W58RGZ26R0001.pdf
PDF 150 KB Posted
- Solicitation number
- W58RGZ-26-R-0001
About this file
This is a Solicitation/Contract/Order for Commercial Items (SF 1449) for a three-year Firm Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ) maintenance contract to overhaul Vibration Control Systems for UH-60 helicopters.
The Army Contracting Command-Redstone (CCAM-AL-M) issued this solicitation with contract number W58RGZ-26-R-0001, requisition number 334519, and NAICS code 334519. The solicitation closing date was May 18, 2026, at 5:00 PM. The Government estimates a minimum quantity of 36 units and maximum of 130 units (including 22 reserved for Foreign Military Sales) over the contract period. The contract includes three ordering periods of 365 days each. The minimum quantity of 36 units must be obligated on the first delivery order issued simultaneously with contract award. Input NSNs are 6635-01-557-9607 with part numbers C99081-001 and 70600-01816-103; output NSN and part number are 6635-01-557-9607 and C99081-001, respectively. The only known source is Moog, Inc., CAGE Code 94697, located at 400 Jamison Road, East Aurora, NY 14052. Quotes must be submitted electronically to andrew.e.cameron.civ@army.mil and lindy.l.pinchon.civ@army.mil. The contract requires submission of a Maintenance and Overhaul Plan within 30 days of award and includes a mandatory Product Verification Audit of three assets. Offerors must provide firm fixed unit prices for all three ordering periods. The solicitation is restricted to commercial items, so certified cost or pricing data is not required. FAR clauses 52.212-1, 52.212-3, 52.212-4, and 52.212-5 apply to this commercial items acquisition.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
Offeror To Complete Block 12, 17, 23, 24, & 30
1. Requisition Number Page Of
2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date
7. For Solicitation Information Call:
A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time
9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:
Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program
Hubzone Small Business EDWOSB
Service-Disabled Veteran-Owned Small Business NAICS:
Email: 8(A) Size Standard:
11. Delivery For FOB Destination Unless Block Is Marked
12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating
See Schedule 14. Method Of Solicitation RFQ IFB RFP
15. Deliver To Code 16. Administered By Code
Telephone No.
17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code
Telephone No.
17b. Check If Remittance Is Different And Put Such Address In Offer
18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
(Use Reverse and/or Attach Additional Sheets As Necessary)
25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)
27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.
27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.
28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.
Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:
30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)
30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed
Authorized For Local Reproduction Previous Edition Is Not Usable
Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212
W58RGZ-26-R-0001 2026APR02
ANDREW CAMERON (256)842-7478
ANDREW.E.CAMERON.CIV@MAIL.MIL
2026MAY18 05:00pm
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
334519
X
X DOA1
X
SEE SCHEDULE
SEE SCHEDULE
X X
X 1
1 72
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
32a. Quantity In Column 21 Has Been
Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________
32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative
32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative
32g. E-Mail of Authorized Government Representative
33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final
38. S/R Account No. 39. S/R Voucher Number 40. Paid By
41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)
42c. Date Rec’d (YY/MM/DD) 42d. Total Containers
Standard Form 1449 (Rev. 2/2012) Back
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: ANDREW CAMERON
Buyer Office Symbol/Telephone Number: CCAM-AL-M/(256)842-7478
Type of Contract 1: Firm Fixed Price
Kind of Contract: Maintenance Contracts
*** End of Narrative A0000 ***
1. This item is not a Critical Safety Item (CSI).
2. This is a three (3) year Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract pursuant to FAR 52.216-22.
Input NSN: 6635-01-557-9607
Output NSN: 6635-01-557-9607
Input P/Ns: C99081-001 and 70600-01816-103
Output P/N: C99081-001
Minimum Quantity: 36
Maximum Estimated Quantity: 130 (including 22 reserved for FMS)
3. There is no Depot Maintenance Work Requirement for the Overhaul of the Vibration Control System. The only known source for this requirement is as follows: Moog, Inc., CAGE Code 94697, 400 Jamison Rd, East Aurora, NY 14052. No other sources have the capabilities in place to accomplish this overhaul effort.
4. When Applicable, the contractor shall complete the Foreign Military Sales (FMS) Customer DA FORM 2410 (Component Removal and Repair
Overhaul Record), submitted with the item for repair, in accordance with DA Pamphlet 738-751, TB-1500-341-01, and TM-1-500-328-23. Upon completion of repair, if authorized, the contractor shall fill out U.S. Army DA Form 2410 and return it to the FMS customer with the repaired asset(s), along with the FMS customer version of the DA Form 2410.
5. The FMS Customer and geographical location(s) for deliveries, inspection and acceptance points are unknown at this time.
6. Subject to the availability of funds, any quantities ordered will be priced at the unit price established for the ordering period in which they are ordered. Funds shall be obligated by issuance of Delivery Orders and not by the contract itself.
7. The minimum quantity of 36 each (US quantity) shall be obligated on the first delivery order, to be issued simultaneously with the award of the contract. Any additional quantities ordered will be priced at the firm fixed price in effect during the ordering period in which they are ordered and will not exceed the maximum of 130 units (including 22 units for FMS).
8. The Government will not be required to obtain the contractor's signature prior to the issuance of an order.
9. The Government has segregated the estimated quantities into three ordering periods. However, this does not preclude exercising the
Government's right under FAR 52.216-19 by ordering the maximum quantity specified in FAR 52.216-19(b)(1) at any time during the three year ordering period.
Ordering Period 1 will be from date of contract award through 365 days after contract award (DACA).
Ordering Period 2 will be from 366 DACA through 730 DACA.
Ordering Period 3 will be from 731 DACA through 1,095 DACA.
10. Please insert your firm fixed unit prices for the 1st, 2nd, and 3rd ordering periods in the spaces provided under each CLIN/SubCLIN.
11. No Government Furnished Materials (GFM), other than the reparable assets and reusable containers, will be provided.
12. Electronic submission of quotes is authorized and is the only acceptable method of transmission. Quotes shall be emailed to andrew.e.cameron.civ@army.mil and lindy.l.pinchon.civ@army.mil.
13. Facsimile and hard copy submission of quotes are not authorized and will not be accepted.
14. The Contractor is required to submit a Maintenance and Overhaul (M&O) Plan in accordance with CDRL A003. The documentation shall be submitted within 30 days after contract award (DACA).
15. There are no critical characteristics for this item.
16. This solicitation is for commercial items; therefore, certified cost or pricing data will not be required. Other data, to include commercial invoices, may be required to substantiate the quoted pricing.
2 72
W58RGZ-26-R-0001 REPRINT
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
17. The contractor is instructed to put the following words in the remarks column of the DD 250/WAWF: "Repair and Return Process D6M".
18. Access to DLA FedMall (formerly known as EMALL) is NOT authorized.
19. The National Defense Authorization Act for Fiscal Year 1993, Public Law 102-484, Section 326, prohibits use of Ozone Depleting
Chemicals (ODCs) in Department of Defense contracts awarded on or after 1 June 1993, unless appropriate authority is granted.
20. The following websites are provided for the purpose of obtaining/reviewing various Army publications and technical manuals/bulletins:
A. https: //www.logsa.army. mil/etmapp/#/etm/home - Technical Manuals and Bulletins
B. https: //www.pubs.army.mil/ - DA Pamphlets and Army Regulations
21. COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:
NAME: _________________________________________
TELEPHONE NUMBER: _____________________________
FAX NUMBER: ___________________________________
E-MAIL ADDRESS: _______________________________
22. The contractor shall comply with the Total Asset Visibility - Contractor (TAV-C) reporting instructions (Attachment 0005 -
Contractor Overhaul TAV-C Requirements).
*** END OF NARRATIVE A0001 ***
3 72
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PVA
0001AA PRODUCT VERIFICATION AUDIT (PVA) $ ________________________________ __________________
SERVICE REQUESTED: PVA
CLIN CONTRACT TYPE:
Firm Fixed Price
This CLIN represents the Product Verification Audit
(PVA) for the Vibration Control System, output NSN:
6635-01-557-9607, as shown in CLINs 0002 and 0003.
This is a Firm Fixed Price CLIN.
Quoter is required to fill in a proposed firm fixed unit price for the PVA:
PVA shall be in accordance with The "Product
Verification Audit (PVA) Statement of Work" in
Narrative E0001.
PVA shall be conducted within 90 days after receipt of reparables. The Contractor shall prepare 3 assets for PVA. The Contractor is required to notify the
Government Quality Office for scheduling of the PVA by email to the following address:
usarmy.redstone.devcom-avmc.mbx.amr-mqcontracts@ army.mil
With copy emailed to the Contract Specialist at:
andrew.e.cameron.civ@army.mil
The Contractor will prepare and forward, through the cognizant Government Quality Element, finalized audit reports within 10 working days after completion of the PVA to the email address above.
PVA requires approval prior to Government acceptance of contract deliverable assets.
Failure to pass the PVA may lead to Termination for
Cause of the contract.
Payment Instructions: The Contractor will be paid for the PVA by utilizing the Wide Area Work Flow (WAWF) site. The Contractor must enter code W58H0Z when submitting the PVA invoice, making it to the attention of Lindy Pinchon. The Contracting Officer will approve the PVA invoice.
4 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0002 VIBRATION CONTROL SYSTEM
NSN: 6635-01-557-9607
Mfr CAGE: 94697
Mfr Part Number: C99081-001
0002AA OVERHAUL OF VIBRATION CONTROL SYSTEM (US) $ $ _________________________________________ ______________ __________________
COMMODITY NAME: VIBRATION CONTROL SYSTEM
CLIN CONTRACT TYPE:
Firm Fixed Price
SYSTEM: UH-60
NOUN: Vibration Control System
INPUT NSN:
6635-01-557-9607
INPUT P/Ns:
C99081-001
70600-01816-103
OUTPUT NSN:
6635-01-557-9607
OUTPUT P/N:
C99081-001
Overhaul shall be in accordance with the Statement of
Work.
This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in the Statement Of Work (SOW).
QUOTER IS REQUIRED TO FILL IN PROPOSED UNIT PRICES:
YEAR 1- U/P $_____________ (FFP) Min Qty 36 ea
YEAR 2- U/P $_____________ (FFP) Est Qty 36 ea
YEAR 3- U/P $_____________ (FFP) Est Qty 36 ea
5 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS
CLIN.
THE MINIMUM QUANTITY SET FORTH HEREIN SHALL BE
OBLIGATED ON THE FIRST DELIVERY ORDER, TO BE ISSUED
CONCURRENTLY WITH THE AWARD OF THE CONTRACT. ANY
ADDITIONAL QUANTITIES ORDERED WILL BE PRICED AT THE
FIRM FIXED PRICE IN EFFECT DURING THE ORDERING PERIOD
IN WHICH THEY ARE ORDERED.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
PACKAGING REQUIREMENTS, SECTION J, ATTACH 0001
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Packaging and Marking: Contractor must comply with
MIL-STD-2073-1E with change 4, DOD Standard Practice for Military Packaging, and MIL STD 129R, Military
Marking for Shipment and Storage, notwithstanding any language in Attachment 0001 to the contrary.
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
Refer to the Narratives entitled "Delivery Schedule" and "Delivery of Additional Quantities" in section F for the Government's Required Delivery Schedule.
(End of narrative F001)
0003 VIBRATION CONTROL SYSTEM
NSN: 6635-01-557-9607
Mfr CAGE: 94697
Mfr Part Number: C99081-001
0003AA OVERHAUL OF VIBRATION CONTROL SYSTEM (FMS) $ $ __________________________________________ ______________ __________________
6 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
COMMODITY NAME: VIBRATION CONTROL SYSTEM
CLIN CONTRACT TYPE:
Firm Fixed Price
SYSTEM: UH-60
NOUN: Vibration Control System
INPUT NSN:
6635-01-557-9607
INPUT P/Ns:
C99081-001
70600-01816-103
OUTPUT NSN:
6635-01-557-9607
OUTPUT P/N:
C99081-001
Overhaul shall be in accordance with the Statement of
Work.
This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in the Statement Of Work (SOW).
QUOTER IS REQUIRED TO FILL IN PROPOSED UNIT PRICES:
YEAR 1- U/P $_____________ (FFP) Min Qty 0 ea
YEAR 2- U/P $_____________ (FFP) Est Qty 11 ea
YEAR 3- U/P $_____________ (FFP) Est Qty 11 ea
INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS
CLIN.
This CLIN will only be used if a FMS Customer requires this item. If no FMS Customers are identified, the US Army Requirer may utilize the FMS quantity.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
PACKAGING REQUIREMENTS, SECTION J, ATTACH 0001
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Packaging and Marking: Contractor must comply with
MIL-STD-2073-1E with change 4, DOD Standard Practice for Military Packaging, and MIL STD 129R, Military
Marking for Shipment and Storage, notwithstanding any language in Attachment 0001 to the contrary.
7 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
Refer to the Narratives entitled "Delivery Schedule" and "Delivery of Additional Quantities" in section F for the Government's Required Delivery Schedule.
(End of narrative F001)
0004 SCRAP
0004AA SCRAP $ ______ __________________
SERVICE REQUESTED: SCRAP
CLIN CONTRACT TYPE:
Firm Fixed Price
This CLIN is for assets which are beyond economical repair (i.e., scrap) from CLINs 0002AA and/or 0003AA.
The Government's estimated quantity per ordering period is 10 each. The estimated quantity of 10 is for quote evaluation purposes only.
Quoter is required to fill in a proposed firm fixed unit price for each ordering period:
Ordering Period 1 $____________ (FFP)Est Qty 10 ea
Ordering Period 2 $____________ (FFP)Est Qty 10 ea
Ordering Period 3 $____________ (FFP)Est Qty 10 ea
Scrapped assets from CLINs 0002AA and/or 0003AA shall be in accordance with the Statement of Work.
Units determined to be scrapped in accordance with
Section C shall be reflected as an increase in CLIN
0004AA with a corresponding decrease in quantity and funds in CLINs 0002AA and/or 0003AA, as applicable.
In the event the Procuring Contracting Officer (PCO) determines that certain items shall be scrapped, the
8 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with the contractor's approved Government property procedures.
The Government may, at its discretion, replace any items scrapped by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.
Scrap requires authorization by the PCO via formal modification. In no event shall the contractor scrap an item prior to receiving a contractual modification for a unit.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0005 CONTAINERS
0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________
SERVICE REQUESTED: CONTAINERS
CLIN CONTRACT TYPE:
Firm Fixed Price
THE GOVERNMENT'S ESTIMATED QUANTITY PER ORDERING
PERIOD IS 10 EACH FOR QUOTE EVALUATION
PURPOSES ONLY.
Quoter is required to fill in proposed firm fixed unit prices for ordering periods 1 to 3:
ORDERING PERIOD 1 $____________ Est Qty 10 EA
ORDERING PERIOD 2 $____________ Est Qty 10 EA
ORDERING PERIOD 3 $____________ Est Qty 10 EA
The contractor shall provide the container in accordance with Section C, entitled Statement of Work and Section J, Attachment 0001 M&O Packaging
Requirements.
NSN: 8145-01-044-3289
9 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
P/N: 13414-095
The Government cannot determine at the time of contract award, how many of the assets to be overhauled will be received by the Contractor in unserviceable containers or received without containers.
The Contractor, IAW Section C Statement of Work, should submit a Report of Discrepancy (ROD) SF Form
364 through the Defense Contract Management Agency
(DCMA) Quality Assurance Representative (QAR) for verification within 7 working days. When assets are received in unserviceable containers or without containers, approval of the PCO is required before replacement containers are purchased.
This CLIN covers containers for CLINs 0002AA and/or
0003AA.
THIS IS A FIRM-FIXED-PRICE CLIN.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0006 CONTRACT DATA REQUIREMENTS LIST (CDRLS) _______________________________________
This CLIN is "Not Separately Priced" (NSP). Pricing for data shall be included in the unit prices of
CLINs 0002AA and/or 0003AA.
The Contractor shall provide Data Items A001 - A003 in accordance with the Contract Data Requirements
List, Exhibits A-C.
(End of narrative A001)
A001 GOVERNMENT PROPERTY INVENTORY REPORT $ ** NSP ** ____________________________________ __________________
SERVICE REQUESTED: CDRL A001
CLIN CONTRACT TYPE:
Firm Fixed Price
10 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
DATA ITEM A001 - DI-MGMT-80441D - Government Property
Inventory Report Instructions - AS REQUIRED Report to be submitted no later than 15 days after completion of physical inventory.
(End of narrative C001)
Deliveries or Performance _________________________
A002 REPORT OF SHIPPING AND PACKAGING DISCREPANCY $ ** NSP ** ____________________________________________ __________________
SERVICE REQUESTED: CDRL A002
CLIN CONTRACT TYPE:
Firm Fixed Price
DATA ITEM A002 - DATA ACQUISITION DOCUMENT NUMBER: DI-
MGMT-80503 (AS REQUIRED)
Submission of the Report of Shipping and Packaging
Discrepancy shall occur within 10 days of discovering the discrepancy.
(End of narrative C001)
Deliveries or Performance _________________________
A003 TECHNICAL REPORT - STUDY/SERVICES - M&O PLAN $ ** NSP ** ____________________________________________ __________________
SERVICE REQUESTED: CDRL A003
CLIN CONTRACT TYPE:
Firm Fixed Price
DATA ITEM A003 - DATA ACQUISITION DOCUMENT NUMBER: DI-
MISC-80508B
Data Item A003 refers to the M&O Plan, as required by
CLIN 0001. The M&O Plan shall be submitted to this office within 30 days after contract award date.
Revisions shall be submitted within 10 calendar days after the change.
Note: A copy of the plan shall be forwarded to the contract specialist at:
andrew.e.cameron.civ@army.mil
11 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative C001)
Deliveries or Performance _________________________
12 72
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
1. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data (other than Government Furnished Property), necessary to accomplish the inspection and overhaul for Vibration Control System for the UH-60 that is required to return the asset to serviceable condition sufficient to meet the standard of continued airworthiness in accordance with (IAW) Army Regulation (AR) 70-62. Upon completion of the overhaul, the overhauled assets shall be packaged IAW the resultant contract and shipped to the destination(s) specified in each individual delivery order.
2. Prior to commencement of overhaul, the Contractor shall disassemble and inspect the Vibration Control System assets to the extent necessary to determine the complete cost to overhaul. The Contractor shall continue the overhaul process on all end items, unless the items are determined to be physically incapable of being overhauled. The overhaul line items shown in section B are firm-fixed price.
The contractor will be required to complete the overhaul on all end items regardless of the damage, unless the items are determined to be physically incapable of being overhauled. The contractor will be required to provide data/documentation proving that the item is physically incapable of being overhauled and a report of discrepancy signed by the DCMA QAR to the Procuring Contracting Officer (PCO) to confirm that the item is physically incapable of being overhauled. To support the determination that the asset is physically incapable of being overhauled, more documentation may be requested by the Government. In no event will an asset be scrapped prior to an approved modification by the Contracting Officer. The firm fixed prices in the overhaul CLINs must include parts required to overhaul the Vibration Control System. The Government cannot guarantee the condition of the assets sent to the Contractor for overhaul.
3. In the event that an asset is determined (approved by PCO) to be physically incapable of being overhauled, the contractor shall scrap such assets at the fixed unit price specified in CLIN 0004AA of section B. Defense Federal Acquisition Regulation Supplement (DFARS)
Clause 252.245-7005 Management and Reporting of Government Property, included in the resultant contract, the Contractor shall complete the Plant Clearance Inventory Schedule using the Plant Clearance capability of the Government Furnished Property (GFP) Module of the
Procurement Integrated Enterprise Environment (PIEE), an electronic equivalent of the Standard Form 1428, Inventory Disposal Schedule.
Users may register for access and obtain training on the PIEE home page https://wawf.eb.mil/piee-landing. Such scrapped items shall count toward the minimum quantities ordered hereunder. The Government may, at its discretion, replace any items scrapped by input of additional assets, and said scrap quantities will not count as part of the total maximum quantity. Any item other than those determined to be scrapped must be overhauled at the firm fixed price in the awarded contract.
4. The Government does not have an adequate Depot Maintenance Work Requirement (DMWR) for this effort.
5. Critical Safety Item: The Vibration Control System is not a critical safety item.
6. Upon receipt of the assets, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/deterioration or those with shipping discrepancies shall be reported IAW DI-MGMT-80503 (Exhibit B). All Reports of Discrepancy (RODS) must be concurred with by
DCMA prior to submitting to the Contracting Officer.
7. GFP Attachment (Attachment 0006): The components being provided to the Contractor are identified and tracked as GFP. The Contractor shall maintain a system of internal controls to manage (control, use, preserve, protect, overhaul and maintain) GFP in its possession
IAW Federal Acquisition Regulation (FAR) 52.245-1, and its property management system shall satisfy the requirements of this clause. The
Contractor shall record the acquisition, receipt, shipment, consumption, disposal of GFP, and any transfer to another contract utilizing the GFP Module in PIEE, https://piee.eb.mil, as required by the DFARS Procedures, Guidance, and Information (PGI) 245.103-72 Government-furnished Property Attachments to Solicitations and resultant contracts. GFP training and guidance is located at the Department of
Defense (DoD) Procurement Toolbox at https://dodprocurementtoolbox.com/.
8. The Contractor shall comply with U.S. Army Technical Manual (TM) 1-1500-345-23, Painting and Marking of Army Aircraft, or most recent version, if painting is required in the performance of the resultant contract.
9. The Contractor shall submit required data IAW the Contract Data Requirements List, DD Form 1423, Exhibits A-C. Completed Data shall be submitted electronically to the addresses indicated on the DD Forms(s) 1423.
10. Product Verification Audit (PVA): The Contractor shall conduct the PVA in accordance with the PVA SOW found in Section E of the solicitation.
11. There is no Army Maintenance Management System Aviation (TAMMS-A) requirement for the resultant contract effort.
12. Product Quality Deficiency Reports (PQDRs): When requested, the Contractor shall assist the cognizant Contract Administration Office in evaluating PQDRs and exhibits for defects reported on components overhauled under the resultant contract to determine the root cause for deficiencies. These defects may be reported from field or depot organizations. Corrective action to prevent repeat discrepancies shall be an integral part of the Contractor's Quality Program. The Contractor shall utilize the Product Data Reporting and Evaluation
13 72
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Program (PDREP) to submit a PQDR at https://www.pdrep.csd.disa.mil/pdrep_files/report_tools/pqdr.htm IAW AR 702-7-1, Reporting of
Product Quality Deficiencies within the U.S. Army.
13. The items the Contractor shall overhaul are identified below:
Input/Output NSN: 6635-01-557-9607
Input P/Ns: C99081-001 and 70600-01816-103
Output P/N: C99081-001
14. The overhaul planned quantity for 5 years is minimum 36, maximum 130. Input will be 30 days after receipt of order. Output shall be as specified in the solicitation and resultant contract delivery schedule. Serviceable assets shall be returned to Department of Defense
Activity Address Directory (DODAAC) W45H08, Plant 7015, and Routing Identifier Code (RIC) B52.
US Quantities
(1) 1st year qty 36
(2) 2nd year qty 36
(3) 3rd year qty 36
FMS Quantities
(1) 1st year qty 0
(2) 2nd year qty 11
(3) 3rd year qty 11
15. Transactional Inventory Procedures - The Contractor shall prepare the following reports:
A. The Contractor shall complete and retain a signed copy of DD Form 1348-1A, receipt for overhauled assets on all shipments. The
Contractor shall complete the DD Form 1348-1A and include a signature to evidence shipment and receipt. Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:
https://www.dla.mil/Disposition-Services/DDSR/Turn-In/1348-Help/
The contractor shall prepare this form and include the following corresponding receipt information:
a. Document Number - (Positions 30-44)
b. National Stock Number (NSN) - (Positions 8-22)
c. Condition Code - (Position 71)
d. Unit Price - (Positions 74-80)
e. Total Price - (Block 1)
f. Actual Quantity Received - (Block 10)
g. Nomenclature - (Block 17)
h. Signature and Date - (Blocks 22 and 23)
For questions with the above information, please contact: usarmy.redstone.usamc.mbx.immc-smb-ammo@army.mil
B. The Contractor shall perform an annual inventory of all GFP, including items for overhaul and any contractor-acquired property such as containers during the period of performance of the resultant contract. This shall include any subcontractor inventories where GFP has been provided by the Government for overhaul. Contractor shall provide all results, findings, and corrective actions of any annual physical inventories to the Government IAW FAR Clause 52.245-1(f)(1)(iv), Physical Inventory. The Contractor shall prepare a physical inventory report IAW DI-MGMT-80441D (Exhibit A - CDRL A001).
C. The Contractor shall comply with the Total Asset Visibility - Contractor (TAV-C) reporting instructions IAW Attachment 0005
"Contractor Overhaul TAV-C Requirements and TAV-C Portal End User Standard Operating Procedures (SOP)".
16. Foreign Military Sales (FMS): Contractor shall always segregate US quantities and FMS quantities and must keep segregated at all times in transit and in storage and shall flow down this requirement to all subcontractors.
17. Item Unique Identification (IUID): The Contractor shall apply IUID IAW Military Standard (MIL-STD) MIL-STD-130N, AR 700-145, Item
Unique Identification, and DA PAM 700-145, IUID Procedures, DFARS 211.274-2 Policy for item unique identification, which requires in paragraph (a)(3)(i) that IUID is required "regardless of value for any DoD serially managed item (overhauled or non-overhauled) or subassembly, component, or part embedded within a subassembly, component, or part." All registered Unique Item Identifiers (UIIs) shall be maintained as received and any UIIs created for component received without one, shall follow any published documentation, such as
DMWRs or Maintenance Engineering Orders (MEO). In the absence of these documents, Contractors must strictly adhere to the procedures outlined in the MIL-STD-130N. "Maintaining a UII as received" means the construction of the UII string shall not change; however, the
UII can and will receive updates to the associated data, such as Marks, PN Rollovers, within the DoD IUID National Registry. Any questions about the IUID program should be directed toward the AMCOM IUID helpdesk at 256-425-8566 or usarmy.redstone.amcom.mbx.immc-sim-
14 72
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
iuid@army.mil.
18. Shipping Containers and Shipment: Contractor shall utilize the packaging requirements contained in "Attachment 0001, M&O Packaging
Requirements." If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be
Contractor-furnished property. The method of shipment must include tracking of all packages for maintaining government property accountability and visibility. Contractor must comply with MIL-STD-2073-1E, DoD Standard Practice for Military Packaging and MIL-STD-
129R, DoD Standard Practice for Military Marking for Shipment and Storage. The Contractor shall package electronic parts susceptible to static discharge damage IAW ANSI/ESD S20.20-2021 Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding
Electrically Initiated Explosive Devices). If TAMMS-A is required, each individual overhauled item must include a copy of all forms required by The Army Maintenance Management System Aviation (TAMMS-A).
19. Overhaul Plan Documentation: The Contractor shall provide overhaul plan documentation to include all legacy (existing) technical information, procedures, and processes (e.g., Overhaul travelers, workbooks, commercial manuals, drawings, specifications, planning, Federal Aviation Administration approved documentation) that the Contractor utilized or shall utilize in the overhaul of the item. The documentation may be in contractor format. The Contractor shall provide documentation IAW DI-MISC-80508B (CDRL A003).
20. NOTE - Applicable Technical Documents: The applicable documents referenced in this Statement of Work (SOW) are listed on the
Contract Document Summary List (DSL) attached to the solicitation and resultant contract. The DSL lists the referenced documents by document ID, title, date, and category. The document versions specified on the DSL take precedence over the generic references (those without the revision letters) cited in the SOW.
*** END OF NARRATIVE C0001 ***
15 72
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
2 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996
3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
AS9110 or equivalent. Any equivalent must be approved prior to award.
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
5 PRODUCT VERIFICATION AUDIT (PVA) STATEMENT OF WORK (SOW)
Purpose: This PVA requirement establishes/assigns responsibilities for insertion of PVA procedures into overhaul work directives, maintenance data packages, and contract documents along with procedures and instructions to be applied in performing PVAs during overhaul, maintenance, modification kit installation, rework, remanufacture, manufacturing, and new procurement contracts. The PVA candidate(s) are used to evaluate that the contractor processes and procedures are adequate to ensure component integrity.
(A) The Contractor shall perform and present for acceptance THREE units as specified in this contract. This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, new manufacture technical requirements or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. PVA actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the Combat Capabilities
Development Command (DEVCOM) Aviation and Missile Center (AvMC) Systems Readiness Directorate (SRD). Like or similar items may be grouped for these purposes provided concurrence is obtained from SRD Quality Management Division. The contractor may be directed by the
Procuring Contracting Officer (PCO) to increase or decrease the scope of a PVA pursuant to the "Changes" clause of the contract for noncommercial items. If however this procurement is for a commercial item, the contractor and the Contracting Officer (CO) will need to enter into a bilateral contract modification to increase or decrease the scope of a PVA.
(B) The Contractor shall,
(1) With the concurrence of SRD Quality Management Division (QMD), schedule and perform PVA as required by the terms of the contract or as otherwise required.
(2) Notify PCO with information copy to the SRD QMD, ATTN, "usarmy.redstone.devcom-avmc.mbx.qs-contracts@army.mil" of the date the PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United States, notification shall be provided at least
95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.
(3) Provide technical personnel tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.
(C) The PVA candidate will be selected by the SRD PVA Team Chairman at random from the three (3) tendered candidates for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.
(1) Alternate Procedure. Normally, three assets are required to be completed at time of PVA. If in the PVA Team Chairman's judgment it is in the best interest of the Government, an alternative approach may be taken due to circumstances such as shortage of overhaul assets, shortage of replacement parts, time constraints, or other considerations. At the PVA Team Chairman's discretion, only one PVA candidate may be required to be completed while the other two assets can be in various stages of overhaul as agreed upon (prior to the beginning of the PVA) between the PVA Team Chairman and the facility to be audited. For instance, one asset could be disassembled and ready for Overhaul Inspection Procedures, while the other may be prepared for a critical process such as acceptance testing. (This approach is particularly helpful if the critical process is performed by a subcontractor.) For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.
16 72
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(D) The item selected for PVA will be inspected for adherence to preservation, packaging, and marking requirements prior to removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.
(E) The PVA Team will review the shop travelers, production processes, procedures, tooling, and equipment used to maintain, overhaul, repair, or manufacture the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.
(F) Disassembly for overhauled items will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant Government Quality
Assurance Representative (QAR), and the SRD PVA Team Chairman and team personnel.
(G) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) of all physical characteristics, to include but not limited to any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings. Depot Maintenance Work
Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in this contract.
(H) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as Shot peening, heat treating, etc.) performed by subcontractors may also be audited. Contractor shall be able to demonstrate that all testing/ inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.
(I) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for Government acceptance including preservation, packaging, marking, and update of historical records and all applicable documentation.
(J) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the SRD PVA Team Chairman's discretion, examination of representative assemblies any may be used as evidence of compliance to specification requirements. The SRD PVA Team Chairman will determine the scope and detail of the PVA process. The SRD PVA Team Chairman may delegate follow-up actions to the DCMA QAR, when it is determined to be prudent to the
PVA.
(K) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor. After the PVA is completed, the SRD PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant
DCMA QAR and PM Representative. The context of the audit findings and corrective actions will be discussed and any disputes will be resolved. Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established
(i.e. workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to ensure compliance with requirements.
(L) All defects will be recorded on a SRD PVA Audit Finding Record by the PVA Team. The PVA Team Chairman will provide copies of each finding to the contractor quality assurance element and the cognizant DCMA QAR and PM Representative. This will allow immediate actions to begin in the resolution of the defect. Corrective actions, as well as actions taken to prevent recurrence, shall also be documented on this form by the contractor. The form shall be signed, as a minimum, by the contractor quality manager or designated representative and the SRD PVA Team Chairman. Further actions outlined below pertain to specific actions required by the contractor depending on the classification of the defects:
(1) Observation: In the event an observation is discovered, the contractor is not required to provide a written response, but it is encouraged to do so.
(2) Minor: In the event a minor defect is discovered, the following actions shall be taken:
(a) The contractor shall isolate the cause of the defect and initiate corrective actions.
(b) All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.
(c) In the event a minor defect is a recurrent deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major defect will apply.
(3) Major: In the event a major defect is discovered, the following actions shall be taken:
(a) The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to the PVA Chairman.
17 72
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(b) The contractor shall provide the DCMA QAR information reflecting the total quantity shipped, if any, and to what destination pertaining to any item that could contain the identified defect.
(c) The contractor shall determine impact of the defect on products previously delivered under this contract, if any, and initiate corrective action to address those units at no additional cost to the US Government.
(d) The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.
(e) The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.
(f) The contractor shall assure the cognizant DCMA QAR and the SRD PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however, a written report from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the DCMA QAR and the SRD PVA Team Chairman within 24 hours after the verbal response.
(4) Critical: In the event a critical defect is discovered, the following actions shall be taken:
(a) All actions outlined in paragraph 3 above shall be completed.
(b) Upon request, the contractor shall provide the SRD technical information necessary for the issuance of a Safety of Flight Message or
Aviation Safety Action Message to the field (if necessary).
(c) Government acceptance/release of product will cease immediately until corrective actions are acceptable to the contracting officer.
NOTE: Systemic quality assurance process discrepancies that affect the outcome of product(s)outside the scope of the PVA will require the cognizant DCMA QAR to issue a Corrective Action Request.
(M) Finding Definitions:
Minor Finding: A defect or a departure from established processes or standards that may result in failure or reduced usability of the product, or a process noncompliance that holds the potential of causing a defect in the future.
Major Finding: A defect, other than critical, that will likely result in failure or reduce the usability of the product for its intended purpose.
Critical Finding: A defect that would result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the product or a defect likely to prohibit the performance of a major end item or major part thereof. This classification requires immediate cessation of Government acceptance/release of product until corrective actions are acceptable to the contracting officer.
Observation: A condition or circumstance that is noted during the PVA that does not currently meet the aforementioned defect criteria.
This category may also be used as suggestions for continuous improvement.
(N) Upon completion of the disassembly and/or testing portion of the selected PVA candidate, without finding any critical or major defects, the other two completed candidates will be released as PVA candidates. In the event that a critical or major defect is found in the audit candidate, the contractor shall satisfy to the PVA Team Chairman that such a defect does not exist in the other two PVA candidates prior to acceptance, and an effective corrective action has been initiated to preclude re-occurrence of the defect.
(O) If there are failures during the PVA, the Contractor shall repeat any or all tests, per Government request. If deemed in the best interests of the Government, contract termination may be initiated. Upon request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the PVA item. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following disapproval. These actions must be coordinated with the cognizant DCMA QAR.
The Government shall take action within 10 working days. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(P) The PVA unit is to be representative of the deliverable quantity. The Contractor shall overhaul both the PVA item and the contractual quantity at the same facility. In the event that there is a change to the process planning (i.e.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .