A01_ATTACHMENT_2_QASP_CB_7_18.docx
DOCX document 36 KB Posted
- Solicitation number
- W81XWH-18-R-0021
- Issued by
-
Department of the Army Medical Command
About this file
A01 ATTACHMENT 2 QASP
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE AND SURVEILLANCE PLAN
For Acquisition Support for Walter Reed Army Institute Research (WRAIR) Business Management Office Contract Number: < upon award, enter contract number> Contract Description: Closely associated with Inherently Governmental Business Management support contract.
Contractor’s name: < upon award, enter contractor name > (hereafter referred to as the contractor).
Contents
| 1. | PURPOSE | 1 |
| 2. | GOVERNMENT ROLES AND RESPONSIBILITIES | 1 |
| 3. | CONTRACTOR REPRESENTATIVES | 2 |
| 4. | PERFORMANCE REQUIREMENTS SUMMARY MATRIX | 3 |
| 5. | METHODS OF SURVEILLANCE | 4 |
| PERFORMANCE REPORT | 6 | |
| CONTRACT DISCREPENCY REPORT (CDR) | 7 |
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored
· How monitoring will take place
· Who will conduct the monitoring; and
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
The following FAR clauses may apply depending on contract type:
52.246-4 Inspection of Services – Fixed-Price
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
Contracting Officer (KO) - The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The KO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned KO: Laura Tomitz Organization or Agency: USAMRAA Telephone: 301-319-2051 Email: laura.a.tomitz.civ@mail.mil
Contract Specialist (CS) - The CS acts as an acquisition consultant and serves as liaison between the contract office and Walter Reed Army Institute of Research (WRAIR).
Assigned CS: Flodean Billings Telephone: 301-619-2648 Email: Flodean.p.billings.civ@mail.mil
Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a “QASP and Performance” file. At the conclusion of the contract or when requested by the KO, the COR shall provide documentation to the KO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the KO for action.
Assigned COR: Calvin Bowens Telephone: 301-319-7534 Email: Calvin.Bowens.Civ@Mail.Mil
Other Key Government Personnel - Title: Director, Business Management Office, Renee Davis Telephone: 301-319-7102 Email: Deborah.r.davis4.civ@mail.mil
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this contract. <Communication should occur with them during QASP development. It will help if they review the draft QASP and accept the final version. You may delete the stated roles or change the naming convention if applicable. >
Program Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>
Task Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>
Other Contractor Personnel - <upon award, enter name or delete these lines if not applicable> Title: <enter title> Telephone: <enter number> Email: <enter address>
4. PERFORMANCE REQUIREMENTS SUMMARY MATRIX
PERFORMANCE REQUIREMENTS SUMMARY MATRIX
| # |
| PWS Ref. |
| Performance Objective |
| Performance Standard |
| Acceptable Quality Level |
| Performance Measurement |
| Incentive |
| 1 |
| 6.2.2.1.10 |
| Business processes, procedures, training plans and metrics are maintained. |
| Processes, procedures, training plans and metrics will be available electronically and not out of date. |
| Provided products will be current IAW all current requirements 90% of the time. |
| Direct observation by COR |
| Past Performance. |
| 2 |
| 6.2.2.1.12 |
| Requirements checklist is accurate and complete. |
| The contracting office should not notify the end user of a required product that has not been included on the checklist. |
| >95% |
| Direct observation by COR, Periodic reports from KO |
| Past Performance |
| 3 |
| 6.2.2.1.14 |
| All Tasker input shall be completed on time. |
| All Tasker inputs shall be completed on time and the COR shall not have to rework to compile or normalize data. |
| No tasker will be delivered after due date. |
| Direct observation by COR |
| Past Performance |
| 4 |
| 6.2.3 and 6.2.4 |
| All requirements will be delivered to contracting office after complete quality review. |
| Packages submitted for action will include all required components and will be consistent with documented acquisition/ guidelines. |
| The contracting office shall return no more than 5% of all packets for substantial rework. |
| Direct observation by COR, Periodic reports from KO |
| Past Performance |
| 5 |
| 6.2.4 |
| Contractor will facilitate the use of e-Commerce where feasible. Where not feasible, coordination will begin with contracting office immediately. |
| Contracting office will be contacted within 2 days for any action that cannot be procured using e-Commerce solutions. |
| Not more than 1 action per quarter may arrive at contracting without prior coordination. |
| Direct observation by COR, Periodic reports from KO |
| Past Performance |
| 6 |
| 6.2.5 |
| Files will be managed in accordance with ARIMS. |
| Files will be managed in accordance with ARIMS. |
| No major findings during ARIMS inspections |
| Periodic inspection |
| Past Performance |
| 7 |
| 6.2.5 |
| Loss of version control will not be indicated as cause for contract pre-award delay. |
| Version control will be maintained for all documents related to an acquisition. |
| At no time will loss of version control cause pre-award delay. |
| Direct observation by COR. |
| Past Performance |
| 8 |
| 6.2.6 |
| Contractor will actively identify and facilitate business process engineering efforts. |
| Contractor will actively identify and facilitate business process engineering efforts. |
| Contractor will be leading all BPR efforts in support of BMO. |
| Direct observation by COR. |
| Past Performance |
| 9 |
| 6.2.8 |
| Contracting dashboard will be available and accurate to authorized users. |
| Dashboard shall be available and allow access in accordance with roles created and assigned. |
| At no time will dashboard information be available to anyone not included in role based access plan. |
| Direct observation by COR, reports from authorized users. |
| Past Performance |
| Required training will be completed on time. |
| All required training will be completed on time. |
| >90% |
| Review of training certificates provided to COR |
| Past Performance |
| Installation Access – Contractor shall follow installation access procedures. |
| Sum of all incidents in which contractor personnel did not follow installation access procedures |
| <1 incident per year |
| Direct observation by COR and installation security. |
| Past Performance |
5. METHODS OF SURVEILLANCE
| # |
| Performance Objective |
| Frequency |
| Method of Surveillance |
| 1 |
| Business processes, procedures, training plans and metrics are maintained. |
| Unscheduled |
| Surveillance Manager: COR |
Periodic Inspection: The COR will assess relevancy and currency of all processes, procedures, training plans and metrics on an unscheduled basis.
