOLS AND TEST EQUIPMENT LIST (TTE)
2. BLOCK 4: CONTRACTOR SHALL DEVELOP LPD USING GEIA-STD 0007 AS GUIDANCE.
3. BLOCK 8: GOVERNMENT APPROVAL WILL BE REQUIRED PRIOR TO SIGNING DD250.
4. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND
TECHNOLOGY. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO
U.S. ARMY PEO STRI, SFAE-STRI-ITTS. WARNING - THIS DOCUMENT
CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY ARMS-EXPORT
CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 240 ET SEQ.
5. BLOCK 12: THE CONTRACTOR SHALL SUBMIT INITIAL SUBMITTAL 30
WORKING DAYS PRIOR TO PHYSICAL CONFIGURATION AUDIT (PCA). THE
GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION AND PROVIDE COMMENTS. THE CONTRACTOR SHALL HAVE 5
WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.
6. BLOCK 13: REVISIONS AS REQUIRED THROUGH THE LIFE OF THE CONTRACT.
7. BLOCK 14: BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM
OF ATTACHMENTS, VIA EMAIL TO
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-AEM-CDRLS@MAIL.MIL AND TO THE
CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE THE
CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD (E.G.,
W900KK-15-D-0001/004, CLIN 0002, CDRL A001, 1 MAY 2015). SUBMISSIONS
SHALL BE IN MICROSOFT OFFICE 2013 AND SEARCHABLE ADOBE ACROBAT
READER (*.PDF) FORMATS. GRAPHIC PACKAGES USED TO CREATE FIGURES,
TABLES, AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT OFFICE 2013.
FOR DATA SUBMISSION WITH AN ELECTRONIC FILE SIZE GREATER THAN 10 MB
OR IF THE COMBINED SIZE OF THE ATTACHMENTS TO THE EMAIL IS GREATER
THAN 10 MB, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS. EMAIL IN
THE FORM OF COMPRESSED OR ZIP FILES AND EXECUTABLE FILES ARE NOT
8. CONTRACTOR FORMAT IS NOT ACCEPTABLE. DELIVERABLES SHALL CONSIST
OF THE ENTIRE GEIA-STD 0007 DATABASE.
Page 10 of 16 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARAGRAPH 3.6.4
DI-SESS-81759A
LOGISTICS PRODUCT DATA SUMMARIES
A011
TM OTHER SESS
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
ONE/R
Block 3: Maintenance Planning and Repair Analysis Summaries
1. BLOCK 4. DATA PRODUCTS ARE REQUIRED FOR DEVELOPMENT OF
MAINTENANCE PLANS, PROCEDURES, AND MANUALS. THE CONTRACTOR SHALL
PREPARE SUPPORTABILITY SUMMARIES USING THE DATA DICTIONARY AND
DATA PRODUCTS OUTLINED IN GEIA-STD-0007 AND THE TAILORED WORKSHEETS
FOR DATA PRODUCTS PROVIDED AS AN ANNEX TO THIS CDRL. SPECIFIC
DELIVERABLES UNDER THIS CONTRACT ARE:
A. MAINTENANCE PLANNING
B. REPAIR ANALYSIS
2. BLOCK 8: GOVERNMENT APPROVAL WILL BE REQUIRED PRIOR TO SIGNING DD250.
3. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO
U.S. ARMY PEO STRI, SFAE-STRI-ITTS. WARNING - THIS DOCUMENT
CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY ARMS-EXPORT
4. BLOCK 12: THE CONTRACTOR SHALL SUBMIT INITIAL SUBMITTAL 30
WORKING DAYS PRIOR TO GOVERNMENT ACCEPTANCE TESTING (GAT). THE
GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION AND PROVIDE COMMENTS. THE CONTRACTOR SHALL HAVE 5
WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.
5. BLOCK 13: LISTS SHALL BE UPDATED AFTER TECHNICAL MANUAL
VERIFICATION AND RESUBMITTED 15 WORKING DAYS PRIOR TO THE SITE
ACCEPTANCE DEMONSTRATION.
6. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-AEM-CDRLS@MAIL.MIL AND TO THE
CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE THE
CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD (E.G.,
W900KK-15-D-0001/004, CLIN 0002, CDRL A001, 1 MAY 2015). SUBMISSIONS
SHALL BE IN MICROSOFT OFFICE 2013 AND SEARCHABLE ADOBE ACROBAT
READER (*.PDF) FORMATS. GRAPHIC PACKAGES USED TO CREATE FIGURES,
TABLES, AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT OFFICE 2013.
FOR DATA SUBMISSION WITH AN ELECTRONIC FILE SIZE GREATER THAN 10 MB
OR IF THE COMBINED SIZE OF THE ATTACHMENTS TO THE EMAIL IS GREATER
THAN 10 MB, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS. EMAIL IN
THE FORM OF COMPRESSED OR ZIP FILES AND EXECUTABLE FILES ARE NOT
7. CONTRACTOR FORMAT IS ACCEPTABLE USING GEIA-STD 0007 AS GUIDANCE.
1 STRI-STRI-ITTS-I
Page 11 of 16 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARAGRAPH 3.6.6
DI-TMSS-80527C
A012
TM OTHER TMSS
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
Block 2: COMMERCIAL OFF-THE-SHELF (COTS) MANUALS AND ASSOCIATED
SUPPLEMENTAL DATA
Block 3: COTS MANUALS AND ASSOCIATED SUPPLEMENTAL DATA
1. BLOCK 4: ALL PAGED BASED COTS DOCUMENTATION SHALL BE INDEXED,
TABBED AND PLACED IN A BINDER. THE INDEXED BINDER SHALL INCLUDE A
TABLE OF CONTENTS.
2. BLOCK 8: FINAL GOVERNMENT APPROVAL IS REQUIRED PRIOR TO
ACCEPTANCE OF THE SYSTEM.
3. BLOCK 9: DISTRIBUTION STATEMENT A APPROVED FOR PUBLIC RELEASE;
DISTRIBUTION IS UNLIMITED.
4. BLOCK 12 AND 13: DRAFT OUTLINES SHALL BE DUE AT ALL PROGRAM
REVIEWS. FINAL DRAFT SUBMISSION SHALL BE DUE 45 DAYS PRIOR TO
GOVERNMENT ACCEPTANCE TESTING (GAT). THE GOVERNMENT WILL HAVE 20
WORKING DAYS TO ACCEPT/REJECT AND PROVIDE COMMENTS. THE CONTRACTOR
SHALL HAVE 10 WORKING DAYS TO INCORPORATE CHANGES. REVISIONS AS
REQUIRED THROUGH THE LIFE OF THE CONTRACT.
5. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-AEM-CDRLS@MAIL.MIL AND TO THE
CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE THE
CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD (E.G.,
W900KK-15-D-0001/004, CLIN 0002, CDRL A001, 1 MAY 2015). SUBMISSIONS
SHALL BE IN MICROSOFT OFFICE 2013 AND SEARCHABLE ADOBE ACROBAT
READER (*.PDF) FORMATS. GRAPHIC PACKAGES USED TO CREATE FIGURES,
TABLES, AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT OFFICE 2013.
FOR DATA SUBMISSION WITH AN ELECTRONIC FILE SIZE GREATER THAN 10 MB
OR IF THE COMBINED SIZE OF THE ATTACHMENTS TO THE EMAIL IS GREATER
THAN 10 MB, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS. EMAIL IN
THE FORM OF COMPRESSED OR ZIP FILES AND EXECUTABLE FILES ARE NOT
6. CONTRACTOR FORMAT IS ACCEPTABLE.
Page 12 of 16 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARAGRAPH 3.6.8
DI-MGMT-81804A
Item Unique Identification Report
A013
TM OTHER MGMT
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
ASREQ
Block 2: Item Unique Identification (IUID) Marking Activity, Validation and
Verification Report
1. BLOCK 4: IUID REPORT IS REQUIRED TO IDENTIFY MANDATED IUID
REQUIREMENTS IN ACCORDANCE WITH MIL-STD-130N. AT A MINIMUM, THE
FOLLOWING IUD DATA ELEMENTS ARE REQUIRED:
