Attachment 1 - BSDC - Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Blowing Sand & Dust Chambers, newest first.
File Type Posted
Att4-BSDC-CDRLs.pdf PDF
Att2-BSDC-Spec-ATC.pdf PDF
Att3-BSDC-Spec-YTC.pdf PDF
CombinedSynSol-BSDC.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PEO-STRI-17-W031

W900KK-16-D-0001

26 May 2017

DISTRIBUTION LIST STATEMENT D

Limited to DoD and DoD Contractors Only

Statement of Work (SOW)

For

Sand and Dust Environmental Test Chamber for the Aberdeen Test Center (ATC)

And the Yuma Test Center (YTC)

U.S. Army Program Executive Office for

Simulation, Training and Instrumentation

12350 Research Parkway

Orlando, FL 32826-3276

Version 1.5

26 May 2017

Prepared By: ________________________ Concurrence: ________________________

MITCHELL PRIMAS DEREK VICK

IMO Systems Engineer IMO Chief Engineer

Date: _______________ Date: _______________

Prepared By: ________________________

GLENN DAENS

IMO Lead Acquisition Logistician

Date: _______________

Submitted By: _______________________ Approved By: _______________________

BOB ARORA MINH VUONG

IMO Assistant Project Manager Director

Instrumentation Management Office

Date: _______________ Date: _______________

19 May 2017 Revision 1.5

DISTRIBUTION LIST STATEMENT D

Limited to DoD and DoD Contractors Only

Revision History

Revision Number

Date Log of Changes Made and Description of

Reason Changes Approved By

1.0 25 April 17 Initial Draft SOW

1.1 3 May 17 Addressed Chief Engineer Comments, Logistics Comments and Cybersecurity statements

1.2 8 May 17 Re-addressed Cybersecurity sections

1.3 16 May 17 SAP edits

1.4 19 May 17 Remove site prep and pad at YTC, minor clarifications

1.5 26 May 17 Heading numbering corrections

26 May 2017 Revision 1.5

DISTRIBUTION LIST STATEMENT D

Limited to DoD and DoD Contractors Only

Table of Contents

1. SCOPE

1.1 BACKGROUND

2. APPLICABLE DOCUMENTS

2.1 Department of Defense Standards

2.2 Department of Defense Directives

2.3 Department of Defense Instructions

2.4 Other Government Documents, Drawings, and Publications

3. REQUIREMENTS

3.1 General

3.2 Program Management

Integrated Master Schedule (IMS)

Quality Control

Risk Management Framework (RMF) Process

Access and General Protection/Security Policy and Procedures

Management Reviews

3.2.5.1 Post Award Conference (PAC)

3.2.5.2 Start of Work Meeting

3.2.8.3 Program Status Reviews

3.3 Systems Engineering

Technical Interchange Meetings (TIM)

3.4 Building Facility Infrastructure and Site Installation

Building Facility Infrastructure

3.4.1.1 Site Survey

Site Activation

Installation Tools and Test Equipment

Installation Spares

3.5 Integrated Testing Requirements

Test Plan

Test Procedures

Test Readiness Reviews (TRR)

Factory Acceptance Test (FAT)

Site Acceptance Test (SAT)

Test Discrepancies

Revision 1.5

DISTRIBUTION LIST STATEMENT D

Limited to DoD and DoD Contractors Only

3.5.6.1 Discrepancy Processing

3.5.6.2 Test Discrepancy Report (TDR)

System Verification Review (SVR)

3.5.7.1 SVR Entry Criteria

3.5.7.2 SVR Completion/Exit Criteria

3.5.7.3 SVR Products

3.6 System Life Cycle Support

Safety Hazard Assessment

Health Hazard Assessment

Training Materials

Spare Parts List

Operations and Maintenance (O&M) Manuals

Commercial Off-The-Shelf (COTS) Manuals

Commercial Drawings/Models/Software and Associated List

Materiel Identification Requirements

3.7 Disposition of Existing Legacy Dust Chamber

4. Warranties

3.6.1 3.6.2 3.6.3 3.6.4 3.6.5 3.6.6 3.6.7 3.3.8

Revision 1.5

DISTRIBUTION LIST STATEMENT D

Limited to DoD and DoD Contractors Only

Statement of Work (SOW) For

Blowing Sand and Dust Chambers For

Aberdeen Test Center (ATC) And

Yuma Test Center (YTC)

1. SCOPE.

This SOW identifies the effort required for managing, documenting, configuring the standard design to suit the installation location, integrating, testing and delivering two environmental test chambers referred to as Blowing Sand and Dust Chamber (BSDC).

One chamber is for installation at ATC within an existing facility, and a second BSDC is for installation at YTC at an outdoors site. The Contractor shall procure all necessary equipment and parts, conduct site surveys, configure the product for each site, install equipment, and test/commission/calibrate the equipment. The BDSC shall be suitable for performing blowing sand and dust testing in accordance with MIL-STD-810G, CN1 “Environmental Engineering Considerations and Laboratory Tests”, Method 510.6, Procedure I (Dust) and Procedure II (Sand).

1.1 BACKGROUND.

The U.S. Army Program Executive Office for Simulation, Training and Instrumentation, Project Manager for Instrumentation, Targets, Threat Simulators and SOF Training Systems (PM ITTS), Instrumentation Management Office (IMO) provides test instrumentation to the test and evaluation community, and is the materiel developer for BDSC at ATC and YTC as part of the Applied Environment Modernization (AEM) project.

2. APPLICABLE DOCUMENTS.

The following documents form a part of this SOW to the extent specified herein. In the event of a conflict between documents referenced herein and the contents of this SOW, the contents of the SOW shall be the governing requirement.

Revision 1.5

DISTRIBUTION LIST STATEMENT D

Limited to DoD and DoD Contractors Only

2.1 Department of Defense Standards.

MIL-STD-810G, CN1 Environmental Engineering Considerations and Laboratory Test Method 510.6, Procedure I (Dust) and Procedure II (Sand)

MIL-STD-882E System Safety, Appendix A, 11 May 2012 MIL-STD-130N Identification Marking of U.S. Military Property w/Change 1, 16 November 2012 MIL-STD-40051-2C Preparation of Digital Technical Information for

Page-Based Technical Manuals (TMs), 15 December 2015

MIL-HDBK-831 Preparation of Test Reports

2.2 Department of Defense Directives.

N/A

2.3 Department of Defense Instructions.

N/A

2.4 Other Government Documents, Drawings, and Publications.

PRF-PT-689 PEO STRI Performance Specification (PS) for ATC Sand and Dust Chamber, 24 April 2017

PRF-PT-693 PEO STRI Performance Specification (PS) for YTC Sand and Dust Chamber, 16 May 2017

3. REQUIREMENTS.

3.1 General.

The Contractor shall fabricate, configure the standard design to the installation location, integrate, test and deliver two BSDC that meet performance criteria per the ATC System Performance Specification PRF-PT-689 and the YTC System Performance Specification PRF-PT-693 and in accordance with the requirements below. The BSDC shall be a standalone system.

Revision 1.5

DISTRIBUTION LIST STATEMENT D

Limited to DoD and DoD Contractors Only

3.2 Program Management.

The Contractor shall provide overall management and administration to ensure the requirements of this contract are accomplished.

Integrated Master Schedule (IMS).

The Contractor shall develop, implement, manage, update and maintain an IMS. The Contractor shall participate with the Government in the assessment of program risk and ensure project schedule key milestones are identified in accordance with supporting schedules.

INTEGRATED PROGRAM MANAGEMENT REPORT (IPMR) (DI-MGMT-81861A)

Quality Control.

The Contractor shall adhere to quality control standards established in industry.

Risk Management Framework (RMF) Process.

The Cybersecurity Office at each Test Center will have the responsibility for RMF. The Cybersecurity requirements for DoD information technologies will be consistent with the principles established in NIST Special Publication (SP) 800-37 in accordance with DoD

8510.01 RMF for DoD Information Technology (IT). The Cybersecurity team will be present during the Start of Work Meeting and throughout the duration of the project to assist the Contractor with the required documentation. The Contractor shall provide the following RMF documentation required to implement the RMF Controls for Confidentiality, Integrity and Availability levels of Low-Low-Low:

a. Security Plan

b. Hardware / Software List

c. Continuity of Operations Plan / Contingency Plan

d. Compliance Deviation Report

The Government Cybersecurity team will provide the Contractor with samples and templates of these documents. The Government will work with the Contractor to ensure that the security requirements and procedures are met in accordance with all required DoD and Army regulations per the Mission Assurance Category and Confidentiality levels defined for the system.