| 2 |
| Requirements checklist is accurate and complete. |
| Unscheduled |
| Surveillance Manager: COR |
Periodic Inspection: The COR will assess relevancy and currency of all processes, procedures, training plans and metrics on an unscheduled basis.
| 3 |
| All Tasker input shall be completed on time. |
| As required |
| Surveillance Manager: Director, BMO |
100% Inspection: The Director, BMO will review and inspect 100% of all Tasker responses prepared in support of this award.
| 4 |
| All requirements will be delivered to contracting office after complete quality review. |
| Unscheduled |
| Surveillance Manager: COR with support from contracting office |
Periodic Inspection: The contracting office will provide feedback to the COR when requirements are returned requiring substantial rework due to identified quality issues.
| 5 |
| Contractor will facilitate the use of e-Commerce where feasible. Where not feasible, coordination will begin with contracting office immediately. |
| Unscheduled |
| Surveillance Manager: COR with support from contracting office |
Periodic Inspection: The contracting office will provide feedback to the COR when requirements arrive uncoordinated.
| 6 |
| Files will be managed in accordance with ARIMS. |
| Annual |
| Surveillance Manager: COR, with support from WRAIR or MRMC Records Manager |
Periodic Inspection: Files will be assessed for ARIMS compliance during MRMC Organizational Inspections or during WRAIR Internal Control inspections.
| 7 |
| Loss of version control will not be indicated as cause for contract pre-award delay. |
| As required |
| Surveillance Manager: COR with support from end users |
User Survey: The COR will inquire with end users to include contracting officers as to delays related to loss of version control in the event of a contract award slip.
| 8 |
| Contractor will actively identify and facilitate business process engineering efforts. |
| Unscheduled |
| Surveillance Manager: Director, BMO |
Direct Observation: The Director will assess business process engineering efforts to ensure accuracy and forward progress for all assigned areas of focus.
| 9 |
| Contracting dashboard will be available and accurate to authorized users. |
| Unscheduled |
| Surveillance Manager: COR |
Validated User Complaints: The COR will collect user feedback related to ability to access and use dashboard data.
| 10 |
| Required training will be completed on time. |
| Annual |
| Surveillance Manager: COR |
100% Inspection: The COR will validate all required training is completed on time.
| 11 |
| Installation Access – Contractor shall follow installation access procedures. |
| Unscheduled |
| Surveillance Manager: COR with support from Installation Security |
Periodic Inspection: The COR will monitor for any documented incidents with any Contractor personnel.
a. DIRECT OBSERVATION. (Can be performed periodically or through 100% surveillance.)
The USG will engage with the Contractor and will ask questions and verify conditions being shown during QASP monitoring.
b. PERIODIC INSPECTION. (Uses a comprehensive evaluation of selected outputs. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)
Items monitored will be monitored as work on the contract progresses. While there is no set schedule, each item being monitored is considered critical to successful performance. Items will be inspected no less than monthly but may be more often to ensure consistent contract performance.
c. USER SURVEY. (Combines elements of validated user complaints and random sampling. Random survey is conducted to solicit user satisfaction. Appropriate for high quantity activities that have historically been satisfactory. May also generate periodic and 100% inspections.)
Items monitored will be actively monitored for issues causing performance delay. Users will be asked for reasons leading to procurement delay to ascertain if version control played a role.
d. VALIDATED USER COMPLAINTS. (Relies on the user of the service to identify deficiencies. Complaints are then investigated and validated. Highly applicable to services provided in quantity and where quality is highly subjective.)
Items monitored will be actively monitored to ensure performance satisfaction. Validated user complaints will be discussed with the Contractor.
e. 100% INSPECTION. (Evaluates all outputs. Most applicable to small quantity, but highly important services. May be used where there are written deliverables and stringent requirements such as tasks required by law, safety, or security.)
The COR will receive deliverables to support all items monitored using 100% Inspection.
PERFORMANCE REPORT
Contract Number: <insert number>
Prepared by: (Name of COR) <insert name>
Date and time of observation: <insert date>
Observation:
<Examples of items to include in a report are:
- Method of surveillance.
- How frequently you conducted surveillance.
- Surveillance results (Exceeds, Meets, Does Not Meet).
- Number of observations.>
Prepared by: <Enter COR’s name>
COR’s Signature
Date
CONTRACT DISCREPENCY REPORT (CDR)
< The COR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects; anytime unacceptable performance is determined critical in nature and requires formal corrective action; and whenever an unfavorable trend is detected in contractor performance.>
Contract Number: <insert number>
Contractor Project Manager: <insert name>
From: <insert name of COR>
Date and time observed discrepancy:
Contract Discrepancy:
<Describe in detail. Identify any attachments.>
Corrective action plan:
A written corrective action plan < is / is not > required.
< If a written corrective action plan is required include the following. > The contractor shall provide the COR with the Corrective Action Plan not later than < # days after receipt of this CDR. >
Prepared by: <Enter COR’s name>
COR’s Signature
Date
Received by: <Enter contractor project manager’s name>
Contractor Project Manager’s Signature
Date
File details come from the government source that posted it.