W5J9JEANA1703401

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT: ANA -17-034 Design-Build Afghanistan Electrical Interconnect (AEI) at Central Supply Depot (CSD) adn Kabul Air Wing (KAW), Kabul Province, Afghanistan. The purpose of this amendment is to post submitted questions and answ ers for the above project.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Feb-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W5J9JE18R0009

X 9B. DATED (SEE ITEM 11)

11-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Feb-2018

CODE

TRANSATLANTIC AFGHANISTAN ENGINEER - TAA

DISTRICT (TAA), US ARMY CORPS OF ENGINEERS

CETAA-CT, BAGRAM AE 09354

W5J9JE 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W5J9JE18R0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

Submitted Questions and Responses

1. Question: Can a firm bid on this solicitation without having past experience?

Response: Solicitation requires specialized experience be demonstrated through recent and relevant projects of the same or similar scope and complexity. Firms with no past experience will not meet this requirement in the solicitation and will not be found as acceptable to move into Phase 2.

2. Question: Do I need to submit RFI prior or we can submit our proposals without any prior RFI submission?

Response: Thanks for your interest if you don’t have any concerns with the solicitaiton please submit your Technical Proposal.

3. Question: This Company has not have over 270,000,000 Past Performance, but has full capability an strong work plan could they submit for this project Yes or No

Response: Submit your proposal for review in accordance with Solicitaiton.

4. Question: Is this project exempted from the Afghanitan Customs Duties and Tazes or Not?

Reponse: Only non-Afghan firms are exempted from Customs duties and Tazes. Afghan firms are not exempt.

5. Question: If available, please provide us feasiblity of the project and also Single Line diagram of existing substation located at north of Kabul.

Response: Additional information will be provided in phase 2 of the source selection.

6. Question: What is the exact distance between existing substation and Central Supply Depot (CSD_ and Kabul Air Wing (KAW)?

W5J9JE18R0009

7. Question: Is there any vacant space in the existing substation for required expansion or not, beside installation works do required to perform there any civil work as well or not?

8. Question: If Available, then provide us the coordinates of exisitng substation and Central Supply Depot (CSD) and Kabul Air Wing (KAW).

9. Question: I’m International Company with subsidiary office in Afghanistan can bid for this project and use all its international qualififcations and financial capabilities. Those the experience required need to be local or can it be international?

Response: This is a full and open competition, so yes, you may submit a proposal. In addition, you may submit past experience from local or international projects; however, we must be able to contact your customer to confirm the project and your performance.

SECTION 00 10 00 - SOLICITATION

The Issued By organization has changed from

TRANSATLANTIC AFGHANISTAN ENGINEER

DISTRICT (TAA), US ARMY CORPS OF ENGINEERS

CETAA-CT, CAMP PHOENIX

APO, AE 09320

to

TRANSATLANTIC AFGHANISTAN ENGINEER - TAA

DISTRICT (TAA), US ARMY CORPS OF ENGINEERS

CETAA-CT, BAGRAM AE 09354

(End of Summary of Changes)