Price_Schedule_5Apr2018.pdf
PDF 409 KB Posted
- Solicitation number
- W5J9JE-18-R-0016
About this file
Price Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questionnaire_for_Phase_1_Offerors_(rev).pdf | ||
| 18R0016_Commando_Amend0001.pdf | ||
| 18R0016_Commando_SolAmend0001.pdf | ||
| 18R0016_Commando_Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
W5J9JE18R0016 Design-Build of Camp Commando
Project Numbers ANA-18-080 and ANA-19-006
Item
No.
Description Quantity Unit Unit Price Extended Amount
0001 Survey
JOB
0002 Geotechnical
Investigation
1 JOB
Engineering Design
Mobilization
Demolition
Grading and
Drainage
Erosion Control
Roads/Parking
Area/Sidewalks
Water System
Sanitary Sewer
Collection System
Site Electrical
System
Site
Communications
System
Headquarters
Buildings
Headquarters
Buildings
Furniture
0015 Joint Operations
Center (JOC)
Building
Fusion Cell
Conference
Furniture for
CLINs 0015 through 0017
As-Built
Drawings
Demobilization
TOTAL PRICE
Total of Base CLINS 0001 through 0020 $ _________________________
NOTE 1: Award will be made as a whole (meaning all line items) to only one (1) offeror.
NOTE 2: Offerors shall furnish unit prices for each item listed in the above Schedule.
If the offeror fails to insert a unit price in the appropriate blank for any of the line items above, but furnishes an extended total, the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity.
IF AN OFFEROR OMITS BOTH THE UNIT PRICE AND THE EXTENDED TOTAL
FOR ANY ITEM, ITS OVERALL OFFER SHALL BE DECLARED INELIGIBLE FOR
AWARD.
NOTE 3: Any offer may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only the total price of the price proposal, but also the unit price and extended price for individual line items.
NOTE 4: The unit “JOB” as used in this Price Schedule is synonymous with the term
“Lump Sum” or “LOT”.
NOTE 5: The offeror’s Cost/Price Breakdown Spreadsheet shall contain costs, rates and data that align with, and support, the unit and extended prices shown in the offeror’s Price Schedule.
NOTE 6: This Price Schedule is for information purposes only during Phase 1. The final version will be provided in the Phase 2 solicitation. ** Be advised the Government may delete or add additional line items to the final version of this Price Schedule.
(Revision 05 April 2018)
File details come from the government source that posted it.