Attachment_C_FFP_STO.pdf

PDF 152 KB Posted

Attached to
Geospatial, Research, Integration, Development and Support (GRIDS) III Federal contract opportunity
Solicitation number
W5J9CQ-16-R-0008
Issued by
Department of the Army Corps of Engineers Geospatial Center

About this file

Attachment C - Firm-Fixed-Price Sample Task Order

View the file

Other files for this federal contract opportunity

Other files attached to Geospatial, Research, Integration, Development and Support (GRIDS) III, newest first.
File Type Posted
AttachmentF_LetterofComm-KeyPersonnel.doc DOC document
AttachmentE_KeyPersonnelResume.doc DOC document
Exhibit2-CDRLs-W5J9CQ-16-R-0008.pdf PDF
AttachmentI_SampleTOTables.xlsx XLSX spreadsheet
Exhibit_1-Quality_Assurance_Surveillance_Plan-W5J9CQ-16-R-0008.pdf PDF
EXHIBIT3-KeySubsPersonnel.doc DOC document
Attachment_D_CPFF_STO.pdf PDF
AttachmentH_RateTable.xls XLS spreadsheet
AttachmentB_EXPERIENCE_PP_REFERENCE.doc DOC document
A21-Draft_Solicitation-W5J9CQ-16-R-0008.pdf PDF
AttachmentG_LetterofCommofKeySub.doc DOC document
AttachmentA_PPQ.doc DOC document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

SOURCE SELECTION SENSITIVE

Performance Work Statement

For Geospatial, Research, Integration, Development and Support (GRIDS III)

Sample Task Order (FFP)

Deployment Operations for the Integrated 3D Sensor System

Part 1. General Information

1.1 Introduction. The goal of this sample firm fixed price task order is to deploy and evaluate the newly developed 3D System Data Collection Tool. This effort seeks to advance the development of the 3D toolset and validate its operational capabilities in an adverse deployed environment. The 3D capability is not for use in single target source images, but rather for large area capture to include detailed urban 3D capture of specific areas. Particular attention should be focused on off- Nadir LIDAR and EO collections to support High Resolution 3D imagery to support Mission Planning Rehearsal and situational awareness in conjunction with Non-Combatant Evacuation Operations (NEO).

Overall Period of Performance for this task order will be six (6) months.

1.2 Background. With past NEO missions showing a lack of planning information and with past analyses showing a need for better situational awareness, the AGC is seeking to increase situational awareness by incorporating 3D high resolution imagery into the pre-deployment phase of NEO. This effort seeks to deploy an innovative 3D sensor capability to provide never before seen data imagery of a dense urban environment to include ingress and egress for military forces. The warfighter’s requirement for high-resolution terrain data has grown exponentially as has the requirement for accurate, timely high-resolution 3D elevation and imagery data to support current and future operations. High-resolution 3D geospatial information provides the foundation data necessary to produce geospatial products that provide the force multiplier necessary for successful operations. The goal of this project is to explore using high-resolution imagery capable of creating 3D models for mission critical situational awareness and battlefield intelligence in support of NEO mission planning and rehearsal.

1.3 Objectives

This effort seeks to operate the newly developed 3D sensor image collection system using advanced 3D LIDAR and EO sensing technology. This effort specifically seeks to advance the existing EO/LIDAR sensing capability by developing new EO and laser performance standards, evaluate new collection techniques in an austere environment, and evaluate new data processing algorithms and data collection techniques. The effort should specifically allow for 3D model generation of the city of Amman, Jordan, to include all ingress and egress routes for use in a NEO from the US Embassy in Amman, Jordan. This effort will provide the US Army, DoD components and other Government agencies with a better understanding of aerial EO/LIDAR technology with the potential to provide a new mission critical mapping toolset. This advanced aerial Data Collection Tool is expected to quickly cover a large region and deliver large quantities of high-resolution data which can then be delivered as 3D models to support required situational awareness and mission planning. This effort will focus on enhancing the Government’s knowledge and understanding of LIDAR/EO combined imagery and its use in 3D high resolution model generation with the ability to collect high resolution data from an aerial platform. Related to the objectives described above, the Contractor must be capable of providing a team of highly qualified personnel that will be able to meet the following GRIDS III requirements:

1.3.1 Provide operational services to various geospatially relevant combat support capabilities - including field operational services, both in Continental United States (CONUS) and Outside Continental United States (OCONUS), during war.

1.3.2 Develop, integrate and operate ground segments/stations for the Intelligence, Surveillance and Reconnaissance (ISR) payload types (e.g., Electro-optical Infrared (EO/IR), Hyperspectral Infrared Sounder (HIS), Light Detection and Ranging (LIDAR), Radio Detection and Ranging (RADAR), Signals Intelligence (SIGINT), communications, etc.).

1.3.3 Acquire, fuse, and disseminate various sources of information (i.e., GEOINT, Counter-Intelligence/Human Intelligence (CI/HUMINT), Signals Intelligence (SIGNIT), Measurement and Signature Intelligence (MASINT), Imagery Intelligence (IMINT), Human Cultural, etc.) at various echelons, from handheld devices to other modes of analysis and data dissemination to be shared across the civilian and military stakeholders from unclassified through National System level.

1.4 Personnel

1.4.1 The Contractor shall provide experienced personnel to perform the required services. The Government and the Contractor understand and agree that the services to be delivered are non-personal services and both parties recognize and agree that no employer-employee relationships exist between the Government and the Contractor and/or between the Government and the Contractor’s employees. Contactor personnel performing under this contract shall not be placed in a position where they are employed by a Federal Officer or are under the supervision, direction, or evaluation of a Federal Officer, military or civilian.

1.4.2. Contractor personnel shall conform to standards of conduct and code of ethics, which are consistent with those applicable to Government employees as provided in the Joint Ethics Regulation 5500.7.R. Contractor personnel shall present a neat professional appearance and be easily identified. This shall be accomplished by wearing distinctive clothing bearing the company name or by wearing appropriate badges that contain the company name and employee’s name. The contracting officer may require the Contractor to remove from the job site an employee working under this contract for reason for misconduct, security violations, or found to be suspected to be under the influence of alcohol, drugs or other incapacitating agent. Contractor employees shall be subject to dismissal from the premises upon determination by the Contracting Officer that such action is in the best interest of the Government. Such removal from the job site or dismissal from the premises shall not relieve the Contractor of the requirement to provide sufficient personnel to perform the services as required by this contract.

1.4.3. The Contractor shall comply with all applicable laws, rules and regulations.

1.4.4. Contractor personnel will obtain a Common Access Card (CAC) for computer access as required and detailed in this task order.

1.4.5. Background Checks. All Contractor personnel hired under this contract must have a favorable National Agency Check and Inquiries (NACI) investigation as a condition to access Federal facilities and information systems. A Secret Security Clearance will be an acceptable substitute for a NACI. Personnel who do not receive a favorable NACI will not be allowed to perform services under this contract.

1.4.6 Key Personnel

1.4.6.1. Certain skilled experienced professional and/or technical personnel are essential for successful Contractor accomplishment of the work to be performed under this task order. These are defined as "Key Personnel" and are those persons whose resumes are submitted for evaluation with this proposal. Key Personnel for this task order will be at the Contractor’s discretion, but will include at a minimum a Program Manager. The Contractor shall notify the contracting officer in writing as to whom will fill these key personnel roles. Key personnel shall be available between 8:00 a.m. to 4:30p.m., Monday thru Friday except Federal holidays or when the Government facility is closed for administrative reasons. An emergency notification list shall be maintained for all Contractor employees. Specific duties for each of the key personnel are listed below:

1.4.6.2. Program Manager: The Contractor shall utilize industry standards and processes in providing overall management and oversight under this contract. The Contractor shall possess knowledge and experience with the Army Geospatial Center’s (AGC) Science and Technology’s mission principles and processes. This shall include providing the necessary personnel and equipment needed to complete the specific tasking outlined in this PWS. The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement. The Contractor shall have a single point of contact between the Government and Contractor personnel assigned to support this contract. The Contractor must ensure they are in compliance with federal, state, and local laws and regulations and applicable international protocols.

The emergency notification list and any updates shall be made available to the Government’s and AGC’s Program Managers. The Contractor shall have all Key Personnel on board on Date of Award (DOA). All Key Personnel shall notify the Contracting Officer whenever they believe they are receiving direction that deviates from the terms of the contract. The Contractor shall notify the AGC Contracting Officer if they intend to substitute any individual serving as key personnel. In the event of such substitution/replacement, key personnel must have equivalent qualifications or better to the original individual intended to fill the specified role. Key personnel on this contract including subs, are subject to AGC Contracting Office approval.