A. IUID TYPE ITEM DESCRIPTION
B. UNIQUE ITEM IDENTIFIER
C. UNIT OF MEASURE
D. ISSUING AGENCY
E. ENTERPRISE IDENTIFICATION NUMBER
F. CONTRACT NUMBER
G. PART NUMBER
H. SERIAL NUMBER
I. SHIPMENT/ACCEPTANCE DATE
J. SHIP TO DODAAC CODE
2. BLOCK 8: GOVERNMENT APPROVAL IS REQUIRED.
3. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND
TECHNOLOGY. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO
U.S. ARMY PEO STRI, SFAE-STRI-ITTS. WARNING - THIS DOCUMENT
CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY ARMS-EXPORT
4. BLOCK 12 AND 13: INITIAL SUBMISSION SHALL BE DUE 60 DAYS PRIOR TO
GOVERNMENT ACCEPTANCE TESTING (GAT). THE GOVERNMENT WILL HAVE 15
WORKING DAYS FOR REVIEW AND ACCEPTANCE/REJECTION. THE CONTRACTOR
SHALL HAVE TEN (10) WORKING DAYS FOR CORRECTION AND RESUBMISSION OF
THIS CDRL. FINAL ACCEPTANCE WILL OCCUR AT FINAL INSPECTION.
REVISIONS THROUGHOUT THE LIFE OF THE CONTRACT.
5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA WIDE AREA WORKFLOW
(WAWF), IAW CONTRACT CLAUSES SET FORTH IN SECTION G CONTRACT
ADMINISTRATION DATA; AND SHALL BE DELIVERED VIA ELECTRONIC MAIL IN
THE FORM OF ATTACHMENTS TO DOROTHY BRYANT AT
DOROTHY.A.BRYANT6.CIV@MAIL.MIL. THE EMAIL SUBJECT LINE SHALL
INCLUDE THE CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING
PERIOD (E.G., W900KK-16-C-0056, CLIN 0002, CDRL A001, 1 MAY 2013).
SUBMISSIONS SHALL BE IN MICROSOFT OFFICE 2013. GRAPHIC PACKAGES
USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE
WITH MICROSOFT WORD 2013. REPRODUCIBLE FOR SOURCE CODE AND
EXECUTABLE FILES SHALL BE DELIVERED ON A CD-ROM TO PEO STRI, ATTN:
DOROTHY BRYANT, SFAE-STRI-KOT, 12350 RESEARCH PARKWAY, ORLANDO, FL
32826. AFTER FINAL ACCEPTANCE OF THIS DOCUMENT A REPORDUCIBLE COPY
SHALL BE DELIVERED TO DOROTHY BRYANT AT
DOROTHY.A.BRYANT6.CIV@MAIL.MIL. FOR DATA SUBMISSION WITH AN
ELECTRONIC FILE SIZE GREATER THAN 10 MB OR IF THE COMBINED SIZE OF
THE ATTACHMENTS TO THE EMAIL IS GREATER THAN 10 MB, CONTACT THE COR
FOR SUBMISSION INSTRUCTIONS. EMAIL IN THE FORM OF COMPRESSED OR
ZIP FILES AND EXECUTABLE FILES ARE NOT ACCEPTED BY THE PEO STRI
FIREWALL. FOR SUBMISSION OF THESE FILE TYPES, CONTACT THE COR FOR
SUBMISSION INSTRUCTIONS.
6. CONTRACTOR FORMAT IS NOT ACCEPTABLE.
1 SFAE-STRI-ITTS
Page 13 of 16 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARAGRAPH 3.5.14
DI-SESS-81000E
Product Drawings/Models and Associated Lists
B001
X TM OTHER
B
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,
EFFECTIVE 3 MAR 2012. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE
REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-PS-G4.
4. THE GOVERNMENT SHALL HAVE 5 CALENDAR DAYS TO REVIEW AND
ACCEPTANCE OR REJECTION.
5. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-AEM-CDRLS@MAIL.MIL AND TO THE
CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE THE
CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD (E.G.,
W900KK-15-D-0001/004, CLIN 0002, CDRL A001, 1 MAY 2015). SUBMISSIONS
SHALL BE IN MICROSOFT OFFICE 2013 AND SEARCHABLE ADOBE ACROBAT
READER (*.PDF) FORMATS. GRAPHIC PACKAGES USED TO CREATE FIGURES,
TABLES, AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT OFFICE 2013.
