AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0002 2021OCT28
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
MEAGAN MELTON
EMAIL: MEAGAN.M.MELTON.CIV@MAIL.MIL
W58RGZ-21-B-0007
2021SEP15
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 2
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: MEAGAN MELTON
Buyer Office Symbol/Telephone Number: CCAM-ALA/(256)842-7406
Type of Contract 1: Firm Fixed Price
Kind of Contract: Maintenance Contracts
*** End of Narrative A0000 ***
The purpose of Amendment 0002 to Solicitation W58RGZ-21-B-0007 is to provide answers to the following questions received from industry.
Question 1: Does Piston, Figure 1, Item 22, PN 114H4707-1, require superfinishing as described in Step 5.a.?__________
Answer 1: All pistons receive a superfinish.\~ Stone 10D9AS can be acquired from Supfina Tooling Company CAGEC 59025.\~ DMWR 1-1650-________
302&P WP 0011, Replating, Step 7 should read "Perform super finish per refinish step 5.a."\~ Uploaded draft MEO D2890 to clarify the super-finish requirements. The MEO is currently being routed for final signature.
WP 0011, Refinishing, steps 5.a through 5.b, CHANGED TO:
a. All pistons require a finish of 8-16 RMS prior to superfinish (Reference Figure 2) using 10D9AS stone (WP 0020, Item E26) or equivalent.
b. To cleanup slight chrome surface damage, fast material removal, use 6D9AS stone (WP 0020, Item E27), or equivalent, followed with
10D9AS stone (WP 0020, Item E26) or equivalent.
WP 0011, Refinishing, step 5.h, CHANGED TO:
h. Finish crosshatch at 150 - 180 RPM using scotchbrite (WP 0020, Item E28) at a feed rate 0.125-0.250 inch per revolution, amplitude
3.5 to 5 mm and 70 PSI pressure, 2 passes.
Question 2: However, is it possible, that the following Part Numbers under section WP 0022 MANDATORY REPLACEMENT PART correlate?__________
Unfortunately the Item numbers between section WP
0018 and WP 0022 do not match, a comparison is only possible based on Part Numbers. The suggested correlation is based on the 2 that were left over.
Answer 2: MEO D2884 has corrected items 32 and 33 in WP 0018, Figure 1 to read MS28774-333 and MS28775-333 respectively.________
*** END OF NARRATIVE A0003 ***
2 2
W58RGZ-21-B-0007
SECTION A