1.4.7. Key Personnel Labor Categories, Descriptions and Qualifications

The Contractor shall submit their proposed key personnel to meet the Government’s needs based upon the key tasks within the PWS. The Contractor shall include the title of the key personnel, the qualifications to meet the Government need as well as the educational experience necessary to successfully perform as the key personnel on the task. The Government holds the right to add necessary qualifications and/or educational experience of the proposed key personnel to perform the tasks based upon specific task order requirements and/or skills needed.

1.5 Period and place of Performance

1.5.1 This task order period of performance is six (6) months.

1.5.2 The Contractor shall provide on and off-site services in support of AGC’s tasks. Operational deployment is expected to take place OCONUS in the country of Jordan.

1.6 Scope

The Contractor shall provide highly specialized expertise and technical services to execute the objectives of this PWS that directly correlates to the overarching objectives and goals of the AGC’s overall mission. The Contractor shall provide all personnel and supervision necessary to perform the services defined in the PWS. All tasks must be performed to the standards set forth in this document.

1.7 General Information

1.7.1 Access to and Disclosure of Information

The Contractor may require access to data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use, other than as specified in this contract, would be adverse to the interests of the Government or others. Neither the Contractor, nor Contractor employees shall divulge or release data or information developed or obtained under performance of this contract, except to authorized Government personnel or upon written approval of the COR or designated representative. The Contractor shall not use, disclose, or reproduce proprietary information bearing a restrictive legend, other than as specified in the contract.

Disclosure of information regarding operations and services of the activity to persons not entitled to receive it, or failure to safeguard any classified, proprietary or other similar items or information that may come to the Contractor (or any persons under the Contractor’s control) in connection with work under this contract, may subject the Contractor, Contractor’s agent, or employees to criminal liability under Title 18, Sections 793 and 798 and/or other sections of the United States Code. Neither the Contractor nor the Contractor’s employees shall disclose or cause to be disseminated, any information concerning the operations of the activity that could result in, or increase the likelihood of, the possibility of a breach of the activities’ security or interrupt the continuity of operations.

The Contractor shall direct to the Project Officer/COR, all inquiries, comments, or complaints arising from matters observed, experienced, or learned as a result of, or in connection with the performance of this contract, the resolution of which may require the dissemination of official information.

Inquiries received by the Contractor for work performed under this contract shall be referred to the Government for evaluation under the Freedom of Information Act (FOIA) of 1975, Public Law 93-502, 5 U.S.C., Section 552. The Government FOIA officer shall be responsible for determining whether such requests will be honored. The Contractor will not release any information concerning the project to the public without written authorization from the Government.

The Contractor shall not release any information (including photographs, files, public announcements, statements, denials, or confirmations) on any part of the subject matter of this contract, or any phase of any program hereunder, without the prior written approval of the Project Officer/COR. The Contractor shall not release information regarding individuals without prior authority of the Project Officer/COR. Any documentation showing individuals’ names or other personal information will be controlled and protected. The provisions of the Privacy Act of 1974, Public Law 93-579, 5 U.S.C., Section 552a, shall apply.

1.7.2 Quality Control. The Contractor shall develop and maintain an effective quality control plan (QCP) to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s QCP is the means by which the Contractor assures its work complies with the requirements of the contract. As a minimum, the Contractor shall develop QCP procedures that address the areas identified in Specific Tasks Section 5 and the Technical Exhibit 1, “Performance Requirements Summary”. The Contractor will be required to submit a QCP with its proposal. The Contractor shall receive the Contracting Officer’s acceptance in writing of any proposed change to the QCP in advance of implementation. The QCP shall:

1.7.2.1. Have direct accountability to the Contractor’s top management.

1.7.2.2. Address overall project management and administration.

1.7.2.3. Be a comprehensive program to plan and deliver quality services to the Government.

1.7.2.4. Cover all services described in this contract, prioritize services, and concentrate on the most essential services as identified in the Performance Requirements Summary (PRS).

1.7.2.5. Describe a method, acceptable to the Government, of identifying deficiencies in the quality of service performed under this contract before the level of performance becomes unacceptable, and address processes for corrective actions without dependence upon Government direction.