FOR DATA SUBMISSION WITH AN ELECTRONIC FILE SIZE GREATER THAN 10 MB
OR IF THE COMBINED SIZE OF THE ATTACHMENTS TO THE EMAIL IS GREATER
THAN 10 MB, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS. EMAIL IN
THE FORM OF COMPRESSED OR ZIP FILES AND EXECUTABLE FILES ARE NOT
ACCEPTED BY THE PEO STRI FIREWALL. FOR SUBMISSION OF THESE FILE
Page 14 of 16 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SFAE-STRI-PMITTS
SOW PARAGRAPH 3.6.7
DI-SESS-81003E
COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LISTS
B002
X TM OTHER
B
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,
EFFECTIVE 3 MAR 2012. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE
REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-PS-G4.
4. THE GOVERNMENT SHALL HAVE 5 CALENDAR DAYS TO REVIEW AND
ACCEPTANCE OR REJECTION.
5. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-AEM-CDRLS@MAIL.MIL AND TO THE
CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE THE
CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD (E.G.,
W900KK-15-D-0001/004, CLIN 0002, CDRL A001, 1 MAY 2015). SUBMISSIONS
SHALL BE IN MICROSOFT OFFICE 2013 AND SEARCHABLE ADOBE ACROBAT
READER (*.PDF) FORMATS. GRAPHIC PACKAGES USED TO CREATE FIGURES,
TABLES, AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT OFFICE 2013.
FOR DATA SUBMISSION WITH AN ELECTRONIC FILE SIZE GREATER THAN 10 MB
OR IF THE COMBINED SIZE OF THE ATTACHMENTS TO THE EMAIL IS GREATER
THAN 10 MB, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS. EMAIL IN
THE FORM OF COMPRESSED OR ZIP FILES AND EXECUTABLE FILES ARE NOT
ACCEPTED BY THE PEO STRI FIREWALL. FOR SUBMISSION OF THESE FILE
Page 15 of 16 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARAGRAPH 3.6.5
MIL-STD-40051-2C
Page-Based Technical Manuals
C001
TM X OTHER
C
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
1. BLOCK 4: MANUAL CONTENT SHALL USE GUIDANCE FROM MIL-STD-40051-2C
BUT CONTRACTOR FORMAT IS ACCEPTABLE.
2. BLOCK 8: GOVERNMENT APPROVAL WILL BE REQUIRED PRIOR TO SIGNING DD250.
3. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO
U.S. ARMY PEO STRI, SFAE-STRI-ITTS. WARNING - THIS DOCUMENT
CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY ARMS-EXPORT
4. BLOCK 12 AND 13: DRAFT OUTLINES SHALL BE DUE AT ALL PROGRAM
REVIEWS. FINAL DRAFT SUBMISSION SHALL BE DUE 45 DAYS PRIOR TO
GOVERNMENT ACCEPTANCE TESTING (GAT). THE GOVERNMENT WILL HAVE 20
WORKING DAYS TO ACCEPT/REJECT AND PROVIDE COMMENTS. THE CONTRACTOR
SHALL HAVE 10 WORKING DAYS TO INCORPORATE CHANGES. REVISIONS AS
REQUIRED THROUGH THE LIFE OF THE CONTRACT.
5. BLOCK 14: CONTRACTOR SHALL SUBMIT DRAFT AND REPRODUCIBLE PRODUCTS,
IN THE FORM OF ATTACHMENTS, VIA EMAIL TO
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-AEM-CDRLS@MAIL.MIL AND TO THE
CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE THE
CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD (E.G.,
W900KK-15-D-0001/004, CLIN 0002, CDRL A001, 1 MAY 2015). SUBMISSIONS
SHALL BE IN MICROSOFT OFFICE 2013 AND SEARCHABLE ADOBE ACROBAT
READER (*.PDF) FORMATS. GRAPHIC PACKAGES USED TO CREATE FIGURES,
TABLES, AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT OFFICE 2013.
FOR DATA SUBMISSION WITH AN ELECTRONIC FILE SIZE GREATER THAN 10 MB
OR IF THE COMBINED SIZE OF THE ATTACHMENTS TO THE EMAIL IS GREATER
THAN 10 MB, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS. EMAIL IN
THE FORM OF COMPRESSED OR ZIP FILES AND EXECUTABLE FILES ARE NOT
ACCEPTED BY THE PEO STRI FIREWALL. FOR SUBMISSION OF THESE FILE
Page 16 of 16 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
File details come from the government source that posted it. Updated .