KNMH_Morgue_Solicitation.pdf

PDF 566 KB Posted

Attached to
Kabul National Military Hospital Consolidated Morgue and Visitation Center
Solicitation number
W5J9JE-18-R-0008
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
SolicitationAmend_1.pdf PDF
01_11_00_SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W5J9JEAN17026

Project Number: ANA-17-026 Kabul National Military Hospital Consolidated Morgue and Visitation Center, Kabul Afghanistan

FULL AND OPEN PROCUREMENT: This solicitation is open to all contractors. Offerors must have an active and valid ASIA/MOCI license and an active and completed registration in SAM and JCCS at the time of proposal submission to be considered. Offerors must maintain their registrations throughout the solicitation phases and if aw arded a contract, throughout the contract's duration.

In accordance w th Afghan law , Afghan f irms w ill be paid in Afghan currency. Reference Clause 252.232-7014 and 5152.232-5900 for further information.

NOTE: IAW AFARS 5132.702(a)(ii)(B), "Funds are not presently available for this acquisition. No contract aw ard w ill be made until appropriated funds are made available."

NIKISHA W COOK 540-723-4949

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

07-Jan-2018

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________453 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________06 Feb 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

TRANSATLANTIC AFGHANISTAN ENGINEER - TAA

DISTRICT (TAA), US ARMY CORPS OF ENGINEERS

CETAA-CT, BAGRAM AE 09354

W5J9JE

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

05:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

540-665-2758FAX:TEL: 540-662-5665 TEL: FAX:

W5J9JE18R0008 82

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W5J9JE18R0008

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Site Land Survey

FFP

FOB: Destination

PURCHASE REQUEST NUMBER: W5J9JEAN17026

NET AMT

0002 1 Job A-E Design including Structural Interior

FFP

Design

0003 1 Job Geotechnical Investigation

FFP

0004 1 Job Mobilization

0005 1 Job Demolition

0006 1 Job Site Grading

0007 1 Job Erosion Control

0008 1 Job Site Improvements

0009 1 Job Site Water System

0010 1 Job Site Sanitary Sewer System

0011 1 Job Site Electrical System

0012 1 Job Construct Morgue Building

0013 1 Job Demobilization

0014 1 Job As-Built Drawings

0015 1 Job OPTION Construct Subterranean Tunnel

0016 1 Job OPTION Furniture, Fixtures and Equipment (FF&E)

0017 1 Job OPTION Dust Collection System and Shop Equipmen

FFP

T

TOTAL AMOUNT (LINE ITEMS 0001 THROUGH 0014): $ ____________________

TOTAL AMOUNT (LINE ITEMS 0015 THROUGH 0017): $ ___________________

TOTAL AMOUNT (LINE ITEMS 0001 THROUGH 0017): $ _____________________

NOTES:

1. Offerors must propose on all line items shown above. Each item is described in Section

01 11 00 SUMMARY OF WORK.

2. Offerors must include in their Price Proposal a cost breakdown of labor, material, equipment, subcontractor costs and any other pertinent cost data, and also include each fully-burdened labor rate and labor categories (by discipline, trade or profession) that will be utilized for this project.

3. The cost for Land Acquisition efforts may be distributed amongst the line items. Offerors must provide in their Price Proposal the estimated total cost of work activities related to land acquisition, and include the fully-burdened hourly labor rate of their proposed Land Acquisition Specialist.

4. The cost for Defense Base Act (DBA) insurance may be distributed amongst the line items, or may be included in Line Item 0004 Mobilization. Offerors must provide in their Price Proposal the estimated total cost of DBA for this project.

5. Offerors must state in their Price Proposal what work activities and deliverables (for example, DBA) comprise Line Item 0004 Mobilization.

6. Offerors must provide their percentage rate for extended overhead, and this rate will be used after contract award if necessary to support negotiations, modifications, etc., should the offeror be awarded the contract.

7. Pursuant to FAR 15.403-3, the Contracting Officer may request any additional cost or price data from the offeror, as necessary, to determine price reasonableness and price realism of offeror’s proposed price.

8. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.

Section 00 21 00 - Instructions

INSTRUCTIONS

SOLICITATION PROVISIONS INSTRUCTIONS, CONDITIONS, AND NOTICES TO

OFFERORS

A. GENERAL INFORMATION

This solicitation is for a firm-fixed price contract required to provide Kabul National Military Hospital with an adequate morgue and visitation center for Afghan National Defense and Security Forces martyrs fallen in battle from throughout the country. This is a two-phase design-build solicitation, source selection procurement, pursuant to Federal Acquisition Regulation (FAR) Parts 15 and 36. This acquisition will follow the Best Value Trade-Off (BVTO) source selection process.

