W58RGZ20R0068.pdf
PDF 211 KB Posted
- Attached to
- Overhaul of the CH-47 Drive Adapter Assembly
- Solicitation number
- W58RGZ-20-R-0068
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W58RGZ-20-R-0068
X
2020JUN19
2020JUL2005:00pm
DOA1
2020JUN19 SEE SCHEDULE
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
CHRISTOPHER CAPUTO
(256)842-4509
CCAM-ALA/ALA
CHRISTOPHER.M.CAPUTO.CIV@MAIL.MIL
X 1 25
1 84
X 1
X 5 X 15
X 18 X 22
X 28
X 30
X 41
X 63
X 64
X 79
X 84
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: CHRISTOPHER CAPUTO
Buyer Office Symbol/Telephone Number: CCAM-ALA/ALA/(256)842-4509
Type of Contract 1: Firm Fixed Price
Kind of Contract: Maintenance Contracts
*** End of Narrative A0000 ***
W58RGZ-20-R-0068________________
A-1. DEPOT MAINTENANCE WORK REQUIREMENT (DMWR) 55-1615-322, REVISION DATE 11/11/2016, NO CHANGE #, IS ADEQUATE TO SUPPORT A LIMITED
COMPETITIVE SOLICITATION FOR THIS MAINTENANCE AND OVERHAUL EFFORT TO THE FOLLOWING APPROVED SOURCES: THE BOEING COMPANY, CAGE 77272 AND
COLUMBIA HELICOPTERS, CAGE 7W206.
A-2. THIS WILL BE A 5 YEAR FIRM-FIXED PRICE INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) CONTRACT PURSUANT TO FAR 52.216-22.
A-3. SUBJECT TO THE AVAILABILITY OF FUNDS, ANY QUANTITIES ORDERED WILL BE PRICED AT THE UNIT PRICE ESTABLISHED FOR THE ORDERING PERIOD
IN WHICH THEY ARE ORDERED. FUNDS SHALL BE OBLIGATED BY ISSUANCE OF DELIVERY ORDERS AND NOT BY THE CONTRACT ITSELF.
A-4. SHIPPING INSTRUCTIONS WILL BE PROVIDED IN EACH INDIVIDUAL DELIVERY ORDER.
A-5. THE YEARLY ESTIMATED QUANTITIES LISTED HEREIN DO NOT COMMIT THE GOVERNMENT TO ORDERING THAT OR ANY QUANTITY ABOVE THE MINIMUM
QUANTITY.
CH-47 CHINOOK
NOUN: DRIVE ADAPTER ASSEMBLY
INPUT NSN & PART NUMBERS (P/N)______________________________
NSN: 1615-01-140-6703
P/N: 145D3407-7
OUTPUT NSN & PART NUMBER (P/N)______________________________
NSN: 1615-01-140-6703
P/N: 145D3407-7
MINIMUM QUANTITY: 20
MAXIMUM QUANTITY: 264
THE MAXIMUM QUANTITY INCLUDES 44 EACH RESERVED FOR FOREIGN MILITARY SALES (FMS). HOWEVER, IF NO FMS CUSTOMERS REQUIRE THIS ITEM, THE
UNITED STATES ARMY REQUIRER MAY UTILIZE THE FMS QUANTITY.
US QUANTITIES (CLIN 0002AA) FOR NSN: 1615-01-140-6703, DRIVE ADAPTER ASSEMBLY FOR ORDERING PERIODS 1 THRU 5 ARE AS FOLLOWS:
1st _20 MINIMUM ___
2nd _50 ESTIMATED ___
3rd _50 ESTIMATED __
4th _50 ESTIMATED __
5th _50 ESTIMATED __
FMS QUANTITIES (CLIN 0003AA)FOR NSN: 1615-01-140-6703, DRIVE ADAPTER ASSEMBLY FOR ORDERING PERIODS 1 THRU 5 ARE AS FOLLOWS:
1st _ 0_ ESTIMATED ___
2nd _ 11_ ESTIMATED ____
3rd _ 11_ ESTIMATED ____
4th _ 11_ ESTIMATED ____
5th _ 11_ ESTIMATED ____
THE MINIMUM QUANTITY SET FOR HEREIN SHALL BE OBLIGATED ON THE FIRST DELIVERY ORDER, TO BE ISSUED SIMULTANEOUSLY WITH THE AWARD OF THE
CONTRACT. ANY ADDITIONAL QUANTITIES ORDERED WILL BE PRICED AT THE FIRM FIXED UNIT PRICE IN EFFECT DURING THE ORDERING PERIOD IN WHICH
THEY ARE ORDERED.
A-6. ALL ORDER PERIODS ARE IN INCREMENTS OF 12 MONTHS FROM THE DATE OF AWARD.
2 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
ORDERING PERIODS:_________________
THE FIRST ORDERING PERIOD IS FROM DATE OF CONTRACT AWARD THROUGH 365 DAYS AFTER CONTRACT AWARD.
THE SECOND ORDERING PERIOD IS FROM 367 DAYS AFTER CONTRACT AWARD THROUGH 731 DAYS AFTER CONTRACT AWARD.