1.7.2.6. Establish an inspection system covering all services required by this contract. This plan shall specify areas to be inspected on both a scheduled or unscheduled basis and the title of the individual who will do the inspection. The Contractor will provide the ACO with a current list of all titled positions and the names of the incumbents.

1.7.2.7. Contain specific quality control techniques for contract services identified in the PRS. The quality control methods shall be comprehensive and adaptable to the reporting systems of the QCP.

1.7.2.8. Include a customer complaint feedback system for correction of validated complaints and to inform the customer of corrections. The QCP shall describe how users, or other interested parties, may identify problem areas or situations to the Contractor. The customer complaint program shall be compatible with the reporting and communication systems of the QCP.

1.7.2.9. Require documentation of all Contractor quality control inspections and corrective actions be maintained by the contactor throughout the term of this contract. Copies of inspection documents will be provided to the ACO upon request.

1.7.2.10. Describe methods of direct and indirect communications with the Government regarding performance of the contract. The QCP shall include regular and formal meetings with the Government and proposed formats and/or schedules for informal communications (e.g., periodic e-mails to the Project Officer/COR).

1.7.3 Quality Assurance. The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). The QASP is the method the Government will use to measure Contractor performance in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.7.4 Recognized Holidays. The AGC observes the following Federal holidays:

New Year's Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

Note: When a holiday occurs on a Saturday, Federal employees are normally granted the previous Friday as the holiday observance. When a holiday occurs on a Sunday, Federal employees are normally granted the following Monday as the holiday observance.

1.7.5 Hours of Operation. The Contractor shall be responsible for providing requested services, between the hours of 0630-1830 Jordan time, with 12-hour workdays, the expected norm. Some personnel may be required to work a varied schedule outside of the foregoing. These assignments may extend the work week beyond the expected normal operations of 12-hour workdays, depending on the needs of the Government. All work performed by the Contractor personnel will be at a location/s directed by the Government. The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS. The Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.7.6 Type of Contract. The Government anticipates awarding Firm Fixed Price Task Order contract for six (6) months.

1.7.7 Security Requirements

1.7.7.1 The Contractor will be required to have access to Unclassified, For Official Use Only (FOUO), Secret, Top Secret (TS), and Sensitive Compartmented Information (SCI), during their performance of this contract. Contractor personnel requiring access to Government data shall hold Top Secret clearance and be eligible for SCI data access. A DD Form 254, Contract Security Classification specification, will be prepared by the ordering agency and issued with the task order, providing specific classification guidance.

1.7.7.2 All Key Contractor personnel shall possess TOP SECRET clearance and be eligible for SCI adjudication on the start date of the period of performance. All remaining Contractor personnel shall possess at a minimum SECRET clearances.

1.7.7.3 The Contractor shall perform in accordance with the Department of Defense (DoD) Industrial Security Manual (DoD 5220.22M) and ensure that classified material is handled in accordance with the latest appropriate security classification specifications.

1.7.7.4 Loss or suspension of required security clearance as set forth on the DD Form 254, “Contract Security Classification Specifications”, would result in the Contractor’s inability to perform in accordance with the terms and conditions of this contract. As a result of this failure to perform, the Contractor is subject to termination under the appropriate termination clause herein.

1.7.7.5 Facility Requirements

Based on task order requirements, the Contractor will be required to have a TOP SECRET facility clearance with SECRET safeguarding capabilities. The Contractor shall require access to Communications Security (COMSEC) information, SCI, Non-SCI intelligence information, and FOUO information. The Contractor shall also require access to the JWICS/SIPRNET/NIPRNET Systems. These are necessary to perform the C4ISR mission requirements and enable open access to sensor information required to operate in a classified environment.

1.7.7.6 The Contractor shall comply with all applicable DoD security regulations and procedures during the performance of this contract. The Contractor shall not disclose and must safeguard procurement sensitive information, computer systems and data, Privacy Act data, and Government personnel work products that are obtained or generated in the performance of this contract. This includes dissemination of protocols and papers not generally available through the public literature.

1.7.7.7 Anti-Terrorism (AT) Awareness Training for Contractor Personnel Traveling Overseas. All US based Contractor employees and associated sub-Contractor employees traveling overseas will receive the Government provided Area of Responsibility (AOR) specific AT awareness training prior to departure.

1.7.7.8 Contractor Employees Who Require Access to Government Information Systems. All Contractor employees with access to a Government info system must be registered in the Army Training Certification Tracking System (ATCTS) at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the information systems and then annually thereafter IAW AR 380-67 (Personnel Security Program) and Homeland Security Presidential Directive 12 (Policy for a Common Identification Standard for Federal Employees and Contractors).

1.7.7.9 Handling Requirements: In performing this contract, the Contractor may receive and generate classified material, modify, or store classified hardware, have access to classified information outside the U.S, Puerto Rico, U.S.

possessions and trust territories, require a COMSEC account, have Operations Security (OPSEC) requirements, and be authorized to use the Defense Courier Service.

1.7.7.10 OPSEC Standing Operating Procedure/Plan (CDRL A021). The Contractor shall develop an OPSEC SOP/Plan in accordance with AR 530-1, Operations Security, within 90 days of contract award. The OPSEC SOP/Plan must be reviewed and approved by the RA OPSEC Officer. The SOP/Plan will include the Government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.

1.7.7.11 Contractors Authorized to Accompany the Force. All Contractor employees shall ensure the following AT/OPSEC requirements are met prior to deploying personnel authorized to accompany U.S. Armed Forces outside the United States: required compliance with laws and regulations, pre-deployment requirements, required training (per combatant command guidance), and personnel data required

1.7.7.12 Performance or Delivery in a Foreign Country. All contracting personnel will comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the Contractor’s compliance with combatant commander and subordinate task force commander policies and directives.

1.7.7.13 Key Control: The need for key control may be required based on this task order. Contractor personnel shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.7.7.13.1. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.7.7.13.2. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.7.8 Personal Identity Verification (PIV)

1.7.8.1 The Contractor shall comply with PIV procedures implemented by Homeland Security Presidential Directive- 12 (HSPD-12), Federal Information Processing Standards Publication (FIPS PUB) Number 201-1, Office of Management and Budget (OMB) Guidance M-05-24.

1.7.8.2 The Contractor shall insert this clause, FAR 52.204-9 as required by FAR 4.1303, in all subcontracts when the SubContractor is required to have physical access to a Federally-controlled facility or access to a Federally-controlled information system.

1.7.8.3 In accordance with HSPD-12, OMB M-05-24 and FIPS 201-1, unless a previous favorable background investigation has been completed in the last ten (10) years, all Contractor employees shall be the subject of a background investigation conducted by the Government.

1.7.8.4 No Contractor employee shall commence work until the Personnel Security Questionnaire (PSQ) paperwork has been completed, reviewed and submitted to the Office of Personnel Management (OPM).

1.7.8.5 Contractor employees not meeting the minimum PIV requirements shall be the subject of a National Crime Information Center (NCIC) check prior to beginning work in addition to the submission of the PSQ to OPM.

1.7.8.6 Non-US citizens shall not be used in the performance of this contract unless the provisions of Army Regulation 25-2, Information Assurance have been fully completed and approval has been granted by the Government for the non-US citizen to perform the required mission.

1.7.9 Visit Notifications

1.7.9.1 If the Contractor has previously been granted a facility clearance (FCL) through the Defense Industrial Security Clearance Office (DISCO), the Contractor Facility Security Officer (FSO) shall submit visit notifications via Joint Personnel Adjudication System (JPAS) in the format prescribed and provided by AGC Security through the Government COR.

1.7.9.2 If the Contractor is not cleared through DISCO, the Contractor shall submit a signed visit request on company letterhead stationary through the Government COR. The request shall include the full name (last, first, middle), date of birth (MM/DD/YYYY), place of birth (city, state, country), citizenship, type of last investigation and date last investigation was completed, if any, and shall be the subject of a NCIC check prior to beginning work.

1.7.10 Regulations

All Contractor employees shall read all applicable security regulations, to be provided by the Government. Contractor personnel shall familiarize themselves with the Government’s regulations and policies and site-specific regulations regarding access to sensitive materials, computer facility/IT network access, issue of access credentials which shall be provided as required by the Government.

1.7.11 Physical Security

Some work shall be performed off the Government site however, when the Contractor is required to work on the Government site, the Contractor shall be responsible for safeguarding all Government information and property provided for Contractor use based on direction from the COR as applicable. At the close of each work period, Government facilities, equipment, and materials shall be secured.