CYBERSECURITY ARTIFACTS (DI-MISC-80711A)

Revision 1.5

DISTRIBUTION LIST STATEMENT D

Limited to DoD and DoD Contractors Only

Access and General Protection/Security Policy and Procedures.

Test Center visitor credential requirements are as follows:

a. ATC: http://www.atc.army.mil/visitorGuide/visitor_badge.html

b. YTC: https://www.yuma.army.mil/Visiting

Management Reviews.

3.2.5.1 Post Award Conference (PAC).

A Post Award Conference shall be held via telecon seven (7) calendar days after contract award. The PAC shall introduce the key participants, identify points of contact, and discuss both parties’ understanding of the scope of work and other contract issues.

The Government will provide the agenda and documentation and lead the PAC.

3.2.5.2 Start of Work Meeting

A Start of Work Meeting will be held at the Contractor location within 14 calendar days after contract award to establish the framework of the Contractor and Government interaction during the duration of the contract. There will be a tour of the Contractor facility. Discussion topics include:

a. Identify key coordination events, timelines and test readiness.

b. Presentation of a top level and realistic IMS, with critical paths and supporting events.

c. Product configuration approach, reliability and maintainability analysis, testing and acceptance approach.

d. Team participants, responsibilities and contact list to include names, location, phone numbers and email addresses.

e. Long lead time item identification and status.

3.2.8.3 Program Status Reviews

The Contractor shall participate in a monthly telecon with the Government to discuss project status including schedule.

3.3 Systems Engineering.

The Contractor shall plan, document, implement and control an integrated technical effort to meet requirements in PRF-PT-689 and PRF-PT-693. The product configuration shall address performance, industry acceptance, long-term availability and supportability and upgrade potential. The BDSC shall utilize specifications and http://www.atc.army.mil/visitorGuide/visitor_badge.html

Revision 1.5

DISTRIBUTION LIST STATEMENT D

Limited to DoD and DoD Contractors Only standards adopted by industry and set by the marketplace for interfaces, products, practices and tools to the extent practical.

Technical Interchange Meetings (TIM).

The Contractor shall conduct and participate in TIMs as needed throughout the duration of the contract. The TIMs will be conducted via telecon. The Contractor shall prepare drawings and other data, as required, to aid in discussions. The Contractor shall ensure that all required personnel and resources are present, document significant discussions in meeting minutes, and track the status of action items as required.

3.4 Building Facility Infrastructure and Site Installation.

Building Facility Infrastructure.

The Government will provide the building facility for the BSDC installation at ATC and infrastructure required to support the BSDC and subsystems based on timely identification of system requirements. This infrastructure includes structural floor trenches, HVAC, electrical power connection points, cable tray systems, domestic water connections, floor drains, cable tray systems for low voltage wiring, and radiation shielding to make the BSDC operational.

For the BSDC installation at YTC, the Contractor shall be responsible for weather proofing to support full operation upon delivery. The Contractor shall provide necessary drawings and information to support the Department of Public Works (DPW) Work

Order process. The Contractor cannot complete final terminations/connections to Real

Property service (water, electric, gas, etc.). Government personnel will coordinate this effort, and will require input from the Contractor for scope and scheduling.

3.4.1.1 Site Survey.

The Contractor shall conduct a survey at the site installation site no later than 14 calendar days after the Start of Work meeting. The purpose of the survey is to discuss and confirm installation requirements and to provide information on any modifications required at the installation site. During the survey, the Contractor shall:

a. Review the status of the building or location where the system will be installed.

Revision 1.5

DISTRIBUTION LIST STATEMENT D

Limited to DoD and DoD Contractors Only

b. Confirm the required positions of equipment, assemblies, cableways, access ways, and any other unique feature, and measure to insure clearance during the installation.

c. Review and confirm the existing and proposed location of power distribution boxes, switches, water and air supply points and air ducting, and other unique building or location features.

d. Determine the availability of required services.

e. Review and confirm arrangements for hours of work, access to work areas, supporting workshops facilities, and on-site personnel participation.

f. Discuss and resolve any outstanding issues pertaining to the installation program.

g. Confirm all required arrangements for DoD 8500.2 controls identified as being inherited by the system are in existence.

SCIENTIFIC AND TECHNICAL REPORT (SITE SURVEY REPORT) (DI-MISC-

80711A)

Site Activation.

The Government is responsible for modifications to infrastructure (power, network, mechanical).

Installation Tools and Test Equipment.

The Contractor’s installation team shall be equipped with all tools required for system installation. Any special tools and test equipment required for operation and maintenance of the system shall be delivered with the system at time of installation.

Installation Spares.

The Contractor’s installation team shall be equipped with an installation spares package of common items as required to perform Site Acceptance Testing (SAT). The

Revision 1.5

DISTRIBUTION LIST STATEMENT D

Limited to DoD and DoD Contractors Only installation spares packages shall remain at the site and become property of the Government.

3.5 Integrated Testing Requirements.

The Contractor shall plan, coordinate, establish and implement a test and evaluation effort to verify that the BSDC meets the requirements in PRF-PT-689 and PRF-PT-693.

The Contractor shall be responsible for developing a test plan, performing all test procedures, conducting test readiness reviews, tracking and closing test discrepancies, and verifying the BSDC satisfies its requirements. The Contractor shall provide sufficient quantities of sand and dust to conduct all test events, as defined in PRF-PT- 689 in PRF-PT-693 for each Test Center.

Test Plan.

The Contractor shall develop a Test Plan that outlines the plans and performance objectives at every level of testing on systems or equipment to include Factory Acceptance Test (FAT) and Site Acceptance Test (SAT). The Test Plan shall describe the test concept, objectives and requirements to be satisfied, test methods, elements, responsible activities associated with the testing, coordination of test assets and resources, measures required, and recording procedures to be used.

(DI-NDTI-80566A) Test Plan

Test Procedures.

The Contractor shall develop written test procedures for FAT the SAT that define step-by-step testing operations to be performed. The Contractor shall identify items to be tested, the test equipment and support required, the test conditions to be imposed, the parameters to be measured, and the pass and fail criteria against which the test results will be measured. The test procedures shall be assigned a unique document reference identifier. The test procedures shall be written so that the test steps can be traced to individual requirements in PRF-PT-689 and PRF-PT-693 for each Test Center, and will indicate pass/fail results. Test procedures to support FAT and SAT shall be submitted to the Government for approval prior to testing.

Test Readiness Reviews (TRR).

The Contractor shall conduct TRRs for FAT and SAT. The TRRs shall be conducted by telecon seven (7) calendar days prior to the start of FAT and SAT. Entry into each TRR requires that the FAT and SAT Test Procedures have been approved by the

Revision 1.5

DISTRIBUTION LIST STATEMENT D

Limited to DoD and DoD Contractors Only

Government. Entry into SAT requires that the Contractor provide evidence that test discrepancies from FAT were resolved to Government satisfaction, and that resources are ready for the start of SAT.

Factory Acceptance Test (FAT).

The Contractor shall plan, conduct, and support Government witnessed FAT to verify that the BSDC complies with Performance Specification requirements that can be tested at the factory or at a test lab/facility. The Contractor shall ensure that systems and test equipment are operational, and calibrated and tuned prior to start of test. The Contractor shall record and analyze the results of each test. Contractor shall document the test results in Test Reports.

(DI-NDTI-80603A) Test Procedure (DI-NDTI-80809B) Test/Inspection Report

Site Acceptance Test (SAT).