THE THIRD ORDERING PERIOD IS FROM 732 DAYS AFTER CONTRACT AWARD THROUGH 1096 DAYS AFTER CONTRACT AWARD.
THE FOURTH ORDERING PERIOD IS FROM 1097 DAYS AFTER CONTRACT AWARD THROUGH 1461 DAYS AFTER CONTRACT AWARD.
THE FIFTH ORDERING PERIOD IS FROM 1462 DAYS AFTER CONTRACT AWARD THROUGH 1826 DAYS AFTER CONTRACT AWARD.
PLEASE INSERT YOUR FIRM FIXED UNIT PRICE FOR THE 1st, 2nd, 3rd, 4th, and 5th YEAR IN THE SPACES PROVIDED UNDER EACH CLIN/SUBCLIN.
NOTE: THE OFFERORS ATTENTION IS CALLED TO AMCOM PROCEDURES FOR RECEIPT OF REPARABLES, WHICH FOLLOWS:
A-7. TWO (2) RECEIPTED COPIES OF DD FORM 1348-1A OF ALL SHIPMENTS OF REPARABLE ITEMS RECEIVED SHALL BE MAILED DIRECTLY TO COMMANDER, US
ARMY AVIATION AND MISSILE COMMAND, REDSTONE ARSENAL, AL 35898-5000, ONE (1) COPY SENT ATTN: AMSAM-AC-LS AND ONE (1) COPY SENT ATTN:
AMSAM-MMCLS-MDC, WITHIN THEN (10) WORKING DAYS AFTER RECEIPT. THE DD FORM 1348-1A WILL BE STAMPED DIAGONALLY ACROSS THE CENTER REPARABLE
IN BOLD LETTERS, VERIFYING DATA THEREON AND ANNOTATING TO WHICH CONTRACT/DELIVERY ORDER ASSETS WILL BE APPLIED.
A-8. AN ELECTRONIC COPY OF DD FORM 1348-1A FOR ALL SHIPMENTS OF REPARABLES SHALL BE FORWARDED TO 1) THE EMAIL ADDRESS IN BLOCK 10 ON
PAGE 1 OF THE BASIC CONTRACT/DELIVERY ORDER/MODIFICATION AND ALSO TO 2) . THE DD FORM 1348-1A SHALL ANNOTATE TO WHICH CONTRACT/DELIVERY
ORDER THE ASSETS WILL BE APPLIED AS REPARABLES.
THE DD FORM 1348-1A GUIDANCE AS FOLLOWS:
A. MAINTAIN ANY RECEIPT DOCUMENTATION RECEIVED FROM THE DEPOTS
B. UPON RECEIPT OF MATERIAL, FILL IN BLOCK 10 TO INDICATE THE QUANTITY RECEIVED AND PROVIDE A SIGNATURE AND DATE ON THE DD FORM 1348-1A.
PRINTED NAMES, NAME/DATE STAMPS, AND INITIALS ARE NOT ACCEPTABLE.
C. IF A DD FORM 1348-1A IS NOT RECEIVED, A 1348-1A MUST BE CREATED WITH THE CORRESPONDING RECEIPT INFORMATION TO CONTAIN INFORMATION
FOUND IN THE STATEMENT OF WORK.
AN EXAMPLE OF A 1348-1A FILLED OUT CORRECTLY IS ATTACHED (SEE ATTACHMENT 0006).
A-9. WHEN APPLICABLE, THE CONTRACTOR IS REMINDED TO COMPLETE THE FOREIGN MILITARY SALES (FMS) CUSTOMER DA FORM 2410 (COMPONENT REMOVAL
AND REPAIR OVERHAUL RECORD), SUBMITTED WITH THE ITEM FOR REPAIR, IN ACCORDANCE WITH DA PAMPHLET 738-751 AND TB-1500-341-01. UPON
COMPLETION OF REPAIR, IF AUTHORIZED, THE CONTRACTOR IS REMINDED TO FILL OUT DA FORM 2410 AND RETURN IT TO THE FMS CUSTOMER WITH THE
REPAIRED ASSET(S), ALONG WITH THE FMS CUSTOMER VERSION OF THE DA FORM 2410.
A-10. THE NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 1993, PUBLIC LAW 102-484, SECTION 326, PROHIBITS USE OF OTHER DIRECT COSTS
(ODC) IN DEPARTMENT OF DEFENSE CONTRACTS AWARDED ON OR AFTER 01 JUNE 1993, UNLESS APPROPRIATE AUTHORITY IS GRANTED.
THE FOLLOWING WEBSITES ARE PROVIDED FOR THE PURPOSE OF OBTAINING/REVIEWING VARIOUS DA PAMPHLETS AND ARMY REGULATIONS AND TECHNICAL
MANUALS/BULLETINS:
- https://www.logsa.army.mil/etms/online.htm
- http://www.usapa.army.mil/
A-11. NO GOVERNMENT FURNISHED MATERIALS (GFM), OTHER THAN THE REPARABLE ASSET, WILL BE PROVIDED.
A-12. ALL PROPOSALS/RESPONSES SHALL INCLUDE A SPECIAL TOOLING AND TEST EQUIPMENT SECTION THAT ADDRESSES THE CONTRACTOR'S PLAN TO MEET
ALL GOVERNMENT SPECIAL TOOLING AND TEST EQUIPMENT REQUIREMENTS WITH EITHER:
1. PHYSICAL POSSESSION OF THE REQUIRED TOOLS.
2. CONFIRMED REQUISITIONS FOR THE REQUIRED TOOLS.
3. CONFIRMED ARRANGEMENTS FOR SUBCONTRACTING THE PROCESSES REQUIRING THE SPECIAL TOOLS OR,
4. SPECIFIC PLANS DESCRIBING THEIR TECHNICAL APPROACH TO DEVELOP EQUIVALENT TOOLS.
A-13 . PROPOSALS SHALL BE SUBMITTED IN ACCORDANCE WITH FAR CLAUSE 52.215-1.
3 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
PROPOSALS SHALL BE MAILED TO:
ARMY CONTRACTING COMMAND - REDSTONE ARSENAL
ATTN: CHRISTOPHER CAPUTO
BLDG 5303, 2ND FLOOR
REDSTONE ARSENAL, AL 35898-5280
A-14. THE GOVERNMENT INTENDS TO AWARD ONLY ONE CONTRACT AS A RESULT OF THIS SOLICITATION.
A-15. COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:
NAME: _________________________________________________________
TELEPHONE NUMBER: _____________________________________________
FAX NUMBER: ____________________________________________________
E-MAIL ADDRESS: _________________________________________________
A-16. A PAST PERFORMANCE QUESTIONNAIRE (ATTACHMENT 0009) MUST BE COMPLETED AND SUBMITTED. THE OFFEROR SHALL COMPLETE PART I OF THE
PAST PERFORMANCE QUESTIONAIRE, E-MAIL THE QUESTIONNAIRE TO BOTH THE GOVERNMENT CONTRACTING ACTIVITY AND THE TECHNICAL REPRESENTATIVE
RESPONSIBLE FOR THE PAST/CURRENT CONTRACT AND PROVIDE THE CONTRACING OFFICER WITH A LIST OF ALL POCs WHO WERE SENT A QUESTIONNAIRE
WITHIN 10 DAYS AFTER THE RELEASE OF THE RFP. THE POC LIST SHALL BE SUBMITTED IN WORD FOR WINDOWS TABLE FORMAT TO INCLUDE THE FOLLOWING
FIELDS: SOLICITATION NUMBER; COMPANY NAME; CONTRACT NUMBER; GOVERNMENT AGENCY; POC LAST NAME, FIRST NAME; POC TITLE; POC TELEPHONE
NUMBER; POC E-MAIL ADDRESS; AND DATE E-MAIL TO POC (MONTH/DAY). THE POCs SHALL BE INSTRUCTED TO ELECTRONICALLY COMPLETE PART II OF THE
QUESTIONNAIRE AND E-MAIL THE ENTIRE QUESTIONNAIRE TO THE CONTRACTING SPECIALIST AT christopher.m.caputo.civ@mail.mil WITHIN 20 DAYS
AFTER THE RELEASE OF THE RFP.
A-17. TECHNICAL DATA CAN ONLY BE DISTRIBUTED TO CONTRACTORS WHO HAVE A CURRENT DD 2345, MILITARILY CRITICAL TECHNICAL DATA AGREEMENT ON
FILE WITH DEFENSE LOGISTICS INFORMATION SERVICE (DLIS). TECHNICAL DATA THAT ARE EXPORT-CONTROLLED MUST BE MARKED WITH AN EXPORT CONTROL
WARNING NOTICE. THIS STATEMENT IDENTIFIES TECHNICAL DATA WHICH THE DOD WILL WITHHOLD FROM PUBLIC RELEASE USING AUTHORITY IN 10 U.S.C.
130. THE GOVERNMENTS RIGHT TO USE, MODIFY, REPRODUCE, RELEASE, PERFORM, DISPLAY, OR DISCLOSE SUCH TECHNICAL DATA ARE RESTRICTED FOR THE
CONTRACTOR/THEIR SUBSIDIARIES/OR SUB-CONTRACTORS AT EVERY LEVEL. ANY REPRODUCTION OF TECHNICAL DATA OR PORTIONS THEREOF MARKED WITH
THESE LEGENDS MUST ALSO REPRODUCE THESE LEGENDS ON SUCH TECHNICAL DATA. CONTRACTORS WANTING TO OBTAIN ACCESS TO THE UNCLASSIFIED
TECHNICAL DATA DRAWINGS MUST HAVE JOINT CERTIFICATION PROGRAM (JCP) CERTIFICATION. INSTRUCTIONS FOR OBTAINING JCP CERTIFICATION CAN BE
FOUND AT: HTTPS://PUBLIC.LOGISTICSINFORMATIONSERVICE.DLA.MIL/PUBLICHOME/JCP/DEFAULT.ASPX .
DMWR AND ASSOCIATED MAINTENANCE AND ENGINEERING ORDERS (MEO) CAN BE OBTAINED BY CONTACTING THE AMCOM PUBLICATIONS OFFICE VIA EMAIL AT
JAMES.H.TIETJEN.CTR@MAIL.MIL OR 256-842-6544. PLEASE NOTIFY THE CONTRACT SPECIALIST, CHRISTOPHER CAPUTO, AT
CHRISTOPHER.M.CAPUTO.CIV@MAIL.MIL WHEN THIS REQUEST IS MADE.
SOLICITATION PERIOD WILL NOT BE EXTENDED AS A RESULT OF LATE REQUESTS FOR TECHNICAL DATA.
A LIST OF APPLICABLE MEOs CAN BE FOUND IN ATTACHMENT 0001
*** END OF NARRATIVE A0001 ***
4 84
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PVA
0001AA PRODUCT VERIFICATION AUDIT (PVA) $ ________________________________ __________________
SERVICE REQUESTED: PVA
CLIN CONTRACT TYPE:
Firm Fixed Price
Note: The contractor must submit an M&O Frozen plan, in accordance with the attached "Frozen Plan
Description & Guidance" (Attachment 0002) and "M&O
Plan Guidance" (Attachment 0003). This plan must be submitted no later than 30 days after award. The
Frozen Plan must be approved before the assets for
PVA will be shipped.
This CLIN represents the Product Verification Audit
(PVA) for the DRIVE ADAPTER ASSEMBLY, output NSN:
1615-01-140-6703 as shown in CLINs 0002AA and
0003AA.
This is a Firm Fixed Price CLINS.
Offeror is required to fill in a proposed firm fixed unit price for the PVA:
PVA shall be in accordance with The "Product
Verification Audit (PVA) Statement of Work".
PVA shall be conducted within 90 days after receipt of reparables. The Contractor shall prepare 3 assets _________ for PVA. The Contractor is required to notify the
Government Quality Office for scheduling of the PVA by email to the following address:
QS-usarmy.redstone.ccdc-avmc.mbx.qs-contracts@mail.mil
With copy emailed to the Contract Specialist at:
christopher.m.caputo.civ@mail.mil_________________________________
The Contractor will prepare and forward, through the cognizant Government Quality Element, finalized audit reports within 10 working days after completion of the PVA to the email address above.
NOTE: A copy of the cover letter for the report shall be forwarded to the Contract Specialist at:
U.S. Army Contracting Command - Redstone
Bldg 5303, 2nd Floor
ATTN: CCAM-AL-A, Christopher Caputo, 5 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Redstone Arsenal, Alabama 35898-5000 or emailed to:
christopher.m.caputo.civ@mail.mil
PVA requires approval prior to Government acceptance of contract deliverable assets.
Failure to pass the PVA may lead to Termination for____________________________________________________
Default of the contract.________________________
Payment Instructions: The Contractor will go into_____________________
Wide Area Work Flow (WAWF) to receive payment for the
PVA. The Contractor shall use DODAAC W58RGZ when submitting the PVA invoice in WAWF, making it to the attention of Charles R. Miller. The Contracting
Officer will approve the PVA invoice.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0002 DRIVE ADAPTER ASSEMBLY
NSN: 1615-01-140-6703
0002AA OVERHAUL/REPAIR (US QTY) $ $ ________________________ ______________ __________________
COMMODITY NAME: DRIVE ADAPTER ASSEMBLY
CLIN CONTRACT TYPE:
Firm Fixed Price
SYSTEM: CH-47
INPUT NSN: 1615-01-140-6703
INPUT PART NUMBER: 145D3407-7
OUTPUT NSN: 1615-01-140-6703
OUTPUT PART NUMBER: 145D3407-7
Overhaul shall be in accordance with Section C entitled 'Statement of Work/Specifications-Contractor
Specifications'.
6 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
This Firm Fixed Price (FFP) CLIN includes all mandatory and nonmandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit, to a serviceable condition, as stated in section C, Statement of Work.
OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED
UNIT PRICE: US QTY 220 __________
ORDERING PERIOD 1- $_________ (FFP)EST Qty 20 ea
ORDERING PERIOD 2- $_________ (FFP)EST Qty 50 ea
ORDERING PERIOD 3- $_________ (FFP)EST Qty 50 ea
ORDERING PERIOD 4- $_________ (FFP)EST Qty 50 ea
ORDERING PERIOD 5- $_________ (FFP)EST Qty 50 ea
THESE ARE ONLY ESTIMATED QUANTITIES. THE TOTAL
MAXIMUM QUANTITY FOR THIS REQUIREMENT IS 264 EACH _________
(220 US/44 FMS).______________
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE ATTACHMENT 0004 - PACKAGING REQUIREMENTS
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: A
ALL WOOD PACKAGING MATERIAL (WPM)MUST BE -15
COMPLIANT
PRESERVATION REQUIREMENT AND PACKAGING REQUIREMENT
CONTAINED IN PACKAGING INSTRUCTIONS (ATTACHMENT
0004).
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
7 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
ITEMS REQUIRED UNDER THIS
REQUISITION.
0003 DRIVE ADAPTER ASSEMBLY
NSN: 1615-01-140-6703
0003AA OVERHAUL/REPAIR (FMS QTY) $ $ _________________________ ______________ __________________
COMMODITY NAME: DRIVE ADAPTER ASSEMBLY
CLIN CONTRACT TYPE:
Firm Fixed Price
SYSTEM: CH-47
INPUT NSN: 1615-01-140-6703
INPUT PART NUMBER: 145D3407-7
OUTPUT NSN: 1615-01-140-6703
OUTPUT PART NUMBER: 145D3407-7
Overhaul shall be in accordance with Section C entitled 'Statement of Work/Specifications-Contractor
Specifications'.
This Firm Fixed Price (FFP) CLIN includes all mandatory and nonmandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit, to a serviceable condition, as stated in section C, Statement of Work.
OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED
UNIT PRICE: FMS QTY 44 _______
ORDERING PERIOD 1- $_________ (FFP)EST Qty 0 ea
ORDERING PERIOD 2- $_________ (FFP)EST Qty 11 ea
ORDERING PERIOD 3- $_________ (FFP)EST Qty 11 ea
ORDERING PERIOD 4- $_________ (FFP)EST Qty 11 ea
ORDERING PERIOD 5- $_________ (FFP)EST Qty 11 ea
THESE ARE ONLY ESTIMATED QUANTITIES. THE TOTAL
MAXIMUM QUANTITY FOR THIS REQUIREMENT IS 264 EACH _________
(220 US/44 FMS).______________
(End of narrative C001)
8 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE ATTACHMENT 0004 - PACKAGING REQUIREMENTS
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: A
ALL WOOD PACKAGING MATERIAL (WPM)MUST BE -15
COMPLIANT
PRESERVATION REQUIREMENT AND PACKAGING REQUIREMENT
CONTAINED IN PACKAGING INSTRUCTIONS (ATTACHMENT
0004).
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0004 SCRAP
0004AA SCRAP $ ______ __________________
SERVICE REQUESTED: SCRAP
CLIN CONTRACT TYPE:
Firm Fixed Price
THIS CLIN APPLIES TO US AND FMS QUANTITY.________________________________________
SECTION C - Description/Specifications/Work Statement_________
Units from CLIN 0002AA,0003AA,shall be scrapped or returned in accordance with Section C, Statement of
Work/Specifications - Contractor Specifications.
Units determined to be scrap IAW Section C shall be reflected as an increase to CLIN 0004AA with a corresponding decrease in quantity and funds to CLIN
9 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0002AA AND 0003AA as appropriate. In the event the
PCO determines that certain items are scrap the
Contractor shall make disposition IAW the contractors approved Government property procedures. Scrapped items shall count toward the minimum quantities ordered hereunder. The Government may, at its own discretion, reduce any items determined scrap by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.
Scrap requires authorization by the Contracting
Officer via formal modification. In no event shall the Contractor scrap an item prior to receiving a contractual modification for a unit.
OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED
UNIT PRICE:
ORDERING PERIOD 1- $ _________ (FFP) Est Qty 1 ea
ORDERING PERIOD 2- $__________ (FFP) Est Qty 1 ea
ORDERING PERIOD 3- $__________ (FFP) Est Qty 1 ea
ORDERING PERIOD 4- $__________ (FFP) Est Qty 1 ea
ORDERING PERIOD 5- $__________ (FFP) Est Qty 1 ea
ESTIMATED QUANTITIES ARE PROVIDED FOR EVALUATION
PURPOSE ONLY.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0005 CONTAINERS
0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________
SERVICE REQUESTED: CONTAINERS
CLIN CONTRACT TYPE:
Firm Fixed Price
THIS IS A FIRM-FIXED- PRICE CLIN________________________________
THESE PRICES APPLY TO U.S. AND FMS REUSABLE
CONTAINERS.
10 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
FIRM-FIXED- UNIT PRICES:
ORDERING PERIOD 1- U/P $ ______ (FFP) Qty 1 ____________ ea, Estimated
ORDERING PERIOD 2- U/P $ ______ (FFP) Qty 1 ____________ ea, Estimated
ORDERING PERIOD 3- U/P $ ______ (FFP) Qty 1 ____________ ea, Estimated
ORDERING PERIOD 4- U/P $ ______ (FFP) Qty 1 ____________ ea, Estimated
ORDERING PERIOD 5- U/P $ ______ (FFP) Qty 1 ____________ ea, Estimated
ESTIMATED QUANTITIES ARE PROVIDED FOR EVALUATION_________________________________________________
PURPOSES ONLY.______________
The Contractor shall provide Containers, in accordance with Attachment 0002, Packaging
Requirement Instructions and Section C entitled, "Statement Of Work/Specification-
Government Specifications" and "Reusable
Containers".
The Government cannot determine at the time of contract award, how many of the assets to be repaired will be received by the
Contractor in unserviceable containers or received without containers. The Contractor, IAW Section C, "Statement of Work," shall submit a Report Of Discrepancy (ROD, SF FORM
364, through their Government QAR for verification, within seven working days to the address shown on EXHIBIT D - DATA ITEM
A004. Assets received in unservicable containers or without a container, require the PCO prior to the purchase of a servicable container.
CONTRACTOR WILL FURNISH CONTAINERS: NSN 8110-00-431-
8670/ P/N : MS27684-1
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0006 CONTRACT DATA REQUIREMENTS LIST _______________________________
11 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A001 THE ARMY MAINTENANCE MANAGEMENT SYSTEM - AVIATION _________________________________________________
(TAMMS-A) 1 LO $ ** NSP ** _________ __________________
SERVICE REQUESTED: EXHIBIT A
LOGISTICS PRODUCT DATA / TAMMS-A / DI-SESS-81758A
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 AS REQUIRED
A002 CONTRACT DEPOT MAINTENANCE (CDM) REPORT 1 LO $ ** NSP ** _______________________________________ __________________
SERVICE REQUESTED: EXHIBIT B
CDM PRODUCTION REPORT / DI-PSSS-81995
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 AS REQUIRED
A003 QUALITY DEFICIENCY REPORT (QDR) 1 LO $ ** NSP ** _______________________________ __________________
SERVICE REQUESTED: EXHIBIT C
QDR / DI-QCIC-80736
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 AS REQUIRED
12 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A004 REPORT OF SHIPPING (ITEM) AND PACKAGING _______________________________________
DISCREPANCY (ROD) 1 LO $ ** NSP ** _________________ __________________
SERVICE REQUESTED: EXHIBIT D
ROD / DI-MGMT-80503
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 AS REQUIRED
A005 GOVERNMENT PROPERTY INVENTORY REPORT 1 LO $ ** NSP ** ____________________________________ __________________
SERVICE REQUESTED: EXHIBIT E
GOVERNMENT PROPERTY INVENTORY REPORT / PHYSICAL
INVENTORY INSTRUCTIONS / DI-MGMT-80441C
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 AS REQUIRED
A006 TECHNICAL REPORT/STUDY SERVICES / DD FORM 1348-1A 1 LO $ ** NSP ** _________________________________________________ __________________
SERVICE REQUESTED: EXHIBIT F
TECHNICAL REPORT-STUDY/SERVICES / DD FORM 1348-1A /
DI-MISC-80508B
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
13 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
REL CD QUANTITY DATE ________ ______________ __________
001 1 AS REQUIRED
A007 TECHNICAL REPORT - STUDY/SERVICES (PROCESS PLAN) 1 LO $ ** NSP ** ________________________________________________ __________________
SERVICE REQUESTED: EXHIBIT G
TECHNICAL REPORT-STUDY SERVICES / PROCESS PLAN / DI-
MISC-80508B
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 AS REQUIRED
14 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Statement of Work (Limited Competitive) for
NSN: 1615-01-140-6703
a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data (other than Government Furnished Property), necessary to accomplish the inspection and overhaul for DRIVE ADAPTER ASSEMBLY that is required to return the items as specified in Section B, to condition code A as defined by Army Regulation 725-50. The input/output configuration shall be as defined in Section B herein. Upon completion of the overhaul, as applicable, the items shall be packaged as defined in each individual delivery order of the contract and shipped to the destination(s) specified in each individual delivery order.
b. Prior to commencement of overhaul, the Contractor shall disassemble and inspect the item to the extent necessary to determine if the item is physically unrepairable or has suffered abnormal or catastrophic damage. If the latter condition exists, the Contractor shall notify the Procuring Contracting Officer (PCO) through the cognizant Administrative Contracting Officer (ACO) and shall stop work on the item(s) until given further instructions or disposition of the item(s) by the PCO.
c. In the event the PCO determines that certain items should be scrapped, the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with (IAW) the Contractor's approved Government property procedures. Such scrapped items shall count toward the quantities ordered hereunder.
d. Overhaul shall be accomplished IAW Depot Maintenance Work Requirement (DMWR)
DMWR-55-1615-322
DRIVE SHAFTING SHAFT ASSEMBLY. FORWARD SYNCHRONIZING DRIVE
e. Critical Safety Item: The overhaul shall comply with the critical characteristics identified as an attachment to the solicitation/contract.
f. Upon receipt of the reparables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the
Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/ deterioration or those with shipping discrepancies shall be reported IAW DI-MGMT-80503.
g. Any Contractor paint facility which is used in the performance of this contract shall comply with the Environmental Protection Agency and Occupational Safety and Health Administration standards for painting as implemented by TM 1-1500-345-23, CH1, Painting and Marking of Army Aircraft.
h. Data and reports shall be submitted IAW the Contract Data Requirements List, DD Form 1423, Exhibit A. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addresses indicated on the DD Forms(s) 1423.
i. Product Verification Audit (PVA): The Contractor shall conduct the PVA in accordance with AMCOM FAR CLAUSE 52.209-4723 as specified in the solicitation/contract attachment.
j. The Army Maintenance Management System - Aviation (TAMMS-A): The Contractor shall prepare TAMMS data IAW DI-SESS-81758 and the TAMMS instructions attached to the solicitation/contract. The Contractor shall complete the forms and records as specified in DA PAM 738-751, TB 1-1500-341-01, TM 1-1500-328-23.
k. Serial Number Report Requirement (SNRR): N/A
l. The items the Contractor shall overhaul are identified below:
Input NSN: 1615-01-140-6703
Input PN: 145D3407-7
Output NSN: 1615-01-140-6703
Output PN: 145D3407-7
m. The overhaul planned quantity for 5 years is minimum 20, maximum 264. Input will be 30 days after receipt of order (ARO). Output shall be as specified in the solicitation/contract schedule. Serviceable assets shall be returned to PLANT 7011.
15 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Estimated Quantities:
1st Year 20ea
2nd Year 61ea
3rd Year 61ea
4th Year 61ea
5th Year 61ea
n. Inventory Transactions - The contractor shall prepare the following reports:
1. The contractor shall prepare a Contract Depot Maintenance Production Report IAW DI-PSSS-81995.
2. The contractor shall complete and maintain the DD Form 1348-1A receipt for repairables on all shipments IAW DI-MISC-80508 and DD Form
1348-1A. The contractor shall complete the DD Form 1348-1A, Block 10 (indicates the quantity received), along with Block 22 (signature), and Block 23 (date). Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at: http://www.dtic.mil/whs/directives/forms/eforms/dd13481a.pdf
The contractor shall prepare this form to include the following corresponding receipt information:
A. Document Number - (Positions 30-44)
B. National Stock Number (NSN) - (Positions 8-22)
C. Condition Code - (Position 71)
D. Unit Price - (Positions 74-80)
E. Total Price - (Block 1)
F. Actual Quantity Received - (Block 10)
G. Nomenclature - (Block 17)
H. Signature and Date - (Blocks 22 and 23)
If there are any questions with the above information please contact: "mailto:usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil"
3. The contractor shall perform a 100% physical inventory of general supplies on an annual basis per AR 740-26, Physical Inventory
Control. The contractor shall perform a 100% physical inventory of missiles/ammunition on a bi-annual basis per AMCR 740-27, Ammunition
Inventory and Accountability.
The contractor shall perform special inventory requests the same day as a government request is received from the responsible inventory manager.
The contractor shall prepare a physical inventory report IAW DI-MGMT-80441. Along with this report, an inventory memorandum to include count type, date performed, total count of lines, and signature shall be provided. The contractor shall ensure that the total lines inventoried correlates with lines present on count sheets.
If the physical inventory shows less than 97% of general supplies or less than 98% of missiles/ammunition are accounted for, the accountable Property Officer, Item Manager, or Contracting Officer is authorized to schedule a 100% physical inventory by a government official.
o. Foreign Military Sales (FMS): These total requirements meet or exceed the requirements for the Security Assistance Management
Directorate (SAMD) per the Acquisition Center Directorate IAW SAMD and Integrated Material Management Center (IMMC) Method of
Understanding (MOU) document dated 4 December 2004. The IMMC is responsible for conducting Weapons System Team (WST) reviews of SAMD's
FMS Aviation hardware, allowing 20% over the Army's maximum quantity during the life of the contract specifically for FMS requirements.
SAMD and IMMC will negotiate provisions for FMS critical items that exceed the standard 20% on case-by-case basis.
p. The replacement cost is $6,565.00 for the subject item. When price of overhaul exceeds $4,267.25, a review of disposition will be made by AMCOM.
q. The Government reserves the right to replace any items scrapped.
r. Overhaul Repair Report: N/A
s. Quality Deficiency Report: The Contractor shall prepare the Quality Deficiency Report IAW DI-QCIC-80736.
t. Supplier Interface and Oversight: The Contractor shall prepare the Process Plan IAW DI-MISC-80508, QE-STD-2, and the Frozen Plan
Description and Guidance (Attachment 0002) & M&O Plan Guidance (Attachment 0003).
u. Shipping Containers NSN: 8110-00-431-8670, P/N: MS27684-1 shall be utilized. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be Contractor Furnished Material. Shipment: The method of shipment must use a procedure so that the package can be tracked in case the shipment is not received by AMCOM.
v. Overhaul/Recapitalization/Upgrade Documentation: N/A
16 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE C0001 ***
17 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996
E-2 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2000 OR EQUIVALENT
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
PRODUCT VERIFICATION AUDIT (PVA) STATEMENT OF WORK__________________________________________________
Purpose: The purpose of this PVA SOW is to provide guidance to the contractor in the preparation for and execution of the PVA. The primary concept of the PVA is to validate that the contractor's overhaul processes and procedures comply with contract technical requirements. The PVA candidate(s) are used to evaluate that the contractor processes and procedures are adequate to ensure component integrity.
(a) The Contractor shall perform overhaul and present for acceptance THREE units of Lot/Item 0001AA as specified in this contract. This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure overhauled items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. The Command's actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the
SRD Engineering Directorate (ED). Like or similar items may be grouped for these purposes provided concurrence is obtained from SRD ED.
The contractor may be directed by the Contracting Officer (CO) to increase or decrease the scope of a PVA pursuant to the "Changes" clause of the contract.
(b) The Contractor shall:
(1) With the concurrence of the cognizant government quality element and AMCOM, schedule and perform PVA as required by the terms of the contract or as otherwise required.
(2) Notify AMCOM through the cognizant government quality assurance element, with information copy to the SRD ED, ATTN:
usarmy.redstone.ccdc-avmc.mbx.qs-contracts@mail.mil, of the date the PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the
Continental United States, notification shall be provided at least 95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.
(3) Provide technical personnel, tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.
(c) The initial PVA will be performed on one of the first three (3) items overhauled. The PVA candidate will be selected by the SRD PVA
Team Chairman at random from the three (3) tendered for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.
(d) The item selected for PVA will be inspected for adherence to preservation, packaging, packing, and marking requirements prior to
18 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.
(e) The PVA Team will review the shop travelers, production processes, procedures, tooling, and equipment used to overhaul the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.
(f) Disassembly will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant government Quality Assurance
Representative (QAR), and the SRD PVA Team Chairman and team personnel.
(g) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings. Depot Maintenance Work
Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in this contract.
(h) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as shotpeening, heat treating, etc.) performed by subcontractors will also be audited. Contractor shall be able to demonstrate that all testing, inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.
(i) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for government acceptance including preservation, packing, packaging, marking, and update of historical records and all applicable documentation.
(j) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the SRD PVA Team Chairman's discretion, examination of representative assemblies amy be used as evidence of compliance to specification requirements. The SRD PVA Team Chairman will determine the scope and detail of the PVA process. The SRD PVA Team Chairman may delegate follow-up actions to the government QAR, when it is determined to be prudent to the PVA.
(k) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor. After the PVA is completed, the SRD PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant government QAR. The context of the audit findings and corrective actions will be discussed and any disputes will be resolved. Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established (i.e., workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to comply with requirements.
(l) All defects will be recorded on the SRD PVA Audit Finding Record by the PVA Team. The PVA Team Chairman will provide copies of each
Finding to the contractor quality assurance element and the cognizant government QAR. This will allow immediate actions to begin in the resolution of the defect. Corrective actions as well as actions taken to prevent recurrence shall also be documented on this form by the contractor. The form shall be signed, as a minimum, by the contractor's quality manager or designated representative and the
SRD PVA Team Chairman. Further actions outlined below pertain to specific actions required by the contractor depending on the classification of the defects.
1. Observation: In the event an observation Finding is discovered, the contractor is not required to provide a written response, but it is encouraged to do so.
2. Minor: In the event a minor defect is discovered, the following actions shall be taken:
a. The contractor shall isolate the cause of the defect and initiate corrective actions.
b. All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.
c. In the event a minor defect is a recurring deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major defect will apply.
3. Major: In the event a major defect is discovered, the following actions shall be taken:
a. The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to
19 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
the PVA Chairman.
b. The contractor shall provide the QAR information reflecting the total quantity shipped, if any, and to what destination pertaining to any item that could contain the identified defect.
c. The contractor shall determine impact of the defect on products previously delivered under this contract, if any, and initiate corrective action to address those units at no additional cost to AMCOM.
d. The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.
e. The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.
f. The contractor shall assure the cognizant QAR and the SRD PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however, a written report from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the QAR and the SRD PVA Team Chairman within 24 hours after the verbal response.
4. Critical: In the event a critical defect is discovered, the following actions shall be taken:
a. All actions outlined in paragraph 3 above shall be completed.
b. Upon request, the contractor shall provide the SRD Aviation Engineering Directorate technical information necessary for the issuance of a Safety of Flight Message or Aviation Safety Action Message to the field (if necessary).
c. Government acceptance/release of product will cease immediately until corrective actions are acceptable to the contracting officer.
NOTE: Systemic quality and overhaul process discrepancies that affect the outcome of product(s) outside the scope of the PVA will require the cognizant QAR to issue a Corrective Action Request.
(m). Upon completion of the disassembly and testing portion of the selected PVA candidate, without finding any critical or major defects, the other two completed candidates will be released as PVA candidates. In the event that a critical or major defect is found in the audit candidate, the contractor shall satisfy the PVA Team Chairman that such a defect does not exist in the other 2 PVA candidates prior to acceptance, and effective corrective action has been initiated to preclude reoccurrence of the defect.
(n). The contractor shall prepare and forward, through the cognizant government quality element, finalized audit reports within ten (10) working days after completion of the PVA to Commander, U.S. Army Research Development and Engineering Command, ATTN:
usarmy.redstone.ccdc-avmc.mbx.qs-contracts@mail.mil, Redstone Arsenal, AL 35898-5000 and the Acquisition Center address as shown on
Order 0001. (In the event reorganization changes this address, the contractor will be notified of the new, correct address by the CO).
The report shall include:
1. Name and location of contractor
2. Contract number or equivalent
3. Descriptive noun, national stock number, part number, and serial number of the item audited
4. Complete description of each audit finding, with corrective action taken, and action taken to prevent recurrence.
5. The audit report shall be signed, as a minimum, by the contractor's quality manager or his designated representative.
Objections, accompanied with…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .