Attachment 0002 - 2020H593 AED Requirements.pdf

PDF 4 KB Posted

Attached to
Solicitation for the Maintenance and Overhaul of the AH-64 Apache D/E Model Searchlight
Solicitation number
W58RGZ-21-B-0009
Issued by

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11/10/2020

2020H539PRID 7-211B12031Part Number

6220-01-160-3527NSN AH-64System

SEARCHLIGHTNomenclature

YAdequate DMWR Available?

DMWR-55-6220-211DMWR ID

09/15/2009DMWR Date

DMWR Chg #

YPre-Award Survey Recommended?

NCorrelation Performance Study Required ? YPVA Recommended?

See DMWR 55-6220-211 Chapter 4 for Final Assebmly and Testing. All Deviations and substitutuions shall require Government approval (REF MEO C7216).

Identify Any Special Processes, Test Procedures, and/or Instructions

NCritical Safety Item?

Systems Readiness Directorate (SRD) was requested to review for any emerging airworthiness issues, upcoming ECP's possibly affecting content, testing requirements or reliability issues concerning the Searchlight, P/N 7-211B12031. This office is not aware of any upcoming issues that would affect the M&O of the Searchlight.

Special Airworthiness Considerations

FCDD-AMA-M-Sustainment has verified through the ARISE CIM database on 14 July 2020 and the part is Non-CSI and Non-

NST.JC

Other Requirements / Comments

If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:

NSpecial Post-Contract Award Requirements?

Special Post-Contract Award Requirements

DMWR 55-6220-211 does not contain detailed IUID requirements for this component. The PM has not tasked AED to update this DMWR to incorporate IUID detailed procedures. Recommend contacting AH-64 PM IUID Office, Leah Trusley (256) 955-3307, for any updates and/or waiver/deviation of IUID Contracting DFAR clauses on the IUID marking of the Searchlight.

Other Requirements / Comments (Part II)

FCDD-AMA-M-Sustainment has reverified through the ARISE CIM database on 18 August 2020 and the part is Non-CSI and Non-NST.DEM

Other Requirements / Comments (Part III)

Other Requirements / Comments (Part IV)

Other Requirements / Comments (Part V)

NDoes QE-STD-2 Apply?

N

Additional CSI Requirements

CSI Contains CSI Replacement Parts? NEngineering Testing Required?

The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:

1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.

RStatus

YTDPL?

Approved Date

M&O AED REQUIREMENTS DATA

Correlation Performance Study Requirements

Commerciality Determination

Commercial Item? N NBest Commercial Practice Acceptable?

11/10/2020

2020H539PRID 7-211B12031Part Number

6220-01-160-3527NSN AH-64System

C4598

C6811

C6893A

C6992

C7096

C7216

E1148

E1159

E1160

E1760

E1979

E1981

E2217

E2218

E2219

E2249

See Table 2-1 Fabricated Tool and Equipment and Table 2-2 Special Tools and Equipment

Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes

MEOs Required for Competitive Contract?

RStatus

File details come from the government source that posted it. Updated .