Government approval of FAT is required prior to shipping the BSDC to the Test Center for SAT. The Contractor shall plan, conduct, and support Government-witnessed SAT at the Test Center to verify that the BSDC complies with Performance Specification requirements. The Contractor shall ensure that unique facilities, equipment, and instrumentation required to perform tests will be available at the Test Center and that sufficient test articles (including support items) are available. The Contractor shall ensure that systems and test equipment are operational, calibrated, and tuned prior to start of test. The Contractor shall provide technical support for SAT to include troubleshooting, spare parts, repair and replacement of failed systems and subsystems, components, and preventive maintenance. The Contractor shall record and analyze the test results. The Contractor shall document the test results in a Test Report.

(DI-NDTI-80603A) Test Procedure (DI-NDTI-80809B) Test/Inspection Report

Test Discrepancies.

The Contractor shall document all test discrepancies for FAT and SAT and track the failure analysis and corrective action for each test discrepancy until correction and regression tests are successfully completed.

Revision 1.5

DISTRIBUTION LIST STATEMENT D

Limited to DoD and DoD Contractors Only

3.5.6.1 Discrepancy Processing.

The Contractor shall document changes made to the equipment to correct each discrepancy. Each discrepancy correction that modifies or changes any baseline shall be incorporated into final BSDC documentation.

3.5.6.2 Test Discrepancy Report (TDR).

The Contractor shall assign a unique reference number for each discrepancy and will be tracked as a TDR. The Contractor shall establish a suspense system to ensure timeliness of analysis and corrective action of each test discrepancy. Upon correction of the test discrepancies, the Contractor shall test the system to ensure that the correction of the test discrepancies did not interfere with or alter the functionality of the system. The TDR will only be closed with Government approval.

System Verification Review (SVR).

The SVR is a multi-disciplined assessment to ensure the system has met performance requirements prior to formal acceptance by the Government. Final FAT and SAT test reports will be reviewed. The system will not be accepted until the requirements have been met and verified.

3.5.7.1 SVR Entry Criteria.

a. Completed and approved FAT results.

b. Completed and approved SAT results.

3.5.7.2 SVR Completion/Exit Criteria.

a. Traceability Matrix showing that requirements have been met.

3.5.7.3 SVR Products.

a. Final detailed drawings of the BSDC configuration and all support systems.

b. Final Logistic documentation and product Operation and Maintenance manuals.

3.6 System Life Cycle Support.

The Contractor shall support safety and health hazard analysis, provide operator and maintenance training and training materials, and provide system documentation.

Revision 1.5

DISTRIBUTION LIST STATEMENT D

Limited to DoD and DoD Contractors Only

3.6.1 Safety Hazard Assessment.

The Contractor shall identify safety hazards to personnel and ensure that all hazards are assessed and that each hazard is tracked until final resolution. The Contractor shall obtain Government approval for final resolution. Safety features of the system shall be demonstrated during performance testing as well as the safety impacts due to inadvertent functioning or functional failure. Subsystems that the system will interface with shall be evaluated to ensure hazards and risks are avoided.

(DI-SAFT-80102C) Safety Assessment Report (SAR)

3.6.2 Health Hazard Assessment.

The Contractor shall identify potential health hazards and ensure all health hazards are assessed and each health hazard is tracked until final resolution. Health hazards shall be addressed including hazards due to inadvertent functioning or functional failure.

Subsystems that the system will interface with shall be evaluated to ensure health hazards and risks are avoided. The Contractor shall obtain Government approval of the final health hazard resolution; recommend engineering controls, clothing, equipment and protective procedures to reduce the associated risk to an acceptable level. The Contractor shall assess system, facility, and personnel protective equipment requirements to ensure safe operation and maintenance. The Contractor shall identify the cleaning agents to be used for the system and ensure they are non-hazardous.

(DI-SAFT-80106C) Health Hazard Assessment Report (HHAR)

3.6.3 Training Materials.

The Contractor shall make provisions to conduct operation and maintenance familiarization training through a combination of classroom, written instruction, and/or hands-on training on the BSDC. The Contractor shall provide all courseware, to include the program of instruction to accommodate new equipment training, sustainment training, and training of testers and evaluators. The Contractor shall conduct the training on location at the Test Center where the system is installed.

TRAINING MATERIALS (DI-ILSS-80872)

3.6.4 Spare Parts List.

The Contractor shall provide the Government an approved spare parts list for each system.

LOGISTICS PRODUCT DATA (DI-SESS-81758A), LOGISTICS PRODUCT DATA

SUMMARIES (DI-SESS-81759A)

Revision 1.5

DISTRIBUTION LIST STATEMENT D

Limited to DoD and DoD Contractors Only

3.6.5 Operations and Maintenance (O&M) Manuals.

The O&M instructions shall accurately provide the technician with all the information needed to keep the equipment operational. It shall provide system and subsystem-oriented instructions for installation, operation, maintenance, and testing. All tools, test equipment, and consumable items required to accomplish any maintenance or installation shall be identified. All publications shall reflect the configuration of fielded hardware. The Operations Manual shall also include operator maintenance tasks such as preventive maintenance checks and services, inspection, lubrication, adjustment, and other operator-level repair and replacement tasks. The Contractor shall identify all required spare parts, consumables, tools, and test/support equipment associated with each maintenance task.

Preparation of Digital Technical Information for Page-Based Technical Manuals (TMs)(MIL-STD-40051-2C)

3.6.6 Commercial Off-The-Shelf (COTS) Manuals.

The contractor shall deliver COTS technical publications for all commercial equipment delivered with the training system or modification. The COTS documentation shall be obtained in electronic media or scanned into indexed electronic media (i.e., portable document format) for delivery to the Government and be sufficient to support the operation and maintenance of all COTS components. The Contractor shall review the COTS documentation and identify deficiencies or deviations in the manuals. If the COTS document is not sufficient to support the operation and maintenance and the contractor is unable to retrieve the required data from the vendor, the Contractor shall provide supplementary data COTS item.

COMMERCIAL OFF THE SHELF MANUALS & ASSOCIATED SUPPLEMENTAL

DATA (DI-TMSS-80527C)

3.6.7 Commercial Drawings/Models/Software and Associated List.

The Contractor shall provide the physical size of completed chamber as well as clearances required for installation, operation and maintenance. The Contractor shall provide the instrumentation that will be used to control the test environment, document test conditions, and briefly describe the capabilities and limitations of the instrumentation. The Contractor shall provide all the technical documents needed to maintain and sustain the system (equipment drawings, specifications).

PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS (DI-SESS-81000E)

COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LISTS (DI-SESS-81003E)

Revision 1.5

DISTRIBUTION LIST STATEMENT D

Limited to DoD and DoD Contractors Only

3.6.8 Materiel Identification Requirements.

The Contractor shall implement an Item Unique Identification (IUID) of tangible items in accordance with MIL-STD-130N w/Change 1. IUID means a set of data marked on items that is globally unique, unambiguous, and robust enough to ensure data information quality throughout the system’s life. These requirements apply to fabricated and commercial items. The Contractor shall coordinate with the Government and identify the UID to be used, and items requiring unique identification including embedded subassemblies, components, and parts. The Contractor shall provide IUID, or a DoD-recognized unique identification equivalent, for all identified items delivered.

The Contractor shall submit this data to the DoD IUID central registry. UID marking of items shall be both machine-readable and human-readable.

ITEM UNIQUE IDENTIFICATION (IUID) MARKING ACTIVITY, VALIDATION AND

VERIFICATION REPORT (DI-MGMT-81804A)

3.7 Disposition of Existing Legacy Dust Chamber.

ATC is responsible for removal of the existing legacy Dust Chamber.

4. Warranties.

The Contractor shall ensure all original equipment manufacturer (OEM) warranties are transferred to the Government upon system acceptance. The Contractor shall provide a one year commercial warranty and technical support.

Text1: 25 May 2017
Text2: 30 May 2017
Text3: 25 May 2017
Text4: 30 May 2017
Text5: 01 June 2017
2017-05-25T10:27:40-0400
PRIMAS.MITCHELL.A.1228686936
2017-05-30T12:58:54-0400
VICK.DEREK.S.1384303699
2017-05-25T10:51:44-0400
DAENS.GLENN.R.1088245730
2017-05-30T15:39:38-0400
ARORA.BOBBY.1092442884
2017-06-01T15:38:36-0400
PLATT.KYLE.I.1286591279

File details come from the government source that posted it. Updated .