W58RGZ21B0009 - 0001.pdf

PDF 179 KB Posted

Attached to
Solicitation for the Maintenance and Overhaul of the AH-64 Apache D/E Model Searchlight
Solicitation number
W58RGZ-21-B-0009
Issued by

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB) Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item 10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W58RGZ-21-B-0009 X 2022JAN04

1 signed

2022MAR0402:00pm

DOA1

2022JAN04 SEE SCHEDULE

W58RGZ

ARMY CONTRACTING COMMAND-REDSTONE

REDSTONE ARSENAL AL 35898-5280

MATTHEW REDMAN

CCAM-AL-A

MATTHEW.P.REDMAN.CIV@ARMY.MIL

1 65

X 1

X 5 X 12

X 14 X 18

X 25

X 27

X 30

X 47

X 48

X 61

X 65

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

THE FOLLOWING AMENDMENTS HAVE BEEN INCORPORATED

Buyer Name: MATTHEW REDMAN

Buyer Office Symbol/Telephone Number: CCAM-AL-A/(256)842-8151

Type of Contract 1: Firm Fixed Price

Kind of Contract: Maintenance Contracts

*** End of Narrative A0000 ***

The purpose of Amendment 0001 to Solicitation W58RGZ-21-B-0009 is to incorporate the following:

a. Change POC for Depot Maintenance Work Requirement (DMWR)request in Section A-18. The new POC for the DMWR:

DMWR-55-6220-211, Revision Date: 09/15/2009, No Change #, is Mr. James Tietjen, james.h.tietjen.ctr@army.mil.

b. Confirm the 2009 version of DMWR DMWR-55-6220-211 with the MEOs listed in Attachment 0002 is correct.

c. Update the replacement cost, and max bid in Section A-3.

d. Update the replacement cost, and max bid in Section C.

e. Correct the container information in CLIN 0005AA narrative to NSN: 8145-00-485-8256, and P/N: 13414-038.

f. Extend the deadline dates as follows:

i. Question Deadline: February 10, 2022 @ 11:00 pm CST.

ii. Proposal Deadline: March 4th, 2022 @ 02:00 pm CST.

iii. Opening of Bids: March 8th, 2022 @ 10:00 am CST.

g. All other terms and conditions of the solicitation remain the same.

*** END OF NARRATIVE A0002 ***

W58RGZ-21-B-0009________________

A-1. This is a Small Business Set-Aside (SBSA). The applicable North American Industry Classification Systems (NAICS) code is 336413 and the size standard is 1,250 employees. Only bidders with NAICS code 336413 registered in Sam.gov are eligible to submit a bid.

A-2. Any questions regarding the solicitation must be submitted by email to Matthew Redman at Matthew.P.Redman.civ@army.mil, by

February 10, 2022 @ 11:00 pm CST. All questions will be adressed in a single response that will be given by the Government in the form of a solicitation amendment published to sam.gov before the solicitation period closes.

A-3. The replacement cost is $6,091.33 for the subject item. If any bid price exceeds $3,959.36 each for overhaul and repair of the

Searchlight, such bid will be deemed non-responsive and shall be rejected and will not be considered for award.

A-4. This will be a 5 year Firm-Fixed Price (FFP) Maintenance and Overhaul (M&O) Indefinite Delivery Indefinite Quantity (IDIQ)

Contract pursuant to Federal Acquisition Regulation (FAR) 52.216-22 and in accordance with FAR Part 14, Sealed Bidding.

A-5. The SEARCHLIGHT is not a Critical Safety Item (CSI). There is an adequate Depot Maintenance Work Requirement (DMWR): DMWR-55-6220-

211, Revision Date: 09/15/2009, No Change #.

A-6. No Government Furnished Material (GFM) other than the reparables will be provided.

A-7. Access to FedMall is not authorized.

A-8. Subject to the availability of funds, any quantities ordered will be priced at the unit price established for the ordering period

2 65

W58RGZ-21-B-0009 REPRINT

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

in which they are ordered. Funds shall be obligated by issuance of delivery orders and not by the contract itself.

A-9. Shipping requirements will be provided in each individual Delivery Order.

A-10. The yearly estimated quantities listed herein do not commit the Government to ordering that or any quantity above the minimum quantity for the following:

AH-64 APACHE

Noun: SEARCHLIGHT

Input NSN & Part Numbers (P/N)______________________________

NSN: 6220-01-160-3527

P/N: 7-211B12031

NSN: 6220-01-160-3527

P/N: 45-0202-1

Output NSN & Part Number (P/N)______________________________

NSN: 6220-01-160-3527

P/N: 7-211B12031

Minimum quantity: 25

Maximum quantity: 1500

The maximum quantity includes 250 reserved for Foreign Military Sales (FMS).

A-11. The minimum quantity set forth herein shall be obligated on the first delivery order, to be issued simultaneously with the award of the contract. Any additional quantities ordered will be priced at the Firm Fixed unit price in effect during the ordering period in which they are ordered.

A-12. All ordering periods are in increments of 12 months from the date of award.

Ordering periods:_________________

The first ordering period is from date of contract award through 366 days after contract award (DACA).

The second ordering period is from 367 DACA through 731 DACA.

The third ordering period is from 732 DACA through 1,096 DACA.

The fourth ordering period is from 1,097 DACA through 1,461 DACA.

The fifth ordering period is from 1,462 DACA through 1,826 DACA.

Please insert your Firm Fixed unit price for the 1st, 2nd, 3rd, 4th, and 5th year in the spaces provided under each CLIN/SubCLIN.

Note: the Offeror's attention is called to the requirements for receipt of reparables, which follows:

A-13. An electronic copy of DD Form 1348-1A for all shipments of reparables shall be forwarded to 1) the email address in block 10 on page 1 of the basic contract/delivery order/modification and 2) Usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil. The DD Form 1348-1A shall annotate to which contract/delivery order the assets will be applied as reparables.

The DD Form 1348-1A guidance as follows:

A. Maintain any receipt documentation received from the depots

B. Upon receipt of material, fill in block 10 to indicate the quantity received and provide a signature and date on the DD Form 1348-1A.

Printed names, name/date stamps, and initials are not acceptable.

C. If a DD Form 1348-1A is not received, a 1348-1A must be created with the corresponding receipt information to contain the following:

I. Unit of issue and quantity - (Positions 23-29)

Ii. Document number (Positions 30-43)

3 65

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Iii. National stock number (NSN) Positions 8-22)

Iv. Condition code (Position 71)

V. Unit price (Positions 74-80)

Vi. Total price (Block 1)

Vii. Actual quantity received (Block 10)

Viii. Nomenclature (Block 17)

Ix. Signature and date (Blocks 22 and 23)

D. Completed 1348-1A should be sent to the following mailbox upon receipt of material:

Usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil

An example of a 1348-1A filled out correctly is attached (see Attachment 0001).

A-14. When applicable, the contractor is reminded to complete the FMS customer DA Form 2410 (component removal and repair overhaul record), submitted with the item for repair, in accordance with DA Pamphlet 738-751 (2014) and TB 1-1500-341-01. Upon completion of repair, if authorized, the contractor is reminded to fill out DA Form 2410 and return it to the FMS customer with the repaired asset(s), along with the FMS customer version of the DA Form 2410.

A-15. The National Defense Authorization Act for Fiscal Year 1993, Public Law 102-484, Section 326, prohibits use of ozone depleting chemicals in Department of Defense contracts awarded on or after 01 June 1993, unless appropriate authority is granted.

The following websites are provided for the purpose of obtaining/reviewing various da pamphlets and army regulations and technical manuals/bulletins:

- "Https://liw.logsa.army.mil/etmapp/#/etm/home

- "https://armypubs.army.mil/ProductMaps/PubForm/AR.aspx

A-16. The Government intends to award only one contract as a result of this solicitation.

A-17. Complete the following contractor point of contact information:

Name: _________________________________________________________

Telephone number: _____________________________________________

Fax number: ____________________________________________________

E-mail address: _________________________________________________

A-18. Technical Data can only be distributed to contractors who have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). Technical Data that are export-controlled must be marked with an export control warning notice. This statement identifies technical data which the DOD will withhold from public release using authority in 10 U.S.C.

130. The Governments right to use, modify, reproduce, release, perform, display, or disclose such technical data are restricted for the contractor/their subsidiaries/or sub-contractors at every level. Any reproduction of technical data or portions thereof marked with these legends must also reproduce these legends on such technical data. Contractors wanting to obtain access to the unclassified technical data drawings must have Joint Certification Program (JCP) certification. Instructions for obtaining JCP certification can be found at:

https://public.logisticsinformationservice.dla.mil/publichome/jcp/default.aspx

DMWR and associated Maintenance and Engineering Orders (MEO) can be obtained by contacting the AMCOM publications office via email James

Tietjen at james.h.tietjen.ctr@army.mil. Please notify the Contract Specialist, Matthew Redman, at Matthew.P.Redman.civ@army.mil when this request is made.

Solicitation period will not be extended as a result of late requests for technical data.

19. The contractor shall comply with the Total Asset Visibility - contractor (TAV-C) reporting instructions IAW Attachment 0006 -

Contractor Repair TAV-C Requirements.

*** END OF NARRATIVE A0001 ***

4 65

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 PVA

0001AA PRODUCT VERIFICATION AUDIT (PVA) $ ________________________________ __________________

SERVICE REQUESTED: PVA

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN represents the Product Verification Audit

(PVA) for the SEARCHLIGHT, Output NSN: 6220-01-160-

3527 shown in CLINs 0002AA and 0003AA.

This is a Firm Fixed Price CLIN.

Offeror is required to fill in a proposed firm fixed unit price for the PVA:

PVA shall be in accordance with The "Product

Verification Audit (PVA) Contract Requirements".

The Contractor shall prepare 3 assets for PVA. The _________

Contractor is required to notify the Government

Quality Office for scheduling of the PVA by email to the following address:

usarmy.redstone.devcom-avmc.mbx.qs-contracts@mail.mil

With copy emailed to the Contract Specialist at:

Matthew.P.Redman.civ@army.mil

PVA requires approval prior to Government acceptance of contract deliverable assets.

(End of narrative B001)

Inspection and Acceptance_________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance_________________________

5 65

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0002 SEARCHLIGHT

NSN: 6220-01-160-3527

0002AA OVERHAUL/REPAIR (US QTY) $ $ ________________________ ______________ __________________

COMMODITY NAME: SEARCHLIGHT

CLIN CONTRACT TYPE:

Firm Fixed Price

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE ATTACHMENT 0004 - PACKAGING REQUIREMENTS

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT:

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

0003 SEARCHLIGHT

NSN: 6220-01-160-3527

0003AA OVERHAUL/REPAIR (FMS QTY) $ $ _________________________ ______________ __________________

COMMODITY NAME: SEARCHLIGHT

CLIN CONTRACT TYPE:

Firm Fixed Price

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE ATTACHMENT 0004 - PACKAGING REQUIREMENTS

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

6 65

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Deliveries or Performance _________________________

FOB POINT:

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

0004 SCRAP

0004AA SCRAP $ ______ __________________

SERVICE REQUESTED: SCRAP

CLIN CONTRACT TYPE:

Firm Fixed Price

THIS CLIN APPLIES TO US AND FMS QUANTITY.________________________________________

SECTION C - Description/Specifications/Work Statement_________

Units from CLIN 0002AA,0003AA,shall be scrapped or returned in accordance with (IAW) Section C, Statement of Work/Specifications - Contractor

Specifications.

Units determined to be scrap IAW Section C shall be reflected as an increase to CLIN 0004AA with a corresponding decrease in quantity and funds to CLIN

0002AA and 0003AA as appropriate. In the event the

PCO determines that certain items are scrap, the

Contractor shall make disposition IAW Government property procedures. Scrapped items shall count toward the minimum quantities ordered hereunder. The

Government may, at its own discretion, reduce any items determined to be scrap by input of additional assets and said scrap quantities will not count as part of the total maximum quantity. Scrap requires authorization by the Contracting Officer via formal modification. In no event shall the Contractor scrap an item prior to receiving a contractual modification for a unit.

OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED

UNIT PRICE:

ORDERING PERIOD 1- $ _______ Qty 1 ea __

ORDERING PERIOD 2- $__________ Qty 1 ea

ORDERING PERIOD 3- $__________ Qty 1 ea

ORDERING PERIOD 4- $__________ Qty 1 ea

7 65

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

ORDERING PERIOD 5- $__________ Qty 1 ea

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

0005 CONTAINERS

0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________

SERVICE REQUESTED: CONTAINERS

CLIN CONTRACT TYPE:

Firm Fixed Price

THIS IS A FIRM-FIXED- PRICE CLIN________________________________

THESE PRICES APPLY TO U.S. AND FMS REUSABLE

CONTAINERS.

FIRM-FIXED- UNIT PRICES:

ORDERING PERIOD 1- $ ______ Qty 1 ea __________

ORDERING PERIOD 2- $ ______ Qty 1 ea __________

ORDERING PERIOD 3- $ ______ Qty 1 ea __________

ORDERING PERIOD 4- $ ______ Qty 1 ea __________

ORDERING PERIOD 5- $ ______ Qty 1 ea __________

The Contractor shall provide Containers, in accordance with Attachment 0004, Packaging

Requirement Instructions and the Statement of

Work.

The Government cannot determine at the time of contract award, how many of the assets to be repaired will be received by the

Contractor in unserviceable containers or received without containers.

The Contractor, IAW the Statement of Work, shall submit a Report Of Discrepancy (ROD) SF

FORM 364, through their Government QAR for verification, within seven working days to

8 65

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

the address shown on EXHIBIT A - CDRL A001.

Assets received in unservicable containers or without a container, require approval by the

PCO prior to the purchase of a servicable container.

CONTRACTOR WILL FURNISH CONTAINERS: NSN: 8145-00-485-

8256, P/N: 13414-038

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

0006 CONTRACT DATA REQUIREMENTS LIST _______________________________

A001 REPORT OF SHIPPING AND PACKAGING DISCREPANCY (ROD) 1 LO $ ** NSP ** __________________________________________________ __________________

SERVICE REQUESTED: EXHIBIT A

ROD / DI-MGMT-80503

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 AS REQUIRED

A002 GOVERNMENT PROPERTY INVENTORY REPORT 1 LO $ ** NSP ** ____________________________________ __________________

SERVICE REQUESTED: EXHIBIT B

GOVERNMENT PROPERTY INVENTORY REPORT / PHYSICAL

INVENTORY INSTRUCTIONS / DI-MGMT-80441C

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

9 65

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 AS REQUIRED

A003 TECHNICAL REPORT - DD FORM 1348-1A 1 LO $ ** NSP ** __________________________________ __________________

SERVICE REQUESTED: EXHIBIT C

TECHNICAL REPORT - STUDY/SERVICES / FROZEN PLAN / DD

FORM 1348-1A / DI-MISC-80508B

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 AS REQUIRED

A004 CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT 1 LO $ ** NSP ** __________________________________________________ __________________

SERVICE REQUESTED: EXHIBIT D

CDM PRODUCTION REPORT / DI-PSSS-81995

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 AS REQUIRED

A005 QUALITY DEFICIENCY REPORT 1 LO $ ** NSP ** _________________________ __________________

SERVICE REQUESTED: EXHIBIT E

QDR / DI-QCIC-80736

(End of narrative B001)

Inspection and Acceptance _________________________

10 65

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

INSPECTION: Destination ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 AS REQUIRED

11 65

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

Statement of Work (Competitive) for

NSN: 6220-01-160-3527

PRID: 2020H539 PART NUMBER: 7-211B12031 STATUS: R

a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data (other than Government Furnished Property), necessary to accomplish the inspection and overhaul for SEARCHLIGHT that is required to return the items as specified by Section B, to condition code A as defined by Army Regulation 725-50. The input/output configuration shall be as defined in Section B herein. Upon completion of the overhaul, as applicable, the items shall be packaged as defined in each individual delivery order of the contract and shipped to the destination(s) specified in each individual delivery order.

b. Prior to commencement of overhaul, the Contractor shall disassemble and inspect the item to the extent necessary to determine if the item is physically unrepairable or has suffered abnormal or catastrophic damage. If the latter condition exists, the Contractor shall notify the Procuring Contracting Officer (PCO) through the cognizant Administrative Contracting Officer (ACO) and shall stop work on the item(s) until given further instructions or disposition of the item(s) by the PCO.

c. In the event the PCO determines that certain items should be scrapped, the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with (IAW) the Contractor's approved Government property procedures. Such scrapped items shall count toward the quantities ordered hereunder.

d. Overhaul shall be accomplished IAW Depot Maintenance Work Requirement (DMWR) DMWR-55-6220-211. DMWR 55-6220-211 does not contain detailed IUID requirements for this component. The PM has not tasked AED to update this DMWR to incorporate IUID detailed procedures.

e. Critical Safety Item: N/A

f. Upon receipt of the reparables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/ deterioration or those with shipping discrepancies shall be reported IAW DI-MGMT-80503.

g. Any Contractor paint facility which is used in the performance of this contract shall comply with the Environmental Protection

Agency and Occupational Safety and Health Administration standards for painting as implemented by TM 1-1500-345-23, w/ Chg 1, Painting and Marking of Army Aircraft.

h. Data and reports shall be submitted IAW the Contract Data Requirements List, DD Form 1423, Exhibit A. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addresses indicated on the DD Forms(s) 1423.

i. Product Verification Audit (PVA): The Contractor shall conduct the PVA in accordance with Section E-5 of this solicitation.

j. The Army Maintenance Management System - Aviation (TAMMS-A): N/A

k. Serial Number Report Requirement (SNRR): N/A

l. The items the Contractor shall overhaul are identified below:

Input NSN P/N

6220-01-160-3527 7-211B12031

6220-01-160-3527 45-0202-1

Output NSN P/N

6220-01-160-3527 7-211B12031

m. The overhaul planned quantity for 5 years is minimum 25, maximum 1500. Input will be 30 days after receipt of order (ARO). Output shall be as specified in the solicitation/contract schedule. Serviceable assets shall be returned to W62G2T.

(1) 1st year qty 30 (4) 4th year qty 367

(2) 2nd year qty 369 (5) 5th year qty 367

(3) 3rd year qty 367

n. Inventory Transactions - The contractor shall prepare the following reports:

12 65

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

1. The contractor shall prepare a Contract Depot Maintenance Production Report IAW DI-PSSS-81995.

2. The contractor shall complete and maintain the DD Form 1348-1A receipt for repairables on all shipments IAW DI-MISC-

80508 and DD Form 1348-1A. The contractor shall complete the DD Form 1348-1A, Block 10 (indicates the quantity received), along with Block 22 (signature), and Block 23 (date). Printed names, name/date stamps, and initials shall not be acceptable. If a DD

Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:

http://www.dtic.mil/whs/directives/forms/eforms/dd13481a.pdf

The contractor shall prepare this form to include the following corresponding receipt information:

A. Document Number - (Positions 30-44)

B. National Stock Number (NSN) - (Positions 8-22)

C. Condition Code - (Position 71)

D. Unit Price - (Positions 74-80)

E. Total Price - (Block 1)

F. Actual Quantity Received - (Block 10)

G. Nomenclature - (Block 17)

H. Signature and Date - (Blocks 22 and 23)

If there are any questions with the above information please contact: "mailto:usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil

3. The contractor shall perform a 100% physical inventory of general supplies on an annual basis per AR 740-26, Physical

Inventory Control.

The contractor shall perform special inventory requests the same day as a government request is received from the responsible inventory manager.

The contractor shall prepare a physical inventory report IAW DI-MGMT-80441. Along with this report, an inventory memorandum to include count type, date performed, total count of lines, and signature shall be provided. The contractor shall ensure that the total lines inventoried correlates with lines present on count sheets.

4. The contractor shall comply with the Total Asset Visibility - Contractor (TAV-C) reporting instructions IAW Attachment 0003

"Contractor Repair TAV-C Requirements".

o. Foreign Military Sales (FMS): These total requirements meet or exceed the requirements for the Security Assistance Management

Directorate (SAMD) per the Acquisition Center Directorate IAW SAMD and Integrated Material Management Center (IMMC) Memorandum of

Understanding (MOU) document dated 4 December 2004. The IMMC is responsible for conducting Weapons System Team (WST) reviews of SAMD's

FMS Aviation hardware, allowing 20% over the Army's maximum quantity during the life of the contract specifically for FMS requirements.

SAMD and IMMC will negotiate provisions for FMS critical items that exceed the standard 20% on case-by-case basis.

p. The replacement cost is $6,091.33 for the subject item. When price of overhaul exceeds $3,959.36, a review of disposition will be made by AMCOM and the Contracting Officer.

q. The Government reserves the right to replace any items scrapped.

r. Overhaul Repair Report: N/A

s. Quality Deficiency Report: The Contractor shall prepare the Quality Deficiency Report IAW DI-QCIC-80736. See exhibit E.

t. Supplier Interface and Oversight: N/A

u. Shipping Containers NSN: 8145-00-485-8256, P/N: 13414-038 shall be utilized. If containers are not reparable or if assetsare not delivered in the approved containers, the containers shall be Contractor Furnished Materiel. Shipment: The method of shipment must use a procedure so that the package can be tracked in case the shipment is not received by AMCOM.

*** END OF NARRATIVE C0001 ***

13 65

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title DateRegulatory Cite Title Date_______________ ______________________________________________________________________ ___________________________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996

E-3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

ISO 9001:2000 or EQUIVALENT with prior approval from Procurement Contracting Officer.

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

PRODUCT VERIFICATION AUDIT (PVA) CONTRACT REQUIREMENTS______________________________________________________

Purpose: This PVA requirement establishes/assigns responsibilities for insertion of PVA procedures into overhaul work directives, maintenance data packages, and contract documents along with procedures and instructions to be applied in performing PVAs during overhaul, maintenance, modification kit installation, rework, remanufacture, manufacturing, and new procurement contracts. The PVA candidate(s) are used to evaluate that the contractor processes and procedures are adequate to ensure component integrity.

(A) The Contractor shall perform and present for acceptance THREE units as specified in this contract. This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, new manufacture technical requirements or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. PVA actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the Systems Readiness

Directorate (SRD). Like or similar items may be grouped for these purposes provided concurrence is obtained from SRD Quality Management

Division. The contractor may be directed by the Procuring Contracting Officer (PCO) to increase or decrease the scope of a PVA pursuant to the "Changes" clause of the contract.

(B) The Contractor shall,

(1) With the concurrence of SRD Quality Management Division (QMD), schedule and perform PVA as required by the terms of the contract or as otherwise required.

(2) Notify PCO with information copy to the SRD QMD, ATTN, "mailto:usarmy.redstone.devcom-avmc.mbx.qs-contracts@mail.mil " of the date the PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United States, notification shall be provided at least 95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.

(3) Provide technical personnel tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.

(C) The PVA candidate will be selected by the SRD PVA Team Chairman at random from the three (3) tendered candidates for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items

14 65

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

currently available.

(1) Alternate Procedure. Normally, three assets are required to be completed at time of PVA. If in the PVA Team Chairman's judgment it is in the best interest of the Government, an alternative approach may be taken due to circumstances such as shortage of overhaul assets, shortage of replacement parts, time constraints, or other considerations. At the PVA Team Chairman's discretion, only one PVA candidate may be required to be completed while the other two assets can be in various stages of overhaul as agreed upon (prior to the beginning of the PVA) between the PVA Team Chairman and the facility to be audited. For instance, one asset could be disassembled and ready for Overhaul Inspection Procedures (OIPs), while the other may be prepared for a critical process such as acceptance testing. (This approach -is particularly helpful if the critical process is performed at a subcontractor.) For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.

(D) The item selected for PVA will be inspected for adherence to preservation, packaging, and marking requirements prior to removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.

(E) The PVA Team will review the shop travelers, production processes, procedures, tooling, and, equipment used to maintain, overhaul, repair, or manufacture the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.

(F) Disassembly for overhauled items will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant government Quality

Assurance Representative (QAR), and the SRD PVA Team Chairman and team personnel.

(G) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) of all physical characteristics, to include but not limited to any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings. Depot

Maintenance Work Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in this contract.

(H) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as

Shot peening, heat treating, etc.) performed by subcontractors may also be audited. Contractor shall be able to demonstrate that all testing/ inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.

(I) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for government acceptance including preservation, packaging, marking, and update of historical records and all applicable documentation.

(J) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the SRD PVA Team Chairman's discretion, examination of representative assemblies any may be used as evidence of compliance to specification requirements. The SRD PVA Team Chairman will determine the scope and detail of the PVA process. The SRD PVA Team Chairman may delegate follow-up actions to the DCMA

QAR, when it is determined to be prudent to the PVA.

(K) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor.

After the PVA is completed, the SRD PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant DCMA QAR and PM Representative. The context of the audit findings and corrective actions will be discussed and any disputes will be resolved. Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established (i.e. workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to ensure compliance with requirements.

(L) All defects will be recorded on a SRD PVA Audit Finding Form by the PVA Team. The PVA Team Chairman will provide copies of each finding to the contractor quality assurance element and the cognizant DCMA QAR and PM Representative. This will allow immediate actions to begin in the resolution of the defect. The form shall be signed, as a minimum, by the contractor quality manager or designated representative and the SRD PVA Team Chairman.

(M) Corrective actions, as well as actions taken to prevent recurrence, shall be documented on a signed findings form and provided to the cognizant Contracting Officer and to the PVA Team Chairman with 10-Days of PVA conclusion. At the end of 10-days, should additional time be required to further investigate the identified non-compliance, a contractor representative will contact the Contracting Officer and request additional time. Further actions outlined below pertain to specific actions

15 65

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

required by the contractor depending on the classification of the defects:

1. Observation: In the event an observation is discovered, the contractor is not required to provide a written response, but it is encouraged to do so.

2. Minor: In the event a minor defect is discovered, the following actions shall be taken:

a. The contractor shall isolate the cause of the defect and initiate corrective actions.

b. All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.

c. In the event a minor defect is a recurring deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major defect will apply.

3. Major: In the event a major defect is discovered, the following actions shall be taken:

a. The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to the PVA

Chairman.

b. The contractor shall provide the DCMA QAR information reflecting the total quantity shipped, if any, and to what destination pertaining to any item that could contain the identified defect.

c. The contractor shall determine impact of the defect on products previously delivered under this contract, if any, and initiate corrective action to address those units at no additional cost to the US Government.

d. The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.

e. The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.

f. The contractor shall assure the cognizant DCMA QAR and the SRD PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however, a finding form response from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the DCMA QAR and the SRD PVA Team Chairman within 24 hours after the verbal response.

4. Critical: In the event a critical defect is discovered, the following actions shall be taken:

a. All actions outlined in paragraph 3 above shall be completed.

b. Upon request, the contractor shall provide SRD Airworthiness Division technical information necessary for the issuance of a

Safety of Flight Message or Aviation Safety Action Message to the field (if necessary).

c. Government acceptance/release of product will cease immediately until corrective actions are acceptable to the contracting officer.

NOTE: Systemic quality assurance process discrepancies that affect the outcome of product(s)outside the scope of the PVA will require the cognizant DCMA QAR to issue a Corrective Action Request.

(N) Finding Definitions:

Minor Finding: A defect or a departure from established processes or standards that may result in failure or reduced usability of the_____________ product, or a process noncompliance that holds the potential of causing a defect in the future.

Major Finding: A defect, other than critical, that will likely result in failure, or reduce the usability of the product for its_____________ intended purpose.

Critical Finding: A defect that would result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the________________ product or a defect likely to prohibit the performance of a major end item or major part thereof. This classification requires immediate cessation of Government acceptance/release of product until corrective actions are acceptable to the contracting officer.

Observation: A condition or circumstance that is noted during the PVA that does not currently meet the aforementioned defect criteria.___________

This category may also be used as suggestions for continuous improvement.

16 65

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(O) Upon completion of the disassembly and/or testing portion of the selected PVA candidate, without finding any critical or major defects, the other two completed candidates will be released as PVA candidates. In the event that a critical or major defect is found in the audit candidate, the contractor shall satisfy to the PVA Team Chairman that such a defect does not exist in the other 2

PVA candidates prior to acceptance, and an effective corrective action has been initiated to preclude re-occurrence of the defect.

(P) If there are failures during the PVA, the Contractor shall repeat any or all tests, per Government request. If deemed in the best interests of the government, contract termination may be initiated. Upon request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the PVA item. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following disapproval. These actions must be coordinated with the cognizant DCMA QAR.

The Government shall take action within 10 working days. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(Q) The PVA unit is to be representative of the deliverable quantity. The Contractor shall overhaul both the PVA item and the contractual quantity at the same facility. In the event that there is a change to the process planning (i.e. changes in process sources, parts sources, or location where work is to be performed) after official PVA approval from Contracting Officer (CO), the contractor is required to provide notification of such changes to the CO, so that a determination can be made whether a new PVA is warranted.

Notification is required 10 business days prior to shipment of the next delivery.

(R) The PVA candidates shall be shipped IAW contract delivery schedules or released to supply activity upon receipt of the official PVA approval via the Contracting Officer. The Contractor SHALL NOT retain the PVA item approved under this contract to serve as the manufacturing standard of acceptance.

(S) If the Contractor fails to deliver any PVA on time, or the Contracting Officer disapproves any PVA, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(T) Before PVA approval, the acquisition of materials or components for, or the commencement of overhaul of, the balance of the contract quantity is at the sole risk of the Contractor. Before PVA approval, the costs thereof shall not be allocable to this contract for (1)

Progress payments, or (2) termination settlements if the contract is terminated for the convenience of the government.

(U) In cases where this PVA is a part of the Source Approval Request (SAR) process, the process planning will be considered approved upon receipt of an approval memorandum from the SRD Source Approval Authority through the cognizant Contracting Officer. If the component is a Critical Safety Item (CSI), see those specific contract clauses for other requirements that may also be audited during the PVA. PVA approval is contingent on contractor submission and SRD Airworthiness approval of changes to manufacturing planning, to correct defects identified during PVA.

(V) Unless otherwise specified in this contract, any end item destroyed or exceeds reparable limits during the PVA process is not to be considered as part of the contract quantity. The full quantity of acceptable and serviceable items must be delivered.

*** END OF NARRATIVE E0001 ***

CALIBRATION___________

The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National

Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test

Equipment) or ISO 10012:1992 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International

Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance - Vocabulary.

*** END OF NARRATIVE E0002 ***

17 65

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title DateRegulatory Cite Title Date_______________ ______________________________________________________________________ ___________________________ ______________________________________________________________________ ____________

F-1 52.242-15 STOP-WORK ORDER AUG/1989

F-2 52.242-17 GOVERNMENT DELAY OF WORK APR/1984

F-3 52.247-29 F.O.B. ORIGIN FEB/2006

F-4 52.247-34 F.O.B. DESTINATION NOV/1991

F-5 252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY AUG/2012

F-6 252.211-7008 USE OF GOVERNMENT-ASSIGNED SERIAL NUMBERS SEP/2010

F-7 252.211-7003 ITEM UNIQUE IDENTIFICATION AND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .