Attachment_8_QASP(Draft).docx

DOCX document 50 KB Posted

Attached to
Medical Equipment Maintenance, Administrative, and Professional Support Services
Solicitation number
W81XWH-16-R-0045
Issued by

About this file

Attachment 8 - QASP (Draft)

View the file

Other files

File Type Posted
W81XWH-16-R-0045-0001.docx DOCX document
Attachment_1_OCI_Certification_BMET_(updated).doc DOC document
Attachment_3_Labor_Categories_and_Descriptions_BMET.docx DOCX document
Attachment_2_Non-Disclosure_Statement_BMET.doc DOC document
Attachment_7_STAMIS_Averages_BMET.pdf PDF
Attachment_1_OCI_Certification_BMET.doc DOC document
Attachment_6_Cost_Summary_Sheet.xlsx XLSX spreadsheet
Attachment_4_Estimated_Level_of_Effort_BMET.docx DOCX document
W81XWH-16-R-0045_Solicitation.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan for Biomedical Equipment Technician (BMET), Administative, and National Maintenance Program Support Services

1. PURPOSE.

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored?

· How monitoring will take place?

· Who will conduct the monitoring?

· How monitoring efforts and results will be documented?

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES.

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (KO) - The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The KO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned KO: Laura N. Charles Organization or Agency: US Army Medical Research Acquisition Activity Telephone: Phone: 301-619-8392 Email: laura.n.charles2.civ@mail.mil

b. Contracting Officer’s Representative (COR) – The COR is located at the U.S. Army Medical Materiel Agency (USAMMA) Office at 693 Neiman Street, Fort Detrick, MD 21702-5009. The COR will be responsible for technical administration of this contract, and shall assure proper Government surveillance of the contractor’s performance with the assistance of two (2) Contracting Officer’s Technical Representatives (COTRs). The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the KO, the COR shall provide documentation to the KO. A COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the KO for action.

Primary COR: Mr. Stephen Drumsta Telephone: 301-619-4335 Email: stephen.t.drumsta.civ@mail.mil

Alternate COR: Ms. Susan Wilders Telephone: 301-619-4359 Email: susan.a.wilders.civ@mail.mil

3. CONTRACTOR REPRESENTATIVES:

The following employee of the contractor will serve as the contractor’s Program Manager for this contract.

Program Manager: TBD Title: TBD Telephone: TBD Email: TBD

4. PERFORMANCE STANDARDS.

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

Table 1. Performance Requirements

Performance Objective
PWS
Performance Standard
Acceptable Quality Level (AQL)
Surveillance Method

3.1. BMET Support Services

Short notice travel to provide BMET support to Army units.
3.1.8.
a) STD: The contractor shall travel within 58 to 72 hours of notice from the COR.
AQL: 100% responsive to all TDY requests.
Observation and 100% Inspection by the Depot Chief, Shop Supervisor, and COR.
The Contractor shall perform technical inspections.
3.1.9.
a) STD: Contractor shall perform technical inspections on equipment IAW Technical Bulletin Med 750-1 and the manufacturer’s literature.
AQL: 100% of technical inspections on equipment shall be IAW with Technical Bulletin Med 750-1 and the Manufacturer’s literature.
Random Observation and Inspection by the Depot Chief, Shop Supervisor, or Quality Assurance (QA) Team.
The contractor shall repair equipment.
3.1.10.
a) STD: Equipment shall be repaired and returned with all necessary calibration and PMCS actions completed.
AQL: 100% of equipment repaired shall be returned with all necessary calibration and PMCS actions completed.
Random Observation and Inspection by the Depot Chief, Shop Supervisor, or QA team.
The contractor shall perform calibration and PMCS.
3.1.11.
a) STD: Calibration and PMCS shall be performed IAW manufacturer specifications.
AQL: 100% calibration and PMCS shall be performed IAW manufacturer specifications.
Random Observation and Inspection by the Depot Chief, Shop Supervisor, or QA team.
The contractor shall perform overhaul for equipment.
3.1.12.
a) STD: Equipment shall be overhauled and returned with all necessary calibration and PMCS actions complete IAW the manufacturer’s literature.
AQL: 100% equipment overhauled shall be returned with all necessary calibration and PMCS actions completed IAW the manufacturer’s literature.
Random Observation and Inspection by the Depot Chief, Shop Supervisor, or QA team.
The contractor shall enter data into Army automated systems.
3.1.13.
a) STD: Upon completion of the technical inspections, repairs, calibration/PMCS services and equipment overhaul the contractor shall be required to document their services by posting each action in to an Army automation system designed to manage workload.
AQL: 100% accuracy is required for all data input.

Random Observation and Inspection by the Depot Chief, Shop Supervisor, or QA team.

The contractor shall complete maintenance actions. Maintenance actions include but are not limited to, technical inspections, repair, calibrations, verification, and complete refurbishment of medical equipment.

3.1.14.
a) STD: The averages calculated from the Standard Army Management Information System (STAMIS) (Attachment 7).
AQL: Monthly -Maintenance actions shall be completed within 17% or less above the standard

AQL: Quarterly – Maintenance actions shall be completed within 12% or less above the standard.

Random Observation and Inspection as well as review of monthly and quarterly reports by the Depot Chief and/or Shop Supervisor

3.2. M3D Administrative Support Services

The contractor shall provide office administration support and prepare general office correspondence.
3.2.8.
a) STD: The contractor shall provide accurate, quality correspondence, reports, and all types of office automation.
AQL: Rewrites because of errors in fact or judgment should occur in no more than 5% of work products.
Observation and 100% Inspection by the Depot Chief and/or Shop Supervisor.
The contractor shall assist data collection and reporting for incoming, stored and outgoing medical equipment.
3.2.9.
a) STD: The contractor shall assist the Chief of the Medical Maintenance Program in receiving, tracking, monitoring, reporting inventory, and maintenance/storage status of incoming, stored, and outgoing medical equipment.
AQL: Data gathered should be 100% accurate, up to date, and should not contain errors.
Observation and 100% Inspection by the Depot Chief and/or Shop Supervisor.
The contractor shall process work orders in Army automated systems.
3.2.10.
a) STD: The contractor shall open and close work orders in Army automated systems. Contact customers, update addresses, telephone numbers, Unit Identification Code (UIC), and Department of Defense Activity Address Code (DoDAAC). Ensure that all work orders have time, repair parts, and costs charged correctly prior to closing and filing.
AQL: Less than 3% errors for work orders opened and closed in Army automated systems.

Random Observation and Inspection by the Depot Chief, Shop Supervisor, or QA team.

The contractor shall schedule and coordinate workload with the Production Controller.
3.2.11.
a) STD: Coordinate and interface with the Production Controller in scheduling workload and storing, shipping, receiving of medical equipment by correct serial number to specific units/UIC.
AQL: Less than 3% errors for work orders opened and closed in Army automated systems.
Random and Monthly Inspection by the Depot Chief or Shop Supervisor.
The contractor shall coordinate and interface with shipping and receiving for equipment inventories and turn-in of medical equipment including all necessary documentation and updating of Army automated systems.
3.2.12.
a) STD: The contractor shall coordinate and interface with shipping and receiving for equipment inventories and turn-in of medical equipment including all necessary documentation and updating of the Army automated systems.
AQL: Accurately coordinate shipping, receiving, turn-ins with no more than two errors per month.

Random Observation and Inspection by the Depot Chief, Shop Supervisor, or Inventory Manager.

The contractor shall move palletts with equipment requiring a fork lift at Hill AFB and Tracy Army Depot.
3.2.13
a) STD: The contractor shall be certified and available to perform tasks requiring a fork lift at Hill AFB and Tracy Army Depot.
AQL: 100% of the time.
Observation and 100% Inspection by the Depot Chief, Shop Supervisor, or Inventory Manager.

3.3. Support of National Maintenance Program (NMP)

The contractor shall respond to inquiries for medical maintainers, equipment owners and users, and logisticians. The contractor shall field interrogatories and assist the customer by providing research and answers or by connecting the customer with the office most able to support. The contractor shall continue to assist the customer until the issue is resolved, request feedback from the customer relative to the quality of assistance, and document all actions taken to resolve the issue.
3.3.14.
a) STD: The contractor shall research relevant information sources including publications and databases, perform analysis of the information, and construct recommendations, briefings, white papers, and articles.
AQL: Data gathered shall be 100% accurate, up to date, and shall not contain errors.
Observation and 100% Inspection by the NMP Chief and/or Deputy.
The contractor shall conduct research for maintenance issues and projects, and provide reports, briefings, white papers, and articles. The contractor shall research all available information and data relative to assigned projects and maintenance centric issues resulting from maintenance operations, business practices and regulatory requirements, and provide reports, briefings, white papers and articles for topics.
3.3.15.
a) STD: The contractor shall research relevant information sources including publications and databases, perform analysis of the information, and construct recommendations, briefings, white papers, and articles.

AQL: Data gathered shall be 100% accurate, up to date, and shall not contain errors.

Observation and 100% Inspection by the NMP Chief and/or Deputy.

The contractor shall conduct maintenance research and analysis for assigned issues and projects and provide relevant recommendations.
3.3.16.
a) STD: The contractor shall research relevant information sources including publications and databases, perform analysis of the information, and construct recommendations, briefings, white papers, and articles.
AQL: Data gathered shall be 100% accurate, up to date, and shall not contain errors.

Observation and 100% Inspection by the NMP Chief and/or Deputy.

The contractor shall assist the NMP Chief when supporting the command maintenance discipline program and maintenance assistance and instruction team.
3.3.17.
a) STD: The contractor shall research relevant information sources including publications and databases, perform analysis of the information, and construct recommendations, briefings, white papers, and articles.
AQL: Data gathered shall be 100% accurate, up to date, and shall not contain errors.

Observation and 100% Inspection by the NMP Chief and/or Deputy.

The contractor shall develop and lead medical maintenance projects to research, analyze, and provide professional, relevant, logical and timely medical maintenance operations and maintenance management process recommendations to the chief NMP.
3.3.18.
a) STD: The contractor shall research relevant information sources including publications and databases, perform analysis of the information, and construct recommendations, briefings, white papers, and articles.
AQL: Data gathered shall be 100% accurate, up to date, and shall not contain errors.
Observation and 100% Inspection by the NMP Chief and/or Deputy.
The contractor shall evaluate and provide recommendations for Medical Materiel Quality Control Messages. The contractor shall evaluate manufacturer field change orders, recalls, the Emergency Care Research Institute (ECRI), and the Food and Drug Administration (FDA) for health device alerts for relevance to AMEDD inventories with the exclusion of medical supplies and pharmaceutical product alerts
3.3.19.
a) STD: The contractor shall research manufacturer's website, FDA, ECRI and other relevant information sources and databases, perform analysis of the information, and provide alert recommendations.

AQL: Data gathered and resultant recommendations should be 100% accurate, up to date, and contain no errors.

Observation and 100% Inspection by the NMP Chief and/or Deputy.

The contractor shall support the medical maintenance community by tracking MMQC compliance at all owning units.
3.3.20.
a) STD: Contractor shall utilize application resources and tracking techniques to ensure compliance with alerts and recalls and report relevant information on a continuous basis.
AQL: Tracking shall be timely and accurate IAW USAMMA NMP Standard Operating Procedures (SOP).

Observation and 100% Inspection by the NMP Chief and/or Deputy.

The contractor shall maintain visibility of level of repair for sustainment capabilities. Maintaining and understanding of the capability of the Combat Support Hospital (CSH), Medical Logistics Company (MLC), maintainer in the Brigade Combat Team (BCT), and other Army units with medical maintenance capability, of medical devices.
3.3.21.
a) STD: The contractor will research relevant information sources including publications and databases, perform analysis of the information, and construct recommendations, briefings, white papers, and articles.

AQL: Data gathered shall be 100% accurate, up to date, and contain no errors.

Observation and 100% Inspection by the NMP Chief and/or Deputy.

The contractor shall develop and integrate policies, programs, and procedures that provide sustained maintenance support of Army medical equipment.

3.3.22.
a) STD: The contractor shall research relevant information sources including publications and databases, perform analysis of the information, and construct recommendations, briefings, white papers, and articles.
AQL: Data gathered shall be 100% accurate, up to date and contain no errors.

Observation and 100% Inspection by the NMP Chief and/or Deputy.

The contractor shall serve as a resource for national maintenance information to ILS processes.
3.3.23.
a) STD: The contractor shall review ILS maintenance plans against a checklist, manufacturer's information and maintenance data, and will report errors, information gaps and provide recommendations for corrections/improvements.
AQL: Data gathered shall be 100% accurate and shall not contain errors. Recommendations shall be 100% fact based, accurate, and supportable with empirical evidence.

Observation and 100% Inspection by the NMP Chief and/or Deputy.

The contractor shall coordinate maintenance data requirements for logistics automation developers.
3.3.24.
a) STD: Utilize data warehouse and provide relevant strategic analysis.

Provide raw data to requestor/supervisor in response to routine requests within 2 working days and perform analysis (as required) within 5 working days.

Provide raw data to requestor/supervisor in response to moderate requests within 5 working days and perform analysis (as required) within 7 working days.

Provide raw data to requestor/supervisor in response to complex requests within 7 working days and perform analysis (as required) within 10 working days.

AQL: Data gathered should be 100% accurate, up to date, and contain no errors.

Observation and 100% Inspection by the NMP Chief and/or Deputy.

The contractor shall track cost effectiveness and efficiency of medical maintenance repair programs.

3.3.25.
a) STD: The contractor shall research relevant information sources including publications and databases, perform analysis of the information, and construct recommendations, briefings, white papers, and articles.
AQL: Data gathered shall be 100% accurate, up to date, and contain no errors.

Observation and 100% Inspection by the NMP Chief and/or Deputy.

The contractor shall provide recommendations to the NMP Chief and Deputy on challenges and issues elevated to the national level by the logistics and medical maintenance communities.
3.3.26.
a) STD: The contractor shall research relevant information sources including publications and databases, perform analysis of the information, and construct recommendations, briefings, white papers, and articles.
AQL: Data gathered shall be 100% accurate, up to date and contain no errors.

Observation and 100% Inspection by the NMP Chief and/or Deputy.

The contractor shall utilize information from Army medical maintenance databases to analyze maintenance operational and management procedures.
3.3.27.
a) STD: Utilize data warehouse and provide relevant strategic analysis.

Provide raw data to requestor/supervisor in response to routine requests within 2 working days and perform analysis (as required) within 5 working days.

Provide raw data to requestor/supervisor in response to moderate requests within 5 working days and perform analysis (as required) within 7 working days.

Provide raw data to requestor/supervisor in response to complex requests within 7 working days and perform analysis (as required) within 10 working days.

AQL: Data gathered shall be 100% accurate, up to date and contain no errors.

Observation and 100% Inspection by the NMP Chief and/or Deputy.

The contractor shall support Army medical maintenance quality and training programs.

3.3.28.
a) STD: Plan and execute data analysis relevant to AMEDD quality and training objectives. Provide input based on data analysis to the Chief, NMP, in the following formats: briefings, white papers, and/or articles.
AQL: Data gathered shall be 100% accurate, up to date and contain no errors.

Observation and 100% Inspection by the NMP Chief and/or Deputy.

The contractor shall serve as national level MAIT support point for medical maintenance.
3.3.29.
a) STD: When requested to provide input to MAIT conduct investigation and provide recommendations within 5 working days.

b) STD: When selected to conduct MAIT visit, conduct investigation prior to MAIT visit, conduct the MAIT visit within the allocated time frame (available time will be different depending on type of unit(s) visited), complete the after action report (AAR) within 5 working days of returning from the MAIT visit, and provide recommendations for improvement as part of the AAR.

AQL: Data gathered shall be 100% accurate, up to date, and shall not contain errors.

Observation and 100% Inspection by the NMP Chief and/or Deputy.

The contractor shall monitor capability and capacity of maintenance activities within Major Command (MACOM).

3.3.30.
a) STD: Utilize data warehouse and provide relevant strategic analysis.

Provide raw data to requestor/supervisor in response to routine requests within 2 working days and perform analysis (as required) within 5 working days.

Provide raw data to requestor/supervisor in response to moderate requests within 5 working days and perform analysis (as required) within 7 working days.

Provide raw data to requestor/supervisor in response to complex requests within 7 working days and perform analysis (as required) within 10 working days.

AQL: Data gathered shall be 100% accurate, up to date and contain no errors.

Observation and 100% Inspection by the NMP Chief and/or Deputy.

The contractor shall support and process requests for TMDE requirements.
3.3.31.
a) STD: Process requests for approval to purchase TMDE within 2 days of receipt. Process requests to add items to the preferred items list (PIL) within 2 days of request.

Establish an approver account with PD TMDE; review and validate that TMDE SP request packets are accurate and complete, following up with customers for clarification as required; perform NMP TMDE coordinator post procurement actions in accordance with ISO work instructions. Attend scheduled and unscheduled TMDE meetings and conferences and provide subject matter expertise for the acquisition, sustainment and disposal of medical TMDE SP.

AQL: Data gathered shall be 100% accurate, up to date, and contain no errors.

Observation and 100% Inspection by the NMP Chief and/or Deputy.

The contractor shall provide recommendations for publications. The contractor shall provide research, review and analysis for all types of publications (Federal, State, and local regulations, policies, guidance, Federal codes, and directives). The contractor shall determine the effect of publications on all types of medical maintenance activities and provide recommendations for compliance and/or changes to business practices. Provide recommendations for changes to the publications to suit medial maintenance business processes and requirements.
3.3.32.
a) STD: The contractor shall research relevant publications and perform analysis of the information; construct recommendations, briefings, white papers, and articles relevant to the impact on medical maintenance activities, business processes and requirements.

AQL: Data gathered and subsequent analysis should be 100% accurate, relevant, up to date, and contain no errors.

Observation and 100% Inspection by the NMP Chief and/or Deputy.

5. METHODS OF QA SURVEILLANCE.

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

· Feedback from Oversight Board

· Feedback from Government Users

· Feedback from Property Book Officers

· Direct Observation

· 100% Inspection

· Review of Quarterly Reports (various)

· Review of Monthly Reports (various)

Regardless of the surveillance method, the COR shall always contact the contractor's task manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard/AQL.

· DIRECT OBSERVATION. (Can be performed periodically or through 100% surveillance.)

· MANAGEMENT INFORMATION SYSTEMS (MIS). (Evaluates outputs through the use of management information reports. Best used for general surveillance and may need to be supplemented by periodic inspections.)

· PERIODIC INSPECTION. Uses a comprehensive evaluation of selected outputs. Inspections may be scheduled as required.

· Analysis of contractor's progress reports. (Evaluate cost, schedule, etc.)

· Performance reporting.

Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause and the Inspection of Supplies clause in the Contract becomes the basis for the KO’s actions.

6. RATINGS.

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

Example 1:

EXCEPTIONAL:
Performance significantly exceeds contract requirements to the Government’s benefit.
SATISFACTORY:
Performance meets contractual requirements.
UNSATISFACTORY:
Performance does not meet contractual requirements.

7. DOCUMENTING PERFORMANCE.

a. ACCEPTABLE PERFORMANCE.

The Government shall document positive performance. A report template is attached. Any report may become a part of the supporting documentation for fixed fee payments, award fee payments, or other actions.

b. UNACCEPTABLE PERFORMANCE.

When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's task manager or on-site representative. A CDR template is attached to this QASP.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other actions deemed necessary by the KO.

8. FREQUENCY OF MEASUREMENT.

a. Frequency of Measurement.

During contract/order performance, the COR shall take periodic measurements, quarterly as specified in the AQL column of the Performance Standards Summary Matrix, and shall analyze whether the negotiated frequency of measurement is appropriate for the work being performed.

b. Frequency of Performance Assessment Meetings.

The COR shall meet with the contractor quarterly to assess performance and shall provide a written assessment.

PERFORMANCE REPORT

1. Contract Number: TBD

2. Prepared by: COR Name Entered At Time of Award

3. Date and time of observation:

4. Observation:

<Examples of items to include in a report are:

- Method of surveillance.

- How frequently you conducted surveillance.

- Surveillance results.

- Number of observations.>

Prepared by: COR

_______________________________________________________
Signature – Contracting Officer’s RepresentativeDate

CONTRACT DISCREPANCY REPORT (CDR)

1. Contract Number: TBD

2. To: (Contractor Task Manager or on-site representative) Philippe Deschamps

3. From: TBD

4. Date and time observed discrepancy:

5. Discrepancy or Problem:

<Describe in detail. Identify any attachments.>

6. Corrective action plan:

A written corrective action plan < is / is not > required.

< If a written corrective action plan is required include the following. > The written Corrective Action Plan will be provided to the undersigned not later than < # days after receipt of this

CDR. >

Prepared by: COR

________________________________________________________________
Signature – Contracting Officer’s RepresentativeDate

Received by:

_________________________________________________________________
Signature - Contractor Task Manager or on-site representativeDate

The COR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects; anytime unacceptable performance is determined critical in nature and requires formal corrective action; and whenever an unfavorable trend is detected in contractor performance.

File details come from the government source that posted it. Updated .