Magnitude of Construction: is between U.S. $5,000,000.00 and $10,000,000.00

The Primary NAICS code is 236220 with a small business size of $36.5 million.

B. PROPOSAL REQUIREMENTS, CONTENT, AND FORMAT

The Government will not reimburse any costs incurred or associated with preparation and submission of any responses to this solicitation. Oral explanations or instructions to offerors are not binding. Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation. Any and all amendments to the solicitation will be issued electronically via email. It is the offeror’s responsibility to acknowledge any and all amendments in its proposal submission.

Offerors should not modify the terms and conditions of the solicitation in either the technical or price proposal or add conditions or qualifications to their offers. Should an offeror include terms and conditions that conflict with the terms and conditions of the solicitation, that offeror may be determined to be ineligible for award. Any questions related to specific terms and conditions contained within the solicitation should be resolved prior to submission of an offer. Notwithstanding the above, the offeror must clearly describe in its price proposal any modifications to the contractual and/or technical terms and conditions of the solicitation contained in its offer.

References to “confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the offeror’s technical proposal. Offerors that include information in their proposals that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must clearly mark their proposals in accordance with the instructions at FAR Clause 52.215‐1, Instructions to Offerors‐Competitive Acquisition, paragraph (e), Restriction on Disclosure and Use of Data. Use of the words “will”, “shall”, or “must” indicates a mandatory requirement for which failure to comply, at the time and date for submission of proposals, may result in the offeror’s proposal being disqualified from consideration for award. The Government may elect to initiate discussions with some or all of the offerors, thereby providing a means by which appropriate corrections by the offeror(s) involved can be made. Failure to comply with non‐ pricing or pricing requirements that are annotated with the words “should”, or “may” can result in a lowering of an offeror’s non‐pricing ratings, and may have a significant effect upon an offeror being selected for the contract award. Time periods, if stated as a number of days, are calendars days unless otherwise specified.

1. REQUIRED REGISTRATIONS

Failure to have an active and completed registration in any one of the following databases may determine an offeror ineligible for award and removed from competition. A successful offeror with incomplete or expired registrations at the time of award may not be eligible for a contract. In such instances, the Government will award to the next successful offeror who is eligible for award. The Government reserves the right to determine an offeror non‐responsible at any time after receipt of proposal if the offeror is found to be ineligible for installation access in accordance with CENTCOM Clause 5152.225‐5916, Mandatory Eligibility for Installation Access.

Information contained within an offeror’s registration must be current and valid. The responsibility of maintaining current information contained in an offeror’s registration rests solely on the offeror.

a. System for Award Management (SAM): http://www.sam.gov/

b. Joint Contingency Contracting System (JCCS): https://www.jccs.gov/

c. Still valid Afghan Investment Support Agency (AISA) License will be accepted:

http://www.aisa.org.af/ or newly acquired Ministry of Commerce and Industries (MOCI) Entrepreneurial License http://moci.gov.af/.

If an offeror is a joint venture (JV), the JV entity must have a valid registration representing the JV as one business/firm/entity. This is applicable to SAM, JCCS, and AISA and MOCI. The Government will not accept separate registrations and licenses for each separate entity representing the JV.

An offeror’s subcontractors are required to be registered and active in JCCS. In accordance with CENTCOM Clause 5152.225‐5916, Mandatory Eligibility for Installation Access, offerors are required to submit a listing of all proposed subcontractors, at all tiers, to the contracting officer with the submission of their proposal, and provide updates during the life of the contract when subcontractors are added or removed. If no subcontractors are expected to perform during the life of the contract, a bidder must submit a negative response to the contracting officer within its proposal. Subcontractors at every tier are held to the same installation access requirements, as noted above, as prime contractors.

2. PROPOSAL CONTENT

PHASE I TECHNICAL PROPOSAL

Offerors are required to submit proposals with at least the minimum content specified herein. Proposals without the minimum content may be determined ineligible for award and removed from the competition. The Government will not make assumptions concerning intent, capabilities, or experiences. Clear identification of proposal details shall be the sole responsibility of the offeror. The Government may reject incomplete proposals after initial evaluation without further consideration.

All information intended to be evaluated as part of the technical proposal must be submitted within the technical proposal. Do not cross-reference pricing information into the technical proposal or vice versa. Do not include references to material or information not found within its respective volumes. Information submitted in the wrong volumes could lead to an offeror’s proposal being determined unacceptable if materially incomplete in any aspect.

COVER PAGE: A cover page shall appear at the beginning of each volume and, at a minimum, shall consist of the following information:

i. Solicitation number

ii. Offeror’s name, physical mailing addresses, telephone number, and email address of the official having the authority to bind the offeror contractually.

iii. Offeror’s DUNS Number, CAGE Code, AISA License or MOCI License, JCCS ID Number, and Tax

ID (TIN)

TABLE OF CONTENTS: A table of contents shall be placed in each volume and shall identify major areas by title, page numbers, and volume location.

http://moci.gov.af/

BID GUARANTEE: The bid guarantee required must be supported by a surety or irrevocable letter of credit in the amount of thirty percent (30%) of proposed price but shall not exceed $3 million.

VOLUME I, TECHNICAL PROPOSAL: The information required within an offeror’s technical proposal is described under Basis of Award and Evaluation Factors. Do not submit pricing information in the technical proposal.

Evaluation Factors

FACTOR 1: Key Personnel FACTOR 2: Specialized Experience

Evaluation of the offeror’s proposal shall address each factor as it applies to the Solicitation requirements. A detailed explanation of the criteria for the evaluation is set forth in 3.4 Phase 1, Factor 1, Key Personnel Evaluation Criteria and 3.6 Phase 1, Factor 2, Specialized Experience Evaluation Criteria sections below.

During evaluations of each proposal, the Government will assign each factor an acceptable or unacceptable rating and write a narrative to explain any unacceptable ratings.

i. Listing of all proposed subcontractors at every tier.

ii. Subcontractor Letter(s) of Commitment (if applicable). Lack of applicable Letter(s) of Commitment (LOC) is considered unacceptable and submissions lacking the applicable LOC may not be considered.

PHASE II, TECHNICAL AND PRICE PROPOSAL

Offerors are required to submit proposals with at least the minimum content specified herein. Proposals without the minimum content may be determined ineligible for award and removed from the competition. The Government will not make assumptions concerning intent, capabilities, or experiences. Clear identification of proposal details shall be the sole responsibility of the offeror. The Government may reject incomplete proposals after initial evaluation without further consideration.

All information intended to be evaluated as part of the technical proposal must be submitted within the technical proposal. Do not cross-reference pricing information into the technical proposal or vice versa. Do not include references to material or information not found within its respective volumes. Information submitted in the wrong volumes could lead to an offeror’s proposal being determined unacceptable if materially incomplete in any aspect.

Up to five (5) offerors will be advanced to Phase II. Do not submit the Phase II factors during Phase I.

The information required within an offeror’s proposal is described under Evaluation Factors. Within an offerors proposal the following shall be submitted:

COVER PAGE: A cover page shall appear at the beginning of each volume and, at a minimum, shall consist of the following information:

i. Solicitation number

ii. Offeror’s name, physical mailing addresses, telephone number, and email address of the official having the authority to bind the offeror contractually.

iii. Offeror’s DUNS Number, CAGE Code, AISA or MOCI License Number, JCCS ID Number, and Tax

ID (TIN)

TABLE OF CONTENTS: A table of contents shall be placed in each volume and shall identify major areas by title, page numbers, and volume location.

VOLUME II, TECHNICAL PROPOSAL: The information required within an offeror’s technical proposal is described under Basis of Award and Evaluation Factors. Do not submit pricing information in the technical proposal.

Evaluation Factors

Factor 3: Design & Technical Narrative Factor 4: Project Management Plan & Schedule

Volume II, PRICE PROPOSAL: The information required within an offeror’s price proposal is described under Evaluation Factors. Within an offeror’s price proposal, the following must be submitted:

i. Signed Solicitation, Offer, and Award (SF 1442) with blocks 14-20c completed, including acknowledgment of all amendments.

ii. Completed SF 1442, Section 00 11 00 CLIN Bid Schedule

iii. Completed Cost Breakdown spreadsheet in an Excel format. Ensure figures and totals match Section 00 11 00 CLIN Bid Schedule.

iv. Completed Corporate Certificate/Authority to Bind Partnership (Attachment A) __If the offeror is a corporation, completed Corporate Certificate; OR __If the offeror is a partnership, completed Authority to Bind Partnership and a copy of the Partnership Agreement; OR __If the offeror is a joint venture, completed Corporate Certificate for each member of the joint venture and a copy of the Joint Venture Agreement.

v. Completed Representation and Certifications (Section 00 45 00)

vi. Completed Financial Standing Questionnaire (Attachment B)

vii. Copy of AISA or MOCI license Offerors shall verify that the information for all forms submitted are current, correct, and complete, including names of points of contact, email addresses, and telephone numbers.

The Government will not evaluate any material that exceeds the page limits specified within each evaluation factor.

Elaborately prepared proposals are not required, and any material in excess of what is requested, such as corporate marketing information, will not be considered.