1.7.12 Access Credentials

The Contractor shall establish and implement methods of making sure all access credentials (CAC; DD Form 1466, DoD Building Pass) issued to the Contractor employees by the Government are not lost or misplaced and are not used by unauthorized persons. No access credentials issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering access credentials that shall be included in the Quality Control Plan.

Such procedures shall include turn-in of any issued access credentials by Contractor personnel who no longer require access to Government information systems or Government facilities. The Contractor shall immediately report any occurrences of lost access credentials to the COR.

1.7.12.1 In the event access credentials are lost or damaged, the Contractor employee shall immediately notify the COR who will notify AGC Security of the loss or damage and request re-issue of the credential.

1.7.12.2. Multiple occurrences of loss or damaged access credentials shall be reported to the Contracting Officer.

When the replacement of access credentials is performed by the Government, the total cost of re-issuing the credential(s) shall be deducted from the monthly payment due the Contractor.

1.7.12.3 The Contractor shall prohibit the use of Government issued access credentials by any persons other than the Contractor employee to whom the credential is issued. The Contractor shall prohibit the opening of secure or locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the AGC Security Office.

1.7.13 Identification of Contracting Employees

All Contractor personnel attending meetings, answering Government telephones and working in other situations where their Contractor status is not obvious to third parties shall identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. Contractor personnel shall also ensure that all documents or reports produced are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. Contractor employees with assigned duties requiring on-site performance shall meet the requirements to obtain either a Department of Defense, or AGC, building pass. Contractor employees requiring use of Government information systems or facilities shall meet the criteria required to obtain a Common Access Card and building specific identification badge requirements/specifications.

1.7.14 Anti-Terrorism and Operations Security Requirements

1.7.14.1 AT Level I Training. All Contractor employees, to include subContractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of completion for each affected Contractor employee and subContractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training by all employees and subContractor personnel. AT level I awareness training is available at the following website: https://atlevel1.dtic.mil/at.

1.7.14.2 Access and General Protection/Security Policy and Procedures. Contractor and all associated sub-Contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by the Government representative). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, Headquarters, Department of the Army (HQDA) and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.

1.7.14.3 iWATCH Training. The Contractor and all associated sub-Contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 15 calendar days of new employees commencing performance with the results reported to the COR NLT 45 calendar days after contract award.

1.7.14.4 Contractor Employees Who Require Access to Government Information Systems. All Contractor employees with access to a Government info system must be registered in the ATCTS at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the Information System (IS) and then annually thereafter.

1.7.14.5 For Contracts that Require OPSEC Training. Per AR 530-1, Operations Security, new Contractor employees must complete Level I OPSEC training within 30 calendar days of their reporting for duty. All Contractor employees must complete annual OPSEC awareness training and adhere to the organization’s security program.

1.7.14.6 For Information assurance (IA)/information technology (IT) training. All Contractor employees and associated sub-Contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All Contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of employment.

1.7.14.7 For IA/IT certification. Per DoD 8570.01-M , DFARS 252.239.7001 and AR 25-2, the Contractor employees responsible for IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.

1.7.15 Post Award Conference/Periodic Progress Meetings

The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.7.16 Contracting Officer Representative (COR)

The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies; coordinate availability of Government furnished property, and provide site entry of Contractor personnel.

A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract. The warranted Contracting Officer is the only entity with authorization to negotiate and make changes to this contract.

1.7.17 Travel

1.7.17.1 Area of Travel. The Contractor is required to travel to CONUS and OCONUS locations per the PWS Tasking as follows:

Kickoff Meeting (Assume meeting location is Contractor site) Program Management Review Meetings (Assume meeting location is Contractor site or telephonically) Travel will be to OCONUS location of Muwaffeq Salti Air Base (MSAB) Al-Azraq As-Samali, Jordan.

1.7.17.2 The Contractor shall propose any additional travel deemed necessary for the successful completion of the tasking that has not been identified or specifically called out by this PWS. The Contracting Officer and COR will review these events at the time of award.

1.7.17.3 TDY for Operations is expected to CENTCOM; specifically the country of Jordan.

1.7.17.4 Travel Policy. The Government will reimburse the Contractor for allowable travel costs incurred by the Contractor in performance of the contract and determined to be in accordance with FAR subpart 31.2, subject to the following provisions: Travel required for tasks assigned under this contract shall be governed in accordance with rules set forth for temporary duty travel in the Department of Defense Joint Travel Regulations (JTR). All travel and expenses must be approved by the COR in writing, prior to travel.

1.7.17.5 Travel. Travel, subsistence, and associated labor charges for travel time are authorized for travel beyond a 50-mile radius of the local office, whenever a task assignment requires work to be accomplished at an alternate work site. No travel, subsistence or associated labor charges for travel time shall be charged for work performed within a 50-mile radius of the Contractor’s local office, normal work site, or temporary work site unless approved in advance by the Contracting Officer Representative (COR). Under no circumstances will costs be reimbursed for travel performed for personal convenience and daily travel to and from the normal work site, to include parking expenses.

Part 2. Definitions and Acronyms

2.1 Definitions

2.1.1. AUTHORITIVE DATA SOURCE (ADS). An Authoritative Data Source is a recognized or official data production source with a designated mission statement or source/product to publish reliable and accurate data for subsequent use by users. An Authoritative Data Source may be the functional combination of multiple or separate data sources. Authoritative Data Sources provide enterprise-accepted and trusted information for reuse, analysis, and aggregation, which ultimately leads to accurate choices, rapid decisions, and a wealth of knowledge. Once a proposed source is certified by the Army Data Council as authoritative, it is registered in the ADS Registry so users can determine which of many sources containing information is authoritative and ensures the user of the most accurate, timely, trusted data.

2.1.2 AUDITABLE SOURCE SYSTEM. An auditable source system is one where information is first recorded from the original documents and/or business process. Auditable source documents substantiate the integrity of the data being used.

2.1.3 CONTRACTOR. A supplier or vendor having a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.4 CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

2.1.5 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.6 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the

PWS.

2.1.7 DELIVERABLE. Anything that can be physically delivered but may include non-physical things such as meeting minutes.

2.1.8 KEY PERSONNEL. Contractor personnel that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS.

2.1.9 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.10 QUALITY ASSURANCE. The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.11 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.

2.1.12 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.13 SUBCONTRACTOR. One that enters into a contract with a prime Contractor. The Government does not have privacies of contract with the SubContractor.

2.1.14 WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.15 WORK WEEK. Is defined as Monday through Friday, unless specified otherwise.

2.2 Acronyms

3D Three Dimensional ADS Authoritative Data Source AGC Army Geospatial Center AGE Army Geospatial Enterprise AGI Advanced Geospatial Intelligence AGL Above Ground Level ANSI American National Standards Institute AOR Area of Responsibility AT Anti-Terrorism C4ISR Command, Control, Communications, Computers, Intelligence, Surveillance and

Reconnaissance CENTCOM Central Command CF Coalition Forces CFE Contractor Furnished Equipment CFR Code of Federal Regulations COCOM Combatant Command CONEX Container Express CONUS Continental United States (excludes Alaska and Hawaii) COTS Commercial Off the Shelf CRC CONUS Replacement Center CWBS Contract Work Breakdown Structure DA Department of the Army DEM Digital Elevation Model DOD Department of Defense EO Electro-Optical EO/IR Electro-Optical Infrared FMV Full Motion Video FPCON Force Protection Condition GCS Ground Control Station GEOINT Geospatial Intelligence GeoTIFF Geographically Tagged Image File Format GFE Government Furnished Equipment GFI Government Furnished Information GIS Geographic Information System GOTS Government Off-the-Shelf GPS Global Positioning System GRIDS Geospatial Research, Integration, Development and Support GS General Services GSE Ground Support Equipment HAZMAT Hazardous Material HQDA Headquarters, Department of the Army IA Information Assurance IMINT Imagery Intelligence IMS Integrated Master Schedule IPR Interim Program Review IPT Integrated Product Team ISR Intelligence, Surveillance and Reconnaissance IT Information Technology ITAR International Traffic in Arms Regulation

JP2 JPEG 2000

JPEG Joint Photographic Experts Group

LAS LASer File Format Exchange LIDAR Light Detection and Ranging MASINT Measurement and Signature Intelligence MrSID Multi-resolution Seamless Image Database M&S Modeling and Simulation NITF National Image Transmission Format OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Cost OPSEC Operational Security PDSS Pre-Deployment Site Survey PDR Preliminary Design Review PIPO Phase In/Phase Out PM Program Manager POC Point of Contact POR Programs of Record PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QC Quality Control RADAR Radio Detection and Ranging RGB Red Green Blue RSC Regional Support Commands SCI Sensitive Compartmented Information SME Subject Matter Expert SOP Standard Operating Procedure TBO Time Before Overhaul TE Technical Exhibit TM Technical Monitor TOT Time Over Target TS Top Secret USACE US Army Corps of Engineers UDC USACE Deployment Center VDD Version Description Document WAMI Wide Area Motion Imagery WBS Work Breakdown Structure

Part 3. Government Furnished Items and Services

3.1 General

The Contractor shall specify any other Government Furnished Equipment/Government Furnished Information (GFE/GFI) requirements and timelines to facilitate the execution of this sample task order that are not listed below.

3.1.1 The Contract COR with the Army Geospatial Center will sponsor Army Knowledge Online (AKO) accounts.

3.1.2 The Contract COR with the Army Geospatial Center will provide CAC cards for the Contractor personnel.

3.1.3 The Contract COR with the Army Geospatial Center will provide the SPOT approvals and validations needed for OCONUS travel.

3.1.4 The Contractor will need to address ITAR-restricted equipment or information and provide a list for the Government to consider for their use. These approved ITAR restricted items will be provided at the operating site no later than thirty (30) days from contract award.

3.1.5 The Government will provide mission scheduling and planning sufficient to allow Air Operations Center airspace coordination and ATO development within 72 hours prior to mission.

3.1.6 The Government will provide coordination with tactical air control facilities for emergency or pop-up mission requirements within twelve (12) hours of mission.

3.1.7 The Government will provide access to CF weather facilities daily prior to mission.

3.1.8 The Government will provide access to mission profile intelligence briefing for threat identification and assessment daily prior to mission

3.1.9 The Government will provide access to CF airfields as required for mission performance daily prior to mission.

3.1.10 The Government will provide flight oversight of all airspace and aviation procedures by the OCONUS TM or designated equivalent daily prior to mission.

3.1.11 The Government will provide flight profiles that will avoid areas where hostile air threat activities are known to exist or are anticipated to occur based on current threat assessments provided daily prior to mission.

3.1.12 The Government will provide a secure base of operations daily from start to finish of deployment.

3.1.13 The Government will provide all necessary utilities to support operations in areas where they are not commercially available to the Contractor daily.

3.1.14 The Government will provide housing and office locations at forward deployed locations while operating in areas where these items are not commercially available daily.

3.1.15 The Government will provide a secure OCONUS facility for any data processing of classified data daily.

3.1.16 The Government will provide adequate office space that includes adequate power supply and cooling for Contractor personnel who are required to work onsite at Government facilities as part of performing this effort daily.

3.1.17 The Government will provide adequate security for personnel, and aircraft when operating in any environment such as an active combat zone where continuing contingency operations are ongoing daily.

3.1.18 The Government will provide OCONUS HAZMAT and shipping inspectors as required for demobilization 30

(30) days from final date of demobilization.

3.1.19 The Government will provide any requirements for AOR-specific AT awareness training and local deployment requirements and documentation. The COR will provide this information, required training, country clearance requirements, and local deployment requirements and documentation as GFI at contract award.

3.1.20 The Government will provide any GOTS software capabilities required for use in operation of the system to be compatible with Government-approved networks and flight systems.

3.2 Facilities

The Government will provide the necessary workspace and utilities when available for the Contractor staff to execute as outlined this PWS to include meeting space, desk space, telephones, network access, computers, and other items necessary to maintain an office environment for work required to be performed at Government facilities.

3.3 Government Property

The Government will obtain all data rights associated with any software or potential hardware development that may occur under this contract, excluding Commercial Off the Shelf (COTS) hardware or software. Per FAR 27.406 (b) (1), it is not feasible to ascertain all the data requirements at this time, however the clause 52.227-16, Additional Data Requirements, may be used to enable the subsequent ordering by the contracting officer of additional data first produced or specifically used in the performance of such contracts as the actual requirements become known.

Part 4. Contractor Furnished Items and Responsibilities

4. General

The Contractor shall furnish all supplies, equipment, personnel and services required to perform work under this contract that are not listed under Part 3 of this PWS.

Part 5. Specific Tasks

5. Basic Services

The Contractor shall provide technical, managerial, logistical, and engineering support and services to support the United States (U.S.) Government in the execution of its 3D sensor operation and sustainment mission. The remainder of this section describes the specific subtasks and activities that the Contractor shall conduct.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .