5. Industry Day Brf 29 June09.pptx.ppt
PPT presentation 11 MB Posted
- Attached to
- Urban Operations Training Systems (UOTS)
- Solicitation number
- W900KK09R0002
About this file
5. Industry Day Brf 29 June09
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7. UOTS DRAFT Perf Spec.doc.docx | DOCX document | |
| 8. UOTS DRAFT PWS.doc.docx | DOCX document | |
| 6. UOTS Industry Day Atendees 29 June.doc.docm | DOCM document | |
| 3. UO SOW | — | |
| 4. UOTS Perf Spec | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dave Stewart & Wayde Sumerix Project Directors / PM DT 29 June 2009 Urban Operations Training Systems (UOTS) Industry Day
Rules of the Day Thank Fort Benning for their support and hospitality!!!
No cell phone use while driving;
Observance type questions allowed;
No responses to questions on technical requirements;
No Photography;
Do not open equipment racks;
Do not turn on equipment.
Government will post slides and attendee roster. If anyone objects to phone numbers or email address posting, please contact Phil Davis today.
No Facilities at SH, UAC, MMOUT; Limited Facilities at CACTF & AAR
Agenda
| Introductions | 0900 | |
| Brief | ||
| Combined Arms Collective Training Facility (CACTF) | ||
| Shoot House (SH) | ||
| Urban Assault Course (UAC) | ||
| CTC MOUT IS | ||
| Mobile MOUT | ||
| Site Map | ||
| Q&A | ||
| Review of Sites | 1000 to 1130 | |
| Lunch | 1130 to 1300 | |
| Review of Sites | 1300 to 1630 |
Purpose Provide site availability for interested companies to:
| View construction techniques of an actual site; |
| Understand the scope and magnitude of UOTS efforts; |
| Familiarize potential Bidders with the variety of UOTS sites. |
Goal: Enable participation in UOTS to interested companies.
US Army Corps of Engineers Site Responsibilities
CACTFs, SHs,& UACs Site Design Reviews at 35%, 65%, 95% Site Construction Roads;
Buildings Electrical Infrastructure Construction Compliance Inspection (CCI) Target Interface Inspection (TII) Coordinates Beneficial Occupancy Date (BOD)
PEO STRI
Site Responsibilities CACTFs, SHs,& UACs Reviews COE Design Reviews (30%, 65%, 95%) Supports COE CCI Review Supports COE TII Review Site Instrumentation Training Buildings After Action Review Targets & Battlefield Effects New Equipment Training (NET) Spares Package Transition Support
CACTF Sites
Fort Lewis (Leschi Town)
CACTF Capabilities Construction types:
Wood, Concrete block, Metal Instrumentation:
Audio & Video Recording 2D & 3D site models MILES (hit sensing & shootback) Day & NVG Operations After Action Review (AAR) Battlefield Effects (smoke, sound, smells, weapons, targets) CTIA integrated for interoperability Single Mount for all boxes: Contractor specified
Camera Outlet
| Power: 240 VAC; Qty: 1 |
| Power Receptacle: L14-20R |
| Data Outlet Type: RJF-45; Qty: 1 |
| Device Mount: Qty 1 |
All Data Outlets are connected to ROC.
Power & Data Outlets Universal Outlet (UO)
| Power: 240 VAC; Qty: 1 each |
| Camera Power Receptacle: L14-20R |
| Auxiliary Power Receptacle: L5-20R |
| Data Outlet Type: RJF-45; Qty: 2 |
| Device Mount: Qty 1 |
Smoke Generator Smells of War Device location Mobility – any device can plug into any outlet Battle Field Effects Devices (Typical) Human Type Target
HTT
Weapons Simulator
Shoothouse (SH)
Ft Benning
SACON: Shock Absorbing Concrete at Ft Riley
SH Capabilities Construction types:
AR 500 steel with ballistic rubber, SACON (shock absorbing concrete), Sand-filled wood, & Concrete with ballistic rubber Instrumentation:
Digital Recording System Video System Coverage (100%) Audio System Day & NVG Operations After Action Review Human Type Targets (Qty:10) MILES (hit sensing & shootback) Panic Buttons (Qty: 8)
Modular Live Fire Shoot House The Modular Live Fire Shoot House (MLFSH) has been removed from this acquisition.
Urban Assault Course (UAC) Construction:
Wood Concrete Metal Instrumentation:
Station 3
Pedestal AAR: No connection with ROC Senses 40 mm thru window Live Fire Targets: Station 3 Only SRTA, 5.56 mm, 40 mm TPT Façade Targets: Qty: 4 Stationary Infantry Targets: Qty: 6 Stations 1, 2 & 4: Human Type Target s (HTT)
MILES (hit sensing only) capability
SESAM
Total Qty: 26
SESAM
Station 1: Individual & Team Trainer Fort Hood
Station 2: Squad & Platoon Trainer
Station 3: Grenadier Gunnery Trainer Fort Carson
Station 4: Urban Offense/ Defense
CTC MOUT IS
National Training Center’s National Urban Warfare Complex
CTC MOUT IS
Instrument selected MOUT sites at the three Combat Training Centers using the CACTF instrumentation.
National Training Center Joint Readiness Training Center Joint Maneuver Readiness Center
Mobile MOUT
Mobile MOUT: Overview There is no Program Objective Memorandum funding.
Mobile MOUT is a Customer Funded effort.
Mobile MOUT is not a construction/MCA effort.
Each deliver varies based on unique customer and site requirements.
Consists of modular structures and battlefield/visual effects to replicate an urban environment.
Complexity of the effort can range from a single container to a brigade level objective.
Mobile MOUT can be used as a Force-on-Force or Force-on-Target training asset.
Mobile MOUT: Requirements Mobile MOUT projects could include:
CACTF instrumentation Targetry Electrical Multi-story training structures Hardening for Short Range Training Ammunition Site preparation (dirt works, trenching of cables, etc.)
Facades Battlefield effects Environmental effects
Site Map
< Insert Site Map >
Point of Contact For questions concerning this acquisition, please contact Phil Davis.
| Phone: 407.384.5335 |
| Email: Phil.B.Davis@us.army.mil |
Group Breakdowns
| Group 1 | Group 2 | Group 3 | Group 4 |
| SAAB Training |
Raytheon Patriot Products Parsons Military Wraps Vecorder Tech Strategic Systems Coburn Cont GDIT L-3 Comm US Training Ctr Amidon Ctrg AHNTECH Inc Action Target Laser Shot, Inc Cobham Analytic Cubic Harris Corp Pulau Elect Falcon Storage Terran Corp Centurion Res Lockheed Martin Tech Valley Tech Allied Container VT MAK Inc Conflict Kinetics Bowhead Combat Trng Univ Mod Bldg Sutton Devel Camber Corp Ubisense Range Systems
ATK
QinetiQ – NA Meggitt Ahtna STS Omega Cubic Ceres Tech Grp Growth Tech
SAIC
RQ Construction
Time Schedule
| Time | CACTF | Shoot House | UAC | MMOUT |
| 1030 to 1115 | Grp 1 | Grp 2 | Grp 3 | Grp 4 |
| 1115 to 1230 | Lunch | |||
| 1245 to 1330 | Grp 2 | Grp 3 | Grp 4 | Grp 1 |
| 1400 to 1445 | Grp 3 | Grp 4 | Grp 1 | Grp 2 |
| 1515 to 1600 | Grp 4 | Grp 1 | Grp 2 | Grp 3 |
File details come from the government source that posted it. Updated .