GOV RESPONSE TO INDUSTRY QUESTIONS_W58RGZ22R0073_23MAY2022.pdf

PDF 94 KB Posted

Attached to
Soldier Unmanned Aircraft Systems (SUAS) - Design and Engineering Services - Official Request for Proposal
Solicitation number
W58RGZ-22-R-0073
Issued by

About this file

This document contains a government response to industry questions regarding a solicitation for Soldier Unmanned Aircraft Systems design and engineering services. The opportunity is a cost plus fixed fee and firm-fixed price indefinite delivery indefinite quantity contract set aside for small businesses. The Department of the Army Materiel Command Contracting Command at Redstone Arsenal seeks engineering support for Group I unmanned aircraft systems including short-range, medium-range, and long-range reconnaissance aircraft as well as a handheld ground control station. Offerors must submit any questions by May 6th, 2022 and the government will respond on May 13th. Proposals are due by May 31st, 2022 and should be sent to the point of contact listed. The government intends to award a single IDIQ contract for a base period plus four option years and the initial task order for design engineering services.

View the file

Other files

File Type Posted
Attachment_0008_Section_M_Design_ES_21_JUN_2022.docx DOCX document
Attachment_0007_Section_L_Design_ES_21_JUN_2022.docx DOCX document
Attachment_0007_Section_L_Design_ES_21_JUN_2022.docx DOCX document
Attachment_0008_Section_M_Design_ES_21_JUN_2022.docx DOCX document
W58RGZ-22-R-0073_Amendment_0001_21_JUN_2022.pdf PDF
Attachment_0007_Section_L_Design_ES_21_JUN_2022.pdf PDF
Attachment_0008_Section_M_Design_ES_21_JUN_2022.pdf PDF
Attachment 0007 Section L - Appendix B Design ES 11May2022.xlsx XLSX spreadsheet
Government Response to Industry Questions_W58RGZ-22-R-0073_DESIGN.pdf PDF
Attachment 0002 PWS Design ES Task Order 0001 11 May 2022.pdf PDF
Attachment 0007 Section L Design ES 11May2022.pdf PDF
OFFICIAL RFP_W58RGZ22R0073_28 APR 2022.pdf PDF
Section L App B Cage Code and DCMA list 031621.pdf PDF
Attachment 0001 PWS Design ES Base 032321.pdf PDF
Attachment 0003 DSL Design ES 031621.pdf PDF
Attachment 0007 Section L Design ES 14APR2022_FINAL.pdf PDF
Attachment 0009 SEP Design ES 110521.pdf PDF
Section L App A - Labor Cat Mapping_ SUAS Design ES 020321.pdf PDF
Attachment 0005 QASP Design ES Base 031621.pdf PDF
Exhibit_A_CDRL_Design_ES_1423_Forms_Signed_20220304.pdf PDF
Attachment 0002 PWS Design ES Task Order 0001 20 January 2022.pdf PDF
Attachment 0008 Section M Design ES IDIQ_28APR2022.pdf PDF
Attachment 0004 Contract Security DD Form 254 Design ES 031621.pdf PDF
Section L App A Skills Classification Crosswalk Design ES 031621.pdf PDF
Section L App C Preaward Survey Checklist 031621.pdf PDF
Attachment 0006 QASP Design ES TO 0001 031621.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section Question Government Response

Attachment 7

Section L / Pg. 14 /

Para (2)

The first sentence of this paragraph states compliance status will need to be determined for the following business systems: Purchasing and Accounting System. All subsequent sentences in this section only address

Accounting System Adequacy. Can the Government please clarify if adequacy status is required for both Purchasing and Accounting Systems?

The first line of Paragraph 2 is in reference to the prime contractor. The following sentences are for subcontractors of the prime contractor. Adequacy STATUS for both the

Prime's Purchasing and Accounting Systems are required.

Attachment 7

Section

L/Pg.14/para(2)

Please confirm that an approved Purchasing or Accounting

System is not required to be considered for award. If required, will the Government accept the capabilities of a subcontractor to meet this requirement?

The STATUS of the Purchasing and Accounting System are required. Please provide an answer as to whether or not you have an approved Puchasing and Accounting System or not, i.e., never been reviewed or found unacceptable.

Contractors without an approved system are not precluded from proposing.

File details come from the government source that posted it. Updated .