Failing to submit or completely fill out attachments properly may result in rejection of the offer without further evaluation. Therefore, offerors are urged to follow instructions and raise questions through inquiries if instructions are not understood.

3. PROPOSAL FORMAT

a. Proposals must be typed and submitted in English. Proposals submitted in a language other than English will be rejected and will not be considered. Letters of Commitment and JV partner agreements, if not written in English, must be accompanied by an English translated copy with a signed statement by the authorized representative of each JV partner that the English translation is true and correct.

b. An offeror’s proposal shall be in an Adobe portable document format (PDF) with the exception of the Cost Breakdown spreadsheet, which shall be in an Excel format. An offeror’s technical proposal and price proposal shall be submitted as two separate volumes (PDF files).

c. Proposals must be sized to print on 8 1/2” x 11” paper (11” X 17” for drawings). Margins shall be no smaller than a half inch (1/2”), font face shall be Times New Roman or Arial, and font size shall be no smaller than 10 point font. Page is defined as a single sheet of paper with text on one side. Pages furnished for organizational purposes only, such as a cover page or a table of contents, are not included in the page limitation. Joint venture agreements and letters of commitment are also not included in page limitations.

d. Offerors shall place the following notification on the bottom of each page of their proposals:

“SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104. DO NOT DISCLOSE ANY SOURCE

SELECTION INFORMATION TO ANY UNAUTHORIZED PERSON.”

5. PROPOSAL SUBMISSION INSTRUCTIONS

Electronic proposals submitted via AMRDEC at https://safe.amrdec.army.mil/safe/ is the required method of transmission and will be the only form of submission accepted. It is the offeror’s responsibility to ensure its proposal is received by the Government emailing system by the date and time of the proposal deadline, e.g., undeliverable messages due to an offeror’s proposal size is not the responsibility of the Government.

Proposals are due no later than the time and date stated in Block 13 of the SF1442 to the following email addresses:

Nikisha Cook Contract Specialist Office: (540) 723-4949 nikisha.w.cook@usace.army.mil

A. Late Proposals: Any proposal, modification, or revision received by the Government after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the contracting officer determines that accepting the late offer would not unduly delay the acquisition, and (1) if it was transmitted through an electronic commerce method authorized by the solicitation, and it was received at the initial point of entry to the Government infrastructure not later than 4:00 p.m. one working day prior to the date specified for receipt of proposals; or (2) there is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or (3) it is the only proposal received. However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government will be considered at any time it is received and may be accepted.

B. SOLICITATION INQUIRIES

All offeror questions should be emailed to nikisha.w.cook@usace.army.mil. Responses to questions will be provided via an amendment to the solicitation.

C. AMENDMENTS TO THE RFP

Any and all amendments to the Volume I Request for Proposals will be issued electronically and be available via AMRDEC SAFE. It is the Offeror’s responsibility to continuously check for any amendments to this RFP and acknowledge any and all amendments in the text of the cover letter (amendment number and data acknowledged by Offeror) sent with their proposal package in response to this RFP.

D. Pre-Proposal Conference/Site Visit.

A site visit is not currently scheduled, however after the completion of Phase I a site visit will be planned and the information will be distributed to the offerors that are selected for Phase II.

E. DEBRIEFING OF UNSUCCESSFUL OFFERORS

https://safe.amrdec.army.mil/safe/ mailto:nikisha.w.cook@usace.army.mil

Unsuccessful Offerors will be notified in accordance with FAR Subpart 15.5. An unsuccessful Offeror may request a pre-award debriefing or a delayed debriefing after award by submitting a written request to the Contracting Officer within three (3) days after receipt of the notice excluding the Offeror from the competition and award. Offerors are entitled to no more than one debriefing for each proposal. No debriefing will be provided for those Offerors found non-responsive as a result of their base access ineligibility, as the non-responsive determination may have been made in advance of the Offeror’s technical proposal being evaluated.

F. BASIS OF AWARD

Award will be made to the single Offeror who represents the overall best value to the Government, taking into consideration the solicitation’s technical and price factors, and also who has been determined to be ‘responsible’ in accordance with FAR 9.1. The Government will utilize the Joint Contingency Contracting System (JCCS/JCXS) to determine an Offeror’s qualification to compete for this requirement, and if allowed to compete, whether the firm is qualified to win award. A JCCS/JCXS report of the Offeror will be obtained at time of proposal evaluation, and also prior to contract award. A JCCS/JCXS report of an Offeror’s ineligibility to access installations in Afghanistan, will render the Offeror non-qualifying, and, thus, this Offeror’s proposal will not be evaluated

G. EVALUATION FACTORS

All of the submission items to be evaluated shall pertain to the prime offeror, whether a single contractor entity, partnership, or a joint venture, as seventy percent (70%) of work associated with this project is required to be self-performed.

Joint Ventures: A joint venture is defined as a legal business entity formed between two or more companies to undertake the performance activities of a contract together.

Offerors proposing as joint ventures shall provide evidence that the joint venture as a legal entity has been duly formed. Joint ventures shall include a copy of the legal joint venture agreement signed by an authorized officer from each of the firms comprising the joint venture, with the chief executive of each entity identified. The Government will not evaluate the capability of any firms that are not included in the joint venture agreement except to the extent they are a primary subcontractor as identified above.

Phase 1 Solicitation Evaluation Factors

Phase 1 Evaluation Factors Factor 1 Key Personnel Factor 2 Specialized Experience

PHASE 1, FACTOR 1, KEY PERSONNEL SUBMISSION REQUIREMENTS:

The Offeror shall provide detailed experience, education, qualification and certification and professional license information, in a resume for the individual that the Offeror is proposing for each Key Personnel position listed. Each resume shall include a copy of the individual’s educational degree, professional license or certificate (as applicable), and letter of commitment. The resumes shall include dates of all accomplishments, and educational degrees.

Each resume shall be limited to two (2) pages not including a copy of the educational degree, professional license or letter of commitment. Proposals that do not include resumes for each of the listed Key Personnel will NOT be considered for Phase 2.

The Key Personnel position title should be at the very top of the resume. The resume should also specify the following: 1) major construction projects that the individual worked on; 2) the owner of the project or the contracting office that awarded the contract/project (for example, USACE, NATO, USAID, etc.); 3) the location of the project; and, 4) the individual’s role in the project (one-sentence description or bullet of main responsibilities).

The entire resume must be in the English language. Any attachments to the resume, such as the educational degree or license, must be accompanied by its English translation if the document is in a language other than English.

Degrees listed in the resumes must relate to the respective discipline or field and be conferred by a recognized institution of higher education, such as a U.S., Afghanistan or international college or university.

Key Personnel include the following:

(a) Project Manager

(b) Architect

(c) Civil Engineer

(d) Electrical Engineer

(e) Mechanical Engineer

(f) Structural Engineer

(g) Fire Protection Engineer

(h) Design Quality Control Manager

(i) Geotechnical Engineer

(j) Construction Superintendent

(k) Construction Safety Officer

Key Personnel Requirements:

(a) Project Manager: Minimum bachelor’s degree in Architecture, any Engineering discipline or Project Management and 3 years of experience managing design and construction projects that are similar in scope and complexity to the project contemplated for this solicitation.

(b) Architect: Minimum bachelor’s degree in Architecture and 3 years of experience as an architect supervising architectural features of work. This individual can also serve as the Offeror’s proposed Design Quality Control Manager if the individual is a Registered Architect or Professional Engineer.

(c) Civil Engineer: Minimum bachelor’s degree in Civil Engineering and 3 years of experience as a civil engineer in projects that are similar in scope and complexity to the project contemplated for this solicitation.

(d) Electrical Engineer: Minimum bachelor’s degree in Electrical Engineering and 3 years of experience as an electrical engineer supervising electrical features of work.

(e) Mechanical Engineer: Minimum bachelor’s degree in Mechanical Engineering and 3 years of experience as a mechanical engineer, or has 5 years of experience supervising mechanical features of work in the field.

(f) Structural Engineer: Minimum bachelor’s degree in Structural Engineering and 3 years of experience as a structural engineer.

(g) Fire Protection Engineer: (See Supplement to Specification Section 01 445 00 (Contractor Quality Control) – Qualified Fire Protection Engineer Below)

(h) Design Quality Control Manager: Must be a Registered Architect (RA) or Professional Engineer (PE), and certification from the country the individual received the certification or license from, must be attached to this individual’s resume. This individual can also serve as the Offeror’s proposed Architect.

(i) Geotechnical Engineer: Minimum bachelor’s degree in Geotechnical, Civil or Structural Engineering and 3 years of experience as a geotechnical engineer. If the Offeror intends to subcontract to a geotechnical engineering firm, the Offeror must provide the name and address of the firm to be subcontracted and a list of at least 3 construction projects where the company provided geotechnical work.

(j) Construction Superintendent: Minimum 5 years of horizontal and vertical construction field experience.

(k) Construction Safety Officer: Minimum 3 years of experience as a safety officer on construction projects that are similar in scope and complexity to the project contemplated for this solicitation. Must be well-versed in USACE EM-385-1-1 Safety and Health Requirements Manual. A bachelor’s degree in Construction Management, Engineering or a closely related field is highly desired.

SUPPLEMENT TO SPECIFICATION SECTION 01 45 00 (CONTRACTOR QUALITY

CONTROL) – QUALIFIED FIRE PROTECTION ENGINEER

Work specified in this section shall be performed under the direct supervision of the Qualified Fire Protection Engineer (QFPE). The QFPE shall be an individual who is a registered professional engineer licensed to practice fire protection engineering. In other words, the individual shall have passed the written professional engineering examination for fire protection engineering administered by the National Council of Examiners for Engineering and Surveys (NCEES). While a technician certified by National Institute for Certification in Engineering Technologies (NICET) in a subfield of Fire Protection Engineering Technology in accordance with NICET 1014-7 may perform the work to provide active fire protection features or systems, each such technician may neither sign nor seal any design documentation.

The QFPE shall be regularly involved in the type and complexity of system specified in the contractual documentation for this particular project and shall have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than six months. Past performance documentation shall including the following information at a minimum for each completed project: name of project owner (or owner’s designated representative), owner’s address, owner’s telephone number and an associated electronic mail (email) address, project title, project location, type of system(s) designed and provided, and date of final acceptance testing.

Exception: When the individual that is being proposed to serve as the QFPE in order to perform fire protection engineering work is not professionally registered in the United States, then all of the following conditions must be met for that individual to be considered as qualified under this contract:

• That individual shall be listed with the title of EUR ING [which stands for "European Engineer”] by the FÉDÉRATION EUROPÉENNE D'ASSOCIATIONS NATIONALES D'INGÉNIEURS (FEANI), a P.Ing. in Canada or a Chartered Engineer in the United Kingdom, in the FEANI Register;

• That individual must have earned an engineering degree from a program accredited and recognized through theWashington Accord. See http://www.ieagreements.org/accords/washington/

• That individual must provide documentation to support that he or she has a minimum of seven years of professional experience dedicated to fire protection engineering work;

• That individual must be capable of obtaining a grade of “Professional Member” in the Society of Fire Protection Engineers;

• That individual must communicate (i.e., oral and written) in English; and,

• That individual must attest to the fact that he (or she) is familiar with the National Fire Codes, which are published by the National Fire Protection Association (NFPA), and the International Building Code, which is published by the International Code Council (ICC).

[NOTE: In a similar fashion as is the case for individuals certified by NICET in the United States, neither “engineering technicians” nor “engineering technologists” may qualify or be considered to serve as the QFPE.]

PHASE 1, FACTOR 1, KEY PERSONNEL EVALUATION CRITERIA

This factor evaluates the resumes of individuals proposed by the Offeror for Key Personnel roles and responsibilities required for successful execution of the project contemplated by this solicitation. The proposed individual resumes and attachments thereto will be evaluated to determine if the proposed Key Personnel meet the solicitation minimum requirements.

Factor 1 will be evaluated as ACCEPTABLE or UNACCEPTABLE. Proposals that receive an Unacceptable rating for Factor 1 will not receive further consideration or be included in the Phase 2 Solicitation.

To receive an overall Acceptable rating for FACTOR 1, the Offeror’s proposal must have satisfied all of the stated solicitation requirements. Any FACTOR 1 submittal that receives an Unacceptable rating, renders an OVERALL rating of Unacceptable for the factor.

Acceptability Rating ACCEPTABLE Proposal meets the requirements of the solicitation

UNACCEPTABLE Proposal does not meet the solicitation

The Government will evaluate the Offeror’s proposal to ensure 1) the solicitation requirements for FACTOR 1 were submitted; and 2) the information submitted for each FACTOR 1 submittal requirement was adequate, complete and acceptable.

PHASE 1, FACTOR 2, SPECIALIZED SUBMISSION REQUIREMENTS

In separate tabs within the Offeror’s proposal for FACTOR 2, the Offeror shall provide a list of three (3) design-build construction projects that the Offeror has completed within the past 5 years from the issuance date of this solicitation, or that is currently ongoing and substantially complete (at least 50% construction progress completed). These three projects should be recent as noted in this paragraph, and relevant. Relevant projects are similar in size, scope and complexity to the project contemplated for this solicitation.

Relevant projects are defined as follows:

(a) Size: Project with a contract value of at least $5,000,000 (FIVE MILLION US DOLLARS). All submitted project experience must meet this requirement.

(b) Scope: Project including design and construction of structures similar to the structures included in this solicitation. Each project shall include multi-floor new building construction with a minimum 1000 square meters (10,700 square feet), with new utilities including, water, sewer, and electric service.

(c) Project which required a level of activities (labor, subcontracting, equipment, materials, management, supervision, etc.) in design and construction efforts that are similar to the level of activities required for this solicitation’s project. The Offeror’s submitted projects should demonstrate similarity in the interrelated work features required in executing multiple, concurrent design and construction activities involving vertical and horizontal structures. Similarities in features include, but are not limited to surveying, design and construction project elements.

The following information must be provided for each construction project being submitted for evaluation:

(a) Contract and/or Task Order Number

(b) Title, Location, Completion Date and U.S. Dollar Value of Project

(c) Contracting Agency or Project Owner

(d) Contracting Agency or Project Owner Name, Email Address and Phone Number

(e) Whether the Offeror was the Prime, Subcontractor or Part of a Joint Venture and Percentage of Work Performed by the Offeror

(f) Description of the project’s scope of work and the Offeror’s specific roles and responsibilities in the project. Include what specifically was designed, and the name of the Architect/Engineer Designer of Record. If applicable, provide the names of any major subcontractor(s) used (a major subcontractor performed more than 40% of project work requirements).

PHASE 1, FACTOR 2, SPECIALIZED EXPERIENCE EVALUATION CRITERIA

This factor evaluates the Offeror, as an organization, to determine if the Offeror has the qualifications, experience and capability to execute and complete the design-build construction project contemplated for this solicitation. Project-related information submitted must demonstrate the Offeror’s recent and relevant experience and if the submitted information is similar in size, scope and complexity to the project in the solicitation.

The Government will evaluate the Offeror’s proposal to ensure 1) the solicitation’s requirements for FACTOR 2 were submitted, and 2) the information submitted for each FACTOR 2 submittal requirement was adequate, complete and acceptable.

Factor 2 will be evaluated as ACCEPTABLE or UNACCEPTABLE. Proposals that receive an Unacceptable rating for Factor 2 will not receive further consideration or selected for the Phase 2 Solicitation.

Acceptability Rating ACCEPTABLE Proposal meets the requirements of the solicitation

UNACCEPTABLE Proposal does not meet the solicitation

To receive an overall Acceptable rating for FACTOR 2, the Offeror’s proposal must have satisfied all of the stated solicitation requirements. Any FACTOR 2 submittal that receives an Unacceptable rating, renders an overall rating of Unacceptable for the factor.

PHASE 2 SOLICITATION - ONLY THE SELECTED FIRMS WILL SUBMIT PROPOSALS

FOR PHASE 2.

4.6 The following information must be included in the Offeror’s Phase 2 proposal:

(a) Signed conformed SF 1442 Solicitation, Offer and Award, with Blocks 14-20c completed, including acknowledgement of all amendments issued for Phases 1 and 2

(b) Completed Section B Price Schedule of the SF 1442

(c) Price Breakdown per Contract Line Item Number (CLIN)

(d) Factor 3, Design & Technical Narrative Submission

(e) Factor 4, Project Management Plan & Project Schedule Submission

(f) Completed Financial Standing Questionnaire Attachment (for financial responsibility determination)

Phase 2 Solicitation Evaluation Factors: The evaluation of Phase 2 Factors 3 & 4, when combined, are significantly more important than Price.

Phase 2 Solicitation Evaluation Factors Factor 3 Design & Technical Narrative

Factor 3 & 4 are equal in importance Factor 4 Project Management Plan & Schedule

Factor 5

Price

The combined technical evaluation of Factor 3 and Factor 4 is significantly more important than price

PHASE 2, FACTOR 3, DESIGN & TECHNICAL NARRATIVE SUBMISSION

REQUIREMENTS

The Offeror shall provide 10% Preliminary (Conceptual) Drawings that will show the site master plan, floor concept plans, optional tunnel, and utility connections for the new Morgue & Visitors Center. The Offeror shall provide no more than three (3), 11” x 17” drawings. The required 10% Preliminary Drawings should contain early concept technical information.

Provide a Technical Narrative which explains the Offeror’s assumptions, calculations and materials to be used for building construction the water, sewer and electrical utility systems that the Offeror is proposing for Morgue & Visitors Center. The narrative is limited to three (3) pages. The narrative shall address the quality and availability of proposed building materials and equipment. The Offeror shall include cut sheets of the following: 1) proposed furniture (Option); and 2) proposed dust collection system (Option).

Because the Government is not able to provide substantial technical information beyond what is included in the solicitation and specification package, the Offeror would need to make assumptions and rely on its own design and engineering judgment, research and tools to develop its design. The Government understands that the Offeror’s drawings are only preliminary and conceptual in nature and may not contain detailed design elements.

PHASE 2, FACTOR 3, DESIGN & TECHNICAL NARRATIVE EVALUATION CRITERIA

This factor evaluates 1) the Offeror’s ability to design, and 2) the Offeror’s understanding of the project as it relates to utility systems and tie-ins to existing lines/systems. The following Table of Combined Technical/Risk Ratings will be used in the evaluation of submittals for FACTOR 3:

RATING DESCRIPTION

Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths. Risk of unsuccessful performance is low.

Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength. Risk of unsuccessful performance is low to moderate.

Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Risk of unsuccessful performance is no worse than moderate.

Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Unacceptable

Proposal does not meet requirements of the solicitation, and, thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is un-awardable.

PHASE 2, FACTOR 4, PROJECT MANAGEMENT PLAN AND PROJECT SCHEDULE NARRATIVE

SUBMISSION REQUIREMENTS

The Offeror shall provide a Project Management Plan which will contain the following information pertinent to the project in the solicitation:

(a) Explanation of the major activities that the Offeror will undertake from contract award through project completion, to include but not be limited to, mobilization, design work, submittals, facility turnover and Beneficial Occupancy Date (BOD).

(b) Identification of long lead items, and an explanation of how they will be procured and shipped to the job site.

Address any potential schedule risks, such as customs clearance, and explain how your firm will deal with those issues.

(c) A realistic, achievable and logical Preliminary Summary level Project Schedule to support the Offeror’s approach to managing and executing the design and construction efforts described above. The schedule should be task-oriented and clearly indicate milestone dates, sequence and duration for major work activities. The Offeror should use a critical path scheduling method and format.

(d) The length of the project schedule must match the proposed project duration specified in the solicitation (365-days), and a 6-day work week shall be used for scheduling purposes. Key milestones, such as NTP receipt, design, site work, submittal reviews, final inspection, BOD, etc. should be included in the schedule. The Offeror should use an NTP date of 1 June 2018 for the project schedule. General Notes and Assumptions, which contain information pertaining to potential schedule impact (for example, limited working hours during Afghan holidays, weather issues, procurement/delivery problems, etc.), should accompany the Project Schedule.

PHASE 2, FACTOR 4, PROJECT MANAGEMENT PLAN AND PROJECT SCHEDULE NARRATIVE

EVALUATION CRITERIA

This factor evaluates the Offeror’s ability to successfully manage, execute and complete the project contemplated for this solicitation.

Offerors who simply copy the solicitation’s project specifications verbatim to describe management and execution efforts required for the proposed project, will not be rated favorably. It is incumbent upon the Offeror to adequately explain what specific processes the Offeror’s organization will undertake for the project, in order to convince Government evaluators that the Offeror fully understands all efforts required for successful execution and completion of the project.

The following Table of Combined Technical/Risk Ratings will be used in the evaluation of submittals for FACTOR 4:

RATING DESCRIPTION

Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths. Risk of unsuccessful performance is low.

Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength. Risk of unsuccessful performance is low to moderate.

Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Risk of unsuccessful performance is no worse than moderate.

Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Unacceptable

Proposal does not meet requirements of the solicitation, and, thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is un-awardable.

DEFINITIONS:

Strength: An aspect of an offerors’ proposal that has merit or exceeds specified perfomance or capability requirements in a way that will be advantageous to the Government during contract performance.

Deficiency: a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.

Weakness: a flaw in the proposal that increases the risk of unsuccessful contract performance.

Significant Weakness: a flaw that appreciably increases the risk of unsuccessful contract performance

PHASE 2, FACTOR 5, PRICE

The Offeror shall provide Factor 5 pricing information in a volume that is separate from the Phase 2 Technical Proposal. The Offeror shall submit a completed SF 1442 Price (Bid) Schedule and Price Breakdown spreadsheet in .pdf format. Failure by an Offeror to provide a price for all line items in the Price Schedule may result in disqualification of the Offeror’s proposal. The supplemental cost/price breakdown information shall include labor, material, subcontractor and any other related costs of the project.

The Offeror must also provide the following information:

(a) An explanation of what activities make up the Offeror’s Mobilization and Demobilization costs.

(b) The Offeror’s estimated cost of Defense Base Act (DBA) insurance for this project.

(c) The Offeror’s proposed extended overhead percentage rate to be applied after contract award, should there be a need to utilize if for a contract modification.

ADDITIONAL INSTRUCTIONS

The Offeror should not modify the terms and conditions of the solicitation, nor add conditions or qualifications to his proposal based on an assumption or based on his own modification of the terms and/or conditions of the solicitation. Should the Offeror include terms and conditions that conflict with the terms and conditions of the solicitation, that Offeror’s proposal may be determined to be ineligible for further evaluation or for award. Any questions related to specific terms and conditions contained within the solicitation should be resolved with the Contracting Officer prior to proposal submission.

References in the Offeror’s proposal to, and examples of “classified” projects or contracts, should not be included in the Offeror’s proposal unless the information is authorized to be viewed or utilized by the Government for review and evaluation.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.